PRT Value update from PP order in Counter

Hi Friend,
Can any one tell me how to update pp order value(Qty) to PRT Counter value.
Thanks
Sandy

Hi,
Create PRT as Equipment with PRT view activate in Equipment master. then create one measuring counter with PRT equipment no then assign it in Production routing then feed maint plan & counter no in equipment master PRT screen .
Check value of counter will b updated when production order is confirmed but it is possible in discrete manufacturing PP process only.
Regards,
AVI DDS

Similar Messages

  • No revenue update from sales order

    Hi
    I have created SO with account assignment for a WBS billing element. In config I have make the indicator on for revenue value should automatically  update from sales order.
    But neither the revenue from sales order is updating in any of my PS report nor the actual revenue too after billing cycle.
    Does it need some more customisation checking.Cannot find any solution from earlier similar threads.
    Zinni

    To analyze the error, proceed as follows:
    1. Is an account displayed in the sales and distribution document in the condition detail screen (for example, condition PR00) ? Is there a cost element in this account and are you allowed to post sales revenue to it? (cost element category) If the answer is yes, then proceed to 5. If no, then proceed to 2.
    2. Check the relevancy for billing of the sales and distribution document item in Customizing (-> Sales and distribution -> Sales -> Sales documents -> Sales document item -> Define item types).  If 'Not relevant for billing' is entered, correct this.  This will probably clear the error. If 'I' (according to billing plan) is entered, the system only updates sales revenues if billing plan dates exist in the sales document.
    3. Check in Customizing that a billing type is assigned to your sales document type (-> Sales and distribution -> Sales -> Sales documents -> Sales document header -> Define sales document types). The billing type can be found in the 'Billing document' block. The relevant billing type depends on the defined relevancy for billing (see point 2). If no billing type is entered, enter one.  This will probably clear the error.
    4. Check in Customizing that an account determination procedure is assigned to the billing type determined in step 3 (-> Sales and distribution -> Billing -> Billing documents -> Define billing types). If no account determination procedure is entered, enter one. This will probably clear the error. If an account determination procedure has already been assigned, the error is probably caused by an incorrect structure of this plan. Check the plan.
    5. You will probably not be able to correct this error yourself. However, you can provide some information beforehand. Enter parameter MCL in your user master record and valuate it with 'X' (upper case) (-> System -> User profile -> User parameters). You activate an user-specific TRACE function this way.
    6. Change, for example, the pricing date or item value in the quotation or sales order and save the change.
    7. Execute Transaction MC30 for your user ID (/NMC30). You now see a list of all data structures that were set up for the Logistics Information System (LIS) in step 6. Check whether structure S008 is contained in this list. This information is required to further analyze the error.
    8. If structure S008 is contained in the MC30 log, call Transaction SA38, program name RKPSSHOW, -> Execute (F8), enter the number of the affected sales and distribution document and press -> Execute (F8) again. The output list (or the fact that no list is generated) is also needed for analysing the error further.

  • Project Revenue Plan Not Update from Sales Order Item

    I am generating a network and project from the sales order item using Assembly processing. I am using milestone billing on the sales order item and the milestones attached to the project network activities are appearing as billing blocks on the sales order item billing plan. However, the project revenue is not getting updated from the sales order billing plan. Can someone please help?
    I have deleted the billing plan on the billing WBS element and activated revenue planning update from sales order in cusomization for PS. I am looking at CNS41 under the project revenue sched in version 0. Is there a different report I should be looking at?
    Regards,
    Venkat.

    HI Venkat,
    You are looking at the correct report & I believe you have also done the necessary customization. If you create a sales order and reference it to a quotation, the related plan values in the WBS element are refreshed automatically.
    When the payment data is recorded, the terms of payment and the customer payment history are taken into consideration. One of the probable causes could be the credit limit of the customer might have been exceeded. Take help of your SD consultant & increase the credit limit for that customer (from the sales document), t-code FD32 if it is permitted in the business.
    After the new credit limit is set execute the following steps:
    u2022     Go to the t-code Change billing request (VA02)
    u2022     Open the required billing request
    u2022     Remove the account assignment of WBS element from each line item
    u2022     Save the billing request
    u2022     Reopen the billing request in change mode
    u2022     Reassign the WBS elements to all line items
    u2022     Now the changed credit limit will take affect
    u2022     Check the Planned Revenue for the said project in CNS41, it should get updated.
    Rgds
    Deepak

  • Condition update error  :There is no condition update from sales orders.

