Report with cost center, Wbs element and cost element

Dear Experts,
I am creating Income Statement report with report painter using table CCSS.
In this report, I need cost centers, cost elements/ GL accounts and WBS elements.
Report is okay except sales. Because my cost elements for revenue are created with the category "11", it is not showing in the report.
Please suggest what changes to make to get sales revenues in the report.
Thanks

Hi Simi
Structure CCSS of Report Painter is combination of several tables including COEP
Even your revenue should have been updated in COEP table...
May be your report's selection conditions are preventing the revenues from being displayed... Can you check that?/
Also, you can build this report from FI Structures
Br, Ajay M

Similar Messages

  • Cost center , valuation area  and cost element

    Hi ,
    i use OKB9 to access relationship for cost element and cost center,  where can i find table for detail business area/valuation area and cost center , as in OKB9  ineed to drill in one by one to check the data .
    Thanks

    Hello Aik
    Check MARA table, you would find all the fields.
    Reg
    assign points if useful

  • Cost Elements and Cost Centers in a service order

    Hello Finance Friends....
    I am inquiring about something that has been happening and I can not find the answer as to how.  I spoke with the finance consultant and he seems to think it is the valuation class being changed but the valuation class has not been changed at all....so here is my problem as I am at a lost...it is an intermittent problem....
    I have a service order for material to be repaired by the customer...lets say coming in for Ansi Calibration with repair.
    The technician will issue material to the service order for repair....if the technician does not end up using the material for repair he will reverse the goods issue and then the material goes back to stock...
    in my scenerio ....when the material is issued it is under GL account (cost elelment) 5XXXXXXX.  When the reversal was done it went to 6XXXXXXXX.  So when the DP90 transaction is done (billing request) it gives the error for cost center XXXX cost elelment 6XXXXXXX and can not complete the transaction DP90. The error is the Material combination for DP90....this works in others....these are just one offs that it is happening to and there seems to be no rhyme or reason to why it happens... I have tried reverse the transaction to put the material back to the service order and then manually reverse myself using the original GL account number it was issued on (5XXXXXX)...however when doing the DP90 it still reads the 6XXXXXXX cost element and cost center XXX.  Keep in mind that the valuation class or material type has not been changed.
    Where is the GL account and Cost center being derived from in the service order?  What can I check?
    Thanks in advance....

    Hi,
    Check in T030 table for OBYC assignments and TKA3A table for OKB9 settings.
    Also check account assignment tab of PO.
    Best Regards,
    Madhu

  • Combination of cost elements and cost centers

    Hi guys,
    what if I mentioned only cost centers as sender values in a segement of assessment cycle? do you think that is must to have cost element and cost center combination in sender values?  how it will be differnt I dont mention any cost elements along with cost center  in segements as sendors?  please clarify me with the example.

    Hi
    Cost Centers are the cost collectors and cost elements are the cost carriers.
    When you add cost elements and cost centers as senders you define that the cost that are available in the cost centers are carried to other cost objects via the cost elements.
    Hope it helps
    Good Luck
    Hari

  • BAPI KPF6 POST PLAN COST FOR INTERNAL ORDER AND COST ELEMENT

    Hi all gurus,
    I would like to use in a custom report a BAPI/Function Module that help me to simulate KPF6 in order to post planning costs for internal order and cost element (layout 1-401).
    So the input should be:
    1) Version
    2) period from
    3) periodo to
    4) year
    5) internal order n.
    6) cost element n.
    7) value
    I found a lot of BAPI but don't know the correct one and how to use it (example how to fill the input value).
    Can anyone help me on that?
    Kind Regards

    In additio  to the previous I found the BAPI_COSTACTPLN_POSTPRIMCOST but don't know if it's the correct one and how to use it (some example fitting the my case will be very appreciated).
    If the quoted BAPI is correct.
    I tested it filling all fields as following:
    HEADERINFO:
    CO_AREA=FFCA
    FISC_YEAR=2008
    PERIOD_FROM=001
    PERIOD_TO=012
    DOC_HDR_TX='blank'
    INDEXSTRUCTURE:
    OBJECT_INDEX=000001
    VALUE_INDEX=000004 (hope this point at Interna Order)
    ATTRIB_INDEX=000000
    COOBJECT:
    OBJECT_INDEX=000001
    ORDERID=ZO53-08IMZ
    TOTVALUE:
    VALUE_INDEX=000004
    COST_ELEM=3224048
    FIX_VALUE= 200,0000
    DIST_KEY_FIX_VAL=2
    The Return table is set to 0. Nothing happens.....I suspect something related to indexstructure or index is wrong..
    Could anyone help me on that?
    Kind Regards

