Resource date assignment

Dear All,
I have created a resource with St date as 01.03.2009and end date as 31.03.2009.in change mode while changing the dates as st 01.04.2009 and end date 12.12.2009 system is getting saved but it is again showing the previous dates.pls help
Regards
Babuji

Dear Prasob,
The cost center Validity date is From 01.04.2009 to 31.12.9999
But while creating the resource i wrongly entered entered the validity dates as from 01.03.2009 to31.03.2009 in the costing tab validity dates and saved,while changng the dates system showing the below msg
Cost center 100113001 not set up in controlling area 1000 on 01.03.2009
Message no. CR019
Diagnosis
You are attempting to assign a work center to a cost center that has not been set up in controlling area 1000.
Procedure
Assign the work center to a cost center that has been created in controlling area 1000 or
enter the desired cost center in controlling area 1000 within cost center accounting. If you do not have authorization to use this program or to set up a cost center, contact your system administrator.
when iam selecting the validities tab the same above msg is showing
Regards
Babuji

Similar Messages

  • Analysis service cubes - Utilisation report, how to extract resource, team assignment information

    Hi,
    I am using Excel 2013 and attached an external data source from analysis services OLAP cube that Project Server 2013 builds.
    The cube I am using is portfolio analyser.
    I would like categorise the resources by which team they are part of firstly, i.e. Project Management, Technical Services, Delivery
    I have created a PowerPivot table and would like group each user by team and then by resource name, capacity, work and availability. Time across the top, so I can see this for Year, month, and weekly utilisation.
    How can I get the team that each is resource is assigned from this cube?
    Thanks. 

    Hi Guillaume,
    I think the field I require is listed in the Enterprise Custom Fields and Lookup Tables section of PWA, however I believe it was a default field that came pre-configured OOB after install. The exact field I require is located if you go to; PWA Settings
    > Security >Manage Users > Select User> Team Details > Team Name.
    As you can see by the description next team name, there are instructions advising on how to populate the team names for your organisation. So it was a pre-configured field. 
    Team Details    
    Team Details are optional and are used to define team membership and the team resource that represents a team. Before you set these options use "Server Settings"/"Enterprise Custom Fields and Lookup Tables" to create a lookup table that
    contains your team names, and edit the "Team Name" resource custom field to use this lookup table.
    Team Name is used to indicate team membership - each resource in a team will have the same value for Team Name. 
    The Team Assignment Pool check box is selected for the team resource, used when assigning tasks to the team. Often a generic resource will be used with the assignment owner field set as the team manager.
    So I have entered in all my appropriate organisation team names in the Lookup Table for Custom Field; Team.
    I have assigned each resource to one of the team names.
    Now I would like to create a PowerPivot Table and incorporate the resource team to be able to create a utilisation report based on each team within my organisation.
    After receiving the link from you above I have gone to central admin > Service Application > Project Server Service Application > OLAP Database Management > Configuration of Cube > Cube Dimensions > Resource >
    I have added "Team_Resource" to the selected dimension list. Then I completed a "Build Now".
    When I go back to my PowerPivot Excel sheet and refresh data I am able to see the new field however, it is not the field that I need.
    Can you confirm which field I would need to add?
    Is this field a multi field?
    Appreciate your assistance.
    Thanks

  • Role - Resource - Task Assignment

    All,
    We have a requirement where a cProjects task may spread along for, say, 6 months. Resource needs to work on this task for only 2 days per month, every month (say) (Work - 12 days).
    When the role is staffed for 6 months, this resource will not be available for the other projects. And therefore, we want the resource assignment to the task to drive his availability.
    Is there a way out? Or do we have to staff the role 6 times (with the right dates)? The second option works, I know, but is not an elegant way to do it.
    Thoughts/opinions.
    Regards.

    Thanks Niranjan for your attempt.
    The business isn't quite liking the idea of doing so much when a resource is supposed to be working on the task 2days/month. For every time that the resource is to work, the cProjects user would have to staff to the role (or create a role, as you suggested). Everytime, the dates have to be mnaully entered for staffing, Project Role, Resource to task assignment and so on.
    They want this to be done at one place and would like this data to reflect elsewhere. For e.g. when the resource is assigned to the task, this data should drive availability of the resource - is what they want.
    Let me know if I am missing on any of the obvious functionalities of cProjects resource management that I may try to resolve this issue.
    Thanks again.

  • Is there any way to export IT Resource data from OIM using the export tool?

