PRT Cycle

Dear Sir,
Please suggest the process for the following;
I am using a tool on press machine to manufacture the stampings. Number of stroke of the tool is equal to produced quantity of the stampings. Say a perticular tool can do 50000 strokes means 50000 stampings getting produced, in this case how user can get know that this perticulat tool has produced 45000 stampings, please initiate for the new toll procurement.
How to map the production actiivity and entire cycle.
Thanks and Regards,
Chetan

Dear Chetan,
The PRT usage can be traced by creating the PRT as an equipment PRT(for PRT category) and by using measuring document.
Check this link to get the PRT usage for each production order or as a cummulative one,
http://sap-pphelp.blogspot.com/2009/12/calculating-usage-for-prt.html
Regards
Mangalraj.S

Similar Messages

  • Few questions about live cycle 9.0 es2. Opened pdf made from indesign.

    I am new to live cycle. I took a pdf which I created in InDesign.  I have some questions so I may finish editing it in LiveCycle. When I go to group text by dragging the mouse using the field tool, some remains in text boxes, other text remains in light outlined boxes. I would like it to all group and stay within one box for editing. Also, I see no white space to move the text to to edit it off to the right of the form like in InDesign. Nor can I find a way to create a blank page to move the text to to do more editing if  I would like. I also did not see a duplicate spread option to create a copy of the page I am editing. There is blurry and clear text after I opened the pdf in Live Cycle. How do  I make it all clear? This includes an eps logo at the top of the page. How do I do  copy and paste in place. Can I insert a pdf page after I am done edit this pdf page in LiveCycle? CAn brcodes take on alphanumeric, not just 1's and 0's? Thanks.

    No one?
    Some questions are answered by someone else.
    -The SLD is okay, it doesn't need to be configured
    -The Adobe Lifecycle Designer is automatically installed when installing the Netweaver Studio Sneak Preview SP16
    Just two more questions:
    1)when I open http://server:port/webdynpro/dispatcher/local/TutWD_OnlineInteractiveForm/OnlineInteractiveFormApp
    The PDF is shown but I can't use the buttons or the dropdown boxes.
    I tried to install ACF but I have NW04s SP16, and the ACF is only SP11.
    So when I install that, it only shows a blue screen with "I am the placeholder control"
    When I install ACF SP19 for NW04, the PDF shows again, but I still can't use the buttons or dropdowns. Is this normal?
    2) Do I need the license described below?
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/oss_notes/sdn_oss_bc_srv/~form/handler%7b5f4150503d3030323030363832353030303030303031393732265f4556454e543d444953504c4159265f4e4e554d3d373530373834%7d
    Main questions----
    I need to create a form with a few fields (of which some fields are mandatory); then I have to use a few BAPI's to check these fields and to save the content in a CRM system.
    I've installed Netweaver Sneak Preview, and configured Adobe Document Services (made ADSUser & ADSCaller, set IIOP etc to Autostart, Installed the credentials). The tests seem to work fine, but I haven't developed anything yet.
    My questions:
    1) What about the ACF?
    2) Also the license described above?
    Grz
    Allan

  • Table for maintenance plan and maintenance cycle and Unit

    Hello,
    I need to know the table where the values are stored for maintenance plan, maintenance cycle and Unit.
    I know that we can get the maintenance cycle and unit from MMPT table.
    Question 1
    If the maintenance plan has only a single cycle then the data is stored in above table MMPT, but if a maintenance plan has mutiple cycles like 1 maintenance plan has maintenance cycle as 364 Days and 1092 days then the data is not stored in MMPt table.
    Question 2
    Requirement is I need to develop a report where in I need maintenance order, maintenance plan and the relevant maintenance cycle and unit. Supose an maintenance order is created for the above maintenance plan which has 2 maintenance cycle how can I identify for which maintenance cycle the order is created.
    Regards,
    Narendra