    I am testing the condition update by condition type K005 , which have been set the condition update indicator ,and I have also set the Max.number.of.orders  to 1 , but after I created the first sales order ,the condition record still make effect in the second  and third sales order ,which was created without referece to the first one .
    And  when I  look at the cumulative value in the condition record ,it says "There is no condition update from sales orders."
    Anyone can give me some light ?
    BTW , the sales order type is ZOR ,which I copy from the standard order type .And the item category is ZTAN , copy from  standard IC TAN .
    thanks for your help in advance .

    hello, friend.
    there are at least 3 things that you will have to check, since records for condition type K005 is created for a specific combination:
    1.  check if the item category with condition update was the one determined in the order
    2.  check if the customer has a valid K005 record
    3.. check if the material has a valid K005 record
    also, since you specified "1" as maximum number of orders, this could have prevented any updates.
    regards.
    Edited by: jonathan y on Sep 17, 2009 2:59 PM

  • Measuring point update by production order confirmation

    Hi friends,
    I created a prt as equipment and assigned it to the routing. I created a production order and when i confirm the same i am getting following error as:
    Document MeasUnit has a different dimension to the characteristic unit
    Message no. IR071
    Diagnosis
    The measurement unit on creation of the measurement document must have the same dimension as the measurement unit of the characteristic of the measuring point.
    In this case, the measurement unit % does not suit the character unit EA of the measuring point 103.
    System Response
    Processing will not be continued.
    Procedure
    Use the possible entries help.
    Please suggest the solution.

    Hello Sir(s)
    i have gone through entire post for the subject related to measuring point auto update from production order confirmation.  I have tried the same but i dont know what i am missing.
    if i put some value like 1 or 2 and appropriate UOM then only my measuring document is being updated with the same value not with the actual confirmed quantity..  i have already maintained standard formulla in prt view.
    my basic requirement is to get actual value of produced quanity as counter update. means if 20 pieces have been produced and confirmed in co11n, then counter must bhe updated with the value of confirmed quantity.
    please advice what value should i put as usage in routing master to get actuall counter update.
    Will Highly appreciate your quick reply.
    Snapshots
    Regards.
    Mohammad.

  • Planned Value in sap pm order

    Hello All,
    Please explain me from where the planned value updates in refurbishment order in sap pm.
    Thanks,
    Regards,
    piyush

    Split Valuation means that you can define various prices for a Material in the master data (Accounting1 tab) dependent on a certain categorization - Valuation Type. When you have set the Valuation Category for a material to 'C', you may create additional views in Accounting for the material, with a different price for each Valuation Type, e.g.
    C1 - new part - €1000 (new purchased value)
    C2 - damaged part - €10 (scrap value)
    C3 - refurbished part -  €700 (value based on the cost of refurbishment)
    Then with the Refurbishment Order you can take a C2 material & "convert" it to C3, adjusting the price & stock value for your refurbished parts.
    Learn more about the Split Valuation concept at SAP Help & SCN:
    Split Valuation - MM - Material Price Change (MM-IV-MP) - SAP Library
    Split valuation..?
    Split Valuation: MM-FI Integration
    As for the other question, you are probably seeing the cost of the material you are going to refurbish, from the Order header (what is your price control & price for this material in MM03?)

  • Duplicates order by count

    hello,
    Is it possible to see the records in order by the number of counts they appears in the database asc or desc?
    ID | Country
    1 | USA
    2 | UK
    3 | USA
    4 | HKG
    5 | USA
    6 | UK
    Result should return
    ID | Country
    1 | USA
    3 | USA
    5 | USA
    2 | UK
    6 | UK
    4 | HKG
    Thanks

    with ta
      as
         select 1 col1, 'USA' col2 from dual union all
         select 2 col1, 'UK' col2 from dual union all
         select 3 col1, 'USA' col2 from dual union all
         select 4 col1, 'HKG' col2 from dual union all
         select 5 col1, 'USA' col2 from dual union all
         select 6 col1, 'UK' col2 from dual
    SELECT * FROM ta
    ORDER BY
    COUNT(*) over (partition BY col2) DESCRavi Kumar