    Hello,
    we are trying to migrate an OIM development environment to a preproduction environment and we need to migrate more than 400 IT Resources. We have exported some IT Resources and when we imported them in the preproduction environment their data was not migrated. Is there any way to export IT Resource data from OIM using the export tool? Or is there any other way to do this without doing it by hand?
    Thank you for your help
    Kind Regards

    Well , OIM doesnot provide any such facility to export ITResource data along with ITResource .
    Directly updating the DB could be an option ..
    Thanks

  • Resource control assignment failed for project

    I've setup a new project (we run sap), and keep getting the following msg
    pam_unix_cred: project.max-sem-ids resource control assignment failed for
    project "PAB"
    I know you can get this sort of msg if you have wrong syntax in your project, but it all looks well to me. Any ideas gratefully received. cheers Lou
    /etc/project >
    PAB:1000:SAP System PAB:orapab,pabadm::
    process.max-sem-nsems=(priv,2048,deny);project.max-sem-ids=(priv,1024,deny);project.max-shm-i
    ds=(priv,256,deny);project.max-shm-memory=(priv,18446744073709551615,deny)

    Hi
    The original entries were created with projadd.
    I've just done a projdel and another projadd (as below) and watching out for error msgs - will post again when I get the error msgs - cheers Lou
    root@sappab # projadd -p 1000 -c "SAP System PAB" -U pabadm,orapab \
    root@sappab > -K "project.max-sem-ids=(priv,1024,deny)" \
    root@sappab > -K "process.max-sem-nsems=(priv,2048,deny)" \
    root@sappab > -K "project.max-shm-ids=(priv,256,deny)" \
    root@sappab > -K "project.max-shm-memory=(priv,18446744073709551615,deny)" \
    root@sappab > PAB
    root@sappab # more /etc/project
    system:0::::
    user.root:1::::
    noproject:2::::
    default:3::::
    group.staff:10::::
    PAB:1000:SAP System PAB:orapab,pabadm::process.max-sem-nsems=(priv,2048,deny);project.max-sem-ids=(priv,1024,deny);project.max-shm-i
    ds=(priv,256,deny);project.max-shm-memory=(priv,18446744073709551615,deny)

  • Provide Resource Data - Page customization

    Hi Experts,
    1.End-user requests a new resource . Lets say "AD User".
    2.In the second page (Provide Resource Data) , end user will choose the IT Resource (created a Resource Object form for end user to choose a AD IT Resource from the lookup)
    In this page, the OOTB jsp displays the below info in the jsp
    *"Provide the following AD User >> AD Object Form details for Thomas A[THOMSAS A]: "*
    Is it possible to remove only "*AD User >> AD Object Form*" from the above message?
    Kindly assist.
    Thanks & Regards
    INIYA

    Not only for this. it will be removed from all the requests. you have to just comment some part in JSP.
    Otherwise you can use if-else in your JSP for displaying this content.

  • VBA Project Export Resource data vith TimeScaleData ON FILTERED TASK

    Hello,
    I have been using the common code you can find at the following website to export resources data using the TimeScaleData function :
    http://zo-d.com/blog/archives/programming/analyze-microsoft-project-resource-usage-data-in-excel.html
    It works fine. Now, I need to do the same export but at the same time, I need to filter some tasks by a specific value in the Text1 column for example. Thus, I would like to extract the resources data, not on the all tasks, but only on filtered tasks.
    How is it possible ?
    I tried to setup a filter by VBA, but the filter is not take in account. The TimeScaleData retrieved the value of the all tasks and not only of the filtered tasks.
    FilterEdit Name:="Filtre 3", TaskFilter:=True, Create:=True, OverwriteExisting:=True, FieldName:="Texte1", Test:="Égal à", Value:="TITI", ShowInMenu:=True, ShowSummaryTasks:=False
    FilterApply Name:="Filtre 3"
    Can you help me ?
    So sorry for bad English.
    Thank you.
    Emmanuel

    Emmanuel,
    Jack's macro loops through all the resources but your filter is a task filter, so even though you may see the filtered Gantt Chart view, the macro still exports all resource data. What exactly do you want to do?
    John

  • Resource Data Found Damaged: Adobe Elements 10 Organizer.app

    I ran DiskWarrior, which "scanned  the disk named “Macintosh HD” checking all files and folders for damage and potential compatibility problems.
    1 file had resource data that was found to be damaged.
    File:  “AdobeSWFL.rsrc”
    Detected that the resource header is damaged and cannot be repaired. 
    Location:  “Macintosh HD/Applications/Adobe Elements 10 Organizer.app/Contents/ElementsAutoAnalyzer.app/Contents/Frameworks/AdobeOwl.framework/Ve rsions/A/Resources/AdobeSWFL.bundle/Contents/Resources/”
    I deleted Adobe Elements 10, as well as Adobe Elements 10 Organizer, reinstalled Adobe Elements 10, and ran DiskWarrior again.  Again, the same file had resource data that was found to be damaged.
    Should I be worried about the problem?  Has anyone else found the same damage?  What can be done about it, short of Adobe fixing the problem and issuing an upgrade?