  • Shipment cost-G/L Acc and cost center automatically

    Hi gurus,
    I want to get G/L account and Cost center automatically during shipment cost creation I mentioned account assignment category as "U" in the purchase order.currently it is manually entered at the time of shipment cost creation.
    How can i determine the G/Laccount and cost center automatically at the time of shipment cost creation?
    Is it possible or not.
    Thanks in advance

    Dear Sameer,
    Reqd. settings are reqd. o maintain under
    *1*. T. Code: OBYC
    maintain the G/L accounts against the vaild combination, i.e.
    Chart of accounts
    Transaction
    General modifier
    Val Class
    GL Account
    Note: T. Code: OMWD - Assign Val. Grp. Code to Avl Area, if not.
    *2*. T. Code: OKB9 - GL Account / Cost Element & Cost Center Linking
    Maintain entries for default account assignment i.e. maintain entry for combination:
    Company Code -- Cost Element (G/L), and assign Cost Center in "Detail per Profit Cener" from Dialog structure.
    Once done, check setting in
    T. Code: T_56
    (SPRO --> IMG --> Logisitcs-Execution --> Transporation --> Shipment Costs --> Shipment Cost Document --> Shipment Cost Type and Item Category)
    From left-hand side Dialog structure, Click: Assign shipment cost types and item category
    Check, Column: Automatic Propsal, is maintained as "Automatc" or "Manual" for valid Item Category.
    Best Regards,
    Amit

  • Cost center validity change and assign it to new company code

    Hello
    We are having 10 Cost centers  in 1000 Company code, And validity of these cost centers is .01.01.2001 to 31.12.9999.
    Now business want to create one more company code 2000. and wants to extend these same cost centers to 2000 company code also. But as per SAP std Cost center extention is not possible , bcz cost center can use by only one company code.
    Now Company is saying that..they wants the same number for new company code from 23.09.2010 to 31.12.9999..
    system is not allow me to change validity period of these cost centers, bcz  these saying that the cost center is already defined for given period.
    Beacuse new company code will start working from 24.09.2010. so i,e the reason , we want to make example "2561 cost center  validity 01.01.2001 to 22.09.2010 for company code 1000. then after words 23.09.2010 to 31.12.9999 the same cost center 2561 will for 2000 company code.
    but system is not allowing me to change the validity
    Regards
    Mahesh

    Hi Mangesh
    What you wish is not possible.. You will have to create new cost center and assign to the new company code...
    may be for simplicity sake, you can add a prefix or suffix to the existing cost center no i.e Cost Ctr 2356 can become N2356 in new comp code
    Regards
    Ajay M

  • Table for Material-Cost center-Settlement Rule_REM product cost collecter

    I want to generate a report to see for particular material which cost center and which settlement rule is available.
    If we go in Product cost collecter (PCC) there we have an option to see settlement rule under header tab, I want to fetch that data for material as selection parameter, can anyone suggest how to get the data as,
    Material        Cost Center        Settlement Rule
    Thank you.
    Regards,
    Deven

    Hi,
    pleasefind tables related with cost.
                          TKA01               Controlling areas
                         TKA02               Controlling area assignment
                         KEKO               Product-costing header
         KEPH               Cost components for cost of goods manuf.
         KALO               Costing objects
         KANZ               Sales order items - costing objects
         Cost center master data
                        CSKS               Cost Center Master Data
                        CSKT               Cost center texts
                        CRCO               Assignment of Work Center to Cost Center
                        COSP               CO Object: Cost Totals for External Postings
                        COEP               CO Object: Line Items (by Period)
    .     COBK               CO Object: Document header
         COST               CO Object: Price Totals
    Regards
    SANIL