  • Measuring counter update from PRT production confirm

    Dear All,
    I have scenario as client requirement is that they want to do Die maitenance on time based & performance .For performance base they want to update the counter value from production product value ( Finish good product +Rejected goods product) .
    I created Die as equipment with fill data in PRT tab measuring point & maintenance plan .
    So what is procedure to update these measuring counter from prodction order.
    Pl help in these scenario.
    Avi

    hi
    kindly refer [Performance-based Completion Confirmations from Production|http://help.sap.com/saphelp_46c/helpdata/en/fe/67ef189d6f11d189b60000e829fbbd/content.htm]
    regards
    thyagarajan

  • Sales Order value updating in the Internal Order Revenue Planning

    Dear All, 
    We have created an Internal Order and entered the planned value of the Revenue & Costs.When we create the Sales Order ,the Planned Revenue value of the Internal Order is updating by the Sales Order Value,but as per the client requirement ,the planned value of the Internal Order should not get updated by the sales order value.
    Please note that we have activated the CO-PA.Is this CO-PA activation is affecting the Internal Order planned values by the Sales Order value?.If so how to come from this issue.
    Please help me as how to resolve this issue.
    Regards
    Subbu

    Hi,
    Thanks for giving the appropriate SAP Note and I have referred the said note,but in note the SAP has said that
    "The attached modification deactivates the update for the order for all order categories (CO internal order, PM order, CS order)."
    In our scenario we need to update the planned vales in the CO Internal Order ,PM Order and CS Order except the Sales Order value.Is there any other alternative solution without affecting the CO Internal Order,PM order and CS Order?
    Please share as we are in the process of testing.
    Thanks
    Subbu

  • Value not flowing from sales order to contract in  addittional tab b(line i

    Hi all,
    i have created one field for the addittional tab b of sales order-line item wise.
    If i add one field in the screen-SAPMV45A(8459) the sales order and tha contract(VA41) will be updated.
    But in our bussiness case the Contract is automatically creted once the sales order is created, but the value in the new field is updated in sales order and the value in the contract is nill.
    How can i get the value in the contract for the same field?.
    Regards,
    neslin.

    Transaction Code - VA41                     Create Contract
    Exit Name           Description
    SDTRM001            Reschedule schedule lines without a new ATP check
    V45A0001            Determine alternative materials for product selection
    V45A0002            Predefine sold-to party in sales document
    V45A0003            Collector for customer function modulpool MV45A
    V45A0004            Copy packing proposal
    V45E0001            Update the purchase order from the sales order
    V45E0002            Data transfer in procurement elements (PRreq., assembly)
    V45L0001            SD component supplier processing (customer enhancements)
    V45P0001            SD customer function for cross-company code sales
    V45S0001            Update sales document from configuration
    V45S0003            MRP-relevance for incomplete configuration
    V45S0004            Effectivity type in sales order
    V45W0001            SD Service Management: Forward Contract Data to Item
    V46H0001            SD Customer functions for resource-related billing
    V60F0001            SD Billing plan (customer enhancement) diff. to billing plan
    No of Exits:         15
    USER EXIT
    http://www.sap-img.com/abap/a-short-tutorial-on-user-exits.htm
    http://www.sapgenie.com/abap/code/abap26.htm
    http://www.sap-img.com/abap/what-is-user-exits.htm
    http://wiki.ittoolbox.com/index.php/HOWTO:Implement_a_screen_exit_to_a_standard_SAP_transaction
    http://www.easymarketplace.de/userexit.php
    http://www.sap-img.com/abap/a-short-tutorial-on-user-exits.htm
    http://www.sappoint.com/abap/userexit.pdfUser-Exit
    http://www.sap-img.com/ab038.htm
    http://help.sap.com/saphelp_46c/helpdata/en/64/72369adc56d11195100060b03c6b76/frameset.htm
    http://www.sap-img.com/abap/a-short-tutorial-on-user-exits.htm
    http://www.sap-img.com/abap/what-is-user-exits.htm
    http://expertanswercenter.techtarget.com/eac/knowledgebaseAnswer/0,295199,sid63_gci982756,00.html
    Rewards if useful.........
    Minal