    First of all, I personally don't think it's wise to run pre-emptive strikes with repair utilities. Use them when you actually have a problem.
    If you uninstalled PSE by deleting it, you have a problem. You MUST use the uninstaller in Applications>Adobe Photoshop Elements 10. PSE is not a nice tidy package like most mac apps, and there are bits and bobs all over your hard drive. Try running the uninstaller now, but it may well not work. If it doesn't, post back.
    IMHO, running DW unecessarily is more likely to cause problems than to fix them. I'm always hearing from enthusiastic DW users about how it narrowly saved them from a major failure of this or that, while people who don't run these utiities don't have these crises at all. It's great when things really have gone wrong, don't get me wrong. It's the very best for fixing serious problems, but OS X just doesn't need all that maintenance and actually runs better without intervention, most of the time.

  • Resource warehouse Assigning to OPM Organization

    Hi OPM Experts,
    I am trying to assign a resource warehouse to OPM Org. This is the basic step for ASCP in OPM. The navigation is below
    OPM > System Administration > Organizations > Resource Warehouse Field
    I am unable to assign an ORG in that form, can some one tell me the reason for that...
    The following error comes when i try to create a new OPM Org.
    "frm-40200: field is protected against update"
    Thanks for your valuable time reading this thread.
    BR,
    KJB
    Edited by: KJB on Apr 6, 2011 5:39 AM

    Duplicate post -- Resource warehouse Assigning to OPM Organization

  • Date Assigned versus Date of Delinquency

    My husband has a Time Warner bill from when he had roomates back in 2009....he didn't even know it still existed, and it went to collections and he paid it when he got a notice last year in April, 2014.   His report shows "date assigned: April, 2014".  The date of deliquency is like, July 2009. Under "negative factors" on his credit report it shows that his latest collection was that Time Warner Bill "1 year, 2 months ago."  Is that right?  Shouldn't it be from the date of delinquency, not "date assigned"??

    It can only report for a max of 7.5 yrs from the OCs DoFD (sometime in 09 from what you have posted here). The CA reports the date they receive the collection and since he immediately paid it, it was updated to paid in full and Fico will score it from the date of last status, it is legal, if you want it gone you would need to send a GW letter to the creditor asking that the whole TL be removed. http://ficoforums.myfico.com/t5/Rebuilding-Your-Credit/GW-letter-Q-amp-A-Examples-and-GW-Success-Stories/td-p/1573680

  • How to trigger approval request for resources after assigning role

    Hi,
    We have a use case where we need to assign resources to user via assigning roles.
    In order to achive this use case
    1. we have created a role and assigned the access policy to it which contain the resources to be provisioned once the role is assigned to the user.
    2. Created a SOA composite having manager approval and assigned this composite to a approval policy of type 'Assign Role'.
    3. I am already having the approval policy for the resources which are present in roles. The approval policy of resources is of type "Provision Resource".
    4. Also the SOA composite for resource apporal is deployed in OIM and assigned to the approval policy.
    5. Now when I am raising the request from OIM of type "Assign Role" the approval defined in the SOA composite for Role approval gets triggered. After approving the role request the role is assigned to the user and also the resources defined in the access policy gets provisioned to teh user account.
    Now I want to trigger the resource approval process after the role approval instead of directly provisioning the resources. So that once the role is approved the individual Approval Process of resources part of roles should also gets invoked. Based on the approval or rejection of resources approval, the resource gets assigned to the user.
    Please let me know how to achieve the above use case.
    Thanks in advance

    Access policy is saying whoever gets xyz role, will get this abc resource. Now once a user gets xyz role, you are stopping to get abc resource? both are contradictory. Don't go through access policy. User is anyway going to request for roles. Modify your flow and make user request for resource. Have your composite and approval policy attached. User will get resource once it is approved.
    regards,
    GP

  • About Thread resource (data) sharing

    I am new to java. In my project, there is scenario where one thread (Main Thread) creates a resource (data) and create new thread and then that resource (data) needs to be access by thread which is running on same application which is created by Main Thread.How can access a thread resource (data) which is created Main Thread from another thread which also created Main Thread in java?
    Thanks,
    Sidiq

    You could pass it as a parameter to the constructor to your class that implements Runnable (do not extend Thread). Or you could make it available via some globally accessible variable--e.g. a public static member of some class. Or, I think there are tools in java.util.concurrent that you could use for inter-thread data sharing, depending on how things change as you two threads do their work.
    You haven't provided enough detail for a more specific answer than that.

  • When I try to use 'Stacked Column Bar'. with data assigned in the graphs, and want to see it in the 'Preview' mode in Xeclsius, I unable to see the graphs apart from the Axes ans Series Value, the graphs becomes totaly invisible why So ?

