In process Inspection and Rework Qty Issue

Hi,
There is Production Order for 100 qty.  There are 5 in process operations like 0010 Cutting, 0020 Welding, 0030 Inspection, 0040 turning, and 0050 Inspection
(1)0010 operation is finished by production for 50 qty and confirmed through co11n by entering yield as 50 qty.
(2)0020 operation is finished by production for 50 qty and confirmed through co11n by entering yield as 50 qty.
(3)0030 operation: Quality inspected and entered results as 25 as yield and 25 as rework. For defects Q3 notification is
     triggered.( ie CO11N transaction is called in QM)
(4)Production opened rework order CO07 and confirmed the rework operation and booked material and labor cost on cost
     center instead of orginal order.
(5)0040: Operation production could confirm only 25 qty as earlier 0030 operation of inspection  yield was only 25 qty.
(6)Inspection already in 0030 operation 25 qty  was entered as rework. Now after rework how results recording will be done 
     and qty will be posted in yield. Unless yield is entered under 0030 operation for 25 qty , production cannot confirm the 0040
     operation for pending 25qty.
(7)Business requirement is what ever the qty production manufactures it has to be entered in system. Based on quality
     inspection incentive will be paid to only qty which is passed by quality.
Settings Made:
(a)100 Free Inspection, No Qty Relation, Quantity Valuation and Confirmation in Production for only inspection work center
     without any cost capturing.
(b)Confirmation parameters settings with error for over and under delivery tolerance, error if inspection sequence not adhered,
     error message if no inspection results exists
Any suggestion or any other way of handling this requirement.
Thanks & Regards,
RSR

Hi RSR,
Your way of mapping is absolutely fine, few points to be clear...
03 inpection type and enable inspection characterisitics for operation 030
04 inspeciton type to be enabled and operation 050 shall be eliminated if possible, material stock posting will be done from 04 inspection lot for 25 nos.
let me know if you have questions..
regards,
Lenin. A

Similar Messages

  • In-process  inspection for rework operation

    Hi all,
    i have a production order to which the in-process inspection characteristics are assigned in routing. when a production order is released, an in-process inspection lot is created. Inspection is carried after the end of an operation.  During which rework will be carried out if the product is rejected.   Rework operations are trigged through trigger points assigned to the production order. A reference operations set indicating the rework operations is assigned to the trigger point. rework operation in the reference opeation set is also assigned with inspection characteristics.  But during the results recording, the rework inspection characteristics are not displayed for results recording.....
    pls explain the possible solution.
    regards,
    sravan kumar v

    Hello
    I think that the process can be mapped in one of these ways:
    - according to what you describe this is closer to a good receipt inspection and not to in-process inspection, as the trigger for the inspection is the GR and not the release of the order. So, why dont you give a chance to a 04 inspection type, with inspection lot creation for every GR ? Check the indictor in MM02, QM view for "04" inspection, and uncheck the "Stock in quality", so you dont get caught by the stock in quality and resembles in process "Non-stock relevant" inspection
    - alternatively you can define the use of inspection points ? So you are adding new results as new confirmations are made. Disadvantage: you can only give one usage decision to the inspection Lot, irrespective of the number of samples you have analyzed.
    Regards

  • Scrap and rework qty stock

    Dear ALL,
    IN MY SCENARIO I AM DOING THE PRODUCTION CONFIRMATIONS IN CO11N USING MAIN OPERATION IN THE ROUTING.I AM USING AUTO GR FOR HEADER MATERIAL(101)MOVEMENT IN THE FINISHED GOODS LOCATION OF THE CONCERNED SHOP & GI FOR THE COMPONENTS AS PER BOM FROM THE RAW MATERIAL LOCATION OF THE SHOP.BUT I AM UNABLE TO SEE THE STOCKS OF THE SCRAP AS WELL AS THE REWORK QUANTITY OF THE HEADER ITEM.PLEASE HELP ME SO THAT I CAN UPDATE THE STOCK OF SCRAP & REWORK QTY.IN THE SYSTEM IN THE BLOCK LOCATION OF THE SHOP.
    THANKS IN ADVANCE
    R SEHGAL