  • Update Purchase Requisition from Sales Order

    Hi,
    My requirement is to Update Purchase Requisition from Sales Order based on the Vendor number in
    Purchase Requisition .
    I have used Userexit         :- MV45AFZB
                     Customerexit :- EXIT_SAPFV45E_002
                     BADI             :- ME_REQ_OI_EXT, ME_REQ_POSTED
    for my requirement, but in vain.
    Of these Userexit  MV45AFZB, Customerexit EXIT_SAPFV45E_002, BADI ME_REQ_OI_EXT are getting triggered in Sales order creation but, Purchase requisition is not yet triggered and we dont have the VENDOR value with which i need to do perform some checks and update the Purchase requisition.
    After I SAVE sales order, BADI ME_REQ_POSTED is getting triggered.Here, the purchase requisition is created ( not yet inserted into the database ) .I also have required VENDOR value, but in the given
    BADI ME_REQ_POSTED I can make checks according to my requirement but not able to update the new values into purchase requisition.
    Literally speaking, Iam struck up..Dont know what to do.....
    Please let me know any Userexit/BADI/BTE where I can  Update Purchase Requisition from Sales Order based on the Vendor number in
    Purchase Requisition .
    Thanks,
    Shivaa..

    Hi Max,
    It just struck to me...
    As suggested by you, I thought of calling BAPI BAPI_REQUISITION_CHANGE  from user exit USEREXIT_SAVE_DOCUMENT in MV45AFZZ .
    I f I give PReq no. , BAPI BAPI_REQUISITION_CHANGE  will take the particular PReq no., from database and then change it according to our requirements...
    But, in our scenario I am calling the BAPI BAPI_REQUISITION_CHANGE  and passing a PReq no..which doesnt exist in the d/b itself.....
    Anyways, let me try......
    Meanwhile ,please suggest any other options for resolving the issue in question......

  • Condition type value not update in sales order

    Hello Guru's
    As per the  sales order in VA01 the condition type value i.e surcharge value is not updating in sales order.
    But I have maintain the condition record(Surcharge)also and in Condition technique I have checked every thing is correct .
    please find below I have attached the Screen short .
    Please give me solution Asap.

    Hi Sukdev,
    Have you checked the respective pricing procedure for From and To reference step maintained against the condition type ZSUR?
    Regards,
    T.R.S.Praveen

  • No condition update from the sales orders exist - VK322 Message

    Hello All,
    I have activated " Condition Index" & " Condition Update" flag for one of my discount condition type and then created it's condition record along with scales on three levels. The condition type which I mentioned above is set as " Value Scale" in Scale Basis for checking the document value and apply the applicable discount percentage.
    I have created three sales orders wherein the discount percentage is getting applied as per my condition record ( so, the document value is getting accumulated and compared with the condition record correctly )  but when I try to check the cumulative values ( ctrl +shift + F4 ) from the condition record, I get information message " VK322" mentioned in the subject.
    VK322 -
    No condition update from the sales orders exist
    Message no. VK322
    Diagnosis
    The following causes are possible:
    1. There are no sales orders for the condition record that you selected.
    2. Updating condition records in the sales order entry is not active.
    Procedure
    Concerning 1:
    Check the sales orders created for the condition record that you selected.
    Concerning 2:
    Activate the updating for condition records in the sales order entry.
    I have checked everything in SPRO for this but could not find anything which can give me a clue to resolve this problem, especially " Concerning 2" part of this message.
    My requirement > To be able to see the cumulative values from condition record.
    Also, in which table the accumulated values get stored?
    Appreciate your expert advise on this issue.
    Regards,
    Hrishi
    Edited by: Hrishikesh Bhalwankar on Sep 13, 2011 1:59 AM