    When I try to use 'Stacked Column Bar'. with data assigned in the graphs, and want to see it in the 'Preview' mode in Xeclsius, I unable to see the graphs apart from the Axes ans Series Value, the graphs becomes totally invisible why So ?

    Hi Ranendra,
    For basic understanding of Dashboards and Models you can use standard Templates or samples which ll come along with dashboard designer(Formly Xcelsius) installation.
    For path   File-->Templates(or Samples).
    Under Templates you ll have different categories and for each you ll find the dashboard Templates.
    Regards,
    Venkat P

  • Bad resource data offset 0

    GraphicConverter (an image processing program) is dumping this message onto my console about 2 of my files:
    bad resource data offset 0 and size -928468624 in file
         I routinely check my file system with DiskUtility, Disk Warrior, etc. for any inconsistencies.  I can open the files fine from Finder; what is a "bad resource data offset" and does it mean anything about these files in my file system that I should be concerned about?

    Here's what I see when I do mdls on one of those files:
    kMDItemContentCreationDate
    = 2010-08-25 07:10:09 -0400
    kMDItemContentModificationDate = 2010-08-25 07:10:09 -0400
    kMDItemContentType        
    = "com.adobe.pdf"
    kMDItemContentTypeTree    
    = (
    "com.adobe.pdf",
    "public.data",
    "public.item",
    "public.composite-content",
    "public.content"
    kMDItemDisplayName        
    = "pnas00101-0399.pdf"
    kMDItemEncodingApplications
    = (
    "Apex PDFWriter"
    kMDItemFSContentChangeDate
    = 2010-08-25 07:10:09 -0400
    kMDItemFSCreationDate     
    = 2010-08-25 07:10:09 -0400
    kMDItemFSCreatorCode      
    = ""
    kMDItemFSFinderFlags      
    = 0
    kMDItemFSHasCustomIcon    
    = 0
    kMDItemFSInvisible        
    = 0
    kMDItemFSIsExtensionHidden
    = 0
    kMDItemFSIsStationery     
    = 0
    kMDItemFSLabel            
    = 0
    kMDItemFSName             
    = "pnas00101-0399.pdf"
    kMDItemFSNodeCount        
    = 0
    kMDItemFSOwnerGroupID     
    = 20
    kMDItemFSOwnerUserID      
    = 501
    kMDItemFSSize             
    = 1024494
    kMDItemFSTypeCode         
    = ""
    kMDItemKind               
    = "Adobe PDF document"
    kMDItemLastUsedDate       
    = 2012-05-24 07:57:45 -0400
    kMDItemNumberOfPages      
    = 8
    kMDItemPageHeight         
    = 747.6
    kMDItemPageWidth          
    = 493.44
    kMDItemSecurityMethod     
    = "None"
    kMDItemUsedDates          
    = (
    "2010-08-25 00:00:00 -0400",
    "2012-05-24 00:00:00 -0400"
    kMDItemVersion            
    = "1.3"

  • Import an excel file which contain resource data to P6

    Hii,
    I had a problem of importing an excel file into p6 which contain resource data to p6.
    I used the import option which is present in file-import i followed the instruction and at last while clicking the finish tab its showing the import was successful.
    But in the resource it is emplty unable to display a single resource.
    plz help me or is there any other procedure for it plz let me know.
    Best regards
    Himansu

    As the previous poster stated, you need to export using resource assignments not activities. The only changes that P6 will accept will be to information about activities (Description, duration, etc) if you choose activities. Choosing Resources will allow changes to information with resources and resources asignments will allow changes to information pertaining to the interaction of the activities and resources.

Maybe you are looking for

  • Components getting cut off on resizing

    I have a custom panel that sits within a JViewport that sits within a JScrollPane. As I increase the size of the panel, the scrollbars allow me to scroll up and down to see the new area. However, anything I try to put in the area below the original 2

  • Flash Player Hanging while Droping Object at Edge of Canvas

    Hi, I had a problem with Drag and Drop operation, While i am droping object at edge of canvas flash player is hanging, if i drop object center of canas it's working fine. can any one please healp on this issue.

  • Iphone freezes for a few seconds after unlocking HELP PLEASE

    This problem barley started today i have never dropped my phone or anything so i dont know why its acting like this.  It has IOS 5.0.1. It seems to lag when slidding to unlock and when it unlocks and goes to the homescreen it goes black and freezes f

  • Software recover tool unable to connect to server

    Hi There I am trying to use the software recovery tool for my Lumia 1020 but keep getting unable to connect to server message. Im am running Windows 8.1. Has anyone had this problem or have a fix for this. Many Thanks for any advice.Tony Solved! Go t

  • Drag & drop - multi targets that swop?

    Is it possible to have two draggables for two targets? Where drag-A can be dropped on target-A or target-B, but if it does, then drag-B can only be dropped onto the other target (where drag-A is not). The reason for this is a sequence of 15 draggable