QM02 - Logic Capturing Prod Ord in New Report

Hi,
My client wants to develop a report wherein he will get a detail output of Notification Number, Production Order, Inspection lot, Batch etc in one report.Everything is developed and captured from VIQMEL table except Production Order.
The production order in VIQMEL u2013 FERTAUFNR is not the one that I need.
I want to know the logic behind capturing the Production order entered in QM02 while creating Notification, the type being Deviation. In the header screen of QM02 in the object list table below they select the drop down of Order and enter the production order . I need to pick up this order in my report.
Can anybody let me know the logic behind capturing this order in my report since it is stored in as structure or the where this order can be picked up.
Regards
Bhgl.

Hi ,
We have ECC 6.0.
when we go to QM02 , I enter the notification number which has type as "DV - Deviation".
I enter enter any one of Material, Plant and Batch in reference object tab in the header screen.
Below there is a tab of ASSIGNED OBJECT u2013 ITEM1 which is having object category drop down as "ORDER" " Inspection Lot".
Out of this I select object category as Order and enter the production Order number "1000001".
I add new line item in the object assignment tab and enter another Prod Order and so on.
so this means I have created notification of type " Deviation- DV " for many production orders.
I need to capture this production orders in my new Lot history report.
The order where I enter order number the technical details are the table which is of category structure and i.e." QNAOS_OBJ_DATA_UI " and the field is " ORDER_NO " and not AUFNR.
The order which is in QALS is not what I need neither QMEL-AUFNR is what I need.
I hope this is clear.
Regards
Bhgl

Similar Messages

  • New Reporting Currency won't Convert

    Hey Experts!
    We're running BPC v 5.1.502 for Microsoft SQL.
    I've recently setup the Currency Conversion features with BPC.  I was able to successfully convert LC Values to both USD and EUR.  These 2 Currencies were already setup as Reporting currencies by somebody else, probably years ago. 
    Now, I then tried to add the CAD currency to the conversion process, but for some reason when the "FX Restatement" Task is run, the system only converts the USD and EUR values.  It seems to ignore the CAD currency. 
    I've validated the following:
    I have rates existing for the CAD currency in the tblFactRate table.
    For the CAD record in my InputCurrency Dimension, I have "Y" in the reporting field and have defined the same Group that is used by USD and EUR.
    In my Groups Dimension, I've ensured that CAD  is available, has a "Y" in the Reporting Column an dhas a Currency_Type = 'R'
    Everything is set correctly on the Rate, RateEntity, RateSrc, and RptCurrency Dimensions as well.
    What else am I missing?  Why will the first two rates calculate, but not the 3rd?
    Any help is appreciated.
    Thanks!
    Sean

    I'm running Script Logic and even though I have Processed all Dimensions, processed the application and optimized trying to get this thing to work; I figured I'd try your advice on saving and validating the script.  Well, this fixed it!    I'm now able to get my new Reporting curency to convert LC values.
    Thank you so very much for this information.  It would be nice if it were documented somewhere that the Script Logic has to be re-validated and saved after adding a new Reporting Currency. 
    Now, to follow up, if I add more reporting currencies, do I need to optimize and process the entire application after each new currency?  Or is that overkill?  Thanks again for your advice!

  • Steps to follow while creating new report...

    HI friends,
    Can any one please help me with the things to keep in mind and the process to follow while going for creating new reports in BI 7.0. We are about to create some new reports ., also the things to keep in mind while getting the requirement gathering...from the core users,  firstly  the basics to keep in mind and then the finer details technically to logically attempt will greatly help me to accelerate things further,
    very many thanks in advance....

    Hi,
    Get the report layouts from the business.
    Try to limit the data set to a minimum in the report. Decide with the business what chars they would like to have in the variable screen.
    Discuss and decide with your users what they want by default to appear in the report output. The rest of the chars could be put in Free chars and could be drilled down.
    Check if users have to be restricted to some characteristic values. You would need to create authorization objects and attach these to users. Get the list of users and what chars and values they need authorizations for.
    1. Try to avoid Exclusions in RKFs/selections as these degrade performance. Try to include char values instead.
    2. Check if query read mode is set to H - read while navigating and expanding hier (RSRT --> properties). This way the entire dataset is not read from the database at once.
    3. A lot of navigational attributes also affect performance. See if you can add it as char in the backend and read master data while loading.
    Edited by: Murali Krishna K on Feb 2, 2011 11:38 AM

  • Creating a New Report Category for PNP

    Hi,
    Could anyone please help me in knowing the different steps involved while creating a custom and new report category for PNP LDB?
    Thanks,
    Sandeep.