    Hi,
    Please review PM tables
    PM/SM/SD Tables
    MPOS                       Maintenance Items
    AFAB     Network - Relationships
    PLKO     Task list
    PLAS
    AFFH     Operations
    PRT assignment data for the work order
    AFFL     Work order sequence
    AFFT     Order process instructions
    AFFV     Order process instruction values
    AFFW     Goods movements with errors from confirmations
    AFIH     Maintenance order header
    AFKO     Order header data PP orders
    AFPO     Order item
    AFRC     Table of planned changes to conf.: Automatic goods receipt
    AFRD     Default values for collective confirmation
    AFRH     Header information for confirmation pool
    AFRU     Order completion confirmations
    AFRV     Pool of confirmations
    AFVC     Operation within an order
    AFVU     DB structure of the user fields of the operation
    AFVV     DB structure of the quantities/dates/values in the operation
    MPOS     Maintenance ITEM
    AFWI     Subsequently posted goods movements for confirmations
    AUFK     Order master data
    AUFM     Goods movement for order
    MPLA     Maintenance Plans
    BGMK     Master warranty header
    BGMP     Master warranty item
    BGMS     Text item master warranty
    BGMT     Master warranty text
    BGMZ     Warranty counter information
    CRHD     Work Center Header
    CRTX     Text for the Work Center or Production Resource/Tool
    EQKT     Equipment short texts
    EQST     Equipment link to BOM
    EQUI     Equipment master data
    EQUZ     Equipment time segment
    HIKO     Order master data history
    IFLO     Functional Location (View)
    IFLOT     Functional location (TABLE)
    IFLOTX     Functional location: Short texts
    IHGNS     Plant maintenance permit segment
    IHPA     Plant Maintenance: Partners
    IHSG     Object-related permits in Plant Maintenance
    ILOA     PM object location and account assignment
    IMPTT     Measuring point (table)
    IMRG     Measurement document
    KAKO     Capacity Header Segment
    KONP     Conditions (Item)
    KONV     Conditions (Procedure Data)
    OBJK     Plant Maintenance Object List
    QMEL     Quality notification
    QMFE     Quality notification - items
    QMIH     Quality message - maintenance data excerpt
    QMMA     Quality notification - activities
    QMSM     Notification - Tasks
    QMUR     Quality notification - causes
    STPOA     Name is does not have an A at the end; BOM items
    T001     Company Codes
    T001L     Storage Locations
    T001W     Plants
    T077D     Customer account groups
    T003O     Order Types
    T352R     Maintenance revisions
    T353I_T     Maintenance activity type description
    T356     Priorities
    T357G     Permits
    T357G_T     Table 357G texts
    T370A     Activity category for PM lists
    TINCT     Customers: Incoterms: Texts
    TVKO     Organizational Unit: Sales Organizations
    TVKOS     Organizational Unit: Divisions per Sales Organization
    TVKOV     Org. Unit: Distribution Channels per Sales Organization
    TVTA     Organizational Unit: Sales Area(s)
    VIAUFKST     Order selection view
    MMPT Cycle detail
    Regards
    Carlos

  • Phases in development life cycle

    Hi
        can any body explain briefly explain "various phases in development life cycle(in SAP Terminology) ".And also provide links to blogs as soon as possible.
        Plz provide info on DEBUGGING techiniques in XI.
                                                                                    Regards,
                                                                                    Vinod.

    check this doc for debugging:
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/cbc7d790-0201-0010-bea6-c549902e93e2
    and the s/w eng development lifecycle holds good for xi also

  • Cycle sets in Counter plan

    How is it possible to create two cycle sets in one plan. I create one counter plan with one cycle set and save. Plan no is generated. Then how can i create a second cycle set for same plan no as the system is designed for Internal numbering of plan.
    Please explain me the real use of cycle set in multi counter plan. where it is used and when . for what purpose and steps on how to create two cycle sets for one multiple counter plan.
    Thanks in advance
    Murad shaikh

    Hi ,
    Check your config setting as given below
    Plant Maintenance and Customer Service> Maintenance Plans, Work Centers, Task Lists and PRTs> Maintenance Plans> Configure Special Functions for Maintenance Planning.
    The check box should be ticked.
    This allows the maintenance of multiple cycle sets in one plan. Thus you can define different cycle sets, and thus cycles, for calculating the dates within a plan. You can use the assignment between cycle sets and the maintenance item to control that only certain maintenance items generate a call object for certain dates. In the simplest case, a cycle set such as A - B - A - B can be defined. "A" leads to a small inspection and "B" leads to a big inspection.
    Also check below link
    http://help.sap.com/saphelp_di471/helpdata/EN/c9/fccf28f79611d4961300a0c93029cf/content.htm

  • Possibility of cost allocation through PRT

    I have a costing requirement where the cost of a die on which components are manufactured is to be allocated on the components being manufactured based on the useful life of the die (in terms of no. of components that can be produced). Can this requirement be taken care of through PRT ?
    Thanks,
    Kaustubh

