Hi,
when i enter the confirmation no. in co11n, then only plant, work center & material is displaying.
yield to confirm & machine time is not displaying.
could you tell me why the qty & timings is not displaying.
thanks/regards
vish

Hi,
Click on Actual Data you will get it
To make the sys propose then in SPRO you have to do this below setting
In OPK4 go to last tab -Operation Indv entry
under quantites tick on propose
Under dates tick on propose date,display defaults
Regards,
SVP

Similar Messages

  • Consumption qty calculating incorrectly  in CO11n

    Hi Experts,
    IN MTO scenario , while doing confirmation  for a desired production order which contains AFS Finished material. I have entered In bundle yield to confirm field as 1 pc. After when i click the  good movement option ,it has taken 50 pc in quantity field. but it should trigger as 1 PC.
    So it is calculating wrong.I would like to know what are the settings need to be maintained  to overcome this issue.
    please suggest me the solution.
    Thanks & Regards,
    Senthil.

    Dear,
    Please refer the OSS Note 542198 and  653183 - Modification: Discontinued part in the confirmation.
    this note cover your isuue of system does not calculate the quanitities correctly or it displays unnecessary blank lines.
    Regards,
    R.Brahmankar

  • In process Inspection and Rework Qty Issue

    Hi,
    There is Production Order for 100 qty.  There are 5 in process operations like 0010 Cutting, 0020 Welding, 0030 Inspection, 0040 turning, and 0050 Inspection
    (1)0010 operation is finished by production for 50 qty and confirmed through co11n by entering yield as 50 qty.
    (2)0020 operation is finished by production for 50 qty and confirmed through co11n by entering yield as 50 qty.
    (3)0030 operation: Quality inspected and entered results as 25 as yield and 25 as rework. For defects Q3 notification is
         triggered.( ie CO11N transaction is called in QM)
    (4)Production opened rework order CO07 and confirmed the rework operation and booked material and labor cost on cost
         center instead of orginal order.
    (5)0040: Operation production could confirm only 25 qty as earlier 0030 operation of inspection  yield was only 25 qty.
    (6)Inspection already in 0030 operation 25 qty  was entered as rework. Now after rework how results recording will be done 
         and qty will be posted in yield. Unless yield is entered under 0030 operation for 25 qty , production cannot confirm the 0040
         operation for pending 25qty.
    (7)Business requirement is what ever the qty production manufactures it has to be entered in system. Based on quality
         inspection incentive will be paid to only qty which is passed by quality.
    Settings Made:
    (a)100 Free Inspection, No Qty Relation, Quantity Valuation and Confirmation in Production for only inspection work center
         without any cost capturing.
    (b)Confirmation parameters settings with error for over and under delivery tolerance, error if inspection sequence not adhered,
         error message if no inspection results exists
    Any suggestion or any other way of handling this requirement.
    Thanks & Regards,
    RSR

    Hi RSR,
    Your way of mapping is absolutely fine, few points to be clear...
    03 inpection type and enable inspection characterisitics for operation 030
    04 inspeciton type to be enabled and operation 050 shall be eliminated if possible, material stock posting will be done from 04 inspection lot for 25 nos.
    let me know if you have questions..
    regards,
    Lenin. A

  • Excess Qty confirmation than Production order qty

    Hi
    SAP Experts
    Is it possible to confirm excess qty of yield in co11n against Production order qty.
    pl. guide me the steps required.
    with Best Regards
    Yogesh

    Yes,
    If you do not waht to conform excess qty than the production order qty, then the following are the options
    - as our friend told in Work scheduling view the under/over delivery tolerance should be zero and unlimited delivery tick should not be active
    - In production order the under/over delivery tolerance should be zero and unlimited delivery tick should not be active.
    - In OPK4 fior the combintaion of plant and order type the following confirmation parameters are to be maintained
    Under delivery - X error if qty below under delivery tolarance
    Over delivery - X error if qty above over delivery tolarance.
    With this settings you can avoid what you wanted.

  • How to issue more PRT qty than mention in routing

    Dear Guru,
               while confirmation of production order how we post PRT qty more than mentioned in routing. suppose i have consumed one PRT 2 times then how it should taken in account without changeing qty in production order.
    pls guide me.
    Regards,
    Ishwar

    Hi,
             But there is no provision to put more qty than mention in co11n i.e. confirmation of productiojn order. so i think this config will not help. if possible then pls tell me how this config will help me.
    Thanks,
    Regards,
    Ishwar

  • Modification quantity default in the transaction CO11N

    Dear gurus,
    i need to modification the quantity propose in the transaction CO11N.
    For example in the production order 1 for the operation 10 the operation quantity is 100 pzp.
    When we run CO11N we would like see the propose quantity 200 pzp.
    There is the exit for modifcation the operation quantity propose?
    Thanks a lot
    Daniele Pistilli
    PP TEAM