    Hi create a program or use an existing program, which has logical database pnp.
    go to se38-> prog name->change-> goto->attributes-> HR report category->create report category->new entries.
    check and uncheck what all fields you require for your report
    now save the settings.
    This will serve your purpose. reward points will be appriciated.
    Regards,
    Quavi

  • Sale order - mtrl - prod ord ; table link

    hi,
    pl tell me a link through table and field -
    how to get a link between sale ord - item no. - mtrl - prodn ord no. - prodn posted qty.
    regards

    I have an understanding that you are in need of the tables for mat.no,prod.ord.and sales order to make a report to make them all appear in the report...
    If that is so,there is no need for tables..YOu can get that in standard SAP..
    Go to COOIS..enter the plant and execute.. In the resulting screen, go to chane layout. There u can add the sales order in the layout...material and production order will be there by default...
    Thus you can have the material,production order and the corresponding sales order in a single transaction...
    hope this clarifies...
    karthick

  • Creating a New Report Project Crashes

    Hello,
    I've just downloaded the release of CR for VS2010 and installed it correctly.
    But when i try to create a new report in a new solution (i use emty project ) and then try to add with the database expert databases it freeze the vs2010 with no timeout and no error message.
    I saw in te forums that it's a recuring question so i tried to build a Virtual machine with win7 x64 and VS2010 and install CR on this fresh installation and it works !
    I'm wondering if there is any relation with the way my developpement machine was installed:
    Installed VS2010
    Installed VS2008
    Installed CR for VS 2008 sp1
    then Installed CR for VS 2010
    Also when i try to make a new project with the Crystal Reports Project Template there's a reference missing in the project. Even if i correct the mis-reference the project hangs on the database expert ...
    Could you investigate ? i don't want to reinstall my dev computer and i need the CR2008 just time to upgrade the Projects to VS 2010...
    Kind regards

    Hello,
    We are still trying to figure out what is causing this. It only happens on a few users PC's.
    Can you download debugdiag from Microsoft, if you don't have it already, and run it to capture on devenv.exe. Analyze it and tell me what dll the crash is happening in?
    Thank you
    Don

  • OBIEE 10g How ADD new report and use outer join

    Hi,
    I have to add a new report that use a new view...(just created in db)
    I'm new in OBIEE.. can you explain how can i do it?
    Actually:
    1. I opened administrator tool and import new view (and created an alias) in physical
    2. I built a logical table in BMM
    3. I built a new presentation table in presentation
    problem: the table in BMM have yellow icon like a fact table.. why??
    can you explain me what i have to do?
    thank you
    Edited by: 1006028 on 15-mag-2013 2.54

    By default OBIEE 10g considers a table as fact table that is dragged from physical to BMM layer. That's why you see the yellow color icon.
    If it is a dimension table, you will have to join this table with a fact table in BMM layer. After this the yellow color icon will go away.
    Pls mark correct/helpful.

  • New-Report Issue In SQR

    Hi All,
    I have two reports in a sqr ,one is error report and the other is billing report,and i need send these two report as attached to a team,all these should be done in one sqr,so i use new-report function to generate billing report,in this case,we can open PDF from email successfully,however,I face a problem because of this.
    That is I can only find one row in billing report,and i use show method it shows at least two emplids come to this billing report procedure,and one more thing ,i use print method to generate report.
    Can anyone help me on this,many thanks.
    Regards,
    Joan

    Can you share the sample code of the logic used by you to create new-report and print....also specify the order in which you execute the new-report and print (for both reports). I think i know the issue but need to be sure on that.

  • Can we run script logic at the time of preparing reports.

    Helo Everybody!
    I am new to SAP BPC.
    Can we run script logic at the time of preparing reports.
    Thanks & Regards,
    Satish.

    If you mean, "Can we run script logic at the time of preparing reports" is equivalent to entering data into the report and sending it to the database, then yes, you may run logic as Marcel indicates.  Defualt logic is ALWAYS run for ANY and EVERY set of data that is sent via an input template from the field.  You may also run logic when posting a jOURNAL entry as well.  But be careful....if default logic attempts to perform to MANY or COMPLEX calculations, the time it takes to complete the process may not be in expectations with the users plans.  There is a fine design balance required when planning to run logic at the time of input, as opposed to running in a package or at specific times during the day.
    Hope this helps.

  • Can't instal Logic Pro 9 on my new Mac Book Pro

    I installed Logic Pro 9 on my new Mac Book Pro just to receive the Message, the New Mac doesn't Accept old Power Programms...
    HELP. I spent so much money just for the reason to use Logic for my music Production.
    THANK YOU

    Run Disk Utility.
    Select the Mac Partition on that drive (Macintosh HD or whatever you called it)
    Click (Repair Disk)
    Repeat until it comes clean or gets stuck.
    Report any error message back here, with exact wording, please.

  • Stocks Of Prod Ord material no showing !!!

    HI Gurus ,
    When i m confirming prod ord in CO11n , there 's no stock showing in MD04 screen for the ordered material...
    Thanks in advance

    Hi Kumar,
    (ordered material is direct prod item)
    Are you working with collective orders? If yes then please check the item would have been issued to the parent order.
    Also go through the MB51 report for the material, it will give you the details.
    Hope the above helps.
    Regards,
    Vivek

  • Report Generation: New Report.vi

    Running applicaion in development mode works fine.
    After compiling however I get Error 7: Open VI Reference in New Report.vi
    Why am I getting this error?

