Review/Input Requested on Upgrade Plan (from RHv7 to RHv8).

Hi folks!  Hopefully by my asking this and having others review it, it will help others in their upgrade efforts!
I'm the only "real" technical writer at my company (full-time/titled) and need some support from the community on my grand(iose?) plans.  We're upgrading our KB's from RH7 to RH8 to allow more "authors" to come on board to support me - their basic responsibility is content editing and updating.
I'd like some input on this plan and see if I'm missing anything BIG or if there's a "gotcha" I didn't mention.  I didn't see anything else on this particular type of upgrade... I think mainly because I dove into the multi-author environment head first and never looked back.
Current Environment:  Running a front-line support KB in RH7, 4 authors and myself, RSC 3.1 running source control on a database server as project "X".
Project size and characteristics:  2300 topics; 480 variable, 120 snippets.  Four SSL's for different audiences.  Output is WebHelp on DFS based servers (replicated to remote sites for business continuity - think "mirror" if on web);
Usage:  60-100 users daily;
Generation/Publishing: daily when updates occur.
End State:  RH8, 6 authors, RSC 3.1 running source control on database server as project "Y" (this is to allow us to parallel the RH7 and RH8 releases and retire the bloated RH7 database (two years of changes).
Procedure:  (I will perform these steps unless otherwise noted).
Copy source files onto separate machine with RH8 installed (with 8.0.2 update).
Lockdown (partial) database (no changes except emergent).
Open and convert project - denying access to RSC for the project.  (We must still keep RH7 up and running to do emergent updates and backout in case of failure at the end).
Tweak project files (known design changes, templates/master pages, snippets, variables, etc.).
Customize SSL's for testing
Save project as new name and create/rename starting page,
Test Generate and publish all SSLs.
Check publishing.  Repeat above until correct.
Place project into version control.
Test Check In/check out.
Update SSLs to PROD servers.
Update content changes since "partial lockdown".
Generate/Publish/Check content
Announce to users (will have new URLs).
Upgrade existing authors in series.  including:  Deleting old project from hard drive, uninstalling RH7, installing RH8, installing 8.0.2 update, retrieving new project (always a fun time!).
Upgraded authors test check in/check out.
Unfreeze content changes - all changes in RH8 - no changes in RH7 version.
Parallel content for one week.
Remove RH7 generated WebHelp system from PROD.  Replace landing page with redirect.
Archive RH7 database and remove from RSC server.
Bring new authors on individually.
One additional note.  There is a strong push to add about 3,000 new items to the KB.  I say items because I have not evaluated content and do not know if "items" corresponds to topics.  Could be a 1:1; likely a 1:3 (i.e., 9,000 new items).  These items would probably be limited to only one SSL (group).  Should I put these additional items in a separate project (start afresh) for performance sake?
Thanks in advance.

Disregard.  Plan implemented successfully.  For the most part as-is.

Similar Messages

  • Upgrade Planning from 11.1.2.0 to 11.1.2.1 on new environment

    Hi guys,
    We recently got a requirement that we need to install a completely new environment for Hyperion Planning 11.1.2.1. The old system is with 11.1.2.0 on a separate network.
    The installation and configuration document says 11.1.2.1 is a maintenance release. I also couldn't find the 11.1.2.0 -> 11.1.2.1 upgrade path. Does this mean we have to install 11.1.2.0 in the new environment then performance "in place upgrade" to 11.1.2.1?
    What is the recommended upgrade method from 11.1.2.0 to 11.1.2.1 if the deploy to a new environment?
    Thanks,
    Fred.