    Dear ,
    CO11N will propose the Yeild Qty based on the Production  qty  at header level either it is original values or changed values based on your requirement .Now if you are changing the opreaiton qty that may be at operation level and compoenet level changes for same Order Qty or more  .Accordingly , CO11N will be populated  .
    However , You can utilise the below user exit  for your requirement :
    1.PPCO0019 Checks for changes to order operations
    2.CONFPI05
    3.CONFPP01
    4.CONFPM01
    Beside that , you can make Qty Propose an editable field as you want to see the Operation Qty as 200 which  is more than the orginal one .To set this goto CO86-Select Production Order Confirm Detail Screen -Choose Yelied To Confirm -AFRUD-LMNGA  as input field -mark the radio button .
    Regards
    JH

  • Scrap confirmation in Co11n

    Dear Gurus,
              My prodn order qty is 100.In Co11n or in Co12 i am confirming 90 as yield and 10 as scrap.What is the impact in terms of costing and goods movement.My scenario is a press machine sequence.If 10 pcs are damged during press.the 10pcs will become a scrap material which i will sell to the the different customer in kgs.
    say 1 fg cost 100rs
    say 1 rm cost 10 rs.
    operation 10: press1 : yield 90:scrap:10
    operation 20: press1 : yield 90:
    operation 30: press1 : yield 90:
    operation 40: press1 : yield 90:
    Please through some light on this issue.
    Regards,
    Guna
    TCS
    Edited by: Guna on Dec 8, 2008 12:38 PM

    Hi Guna,
    Once the Material is scrapped, it will not be having any value. The quantity can not be seen in the system.
    System understands that you will throw the Material out.
    Now as per your scenario, there is a scrap of 10PC at Opereation 10.
    For the confirmation of Operation 10:
    90 (Yield) + 10 (Scrap).
    For the manufacture of 10 Scrap pieces you have consumed the components and activities will also be posted. (here the consumptions are taken care).
    Now this material can be collected separately and transferred to scrap yard.
    Now follow below procedure..
    Create a MAterial for Scrap:
    Material Type can be : NLAG or PDSO.
    with Valuation Class: 9999.
    With reference to this ask your FI consultant to configure the OBYC for this valuation colass.
    Now the scrap sale:
    Create Sales Order: VA01
    Delivery                 : VL01N
    Billing                    : VF01
    Excise Invoice        : J1IIN.
    For this Material there will not be any quantity shown in the SAP.
    Still you can do the delivery for this as a Sales Process.
    The revinue collected in this will be adjusted in the P&L.
    It means The consumption and actvities will be capture when you do the Confirmation (CO11n) and the revenues against the scrap will be captured after scrap sale.
    As you can not bifurcate different scraps, we generally maintain the scrap material as Metal Scrap and sell it.
    Hope this explains the entire scrap process.
    Regards,
    Siva

  • GR in production order

    Hi
    The last operation in production order is having control key PP03 with autoGR. So when the last operation is confirmed system will do GR for the operation qty.
    The problem is I have done GR through MB31 for the production order, say 3 pcs out of total 10 pcs in the order. So when the last operation is confirmed through CO11N, system is taking entire 10 pcs and trying to do GR resulting into an error for extra 3 pcs. Is there any modification for triggering a  balance qty for GR in CO11N? Please dont advice to change it manually.
    Thanks

    hi,
    This is happening for the difference between GR with respect to order and order confirmation.
    In MB31 the system will only receives the goods.
    But in confirmation you book the yield and also do the gr.
    If you do GR through you are not booking any yield so at the time of confirmation the system will allow you to confirma 10 quantity of yield booking but the system will stop you at over GR of material.
    So if possible try to confirm the order do not use MB31 as it not book yield.
    Hope this will help.
    regards,
    kaushik

  • Dependent reqmt

    Hi All,
    I have a scenario like, i maintain
    one finish product and 3 sub assmy and each have components
    I got the plnned order for the fini and the 2 sub-assmy
    but for the one sub assmy after MRP run .systeml not created the planned order for this assmy and the corresponding its compnents
    istead , for this sub assmby . MDO4  screen . it show the DEP reqmt.
    and no more reqmt is capture for its components
    pls clear me
    what i wa

    Hi Dhokhi,
    I Checked  the relevant data like Operation qty / Activity timings of all the operations.
    the operation toal timing is arround 2 hrs / pc
        *I  Checked scheduling formula of assign work centers.
    i maintian the setup and the process formula sap001 sap002, and the capacity is 14 hrs/ day
    Check also In house production time - -i did not maintian in the material mastr

  • CO11N,Restrict modify consume material QTY

    Hi gurus,
    In our company,all material used as backflush material. So when do CO11N, the material consumed automaticallly. In fact, when do Co11N, user can modify the consume mateiral QTY more or less. We want to restrict user to modify the QTY, and only one range he can modify, for example:
    finish goods QTY(confirmed qty): 100 EA
    one consumed material(say B) QTY: 206 EA ( 3% come from BOM master data)
    We want to restrict user modify B material base on QTY beteween 200 and 206 EA.
    Is there solution can match this requisition? User exit or config or other solution?
    Thanks a lot!

