Hi Gurus,
Would like to have one suggestion from u all, i want to assign one storage location to different plants....
is it recomended??
Thanks
Dushyant

Hi Dushyant,
one storage location to different plants....
Is Possible in Statistical way.
E.g Plant 1000 : Sloc : 0001
Plant 1100 : Sloc : 0001
Plant 1200 : Sloc 0001 :: Up to...". n " no. of plants
In above case it is possible.
However these are not Logical Units. Having said this Plant 1000 and Sloc. 0001 is one unit. similarly Plant 1100 and sloc 0001 is another Units. etc. in consideration to Inventory Management i.e Stock valuation.
Material Creation and Extension. etc.
Hence You can very well give same storage location no. to "N"  number of plants, however they are not the same for operational prospective.

Similar Messages

  • Scrap with different reasons in same storage location

    HI Experts,
    In one of the scenario; the plants gets scrap from different sources such as from production or from other mean. User wants to see the bifurcation of the certain quantity of the same in the same storage location. I have seen that we can maintain storage bin in Plant/sto view 1; but the constrain is one material-one bin. But user needs it as one material-more bins in the same storage location.
    Please advice.

    A further segregation of one material is either batch management  or split valuation.
    Both is not easy to achieve if your material is already active and has stock (this is discussed many times, so please search if you need more info on that)
    You can only differentiate by bins if you use warehouse management, in MM it is as you already found out yourself, 1 location = 1 Bin  per material

  • ATP CHECK in all storage Location of the Plant

    Dear gurus,
    we have the stock for the component in the storage location :
    Storage Location A 10 PZ
    Storage Location B 30 pz
    Storage location C 40 pz
    In the planned order for this component there is the storage location A.
    The ATP check ( in the transaction MDVP) confirm the quantity only in the storage location A, but i would like confim the quantity stock of all the storage location, also having to maintain the storage location A in the position of the component in the planned order.
    For example for the planned order the requirement for this component is 30 pz , when i run the atp check the system confirm only 10 pz in the storage location A present in the position of the component, but i need confirm all quantity because present in others storage location, also having to maintain the storage location A in the position of the component in the planned order.
    I need see in the avalaible ATP check all the storage location of the plant, there are the customizing setting or material master setting.
    Thanks a lot
    Daniele Pistilli

    Daniele,
    First determine which ATP check is being used for your planned orders in OPPJ under plant or MRP group.  Then, also in OPPJ, under 'Determine Check', modify that availability check by ticking the 'no stor locn inspectn' box.
    Perhaps you can advise your 'friend' [Luca Malavasi|http://forums.sdn.sap.com/profile.jspa?userID=841888], of this response as well.  He has asked the same question. 
    Atp Check see all storage location of the plant
    I won't blindly assume that a single person is using more than one userid on these forums.  Many of the moderators do not permit this practice..
    Rgds,
    DB49

  • Same WareHouse  Assigned to different plants under different company codes

    Hi Guys,
                 I assigned a warehouse to two different storage location under two plants under two different company codes. I did do the movement in one plant and i could do TR and TO
    but when i post a material movement in other one. I cant c the TR created for the next one.
    Any idea y?
    thanks a bunch

    Yes i did extend the material master for both the plants and extended to the warehouse too...
    pls help
    thanks a bunch for the reply

  • Atp Check see all storage location of the plant

    Dear gurus,
    we have the stock for the component  in the storage location :
    Storage Location A     10 PZ
    Storage Location B      30 pz
    Storage location  C       40 pz
    In the planned order for this component there are the storage location A.
    The ATP check ( in the transaction MDVP) confirm the quantity only in the storage location A, but i would like confim the quantity stock of all the storage location .
    For example for the planned order the requirement for this component is 30 pz , when i run the atp check the system confirm only 10 pz in the storage location A present in the position of the component, but i need confirm all quantity because present in others storage location, also having to maintain  the storage location A in the position of the component in the planned order.
    I need see in the avalaible ATP check all the storage location of the plant, there are the customizing setting or material master setting.
    Thanks a lot
    Daniele Pistilli

    Hi,
    In OPJJ "Scope of Check" Under "storage location Inspection" check the box against " No storage loc Inspection"
    This indicator is used to set the scope of the availability check. It is used to switch off the check at storage location level.
    Test this and revert back
    pavan