  • Cost of price difference and cost of goods sold

    Dear All,
    I got the explanation from forum :
    The price variance differences are posted per purchased item which are used in making the material to be sold. this difference rolls to the COS line, but not the COGS account.
    May I know what is the difference of cost of goods sold and cost of sales. Both also cost, cost of goods sold is inventory turned to cost upon goods sold whereas cost of sales, to me, can be indirect cost.
    Any help to further explain of COS in relation to price variance?
    Thanks

    Hi
    In SAP there is a concept of COGS, but there is no concept of COS.. COS is more of a accounting terminology,... There are different schools of thought on COS/... Some companies treat COS = COGS + Selling overhead...
    With Material Ledger, the variances of components purchased can be rolled up to the Header Material which consumes them.... If this header mat is consumed in further processes, the consumption can also be revaluated.... Going So on and so forth, you can also revaluate the COGS of the final material....
    Simply said, when variances are rolled up, you can revaluate the inventory... If the inventory is consumed before revaluation, then you can revaluate Consumption / COGS....
    Hope this helps
    Regards
    Ajay M

  • Can 2 cost center group share same cost center?

    Dear Experts,
    Can 2 cost center group share the same cost center? 
    Basically I'm looking at MATRIX structure where one cost center, say an Equipment shared by 2 different cost center groups (say one in "Location-A" cost center group, and the other one is in "Process-A" cost center group).  This is to enable the management to be able to see the costs incurred in either by "Location" cost center group or "Process" cost center group.
    The "Location-A" cost center group may tied to Cost center 101, Cost Center 102 and Cost Center 103.  The "Process-A" cost center group may only tied to Cost Center 101, and other cost center 201 (which is also tied to other "Location-B" cost center group).
    Please advise.
    regards,
    Abraham

    Hi Abraham,
    its not possible to assign a cost center to several cost center groups in the standard hierarchy. Otherwise, the standard hierarchy would be inconsistent.
    As stated in the online documentation under http://help.sap.com/erp2005_ehp_05/helpdata/EN/25/908fc66d8411d194f000a0c93031df/frameset.htm
    'You can assign each cost center to only one group in the standard hierarchy, but to as many alternative groups as you require.!
    Regards,
    Greta

  • Can a cost center reassign to another cost center group

    Dear Expert,
    Does SAP allow a cost center reassign from one cost center group to another cost center group in this scenario the particular cost center which going to reassign to another cost center group have posting into the cost center?
    Please advise how to reassign and what is the impact?
    Please help
    Regards,
    Karen

    Hi,
    Thank you for the prompt reply.
    Would like to seek for your advise.
    The cost center that we need to reassign to other cost center group will it carry the cost from the previous cost center group to a new cost center group?
    Please advise.
    Thank you.
    Regards,
    KH

  • What do i do with a very slow Photoshop Elements and Premiere Elements on a PC?