    Hello Everyone,
    I would like to thank each one of you for giving valuable inputs in regard to my requirement and I would like to let you know that I am able to achieve the results as per the expectation.
    I would also like to share some key things which I did ( with the help of all your expert inputs ) due to which the requirement is met:-
    1. Activation of ' Condition Index, Condition Update' in V/06 for the discount condition type.
    2. Maintained ' B - Value Scale' in Scale Basis for the said condition type in V/06 - my requirement was to check against a value to apply the necessary scale base percentage.
    3. Activation of ' S071' info structure via OM01
    4. Condition record maintenance as per the required scales.
    4. Written a new routine to check the accumulated condition base value from S071 along with the current document condition base value.
    5. Put this routine in ' Scale Formula' in V/06.
    This is giving me the perfect results for the correct application of the discount.
    Just last question - How to re-organize the S071 info structure as I tried to re-organize it with Standard Program ' RV15F001' but it is not re-organizing this info structure... Any idea on this?
    Thanks a lot friends for all your advice...
    Regards,
    Hrishi
    Edited by: Hrishikesh Bhalwankar on Oct 11, 2011 2:11 AM

  • DP90 from service order, and value contract (Resource related billling - DIP Profile)

    Hi all, I've this issue:
    I have created a value contract with an only position, dummy service material (DIEN) via VA41. Then, I've created a service orden with IW31, related it with sales document (position 10 of mentioned value contract). I've did confirmations for several opertations from the order (an operation --> an activity type). In a zeta DIP profile I've link activity tipes with anothers DIEN material. This DIP profile is in orden.
    I can create sales order with DP90, everything ok! But... value released has not been actualized in value contract...
    I found this note, number 1176009, "Value contract FAQs", and say it:
    Question: Does the value contract scenario support documents that were
    created using resource-related billing (for example, DP90, DP91, DP..)?
    Answer: No, this function is not supported in the standard system and
    results in update terminations in the statistic.
    Which is the solution?
    Thanks on advance.

    Well, I think I find the solution. I did it with BADI BADI_SD_V46H0001, method EXIT_SAPLV46H_001, and this code:
    METHOD if_ex_badi_sd_v46h0001~exit_saplv46h_001.
         c_vbapkom-wktnr = c_vbapkom-vgbel.
         c_vbapkom-wktps = c_vbapkom-vgpos.
    ENDMETHOD.
    I'm testing, but it's working.

  • How to update Serial Number from Work Order to Sales order in MTO flow

    Helo Experts,
    I have a requirement to update automatically the Serial number in Make to Order flow, from the Work order to the sales order and then to delivery.
    In fact the flow is the following, when raising the sales order we don't know the SN, it will create a Work order with stock type E, when work order is released a Serial Number is assigned to the material created. After Goods receipt of WO, We need to have the SN updated in the sales order and then in the delivery.
    I tried with the parameters of Serial number profile, i was not able to update from WO to Sales Order.
    DO you have any idea how this requirement could be fullfiled? is it possible in standard?
    Thanks

    I don't think that it is possible in standard.

Maybe you are looking for

  • How to get my 8bit voice memos (iOS 6.1.4)to play in iTunes on my iPhone 5?

    I synced some songs I made in voice memo to itunes on my macbook.  then i tried to sync them to itunes on my iphone 5 iOS 6.1.4 and it says that it can't sync cause its 8-bit.  Is there a good converter that anyone has used before?

  • Date Range in the last year

    Hi, I know this must be basic. I have searched the forum and I have expiremented but I can't come up with the answer And I'm not much of a coder... I have a date field and I need the records to be selected for any date in the past year. In the Select

  • How do you change network settings at the command line when they were set in the

    Ubuntu server setup in a remote location awhile ago, with GUI packages. Currently at version 14.04 LTS. There is ssh access to the remote server. After a lot of digging thru typical command line configs and not finding the existing settings anywhere,

  • Service Unavailable error in Alert Configuration

    Hi all, I have done all the Alert Configuration in the ABAP Stack using the tcode ALRTCATDEF.as mentioned in weblog: /people/michal.krawczyk2/blog/2005/09/09/xi-alerts--step-by-step But when I click on the Alert Configuration tab in RWB, i get the fo

  • Unique iOS8 update issue?

    So I downloaded the update from iTunes to avoid the sluggish download times, or so I thought.  It downloaded in about 10 minutes and then I started to install it.  At first it was the traditional black screen with the white logo and progress bar.  Wh