    Hi Daniel,
    You can refer to the following user exit. one of it will work. Just check these:
    CONFPI01            Process order conf.: Calculate cust.specific default values  
    CONFPI02            Process order confirmation: Customer spec. input checks 1    
    CONFPI03            Process order conf.: Cust. spec. check after op. selection   
    CONFPI04            Process order conf.: Customer specific input checks 2        
    CONFPI05            Process order conf.: Cust. spec. enhancements when saving    
    CONFPP03            PP order conf.: Cust. specific check after op. selection   
    Hope it helps...

  • Order qty and total confirmed qty in PI sheets

    Dear Experts,
    Kindly suggest the possibility of appearing total order qty and already confirmed qty in the PI sheet, system useually provides the same while performing confirmation through co11n or cor6.
    Thanks in advance for your help..
    Regards,
    Nitish

    Hi Srini,
    The following details are available in the table AFVV,
    Standard value, operation qty & Base qty.
    With this values create a formula Standard value * operation qty/ Base qty , this will equal to the planned hours for that particular activity type. Similarlt planned hours for other activities can be calculated.
    The actual/confirmed hours are available in the table AFRU.
    Regards,
    Senthilkumar

  • MB5B Report Qty Problem

    Hi All,
            I have some material Qty Problem while selecting different view in MB5B report.
    While in Storage Location view opening & closing stock is same as in valuated Stock,but Issue & recived Qty is doubled in Storage loaction view.i don't have PP & Qm Module.so we are doing PP Entry Thru 521 MVT.
    What is the possiable reaso for this.
    Regards
    Pavan

    Hi,
    MB5B is a standard report in which you will get the stock on particular date.You cna see the stock of previous or previous week.
    If you trying to execute the report with todays date as posting date,then system will consider all teh material movements happened today,so thats y system is showing 2 different stocks at different timings.
    to check what and all material movements happened today  for that material ,go to SE16 ,input table MSEG and check the material documents.take date and timings on which material document is created. then compare this with MB5B report
    Hope it helps

  • Goods Movement Qty While Confirming the Order

    Hi Friends,
    While confirming the order The end user Will go to the goods movement screen and enter the actual consumed Qty (When all BOM components Are marked with automatic Back flush) For the components with 261 movement type and will enter the storage location and batch no if required .
    Now my requirement is the user should not have the access (it should be in gray) to the BOM Components qty to change
    OR
    He should not be able to change beyond the qty As per scrape % Given in Material Master or BOM.
    The Reason for this is
    Even When there is a shortage for BOM components in SL location, he is reducing/Adjusting  the required quantities as per the existing Qty ( If there is no stock then making it to ZERO also)  and confirming the order.
    Pl suggest me is there any user Exit for this or can I do it thru Standard SPRO settings.
    hari

    Hi,
    You  can make screen variant SHD0 for CO11N and hide it.
    In t code SHD0, give the transaction variant name ( say ZCO11N )of ur std CO11n.
    CO11N screen will appear, when u will save the variant, u will getgood movement tab , it will hide now.
    Activate the transaction variant.
    Regards,
    R.Brahmankar

  • Prod order qty at the end of each operation

    Hi, my client want to monitor the qty of a production order at the end of each operation. can it be possible? say at the end of operation 10, the product A qty is 5, at the end of operation 20, the product B qty is 4 etc. pls advise what are all required to implement.

    Yadav,
    As suggested by the forum members you need to have operation confirmations i.e. CO11N.
    You can see the required report in COOIS or in the order itself against the every individual operations as confirmed quantity in operation overview.
    But as you required, it won't be inprocess material specific as you are not going to identify the inprocess stages as individual materials.
    Lets take as example, you have raw materials X,Y & SFG Z to have finished product A. The order contains 10 operations.
    We have issued X, Y & Z to the order on first operation. Now as per your client's requirement at the end of first operation that inprocess material will be identify with specific material code say P, at the end of second operation it would be Q & so on with quantity.
    But we don't define the inprocess material as particular material, you won't be having the same data.
    Even if you try it would be tedious job.
    So use standard report with the fields available. Or else go for customized report.
    Hope this helps you.
    SmanS

  • Trsct CO11N, how to confirm a prod. order withoout confirming activities?

    Hello
    We are using transaction CO11N to confirm production orders
    Our production orders have several operations.
    The last one creates the goods movement (control key PP03).
    In the others operations we have several activities each one with a standard time taken from the routing.
    Since we are not immediately informed about the time spent by the workers to do each activity, we would like to post the good receipt as first and only after we would like to confirm each operation with the right minutes for each activity.
    But when we post the goods movement in the last operation, the system confirms  automatically all the activities in all the operations using the standard values even if in transaction Co11n the fields activity's values are empty.
    How can we post the goods movement without confirming activities so that we can confirm later the activities with the right values? I think I have to change some settings somewhere but I cannot understand where.
    thanks
    Regards
    Giacomo

    Hi,
    you could always turn off auto gr feature so confirmation with co11n is seperated with mb31 gr production.
    But if you still want to use as is config you can just left the activity blank and you branch to good movement to do auto gr and you can save it.
    For your additional info : ypu can set whether the activity qty is proposed manually or not by setting confirmation paramater or single screen entry confirmation parameter.
    I hope it helps
    Best regards,
    Freddy Ha