    Thanks for your reply John!
    The 11.1.2.1 version is required to be installed on a separate network. If we follow the official route that means to install 11.1.2.0 -> Migrate -> apply maintenance release to upgrade to 11.1.2.1. This would be the last option we want to go with... The 11.1.2.0 installation files are not available from Oracle any more.
    I still have a few questions about the other options.
    Option 2: Clean install of 11.1.2.1 -> Create empty planning apps -> Clone planning apps relational database
    Question: After all the steps above, do I need to perform "upgrade" for each app inside of planning?
    Option 3: Clean install of 11.1.2.1 -> Create empty planning apps -> Use LCM to migrate the content
    Question: Will LCM work between 11.1.2.0 and 11.1.2.1? I personally had some bad experience with LCM when the target and source system is not 100% identical.

  • Is there an upgrade plan from 3G till 3Gs?

    I bought my iphone 1 year ago here in Sweden. There is no info yet about the 3GS phone on their site,but what is the general upgrade plan? Do I have to return my old phone to get the new one? Or can an I give my phone to someone else who can use it with their own chip while I use my new phone with my own contract? How does this work?

    The link was only to give you an idea on options available here. In brief they are:
    Option 1 - wait until eligible for an upgrade.
    Option 2 - purchase the iPhone 3G S on Pay & Go from 19 June.
    Option 3 - pay the remainder of their monthly line rental in one payment and sign a new Pay Monthly contract.
    Makes you sick, done it?
    Joe

  • Upgrading plan from basic to smart phone

    I'm currently on a grandfathered family plan with all basic phones with my parents and siblings. I want to upgrade to a smartphone (probably an iphone) and was wondering if I switch to my own plan can I keep the same phone number? And will this mess up my parents' plan if I'm leaving it? Also, I'm not sure how much data I would need. I've looked at the calculator, but I'm just wondering what is an adequate amount for one person? I frequently use Facebook, email, Google, and Pandora. Lastly, if there is wifi at my house, for example, does it still use the allotted data or does it switch to the wifi the way an ipod touch uses wifi without having to pay extra for it? Thank you so much!

    You need to do an assumption of liability (AOL) for your line of service and move it from your parents account to a new Verizon account in your name.  Depending on your credit score, you may or may not have to pay a deposit as much as $400, refundable after one year of on-time payments.  This should not affect your parents plan if they still have 2 or more lines of service.
    I have no idea how much data you need, but I would start with 2GB and keep a close eye on it.  WIFI does not use your Verizon data, of course.

  • Upgrading Planning from 11.1.2.1 to 11.1.2.2 BR/Calc Manager Issue

    Hi Gurus,
    I am attempting to apply the 11.1.2.2 maintenance release to my 11.1.2.1 environment however I have a question that I cannot find the clear answer to. We have never used Calc Manager so it was never installed. I have already applied the maintenance release to my servers however I have not configured them yet as I do not know what to due about Calc Manager as I was not able to select it during any part of the process. It displays as not installed and I cannot modify my existing home to install it so how am I to migrate the business rules to Calc Manager. The documentation does not state that I need to install Calc Manager prior to applying the maintenance release (I assumed that it would install as part of the process).
    How do I resolve this situation? Is it even possible to install 11.1.2.1 Calc Manager into an environment that has not been configured and is at 11.1.2.2?
    Thanks in advance.
    Gerald

    Really you should have installed Calc Manager 11.1.2.1 before the maintenance release, then when you applied the maintenance release it would upgrade the business rules to Calc Manager, I am sure you would have read that business do not exist in 11.1.2.2
    You will be able to install Calc Manager 11.1.2.2 on top of your existing environment 11.1.2.2 and then deploy it though you will not be able to access your original calc manager rules.
    Did you take an export of the business rules in calculation manager format or do you have access to the rules on another environment.
    Cheers
    John
    http://john-goodwin.blogspot.com/

  • Upgrade project : from SAP R/3 4.6C to ECC 6.0 by using SAP Data Services

    Hi All,
    My client is upgrading from SAP R/3 4.6C to ECC 6.0
    We are planning to use SAP Data Services(Data Integrator) in the upgrade plan from SAP R/3 4.6C to ECC 6.0 for Data Migration.
    we have no idea whether we can use this SAP Data Services(Data Integrator) in SAP upgrade data migration.
    The bottom line is we have to make use this Data Services (Data Integrator) product in our upgrade plan for Data Migration.
    Please tell us if anybody already used it such kind of scenario in a data migration project with Data Services(Data Integrator).
    If we can use Data Service(Data Integrator) what are the pros and cons in using this Data Services(Data Integrator).
    Thank You,
    Ashok