  • Transfer of stock between two storage locations within a plant in two steps

    Hi,
    We have a plant 6400 & we have two storage locations 6401 & 6402. Each storage location belongs to a department which are located at some distance from one another.
    The material to be moved from one storage location to another using a truck.
    For the above mentioned process can we have the following process
    (1) In first posting the material is issue from the storage location to a transit
    (2) In second posting the material from the transit is received into the storage location
    I am looking for a feature that is possible between two plants, can we have a similar feature available within a plant.
    Warm regards,
    Umesh

    Hi Umesh,
    It would be a business decision i suppose. If those 5 nos. are lost / damaged in transit & needs to be scrapped, then the ownership needs to be decided first. If it lies with the sender, then reverse the 5 nos. (MB1B mvt is 314) & then proceed with your scrapping or if it lies with the receiver then receive the 5 nos & then proceed with the scrapping.
    Posting in system is one aspect, but a clear business rule is the key factor. So discuss with your materials mgmt personnel to define the process flow.
    Hope the above helps.
    Regards,
    Vivek

  • Material deletion at plant and storage location deletion at plant

    hI EXPERT,
    We are going to extend the materials in plant A to plant B and C. So we will extend it using LSMW. After extending, we need to delete the materials in plant A and storage location in plant A. How can we do that? Please explain step by step.
    Thanks

    Hi,
    If you want to delete material at storage location level
    Enter MM17
    Select table MARD
    Select fields tab
    find MARD-LVORM
    Execute (F8)
    Enter list of materials
    Enter plant
    enter storage location.
    tick the field lvorm(carry out mass change)

  • Stock transfer between Plant/Storage location to Plant/Storage location

    Dear Experts,
    This is a MM component of SAP Retail.
    We have 4 brands ( Plants of type B, Plants of type C etc) that needs inventory from the same Distribution center (Plant A) for some common products. Here the direction is to prioritize the inventory per brand. The requirement is one brand should not take the inventory of the other brand.
    To overcome this problem , the solution proposed is to have different storage location for different brands in the same DC.
    When we run replenishment  planning for the brands and do a ATP check, the availability check should consider only the one issuing storage location in the DC which we allocated for the brand.
    I do see the following set up in SPRO and I have done the following.
    Step1: Activate Stock Transfer between Storage Locations
SPRO->Material Management->Purchasing->Purchase Order->set up stock transport order->set up stock transport order between storage locations-> u2018Activate Stock transfer between storage locationsu2019
    Step2: Assign Delivery Type and checking rule according to storage
    SPRO->Material Management->Purchasing->Purchase Order->set up stock transport order->set up stock transport order between storage locations->Assign Delivery Type and Checking Rule According to Storage
    Step3: Define Shipping Data for Stock Transfer between Storage Locations
    SPRO ->Material Management ->Purchasing ->Purchase Order ->set up stock transport order ->set up stock transport order between storage locations -> Define Shipping Data for Stock Transfers between Storage Locations

    Step4: Define Rule for Determination off Shipping Point
SPRO->Material Management->Purchasing->Purchase Order->set up stock transport order->set up stock transport order between storage locations -> Set-up Storage-Location u2013dependent shipping point determination->Define rule for determination of shipping point
    Step5: Shipping Point Assignment According to Storage Location
    SPRO->Material Management->Purchasing->Purchase Order->set up stock transport order->set up stock transport order between storage locations-> Set-up Storage-Location u2013dependent shipping point determination-> Assign Shipping Points According to Storage Location
    Question.No:1- After completing the above set up  in me21n, the issuing storage location field is greyed out. I am not able to enter any value here. Can you please help.
    Question.No:2
    I do see the following setting.
    Under IMG ---> Material Management ---> Purchasing --> Purchase Order --> Set up Stock Transport Order -->Business Add-In for Determination of Issuing Storage Location
    Display the IMPLEMENTATION
    Double click on the method GET_SUPPLYING_SL
    Click the Execute button
    Click the detail button on IF_EX_MD_EXT_SUP
    Execute GET_SUPPLYING_SL
    There is a prerequisite for this BADI .I have done those things.What i dont understand is where to force the combination of supplying site/issuing stor.loc/receiving site/receiving stor.loc
    Kindly provide your inputs.
    Thanks,
    Vasanthan