    Hi Rakesh,
    There is no standard report for scrap quantity. We have to develop Z report with the help of tables like AUFK-AUFM and AFVV.
    The best way is get the details of scrap from table AFRU (field XMNGA) and download to excel with order type or with material/plant combination.
    If you are having rework orders for scrap then you can display this rework quantity from COOIS transaction.
    If helps reward points and close this thread.
    Regards
    TAJUDDIN
    Message was edited by:
            TAJUDDIN MOHAMMED

  • In-process inspection and confirmation

    Hi, i have used 03 insp type in material master. for each operation, some characterstics were assigned. after prod order confirmation with co11n t-code, i have done results recording thru qa32 t-code. even without confirmation (co11n) also, system allows to record the results thru qa32. please advise how can we restrict this? is there any link or relation in between confirmation and results recording?

    Dear Yadav
    Let me explain to you in detail the business process and the relevance of 03 inspection .
    1)Suppose you have a product A and routing of this product A be like this.
    0010 Forming > 0020 u2013 Winding > 0030 Testing > 0040 Assembling > 0050 Final Finishing.
    2) In a normal production process suppose you have a production order of 100 for product A
    3) Now during the production process you need to confirm each operation through CO11N what was the yield, rework, scrap, activity time taken etc.
    4) Once all the operation are confirmed the production order is GRu2019ed and this product A goes to quality stock for 04 inspections. 04 inspections is always considered as Final inspection.
    5) 0030 operation being a inprocess inspection , 03 inspection type gives the Quality personal a control over the confirmation process.
    6) Quality personnel can do not only result recording but also confirmation of the quantity thereby giving him the control over the production quantity.
    7) Quality personal can also do the testing partially and record result multiple times and confirm partially
    8 ) To bring the confirmation pop up in QA32 you will have to do
    a) In Routing at header kindly maintain inspection point as 150
    b) At Operation level maintain a QM work center ( testing ) with Control key QM04
    b) double click on the control key and go to Quality Management : Inspection points
    c) Maintain Inspection point completion : Quantity , Valuation and confirmation
    10 ) For a better control over the 03 inspection these setting have to be defined in PP configuration for production order Type in Tcode OPK4 in config
    SPRO > Production> Shop floor control> confirmation> define confirmation parameters
    Maintain
    1)Operation sequence u2013 error when order sequence is not adhered to
    2) Overdeilvery u2013 Error when over delivery tolerance is exceeded
    3) Results Rec. (QM)- Error message if no Insp results exist
    Edited by: Gajesh Nagesh on Dec 17, 2009 9:12 AM

  • Process Order and planned order issue

    Hi people,
    1. While creation of process order using COR1, production version is determined by the system automatically and after that BOM is determined. My requirement is when BOM components are determined it has to compared with ZTABLE which contains restricted components and if entry exists in ZTABLE, then determine a new production version from MKAL but i am not abkle to find any enhancement point or BADI or user exit for the same.
    2. During conversion of planned order to process order, it is always required to read PP master data before saving the order.
        Can't find any enhancement for the same also.
    Please help guys how to get this done.
    Regards,
    Dheeraj

    Kinldy check the below user exit, one of them should help you ....
    PPCO0001            Application development: PP orders
    PPCO0008            Enhancement in the adding and changing of components
    PPCO0004            Sort and processing exit: Mass processing orders
    reg
    Dsk

  • Steps for in process inspection

    Hello experts,
    I am new to QM, I have configured system by reading documents
    please explain me the  steps to be followed..
    I have created a production order
    Inspection lot is created
    Confirmation is done
    what is the next step to be followed
    I thought to post the results, but it is giving me message order is niether completed nor confirmed
    please guide me the steps to be followed
    Thanks
    Satya

    Please find the link below where Gajesh has already explained step of in process inspection.
    [Re: in-process inspection and confirmation]
    Thanks!!!

  • In-process inspection...how to stop the process order confirmation?

    Hi...i'm making an in-process inspection and i want to stop the movement to the next phase or the process order confirmation, until the usage decision is made...how can i make this ?