    My opinion is you would want to utilize SAP tools to port the data - our SAP BASIS administrator is out this week but we can provide exact tool names when he returns.  ELM (External List Management), IDOC are some of the tools.
    You could use DS/DI to export, cleanse, deduplicate the records prior to importing with SAP tools if that is your end goal.
    We also offer a data quality tool that extends DS/DI to cleanse/deduplicate name/address records as they are entered into the system.  It also comes with batch tools to cleanse/dedup the entire systems name/address information.  See Data Quality Management for SAP for further details.

  • Updation of INPUT Request fields in PI sheet automatically from xMII system

    Hi,
    We are getting the consumption data(Material Weight and Batch) from xMII in SAP browser based PI sheet through Z function module as a parameters .These values needs to updated automatically in PPPI_INPUT-REQUEST fields (PPPI_MATERIAL_CONSUMED & PPPI_BATCH),so that PI_CONS(Consumption) process message will be created automatically.
    We are facing problem to update the input request fields(PPPI_MATERIAL_CONSUMED and PPPI_BATCH) automatically in Browser based PI sheet.
    Can you please help us out to populate the input request fields automatically in PI sheet to automate the xMII with SAP PI sheet. I can provide the screen shots of PI sheets and configuration of process management if required.
    Thank you
    Warm Regards
    Darga Ali

    Hello Udayan,
    The issue is in SAP PI Sheet.
    We are getting the data from xMII into variables through function module and able to populate these values in PI sheet,But we need to update these values directly in input request fields ,so that it will create a process message and updated the process order with material consumption data.
    Is there any functionality available in xMII ,to update the vaules directly in input request fields in PI sheet.
    Thank you
    Warm Regards
    Darga Ali

  • An i4 MC603ZA cant upgrade iOS from 4.2.1 to 4.3.2 and show "This device isn't eligible for the requested build"

    An i4 MC603ZA cant upgrade iOS from 4.2.1 to 4.3.2 and show "This device isn't eligible for the requested build"

    Back up your iphone. Erase all content and settings and try to update again. Also on you computer make sure your signed in as the administrator and All antivirus and firewalls are disabled. http://support.apple.com/kb/ts4451

  • I purchased the 9.99 monthly plan from iTunes to convert my resume from .doc to .pdf and it keeps telling me to purchase the upgrade I already bought. I look on my PC and it says I'm still a free customer and need to sign up annually for the pack. Bullshi

    I purchased the 9.99 monthly plan from iTunes to convert my resume from .doc to .pdf and it keeps telling me to purchase the upgrade I already bought. I look on my PC and it says I'm still a free customer and need to sign up annually for the pack. ********! What do I need to do

    If you purchased a subscription from Apple's iTunes store, you'll need to go to them to manage it:
    Manage your auto-renewing subscriptions - Apple Support

  • I just upgraded my data plan from 6GB to 10GB for the same rate of $80 is this a promotion? If yes, when does the promotion end? Thank you.

    I just upgraded my data plan from 6GB to 10GB for the same rate of $80 per month. Is this a promotion? If yes, when does the promotion end?

    In most cases you keep the same plan and promotions even when you upgrade the phone.  There are exceptions for very old plans and unlimited data, but essentially mrhelper is correct. You have option to "keep current plan" when upgrading.  so in most cases, your statement that you will go back to $100 for 10 GB when upgrading is incorrect.  What was your particular circumstance?