    Dear,
    Have You configure MRP in second plant (where you want to transport the Material).
    Please try with this and do again Po for stock transport.
    Regards
    Piyush Patel

  • Storage Location by Plant

    Hi,
    I need some advice from functional perpspective. Is there a T-code where I can view storage location by multiple plant? Appreciate your advice. Thanks
    Rick

    Hello,
    As per standard SAP, one storage location can be assinged to one plant only not multiple plants.
    Ex. SL - 0001 eixst only under Plant - 1000.  The same SL 0001 exist in some other plant - 2000, that is not the same one, the address or location should be different.
    I hope understand my point.
    You can check the same in Table: T001L in R/3 system.
    Regards,
    Suneel Kumar.

  • Different Storage Location required for RGA

    Hi,
    My requirement is that whenever Returns is done for SO, different Storage location should default, which is currently not happening.
    For ex - Standard Storage location(0001) is determined whenever SO is created but we want that different storage location(say 0096 which is created for Returns) should be determined whenever Returns is created.
    For these I have made the following config settings :
    Defined 1000(Shipping Point Std) which is assigned to Plant(BPX1)
    Also 1100(Shipping Point for Returns) is assigned to Plant(BPX1)
    Storage loc (0001- std) is assigned to Plant(BPX1) and warehouse no (BP1)
    Storage loc (0096 - for Returns) is assigned to Plant(BPX1) and Warehouse no (BP1)
    In OVL3 following settings done:
    Shipping Point (1000) , Plant (BPX1) than storage loc - 0001(Std)
    Shipping Point (1100) , Plant (BPX1) than storage loc - 0096(Returns)
    Still when we are creating returns storage loc 0001 is defaulting in Returns and NOT 0096 (Which is my requirement).
    Kindly advise which config settings are still missing to determine 0096 storage loc in RGA.
    Thanks in advance

    Hi,
    I have ticked the Plant and movement type in OMJ8, but still same storage location is coming while posting the Returns.
    Thanks

  • Reg : client level data,plant level data,storage location level data

    hi
    when we enter the data mm01 we select views.these views are based on cleint level,plant level,storage location level .i want the difference between all the three levels.how do we differentiate.

    As per our business process there are one company and in which many plants and storage location are available. In which many materials are available in different plant in different storage location.
    As per SAP Standard structure: -
    Company >> Company code1 & Company code2... >> Plant 1 & Plant 2 & Plant 3 .... >> Storage location 1 & 2 & 3........
    And in all plant and storage location have different data.
    Suppose in one plant we do quality testing for material and it may be possible in other plant we not perform quality testing for material. So in this case for same material quality data is different for different plants.
    Client Level: - Means data is same for all plant level like Basic data
    Plant Level: - Means data is based on plant level like Purchasing, Plant data, Quality data, Accounting view.
    Storage location level: - Means data is based on storage location level, for different storage location data will be different like Storage location stock data ..
    Due to this you can maintain different data on plant level & storage location level.
    Regards,
    Mahesh Wagh

  • MCHB,MARD - Stock available at plant level and storage location level

    Hi ,
    How to determine how much stock available at Storage location level and Plant level. (Lot is not maintained).
    In MCHB-Stock at lot level is shown.
    In MARD-Stock at Storage Location level is shown lncluding
    the stock maintaned at the lot level.
    If i want to know the stock which is not maintained in Lot, i.e, Stocks directly maintained at Storage location / Plant.
    Do I need to subtract the MCHB Value from MARD Value ?
    Is there any other way available to find the stocks which is not maintained at lot level.
    Regards
    Prasath

    Hi prashant,
    What do u mean by stock maintained at SL level without batch level.  Do u mean that some materials are subjected to batch management and some or not?
    If that is the case, for all batch managed materials, u can see the stock at batch level and also same is summed up at SL level.  But still what ever u are getting from MARD table isstock at SL level only.
    If u have activated batch management for any material, it will always be shown at lot level also.
    hope this clarfifies query
    award points if found useful

  • During MRP run unwanted plant and storage location include and exclude

    Hi There,
    During MRP run how to include and exclude the unwanted plant and storage location pls let me know the required configuration settings.
    Thanks in advance.