    I seem to be getting mixed opinions as to why my Adobe software gets so slow, despite efforts to avoid that, but my computer seems to be working just fine, it is only when in Adobe that the problems arise, like freezing, taking longer and longer periods of time to open the screen to edit a photo, or to compare two photos side by side.  Any process seems to take such a long time, and the freezing can last for several minutes, and then continue on.    I have had a computer person come to my house and examine my computer and though his knowledge of Photoshop is limited, he feels that it is NOT the computer but something with Adobe Photoshop.  I would tend to agree with him.   
    Several theories have been explained to me, such as Elements and Premiere Elements are a low end of the scale of Photoshop programs, so it is just not going to be able to process high definition large photos well and quickly.  Stating comments like i can only use 2 GB of my memory even though i have 8 GB, so unless i can use 64 bit this is what i have to deal with, and it is just a way for Photoshop to say you need to upgrade to the fancier programs.  I do not need fancier programs.  I am working hard to master these, and have accomplished 4 great blu rays in high definition thanks to recommendations from the Forum here, especially Steve with the help of his books. 
    Others say i need a solid state hard drive to solve the problem.  Others say the only way i will ever solve the problem is to switch to a MAC.  Others state is a mal-ware problem, but i have never had my hard drive so clean and uncluttered.  I supposedly have as good of PC as i could have as far as QUAD-core, 8GB memory, presently a 1 TB hard drive less than 1/2 full.   All suggestions involve big outlays of money, with no guarantee that things will be any better.  I have tried to contact different computer companies and computer 'nerds', and these are some of the suggestions, but no one really has a lot of knowledge of the Photoshop software. 
    I am thinking of adding an additional internal hard drive, but not sure that is going to help either.  Could i put all my Photoshop of the second hard drive, and might that speed things up? 
    Adobe is rather worthless in trying to get help from them.  I have spent hours on the phone waiting and then talking to someone who says they understand English but they do NOT understand the question i am asking, which becomes very frustrating with repeat phone calls.  I gave up yesterday trying to do that challenging experience yesterday after i had spent 3 times the amount of time they said i would need to wait to get a reply, and i was at work, and my free time had come to an end.  So i am hoping you guys can give me some clues of the best thing to do.
    Is it true that Photoshop Elements and Premiere Elements are just such a lower end program that trying to do things in high definition, with 2000x1500 photos, making them into a blu ray disc is a major challenge with a PC?  I wish i had a greater computer knowledge, but i have struggled to achieve my goal, but the speed of it all gets very frustrating, though it is possible. 
    Another question asked which i don't think exists, is whether there is a program that could clean up Photoshop, or are there some clues that could accomplish that and thereby speed things up.
    Would appreciate any suggestions anyone has.  I am in the middle of another project so now is probably not the best time to consider any major changes.  But any comments would be appreciated.
    Ron

      Premiere Elements 10 is now 64 bit, but not PSE10.
    Take a look at your scratch disk set-up and if you have a spare volume, allocate that first before the C drive. Elements use scratch disks when it gets low on RAM.
    Click image to enlarge
    Turn off face recognition and the auto-analyzer to improve performance.
    When editing photos or videos check the task manager to see what background processes may be running and end them temporarily if not needed.

  • I purchased Adobe Premeire Elements and Photoshop Elements 10.0 in 2012. Since then my computer died.I would like to download them on this computer and am unable to do so successfully. Please advise. It was a downoad purchase with no CD

    I purchased Adobe Premeire Elements and Photoshop Elements 10.0 in 2012. Since then my computer died.I would like to download them on this computer and am unable to do so successfully. Please advise. It was a downoad purchase with no CD

    christineae
    It is not clear if your Premiere Elements 10 was a downloaded purchase from Adobe or from an authorized reseller.
    However, do you have a purchased serial number for the product?
    If you have the purchased serial number, you can download Premiere Elements 10 tryout files from the following web site
    and insert your purchased serial number in them during installation to make them your own.
    Photoshop Elements 10 Direct Download Links: Free Trials, Premiere | ProDesignTools
    It is important to read and carry out carefully that web site's "Note: Very Important Instructions" in order to avoid an Access Denied message.
    Just in case message....
    But there could be a complication with regard to files from any source.
    Adobe allows you to have the purchased activated serial number on no more than 2 of your computers.
    If your failed computer has Premiere Elements trapped on it representing 1 purchased serial number, you will be able to installed
    the purchased serial number on only one more computer. If you have the purchased activated serial number trapped on 2 failed
    computers, then you will not be able to use that purchased serial number on another computer until you deactivate at least one
    on one of the other two computers. In this case, it is only Adobe who might be able to help you. None of this may apply to you. I mention
    it as a just in case caution.
    Please let us know if you have any questions or need clarification.
    Thank you.
    ATR

  • Elements and premiere elements 9 came with my computer and I can't get the updates.