  • Adobe shutting out TLP customers from Upgrade Plan

    I am a network administrator for a small company of about 10 million dollars per year.  We have a copy of Adobe CS6, InDesign and 12 licenses of Adobe Acrobat.  For the last 6 or so years we have purchased the Upgrade Plan though the Transactional Licence Program for the Creative Suite and InDesign.  I am mystified why Adobe is now shutting out smaller customers like use from being able to subscribe to the upgrade plan?
    The changes in licensing over the last 6 or so months have been very negative for us.  We feel like we are being forced into buying upgrades instead of being able to be on a predictable upgrade plan.  I hate to say it, but Adobe's licensing is now worse than Microsoft's.  At least MS is willing to offer any company Software Assurance at any level.
    We also use QuarkXpress in additon to InDesign.  I guess I will need to start pushing that we use Quark instead of Adobe. 
    I hate to be bitter, but this really leaves me feeling screwed by Adobe.

    They also stated the "new" features being released on the Cloud would be released to all users in the next full release. However now there is no next release for perpetual license holders other than the cloud going forward. This is blatant misinformation as well, information they no doubt knew but withheld to ensure further sales of CS6 in the meantime. Very shady practices on Adobe's part, many efforts seem to be made to boost sales of CS6 even when they knew what was happening behind the scenes with their decisions that are now detrimental to many customers going forward.

  • R12 Upgrade Report from 11i Getting Error

    Hi everyone,
    We are currently working an R12 upgrade project from 11.5.10 to 12.1.3. I am currently converting a report from 11i to R12 but it is erroring out when I run it in R12. Below is the log. Any help would be greatly appreciated. Thanks.
    Payables: Version : 12.0.0
    Copyright (c) 1979, 1999, Oracle Corporation. All rights reserved.
    XXHH_APXNACHA_CHASE module: XXHH: NACHA Payment Format Chase (HHG)
    Current system time is 06-DEC-2011 15:52:03
    +-----------------------------
    | Starting concurrent program execution...
    +-----------------------------
    Arguments
    P_PAYMENT_BATCH='JRG120111b'
    Current NLS_LANG and NLS_NUMERIC_CHARACTERS Environment Variables are :
    American_America.US7ASCII
    Enter Password:
    MSG-00001: Org ID: 141
    MSG-00001: After SRWINIT
    MSG-00099: Inside Get_Company_Name
    MSG-00099: Payment Batch = JRG120111b
    MSG-00099: No reporting entity setup found.
    REP-1419: 'beforereport': PL/SQL program aborted.
    REP-0069: Internal error
    REP-57054: In-process job terminated:Terminated with error:
    REP-1419: MSG-00001: Org ID: 141
    MSG-00001: After SRWINIT
    MSG-00099: Inside Get_Company_Name
    MSG-00099: Payment Batch = JRG120111b
    MSG-00099: No reporting entity setup found.
    REP-1419: 'beforereport': PL/SQL program aborted.
    Report Builder: Release 10.1.2.3.0 - Production on Tue Dec 6 15:52:04 2011
    Copyright (c) 1982, 2005, Oracle. All rights reserved.
    Start of log messages from FND_FILE
    End of log messages from FND_FILE
    Program exited with status 1
    Concurrent Manager encountered an error while running Oracle*Report for your concurrent request 3660174.
    Review your concurrent request log and/or report output file for more detailed information.
    Executing request completion options...
    Output file size:
    0
    Finished executing request completion options.
    Concurrent request completed
    Current system time is 06-DEC-2011 15:52:06
    ---------------------------------------------------------------------------

    It looks as though its failing in your beforereport trigger.
    MSG-00099: Inside Get_Company_Name
    MSG-00099: Payment Batch = JRG120111b
    MSG-00099: No reporting entity setup found.
    REP-1419: 'beforereport': PL/SQL program aborted.I dont believe payment batches are used anymore as they need to be done via Payment profiles and therefore you will need to use Payment Instruction ids instead. Also the setup at R12 is Mosaic
    try including this. as the first statement in the Beforereport trigger. All the banks tables payment tables has changed so unless you have changed these to you will need to adjust these correctly to the R12 tables.
    BEGIN
         MO_GLOBAL.INIT ('SQLAP');
    MO_GLOBAL.SET_POLICY_CONTEXT('S',FND_PROFILE.VALUE('ORG_ID'));
    END;