    Hi,
    You can surely maintain die as PRT - Equipment with IE01. Die is used for multiple cyles in manufacturing. So you can maintain both lifecycle & cost with maintaining it as Equipment.
    There is one field called measuring counter where you can maintain no. of cycles for which you use same die & equipment itself is treated as an asset. So you can monitor cost & depreciation as well.
    Regards,
    Tejas

  • PRT- Maintenance Plan

    Hi Experts,
    Here is my Issue ,
    We have Created Maintenance plan for PRT Equipment - for that Measuring point in counter over readg 500 pieces and Annual Estimate also 500 pieces .our Maintenance Package is every 200 cycle.BY confirming the production order exceeds the 200 pieces, the maintenance order also created by measuring document, in this juncture my doubt is , how to maintain the tool life and we wants the tool life is max of 500 pieces only , after exceeding the production order qty 500 pieces , the system will not allow to make production order confermation for that PRT Equipment, what is the settings for that,?
    For Example a Planner m/c is Created by M- categary ( plant maintenance) , but the tool in which is used in planner m/c can be created  P- categary ( PRT) .       is it Right?
    Tool -life only for 500 pieces , in that how to set for Mainetanacec package? instead of 200 pieces,can we assign 500 pieces?
    ok If we set 500 in M.package  , mainetance plan will be created and say tool  is to be replaced, based on the plan we replace the tool and we instal new tool for the planner m/c. now can we create new PRT equipmnet- tool , for the planner m/c ? , For the new TOOL -PRT equipment , can we create new plan for that ? is it Right means what about old plan?
    With  Regards
    SM.Charles Edwin

    HI
    sam,
    As per ur requirment My understadnding is wirtten here-
    1. First off, Creat all Tools as PRT Equipment... because in this way only u can generate maintenance plan for them and can perform maintenance.
    2. For track of PRT Usage or Life u have to define a Measuring Point in PRT (Equipment). Whenever production order get confirm a measuring doucment will be posted...
    in the Measuring point u can see last entered measurement reading that will reflect usage of PRT.
    3. U have to assign a Maintenance Plan in PRT ( Equipment)
        When PRT Usage exeeds certain level..(after confirmation of production order) Maintenace call object would be generated and subsequent maintenance can be carried out.
    4. Besides all these we can not block usage of PRT in Production order.
    5. PRT Must be assigned in Routing ..other wise it won;t work.
    6. so prequesties for PRT Usage and Maintenance is
    create Measuring point and a Performance Based Maintenance Plan. and assign it in PRT(Equipment).
    7. in this case don't create PRT as a Material.
    If Still in Doubt please ask.
    Regards,
    Amit kushwaha

  • REM-PRT

    Hi.
    Im working on a REM envirornment.
    1. I have a routing and Attached a PRT to one operation.
    2. But in MY planned order i dont find the PRT
    3. I have checked the SAP library -in rem no prt is supported -is this true..
    Reg
    DSK

    Hi
    REM Process with  PRT
    Description                                                                     T-Code
    Create an Equipment as a PRT                           IE25
    Create a measurement point as a counter      IK01
    Attach a task list to the equipment                           IA01
    "Create a maintenance plan
    (In plan attach the equipment,task list,cycles/unit)"     IP41
    "Attach the maintenanace plan to the created
    equipment in the PRT tab"                                                IE02
    Attach the PRT equipment in routing            CA02
    REM Backflush                                                MFBF
    "The backflush quantity is not getting updated
    in the measurement document"     
    Regards
    Venkat

  • Issue in creation of control cycle

    Dear Gurus,
    During creation of control cycle (LPK1), the fields for source information is not appearing in my system.
    I compared control cycle in a different ECC system where source information is appearing.
    How can make the screen appear in my ECC system.
    Please find the screenshots.
    Any pointers will be highly appreciated.
    This thread is further to the threads in Production Planning and LE/WM Forum. I could not resolve the issue with the threads.
    Hope that I will get any pointer in EWM forum.
    http://scn.sap.com/thread/3609441
    http://scn.sap.com/thread/3610822
    With Regards,
    Malay

    Hello Malay,
    Can first contact your ABAPer and ensure the bottom screen is not an Screen Enhancement?
    If it is a some custom development, your ABAPer can help you on the logic behind it.
    Else, Let us know.
    Regards,
    Sathish