    HI,
    To control whether a particular storage location will be included or excluded from the MRP run.  (MD02/MD41).
    To exclude it from MRP run :-
    OMIR - Define storage location MRP per plant
    Put the MRP ind. as.         1 - storage location stock excluded for MRP
    To include it from MRP run:-
    OMIR - Define storage location MRP per plant
    Put the MRP ind. as.      space - storage location stock also planned at plant level and save it
    Next go to transaction MM01 - tick only view MRP 2
    Key in Plant and Storage Location
    Look at the Storage Location MRP section
    change the SLoc MRP indicator to space  and save it
    MMD1 - Create MRP Profile - MRP profile is a useful entry aid and makes it easier to manage MRP data.
    You define which fields are filled with values when MRP data is entered in the material master record, which of these values can be overwritten and which not.   You use the information stored in a profile is standard information that is needed again and again in similar constellations when material master records are maintained.
    Regards
    KK

  • Plant & storage location

    when we are having 3 storage locations in 1 plant, In sales order level it shows the 3 storage locations, can we take only one in consideration and others must be in Grey out, or not displayed.

    HI
    Please have a look at this description and help me to figure it out.
    Question : I am using a user exit in transaction vl01n ( Create outbound delivery ) for filling default storage location.
    I am not able to find the exact user exit , where to implement the code . Main thing is we have fill the plant i.e WERKS based on the shipping point in VL01n automatically. i.e when the delivary is executed we will fill the shipping locaiton , then the plant data has to replicate in the delivary order automatically depends on the shipping point.
    Regards,
    sridhar

  • Change storage location and plant for Return Delivery (outbound)

    Hi,
    I'm trying to achieve the following:
    Sales orders contained the 'normal' plant. Whenever a return delivery is created it should default the plant to a 'return delivery plant / storage location'. I've looked in to this and it seems we've got multiple options, however i would like to check:
    - Implement V02V0002 user-exit and link with 'return' movement type. Will this ensure plant change aswell?
    - Use standard RETA rule and define ?situations?. Could somebody clearify whether we can achieve our goal with this: Change plant and storage location?
    Any suggestions to achieve the above are very much appreciated.
    Note: Material contains both views for 'return plant/storage location' and 'normal plant/storage location'.
    System is R/3 4.6c with IS Retail activated.
    Kind regards,
    Tim

    Hi,
    The delivery is created against/follow-on a sales order / subscription order / invoice. I don't think we use/have a 'return sales order'. Yes, we only use 1 plant / storage location for the returns of goods.
    To sum it up:
    - Implement badi/user-exit ensuring that the plant is changed/defaulted in to our 'returns plant' for return documents.
    - Configure storage location via 'shipping condition'.
    Correct?
    Ps. I don't think we'll achieve changing the plant via configuring a shipping condition for our return document type. As the plant from the sales order doesn't match with the shipping condition it won't be taken in to account? And yes: It is mandatory/requirement to change the plant for customer return documents.
    Thank you for your inputs.
    Kind regards,
    Tim

Maybe you are looking for

  • ITunes 11 on a PC - where is Genius and how to use it in this version?

    I'm on a PC and using iTunes 11, and cannot find the bottom right hand show/hide genius toggle. There is no checkbox on PC for "enable genius" in preferences (as some on the Mac forums point out.) I'm trying to get Genius suggestions based on my song

  • CVP call studio and default audio

    Not sure if this should get posted here or on the development forum but it's getting posted here anyways... We have 4 combo boxes in our CVP deployment so we have 4 media servers. I'm trying to figure out what to configure for the Default Audio Path

  • Extended Classic PO output pass to R3 ?

    1. Extended classic Purchase Orders are fully approved (no approval required workflow) in SRM - status "HELD" 2. When we process PO and "order" - the PO is transmitted to R/3 (great, everything seems to be there). 3. There are no messages associated

  • Software migration questions- from Crystal 9 or 11 to CR4E

    Hello, this is my first post here. I'm a system's analyst and I have been working with crystal reports since 2003. My company's product has a report module and basically its architecture is based on jsp, java, asp and crystal reports ( we have over 2

  • I have downloaded the trial version of InDesign CVS5 but can't open the program.

    First time I've used the forum, don't know if my first question was sent. Here it is again: InDesign seems to be attached to my task bar. When I open my file the InDesign icon showing the name of my file appears on the task bar and a small dialogue b