  • I changed my data plan from 6g to 8g while my daughter who attends college outside of the US at Toronto Canada (and we have on a international calling and international data plan) was on spring break at her grandparents house here in the US. I made the ch

    I changed my data plan from 6g to 8g while my daughter who attends college outside of the US at Toronto Canada (and we have on a international calling and international data plan) was on spring break at her grandparents house here in the US. I made the change online since I had been waiting on the phone for over 10 minutes for a customer service rep to come available. Well when I made the change online since that seems to be the thing that Verizon wants it's customers to do and I didn't see all the different plans available and just did the upgrade to 8g. Next bill had over $900 in roaming charges on her phone line. I called the 1-800 number and waiting for a service rep and after 20 minutes of waiting and being put on hold was told it was the customers mistake and there was nothing they could do.Thanks for nothing. I called back after thinking about it and wondered why changing a data plan for the phones in the US would change a international call plan. Waiting over 10 minutes again between waiting for a service rep and hold for one to answer the call. Gave her all the information about it and she said she would call back. Well, 4 days later over the weekend she had nevered called back. So on the phone again for the third time and after 20 plus minutes again was told that when I did it online I click the plan that didn't include international call only the data plan. Explained that I never saw the difference in the plan packages so put on hold again and was told that they could credit $100 to my bill. Wow, thanks alot !!! We have been Verizon customers for probably atleast 12 years and this is how you treat your long term customers?

    Verizon Wireless Customer Support wrote:
    AHARDY454,
    We definitely want to review options on what has happened. We are now connection, so you can hover over my username and send me a Direct Meesage so we can review your account information. We look forward to reviewing.
    Thank you,
    TonyG_VZW
    Follow us on Twitter @VZWSupport
    TonyG_VZW they can't exactly hover over your username unless you actually link it in your post. The generic username for all the reps just doesn't fly.

  • Upgrade GI from 11.2.0.1 to 11.2.0.3 on Stand alone DB

    Hello,
    I want to upgrade GI/ASM from 11.2.0.1 to 11.2.0.3 (out of place). RHL5
    I did not find any link regarding the exact upgrade. I will be highly thankful, if you could answer my simple questions.
    - Pre-requisite patch to install to 11.2.0.1 GI_HOME on Standalone before upgrading?
    - from the 11.2.0.3 NEW_GI_HOME, I will invoke ./runInstaller and choose upgrade GI/ASM for Standalone, and following the steps, thats it right, no second time GUI for example ASMCA or ASMUA
    - I am confused here that will ASM instance be upgraded also within the same GI upgrade GUI steps or do I need to start again GUI from new GI home with ASMUA option or so?
    Thanks a lot for your inputs in advance.
    Best Regards,
    Edited by: John-MK on Feb 19, 2013 12:27 PM
    Edited by: John-MK on Feb 19, 2013 3:07 PM