  • Purchase order to payment cycle report

    Dear Sir/Madam
    We want to have a report on the purchase order to payment cycle.
    this includes the following points:
    1. Purchase Requisition is raised in the system
    2. PO is raised with various line items
    3. Advance payment is done against the PO
    4. GRN is made for goods delivered
    5. Invoice is processed against each GRN
    6. Retention is deducted to be paid in future
    7. Liquidated damages (LD) is deducted which is treated as miscellaneous income in companys books
    8. Payment is made to the vendor
    We require the report in such a way which will give the details of each payment against each GRN line item. tracking of the same should be possible.
    Do we have any standard report which will help in identifying the purchase order to payment cycle.
    Thanks and Regards
    Prashant P. Zinge

    Hi,
    It is always a requiremnet to have a report from PO, GR, IV to payment.
    But unfortunately, SAP do not have such a report, we develop one locally, the difficult is at payment side.
    Several invoices for one vendor has only one payment doc, how to display it need to discuss with end user.

  • Duplicate records for Sale Order Cycle Report(excluding item level detail)

    I have posted this issue in number of forums but till today no one is able to answer it correctly.Here it is:
    I need to create a report which I think most of the sd consultants have also done it.It basically covers sales order cycle without item lvel detail such as:
    Sale Order No -- Sales Order Date-- Delivery No-- Delivery Date
    Now as we all know ,sales orders and deliveries are connected through item table which means in the output I will get duplicate rows for the report above.For Example, if a sales order share 3 items with the delivery then we will get 3 exact duplicate rows in the report.
    What can be the best solution?connecting through VBFA has alos same result as it also has item level details.
    I need a good solution.This a common report and there must be some solution

    Hiiii,
    It is standard SAP rule that system will catch the document flow (document link history) at item level.
    Now your problem that you dont want to show the line item based report because of duplicacy.
    Try this.
    Brows table VBFA -
    In screen selection select the following......
    1. Subsiquent document category
    2. Preceding item
    select "J" in Subsiquent document category
    and "000010" in Preceding item  then execute the table.
    Now system will not show multple line item based delivery report. so No duplicacy will be there
    Regards
    Shambhu Sarkar

  • Ipod touch not recognized by Windows 7. screen cycles constantly

    I think this is different than the other posts. When i connect my ipod touch to my Win7 PC it 'cycles'. It displays the charging screen for about 0.5 seconds, then displays the 'start' screen for about 0.5 seconds. It then cycles between the 2 screens every 0.5 second or so until I unplug it. Anyone have a fix for this?
    John

    The symptoms are a bit different, but since you've got an nVidia chipset and (presumably) at least 4 GB of RAM, I think the first thing to do is make sure you've applied the *Microsoft Host Controller Driver Update* available for you at your drivers and downloads page at HP:
    [HP Pavilion Elite e9120f Desktop PC > Microsoft Windows 7 (64-bit) > Software & Driver Downloads: Microsoft Host Controller Driver Update|http://h10025.www1.hp.com/ewfrf/wc/softwareDownloadIndex?softwareitem=pv -78469-1&lc=en&dlc=en&cc=us&lang=en&os=4063&product=3970019]
    With that update in place, does the Touch behave a bit better when you plug her into the PC?

  • My iphone keeps cycling apple logo, it won't power up when connected to a computer. I can power it up with just a power source, but the it comes up to a generic iphone "no service" screen

    This phone worked great for 2 years until I inherited it from my partner.  Since we changed the phone over to me, it has done this 4 times. The last 3 times it somehow magically came back after taking the Sim card out and putting it back in. I even went and got another new Sim card, in case that was the problem. Apparently it is not, because now I cannot get it to come back at all. I get either the generic gray "no service" screen, or it just cycles the apple logo. I've tried holding the buttons down together, separately, everything. Nothing seems to work. Since the phone is no longer under warranty, am i basically screwed?

    Could you specify the model of MacBook and the OS X it's running, please? Some of the advice or references vary along with the system, so this could be helpful to formulate a reply. I've never used a Guest User selection, but do have more than one User.
    If the computer does not have an optical drive, you may be able to boot it into a recovery disk mode or something; in an attempt to see what is wrong and maybe fix it.
    Good luck & happy computing!