    Has the version of Office on your machine changed since you installed the Report Generation Toolkit?  The VIs will become broken if the ActiveX interface changes, and this can happen when the Office version changes.  I recommend uninstalling and reinstalling the toolkit.  Also, what version of Report Generation Toolkit are you using?  The latest version is 1.1.1.
    -D
    P.S. - I'm going to respond to your other thread that you started with a link to this one.  Instead of creating multiple messages on the same question, just wait for a response to your initial thread.
    Darren Nattinger, CLA
    LabVIEW Artisan and Nugget Penman

  • Error 7 occurred at open vi reference in New Report.VI

    Hello!
    I use the report generation toolkit on LabView 7.0 to create a report in Excel. The program works fine until I make an executable version. I the get the error:
    Error 7 occurred at open vi reference in New Report.VI
    I use the New Report.VI, Bring Excel to front.VI and Save Report To File.vi
    Can you pleace help me!!!

    Most likely, you did not include the required libraries in your build script. When building an executable in which you use the Report Generation Toolkit, you must include the _Word Dynamic VIs.vi from _wordsub.llb and _Excel Dynamic VIs.vi from _exclsub.llb as dynamic VIs on the Source Files tab.
    Check this article for more info.
    http://digital.ni.com/public.nsf/3efedde4322fef19862567740067f3cc/86256a47004e16d186256a84004cb883?OpenDocument
    Daniel L. Press
    PrimeTest Corp.
    www.primetest.com

  • ABAP: Developed new Report for Summarized JIT (Just In Time) calls

    Hi to all,
    Can anybody please tell me about the following:
    ·     Developed new Report for Summarized JIT (Just In Time) calls: This report is for Delco Singapore needs all Summarized JIT calls created between selected dates to be closed. If JIT call quantity is 0 and GR quantity is also 0, then GR flag for JIT call to be checked and JIT call will not be shown open. If the JIT call quantity is greater than zero and GR for JIT call quantity is zero then JIT call quantity made as zero and GR flag for JIT Call to be checked. Once it is checked the JIT call will not be shown in Open.
    Thanks in advance.
    Regards
    Monalisa

    Ok, I was able to figure out the functions that were confusing me. For my own record and for those that do not know, I will list how to create the objects necessary to add a new report to a menu.
    1-Write JSP (should be written just how Oracle writes theirs)
    2-Creat function for the new JSP page as System Administrator responsibility
    3-Use Sys Admin to add the function to a menu somewhere
    4-Using AK Developer responsibility, create an attribute with the label of the attribute being the name of your function you created. Oracle's convention is the name of the attribute has FS in it.
    5-Using AK Developer, lookup the ASF_FUNC_SEC_REG region
    6-Drill down into that regions attributes
    7-Add a your newly created attribute to this region
    You would do all these steps for your advanced search page as well, so that in your main jsp, you can call asfPage.setAdvancedSearchPage() with the attribute name of your advanced page.
    What I Still do not know is:
    (1) My main page keeps coming up saying that there is no default query defined for it. How do you create a default query for a report?
    (2) How to get the personalization to work.
    Can anyone help?
    Thanks!

  • LV 8 problem with New Report.vi in compiled program

    I'm a novice LV programmer trying to finish my first project.  The project is the automation of an air flow stand using field point for acquisition/control.  Have the code written and everything seems to work fine until I compile.  Specifically, I get an error when I attempt to open an Excel template (XLT) using the New Report.vi included in the report generation add on.  When the compiled executable run I get a message with the header "Error 7 occured at Open VI reference in New Report vi>report2.vi>auto air flow testing.vi .   And then in the body of the message is says:
    Possible reason(s):
    LabVIEW:  File not found. The file might have been moved or deleted, or the file path might be incorrectly formatted for the operating system. For example, use \ as path separators on Windows, : on Mac OS, and / on Linux.
    NI-488:  Non-existent board.
    VI Path: C:\builds\auto air flow\My Application\auto air flow 1a.exe\Excel_Open.vi
    Built Application or Shared Library (DLL): Make sure all dynamically loaded VIs were properly included in the build specification for the application or shared libr
    The input to the New Report.vi template connector is C:\Air Flow Data Files\templates\psc.xlt.  Again this works in design so I believe the formatting is correct and the file does exist.
    Why would this work in design environment but not the compiled program?  I recompiled several times and even tried reinstalling the report generation tool kit. Any help or pointers would be greatly appreciated. I will be happy to supply more info if necessary.   thanks. 

    Okay, I found the solution by doing a search here on 'Error 7".  My thanks to those who have posted the solution in the past.  Regards

Maybe you are looking for