    I can't get updates for my Elements and premiere elements 9 which came installed on my computer.  I can't find a serial number either.  Sincerely, Terry

    It is opening the Application manager and I try to download the updates, but it tells me to turn off the sync and it won't let me even open the backup-sync option.TerryDate: Tue, 26 Feb 2013 23:06:51 -0800
    From: [email protected]
    To: [email protected]
    Subject: Elements and premiere elements 9 came with my computer and I can't get the updates.
        Re: Elements and premiere elements 9 came with my computer and I can't get the updates.
        created by Andromeda14 in Photoshop Elements - View the full discussion
    What happens when you click on 'Help->Updates' option? Isn't it opening the 'Adobe Application manager' which shows all the updates. ~Andromeda
         Please note that the Adobe Forums do not accept email attachments. If you want to embed a screen image in your message please visit the thread in the forum to embed the image at http://forums.adobe.com/message/5106168#5106168
         Replies to this message go to everyone subscribed to this thread, not directly to the person who posted the message. To post a reply, either reply to this email or visit the message page: http://forums.adobe.com/message/5106168#5106168
         To unsubscribe from this thread, please visit the message page at http://forums.adobe.com/message/5106168#5106168. In the Actions box on the right, click the Stop Email Notifications link.
         Start a new discussion in Photoshop Elements by email or at Adobe Community
      For more information about maintaining your forum email notifications please go to http://forums.adobe.com/message/2936746#2936746.

  • Deleting photoshop elements and premier elements

    After installing version 11 of protoshop elements and premier elements I find that I still have in the Adobe folder in the windows "program folder" photoshop elements 6 and one-on-one essentials.  None of these show up in the control panel list of programs to uninstall.  Do I need any part of photoshop elements 6 or one-on-one or can I merely delete the folders and all their contents.
    Other Adobe programs I have installed are Reader X, Flash Player 11 and Adobe Air.

    Each version of PSE is a self contained program and there is no need to delete earlier versions which work with the same images on your hard drive, without duplication.
    I keep earlier versions as they often have different templates for creations and on-line galleries etc. It gives me the greatest choice. Normally I would say go ahead and uninstall earlier versions if you are short of disk space and don’t need them. However, if you don’t have the uninstall function via the control panel I would suggest you leave things as they are, as removing PSE6 in the past has been known to cause problems.
     

  • Unable to use Organiser in both Photoshop Elements and Premier Elements

    I am unable to use Organizer in both Photoshop Elements and Premier Elements. An error message appears, "The catalog could not be opened. An internal program error occurred."
    I have tried to repair the catalog, starting a new catalog, and reinstalled both programs, but the error persists.
    I am using Elements and Premier Elements V12 on Windows 8.1.
    Any help to get me going again would be appreciated.
    Thanks
    Colin

    Hello
    Thanks for the suggestion, but it didn't make any difference.
    However, by trail and error I have found a 99% solution.
    Right Click the Elements icon on Desktop.
    Select Troubleshoot Compatibility.
    Select Troubleshoot Program
    Select a problem option (I used Other)
    Select Windows Version (Windows 8 for me)
    Select Test the Program
    If it works, which it did in my case, Save the settings.
    This seems to have resolved my problem, with the exception that I now get an extra screen when opening Elements to allow the program to make changes to my computer. I can live with that.
    When I get time I will check whether there are any Adobe or Windows updates that will make this step unnecessary.
    I hope this will help other people with the same problem.
    Thanks for responding.
    Colin

Maybe you are looking for

  • Service Desk Settings, Automatic Email at status change of messages

    Hello experts, I need your help about this: I am configuring Service Desk Specific Scenario Settings -> Automatic Email at status change. I made the configuration suggested as described SAP Note 691303. Also I configured the status profile SLFN0001 i

  • Please help - need to restore my iPhone

    When plugging my iPhone into computer for the first time, I accidentally restored my iPhone with my fiance's for the backup. I freaked out and unplugged it halfway through the restoration. Now I have half of his settings/apps/contact info. and half o

  • How do I get purchases from my ipod touch to appear as purchases on my comp

    Please help me! I have also recently changed computer's using home share if that makes a difference I do not know. Thank You

  • 'OR' operator is not working in 'IF' condition!

    Hello, I am trying to put some validation/code, by using the 'IF' condition as below with 'OR' operator, but, its not working(am not getting any syntax erorr), pls. let reframe correctly, pls. note that 2 periods after my_form, am using it to point t

  • WKG17005

    I tried to add a ultrasearch portlet into my portal after the installation of Oracle9iAS. But I got the following error: oracle.ultrasearch.query.SearchException: WKG17005: connection failure: data source does not exist I search this error message in