  • Issue during creation of control cycle

    Dear Gurus,
    During creation of control cycle (LPK1), the fields for source information is not appearing in my system.
    I compared control cycle in a different ECC system where source information is appearing.
    How can make the screen appear in my ECC system.
    Please find the screenshot.
    Any pointers will be highly appreciated.
    This thread is further to the thread in Production Planning Forum
    http://scn.sap.com/thread/3609441
    With Regards,
    Malay

    Manish,
    I do not understand how this going to solve the issue because why we need both KANBAN and WM control cycles for one material withdrawal for production?
    Br
    KK

  • HT1212 I am unable to get our of a continuous cycle when trying to update or restore my iPad 2. Plug in to iTunes 12.0.1 (latest version). Click update, told can't update, have to restore. Restore fails with error 9. Any help appreciated.

    When I tried to update my iPad I got an error 9. Now, I am unable to access my iPad. It is in a continuous cycle when I try to update or restore the iPad 2. Plug in to iTunes 12.0.1 (latest version). Click update, told can't update, have to restore. Restore fails with error 9. Any help appreciated.
    Here's the cycle:
    I plug in my iPad when “cable to iTunes shows on iPad screen. It says "Your iPad can't be updated, you must restore it to factory settings." That bad enough news, but it gets worse.
    Click Restore
    Extracting software…
    Preparing iPad for restore
    Waiting for iPad…
    Verifying iPad restore with Apple…
    (empty bar under the Apple logo…does not show any activity)
    “The iPad “iPad” could not be restored. An unknown error occurred (9).”
    Notes: I just upgraded to OS X Yosemite 10.10.1 on my iMac (27-inch, Mid 2011) in the last week. It’s the first time I’m tried to backup/update my iPad since the iMac update.
    I swapped out the USB cable to a new cable and get the same results.
    I also unplugged all other USB devices from the iMac and security on my iPad and still get the same results.
    I find it strange that it shows no Serial number for my my iPad 2 when plugged in. It shows “Serial Number: n/a on the screen when it displays: “iPad Recovery Mode To update your iPad without erasing its contents, click Update. To restore your iPad to its factory settings, click Restore iPad.
    I prefer to update my iPad, but it displays “Your iPad can’t be updated, you must restore it to factory settings. If you previously backed up the iPad, click Restore Backup after the restore process completes.”
    It’s a continuous loop. I get the display on my iPad to plug in the iPad to iTunes, plug it in which ends after going through the above procedure saying an error occurred (9).
    So now I cannot use my iPad. When I turn it on I get the display showing me to plug it into iTunes with the cable. Since this is the only option I have I plug it in and the loop begins.
    Any advice would be appreciated.
    Thanks!

    Hello jaybearden,
    Thanks for the question. After reviewing your post, it sounds like you are not able to restore the iOS device since you get an error 9. I would recommend that you read this article, it may be able to help the issue.
    Resolve iOS update and restore errors - Apple Support
    Check your security software
    Related errors: 2, 4, 6, 9, 1000, 1611, 9006. Sometimes security software can prevent your device from communicating with either the Apple update server or with your device.
    Check your security software and settings to make sure that they aren't preventing a connection to the Apple servers.
    Thanks for using Apple Support Communities.
    Have a nice day,
    Mario

Maybe you are looking for

  • But how to use submit??

    but how to use submit?? i mean how to generate an event thru submit and how to receive these values in the next page

  • IPhone 4 rebooting during video playback

    My new iPhone 4 is rebooting whenever I play a video. It can be a Youtube, a podcast or a video I recorded with the camera. Sometimes it does it a minute or so into the video, sometimes when the video ends. I am also getting artifacts on the screen d

  • GT70-2OC bluetooth problems

    I can't get Bluetooth to work properly under Windows 8.1. Unfortunately I upgraded to 8.1 immediately and don't know if it ever worked under Windows 8. I have tried the latest available drivers from available from MSI, and also the latest "killer" dr

  • Can you use the iPod connector cable to charge the iPhone or

    only the cable that came with the iPod? Also, I put the iPhone briefly into my old inMotion speakers and a message came up saying that the device didn't support an iPhone and would either not charge my iPhone or have bad consequences for my iPhone-i

  • Copying Goods return to AP Credit note

    Hi all, We've returned some goods to a supplier, so we do a goods return on SAP, so that credits stock and Debits allocation account. Our supplier has sent us an AP credit note. So we 'copy to' AP Credit (from Goods return) and the automatic journal