QC Activity based on Material Production Version

Hi,
Normally, we perform QC activity based on Material Code, i.e. in Material Master we maintain inspection type in QM View for material which needs QC activation during Good Receipt from Production
Is it possible to perform QC Activity based on Production Version of a material i.e.
For Example
Product A having 2 Production Versions
IF Product A with Production Version 1 then No QC required during goods receipt from production
IF Product A with Production Version 2 then QC required during goods receipt from production
So please tell me what feasible solution possible from your side
With Regards,
Kunal Sheth

Dear Sap User,
Production version is nothing just a combination of Master recipe/Routing and BOM used for particular production or process.
If you are having so many production version then you have to choose which you want to choose but if you are having a single production version then it will be chosen automatically.
Do it once and revert in case of any query.
Rgrds,
Dheeraj Rawal
Edited by: Dheeraj89 on Feb 9, 2012 6:13 AM

Similar Messages

  • No Automatic Dispatching Of Planned Order to new Production Version

    Dear Sir,
    When rescheduling an operation from one line to another, the system
    checks whether a production version exists for the material to be
    produced that contains the new production line as the preferred work
    center. If such a production version is found, this version is taken
    over into the planned order. The planned order is scheduled again based
    on the production version.
    The second function allows you to automatically search for an
    alternative work center in the case of a capacity overload of a work
    center, and to dispatch the operations to it. The predefined
    prioritization of the alternative work centers is considered in this
    case.
    The indicator Reschedule with production version must be set in the
    strategy profile.
    My issue is sytem does not making automatic Dispatch to the second
    Production version for the material at the time of insufficient capacity
    Best Regards
    Rami Abd El Fattah Mohamed,PPQM Functional & Technical Application
    Consultant

    In the dispatching control u can remove operation date check indicator and regarding the termination indicator SAP help says"
    "if you have not set this indicator then dispatching is not terminated but carried out without taking the production version into account. That means that the planned order is scheduled with the old standard values and the formulas from the new work center and dispatched to the new line."
    Please check if it works now.
    thanks

  • Goods receipt price in diffrent production version

    Dear Gurus,
                In Repetative scenerion I have given in REM profile that system should post activities using data from PRELIMENARY COST ESTIMATE. I have created 3 production version with diffrent BOM and Routings. And created 3 Product cost collector and 3 Prelimanary cost collector. For which i have got price 10, 18 & 25 respectively.But after i do the MFBF system is posted the goods receipt with using the standard price maintained in the material which is Rs 15. So my question is what is the purpose of making diffrent production version and difffrent prelimery cost estimate.
    Regards
    ACP

    Hi,
    Even though you have 3 different Product Cost Collectors based on your production version, you can update the standard cost estimate for the material against only one Version, so your Inventory valuation would be based on Standard Price in Material master.
    Now coming to the effect of Product Cost collector, for every product cost collector, system would create a Internal Order(Production Order), against which all the costs would be collected and settled. So if you look at the costs accumulated in the specific cost collector for the backflushed production you can see the cost of GR based on the prelimenary cost estimate here it wont consider the cost based on the Standard Price.
    Hope I was able to explain what you were looking for,
    Regards,
    Prasobh

  • Selection of BOM with Production version

    Hello friends,
    I have Finish product say A with two alt. BOM and Production Version 1 & 2
    i have semi-finish product say B  with two alt. BOM 1 and 2 in the BOM of the Product A
    Now when i create PIR in MD61 for product A with production version 2 selection,how the system will select the component B
    with alternative BOM 2
    please suggest

    Hi Mangesh,
    The production version is selected based on the setting you are maitaining in MRP-4 view for Dependent Requirement Selection Method. The selection will be based on the Validity dates, Quantity i.e. based on the Lot sizes, and based on the production versions.
    If both the versions are having same date,lot size etc, then the system will select the first version by default.
    IF you do not want any version not to be selected then you can lock that version in MRP-4 view or in C223.
    Thanks and regards
    Muru

  • Production Version in Material Master

    Hi,
    I am having problems with this.
    I need to either change date on a production version or
    delete the product version.
    I have tried using a batch input sequence from my program both for changing the date
    and for deleting the production version and this all works well.
    Now this isn't good enough since there can be multiple production versions on a material
    and I don't know which line to change or delete in the batch run.
    Is there a good FM or BAPI to handle this?
    I don't want to change the MKAL table directly since there is a history table
    connected to this also (MKAL_AEND).
    What is the best approach?
    Rgds,
    /Fredrik.

    How can I use this to achieve what I want to do, either
    change the production version date or delete the production version?
    I have tried C223, but this is not good enough, nor is batch run in MM02.
    I can have multiple production versions and can not pick the correct line
    in batch run to change or delete.

  • Production version selection based on Process order type

    Hi,
    I have the following requirement.
    A material is having two production version one is for R&D and one is for regular production. Now two process order types one for R&D and one for regular production. Now during creation of process order if we use order type of R&D then it has to select production version of R&D and if we use order type of regular productionthen it has to select production version of regular production. This selection has to be happened automatically. How this can be configured.
    Thanks
    Vinamrath.