    Hi John-MK,
    1. Install Oracle GI software only.
    2. To configure Grid Infrastructure for a Stand-Alone Server run the following command as the root user:
    /u02/app/11.2.0/grid/perl/bin/perl -I/u02/app/11.2.0/grid/perl/lib -I/u02/app/11.2.0/grid/crs/install /u02/app/11.2.0/grid/crs/install/roothas.pl
    [root@server> / ]#/u02/app/11.2.0/grid/perl/bin/perl -I/u02/app/11.2.0/grid/perl/lib -I/u02/app/11.2.0/grid/crs/install /u02/app/11.2.0/grid/crs/install/roothas.pl
    Using configuration parameter file: /u02/app/11.2.0/grid/crs/install/crsconfig_params
    Creating trace directory
    LOCAL ADD MODE
    Creating OCR keys for user 'grid', privgrp 'oinstall'..
    Operation successful.
    CSS appears healthy
    Stopping CSSD.
    Shutting down CSS daemon. ===> delete old CSS daemon (11.2.0.1)
    Shutdown request successfully issued.
    Shutdown has begun. The daemons should exit soon.
    CRS-4664: Node dwmdm successfully pinned.
    Adding Clusterware entries to inittab
    dwmdm 2012/07/26 16:18:48 /u02/app/11.2.0/grid/cdata/dwmdm/backup_20120726_161848.olr
    Successfully configured Oracle Grid Infrastructure for a Standalone Server
    3.$ps -fea | grep d.bin
    4. crsctl check has
    5. crsctl stat resource
    6. Delete LISTENER (11.2.0.1) - NETCA
    7. Create LISTENER (11.2.0.3) - NETCA
    8. Run ASMCA to upgrade 11.2.01 to 11.2.0.3. (ASMCA will detect a 11.2.0.1 ASM instance and set the new GRID_HOME for new ASM instance 11.2.0.3).
    9. Click UPGRADE ASM.
    Is best practice upgrade ASM with ASMCA, not with OUI-Oracle GI
    regards
    Amin
    blog: http://www.amin.ol-e.com.mx

  • How to Upgrade datasources from 3x to 7x versions

    Hi Experts
      How to Upgrade datasources from 3x to 7x versions.
      I am planning to upgrade exisisting 3x data sources which are used in data loading are there any risks involved in upgrade
    Thanks

    Hi,
    When you migrate a 3.x DataSource (R3TR ISFS) in an original system, the system generates a DataSource (R3TR RSDS) with a transport connection. The 3.x DataSource is deleted, along with the 3.x metadata object mapping (R3TR ISMP) and transfer structure (R3TR ISTS), which are dependent on it. If a PSA and InfoPackages (R3TR ISIP) already exist for the 3.x DataSource, they are transferred to the migrated DataSource, along with the requests that have already been loaded. After migration, only the specifications about how data is loaded into the PSA are used in the InfoPackage.
    You can export the 3.x objects, 3.x DataSource, mapping and transfer structure during the migration so that these objects can be restored. The collected and serialized objects are stored in a local table (RSDSEXPORT).
    You can now transport the migration into the target system.
    When you import the transport into the target system in the after-import, the system migrates the 3.x DataSource (R3TR ISFS) (as long as it is available in the target system) to a local DataSource (R3TR RSDS), without exporting the objects that are to be deleted. The 3.x DataSource, mapping (R3TR ISMP) and transfer structure (R3TR ISTS) objects are deleted and the related InfoPackages are migrated. The data in the DataSource (R3TR RSDS) is transferred to the PSA.
    Regards,
    Suman

Maybe you are looking for

  • How do I order more than one book at a time?

    I created 10 photo books I would like to order, but when I go to place my order I can only place one book at a time.  I do not want to place 10 different orders.  How do I order more than one book at a time?

  • Problem iphone 4s with dlink 624s wireless with dhcp

    I heve a iphone 4s which is not stable in my wireless with a router dlink 624s and dhcp. Sometimes iphone runs okay, otherwise it is conect to the router but I cannot surf in the web, the iphone indicates "some problem with the server", even www.goog

  • Inactive condition type

    Dear All We have come across a situation where there were few EDI orders which came in and in those orders some of the line items had all its conditions inactive. That is List price, Taxes and customer price all are in yellow status ie. they are inac

  • 701 Mobile Signal Strength

     I have just bought this phone and started using it but it seem to have a weak network signal strength  I am in UK on O2 and in some areas have have low or no signal.  When at home I have only 1 bar showing and sometimes no signal but  a Nokia 7230 a

  • J'ai acheté une application avec mon compte sur le mac d'un ami, comment je peux la mettre sur mon mac sans l'acheter de nouveau?

    J'ai acheté une application avec mon compte sur le mac d'un ami, comment je peux la mettre sur mon mac sans l'acheter de nouveau?