    Dear,
    You can do this with OPK4 setting here slect your plant and process order type go in details here change the setting to
    Results Rec. (QM) = Error message  if no inspection result exist.
    Regards,
    R.Brahmankar

  • REM: production tracking, rework, and in-process inspection

    Gurus,
    I have three issues with REM, and I have my own views on them:
    1. Rework: In case of discrete manufacturing with the help of trigger functions we can generate an operation (in the same  order) or a rework order to cary out reprocessing. But in case of REM we cannot achieve this because there would be no order for inserting new operation and since it is REM we should not generate a new order. The only way is to manually backflush the activities and components (without any reporting point).
    2. Tracking: In case of discrete we have a set of system generated production orders through we can track the GRs, confirmations and issues. But in case of REM we can track those parameters only against cost collector. Only way to know the pending activities is to carry out backflushing against planned orders (which are subjected to reduction) and check pending GR/GI/Operations with the help of the remaining planned orders. Are there any standard reports on that?
    3. In-process Inspection: Can be achieved through inspection type 13 and lot needs to be generated through t-code MFPR.
    Kindly let me know if my understandings are correct. Please let me know if there are other way arounds in Standard SAP.
    Thanks in advance!
    Snigdho

    HI
    As In discrete there is no Rework order in REM.For Tracking you need to assign the Planned order to the Prdocution versions in Planning table thru MF50 and then Backflush against the planned order .Check report MCP6/ MCP8 for GR against planned orders.
    Inprocess inspection can be done thru 13 and lot generation is done thru MFPR.
    hope it is useful.
    Regards
    Anupam Sharma

  • In process Inspection  Lot Qty and Actual Lot quantity difference.

    Hi Experts,
    In case of  In process Inspection
    Scenario : 1. Production Order created, released but before saving the qty is changed.
                    2. Production Order created released and saved. Then qty is changed in Change Prod order txn.
    These scenarios are causing a discrepancy in  Inspection  Lot Qty and Actual Lot quantity. Is there any method to avoid this ?
    This can be made correct in  Inspection lot by resetting the sample calculation. But once confirmation has started for Prodn Order (not necessarily QC operation) or  RR has been done  resetting is not possible.
    Is this the std behavior ? Disallowing the resetting once RR done seems OK, but even if any of the operation in Prodn Order is confirmed it still give status error while resetting. Canceling all the confirmation all the way back  also does not solve the problem.
    Any suggestions ?
    Regards
    Joe

    Hi
    Although your suggestion is valid, it is not practical from user point of view.
    Moving this thread to QM forum.
    Rgds

  • Open order qty,Delivered qty,issued qty, and closing stock---Tables

    Gurus,
    I need to Prepare a report which will show open order qty,Delivered qty,issued qty, and closing stock.
    Please help me with table names where i can find .
    Regards
    venu gopal

    Hi,
    Try EKPO & EKBE tables..
    Thx
    Raju

  • I just downloaded Adobe Acrobat XI Pro, I am in the install process now and I am getting an Error message, Error 1303, stating I need to log on as an administrator ... this is my computer so I don't understand the issue??

    I just downloaded Adobe Acrobat XI Pro, I am in the install process now and I am getting an Error message, Error 1303, stating I need to log on as an administrator ... this is my computer so I don't understand the issue??

    Hi MAX22,
    Even though it's your computer but your user account might not have sufficient privileges to install the software.
    Please try the following :
    > Enable the hidden Admin Account on Windows 7 ( Ref :  http://www.howtogeek.com/howto/windows-vista/enable-the-hidden-administrator-account-on-wi ndows-vista/ )
    Reboot and try installing in the new enabled Admin user account and check.
    Regards,
    Rave

  • BOM component Qty is getting rounded to next value in Process Order and BOM

    We are in ECC 6.0, and maintaining BOM where Item quantities are decimal places e.g 0.3lb with respect to Hader qty. Now when we are craeting process order or exploding in CS11, we are seein that item quantities are getting rounded to next full integer e.g 1, 2 or 3.
    What could be the reason for this behaviour.