    Dear Kumar,
    Assuming the production version selection is automatic in  the order type dependent parameters,then during order creation this
    can be automated only through validity date of the production version or else by locking the production version manually which
    should not get picked or else only through different Lot Size.
    Check and revert.
    Regards
    Mangalraj.S

  • MRP Scheduling with a material with multiple production versions scrap rate

    Greetings all.
    I have a problem with MRP scheduling.  How do you account for different loss rates or scrap rates on a material because of multiple versions of a material that are in production.  For example, we have an item.  There are two differen ways to make that item and both have different loss rates or scrap rates.  How do we account for this.  And whatt happens when you have these with multiple routings.  Thanks.

    Dear,
    It can be handled in 3 ways.
    1st way - Create 2 versions to represent 2 ways of production. Create a 3rd version name it as total and make it as a first version so that MRP will take this version for scheduling. In total version give the most correct scrap qty and timming in routing. Hence when you run MRP system will consider the total version, then change the varsion in planned order as per your requirement.
    Second way - Create 2 version and if you are using Demand planning, in MD61 against the qty represent the version number so that when youn run MRP, the planned order will carry the version.
    3rd way - Create 2 Production version and create a quota arrangement and assihgn these two Production version as Quota items and give the % share. Hence when youn run MRP system will share the demand qty into two different version as per Quiota arrangement(setting in MRP2 is necessary fir planning).
    Please come back which one you are looking for so that we can give furthur information

  • How to maintain production version for material and how it will work

    Dear Friends,
                          i  have created alternative bom for a material , My FG is having two  RM1 and RM2. like below, 
                    FG --->RM1
                    FG---->RM2
    i created alternative BOM. how it will fetch raw materils from BOM while doing production confimation.  what is meant by production  version and how to configure that. how it will work
    regards
    RK

    Dear Raja karthik,
    1.Production version is a combination of BOM & Routing in Discrete scenario & in REM scenario its a
    combination of BOM & Rate routing/Routing.The same can also be created only containing the BOM incase if it is going to be
    used for a sub-contracting purchase info record.
    2.Production version is a method or technique which's is used to produce a material.
    3.A Material may be having one or more than one production version.
    4.Production version can be differentiated by using either the validity date or Lot size range.
    5.Say For Eg: Prod.Version1 --> Alt BOM1 & Routing1
    Prod.Version2---> Alt BOM2 & Routing 1.
    6.It has the status Locked and unlock.We can lock it when it is to blocked for any usage purpose.
    6.Generally its created using T code MM02,by selecting MRP4 view and clicking on Production version key.
    7.It's a master data in REM scenario.
    8.Production versions can also be created using T code C223 for more than one material.
    9.Planned independent requirements can be created production version specific in MD61.
    Regards
    Mangalraj.S

  • Production Version of Material PO

    I have been asked to add Production version of each material Field in my Purchase order QTY report. Which table i can find production version of material for each purchasing Document number

    Hi
    Did you check table EKET?
    regards
    Srinivas

  • Schedules for certifications based on new SAP product versions?

    Are there any schedules available that show when SAP certifications and related curriculum will be updated to newer product versions?
    I also have a current requirement from an end user to find certifications and classes based on Crystal Reports 2013.  Everything I can find is based on the older version 2011.  Is there any schedule for availability based on the newer version?
    Regards,
    Derek Ewell

    Hi Derek,
    I am afraid I could not find any such handy information.
    I would always refer to
    https://training.sap.com
    for any updates and the latest certification / curriculum details.
    Hope this helps.
    Kind Regards,
    Ravi

  • Error in making production version in material master..

    the error is: to date is in the past.
    Scenario: i am trying to maintain production version in the material master for finished material. this error is coming for each material. Pls help. points on the helpful answers..

    Dear,
    Go to the MM02-MRP 4view clik on production version her you need to maintain the validity from From-To date as toadys date say11/11/2008 to 31/12/999 then double click on it then maintain the details like routing, bom and do the consistancy check if green light appear it means your PV is correct.
    Regards,
    R.Brahmankar

  • Impleemt Product Costing with out Activity Based Cisting

    Hi,
    well, i am new bee in this arena.
    please guide me, if product cost controlling can be implemented with out activity-based costing.
    Regards
    Ramakrishna Reddy

    Do you want to know: "Without ABC, or without activities?"
    The answer in both cases is actually yes, but the implications are slightly different.
    You use activities in CO-PC to allocate production-related overheads to a product, but use ABC to implement Activity Based management, which is not limited to Production.

  • Active transaction for the systems of this product version

    Hi All,
    When i tried to create a new transaction for maintenance optimizer, I received the warning below:
    There is already a transaction for the systems of this product version
    The solution from note 1296589 does not help.
    Transaction code /n/tmwflow/maintenance only show one open session (the current session).
    Regards,
    KayJay

    > When i tried to create a new transaction for maintenance optimizer, I received the warning below:
    > There is already a transaction for the systems of this product version
    What happens if you click on the button "Maintenance transactions" just next to the "new Maintenance" button?
    Markus

  • Urgent-material and production version

    Is there a way i can pull the report or details for materials and production version used in a company code?

    Hi,
    USE Transaction C223
    BR
    Diwakar

  • Urgent-production version and material

    Is there a way i can pull the report or details for materials and production version used in a company code?

    Post this in MM forum.
    SAP ERP - Logistics Materials Management (SAP MM)