    In standard  "lb' doesn't have decimal point
    If you want decimal point
    go to CUNI
    select the mass
    you can find the lb
    maintain the decimal point  as 3, & decimal point rounding as as 3, system will show 3 decimal point in process order and in CS11

  • How to revert stock in quality stock after qty issued with movemt type 704

    Hi Experts,
    User issued qty from quality stock to cost centre trough T-Code MI10. Inspection lot against the issue qty has status u201CREL CALC SPCO PRII CROK QLCHu201D This lot has been generated through mov  101 against PO (GR). After doing GR qty posted in quality stock. By mistake user has issued qty from quality stock to cost centre trough T-Code MI10. For same movement type was 704.
    Now they want same qty back in quality stock also they want to do UD for the same. How to get back this stock in quality stock?
    Awaiting for your expert reply.
    Thanks and Regards,
    Sandy

    hi Sandy,
    Quickest and easiest option without lot of configuration and process change for your scneario will be ,
    The transaction code is MB0A.
    The steps for executing the above trancode is as follows.
    Inputs:-
    Posting date : UD date.
    Movement type : 102
    Enter relevant plant, storage location, vendor and the material code
    The purchase order/sch.agreement for the given vendor-matl-plant combination will be displayed.
    Select the correct PO and click adopt selected.
    The material with quantities to be reversed will appear in various line items. Select the correct quantity for which the reversal to be made.
    Click adopt + details
    Enter storage location
    Remove "X" in the stocktype field
    Save.
    Material document will be generated.
    The correct material could be inwarded again and correct usage decision can be taken  against this lot.  
    Get approval from Materials and  Finance guys.   As long as your accounting documents nurlifies each other  ,  you should be good to go.
    If not  you have to use the same proess   witht twiests , with other movement types for which you have activated  inspection type.
    Hope this helps
    Cheers
    Rav

  • In-Process Inspection material having inspection type 04

    Dear Sir/Mam
    My question.In-Process Inspection material having inspection type 04.As we accept the inspection lot we put the stock into unrestricted.But when we have to reject we convert that stock into new material or if rework to be carried out,the criteria is stock should be quality,than production people cancel the confirmation and rework is carried out through trigger point.So my concern can we put the stock in block and in background whole production order is cancelled.
    Thanks
    kunal

    Dear Kunal
    This is the process i have defined for rework. let me know your feedback
    1.Reject the material in QA32 to block stock
    2.Reverse faulty material using Tcode MB1A u2013 262 movement type against the production order
    3.if you need to scrap highly faulty materials   use Tcode MB1A u2013 551 movement type against a cost centre
    4.Create a rework order using Tcode Co01 order type (PP03)
    5.Enter the Parent production order number in the goods receipt tab in Co01. (inbound delivery)
    6.Issue goods against the rework order using MIGO
    7.confirm the rework order through co11n
    8.Move the material back from block to quality using Tcode MB1B u2013 349 movement type (activate 08 inspection)
    9.Inspection lot created
    10.Do the posting accordingly
    Regards
    Gajesh

  • Goods picking and Post goods issue in VL02N

    Dear All,
    Am hving problem in Picking goods and Post goods issue.
    This is for the Stock Transport Order with Delivery via Shipping
    Supplying plant is 1000(SAP std,sloc 0001) and Receiving plant 1100(sloc 0001).
    Sales org:1000
    Distrbn Chnnl:10
    Division:00
    1.maintained matrial for both the plants.
    2.Creted STO by using DOC type as "UB" and item cat "U".
    3.And getting the Shipping data for the material in the STO.as shipping point is 1000.
    saved the Po.
    4.After that i done the GR w/o PO for the material using Mvt type 501.
    5.Then,VL10B creating Delivery doc.n this is also created.
    6.but when i do the picking and PGI in VL02N there picking field is greyed out bt i have tried to mangae that when i give the picking Qty in the picking qty field system is throwing the following error.
    <b>Item to be picked by WM (picking quantity cannot be entered)
    Message no. VL118
    Diagnosis
    For this item, picking is carried out using warehouse management transfer orders since the material is stored in a warehouse with random storage.
    System Response
    The system does not allow you to enter a picking quantity manually. The picking quantity is copied automatically into the delivery during the creation of the corresponding transfer order.</b>
    is any data missed by me while doing this process?
    pls let me know n help me in this regrds
    Thank you all

    Hi Vijay
    By changing storage location you could do b'coz the new storage location is not maintained with warehouse, hence no need to perform warehouse transactions (TO creation and confirmation) before inventory mgmt transactions (PGI).
    For trying pick up with WH, first u should have enough stocks in approppriate storage bins and u should perform pick up by creation of TO and confirmation.
    warm regards
    sairam akundi