SAP ERP6  product version missing in SMSY for EHP4 upgrade Solman 7

Hello
I am trying to install Ehp 4 but when i try to create the new system as SAP ERP6 in solution manager (SMSY )but  product version is missing  ?
iam now stuck any ideas will be welcome as i need to get the stack.xml  inorder to proceed with EHP installer

Hi,
Check below notes before proceeding with EHP download in solman,sap has recommaned to apply these notes when we tried to download EHP,
Must Implemeted
1238929 MOPZ: Solution Is Not Selected in Work Center
1240389 Maintenance optimizer transaction with incorrect Java host
1243197 MOPZ: Add Caption for Product and Stack of Stack Delta XML
1246549 Status were reset to step 1 after Download Basket approval
1247550 present all avaliable systems in mopz step 1
1250781 SMSY: Error for Java system components from the SLD
1255219 Java systems w/o ABAP instance in maintenance optimizer
1262239 SMSY: Database name *LOCAL
1273095 SMSY: Incorrect database server (Java)
1306173 Maintenance Optimizer: Enhancement Package Stacks
1308152 MOPZ: Check configuration for stack delta XML generation
1311841 Maintenance Optimizer: Rename stack delta index file
1319083 Maintenance Optimizer: Technical corrections
1326123 MOpz: Error "Update product data in Solution Manager"
1357565 MOpz: Maintain a system where EHP is installed
1402615 Translate hostname in Mopz to lower case
1407905 MOpz: Error when withdrawing in step 4
Cannot be implemented, but manual steps must be performed.
1141296 Solution Manager: ERP product data missing
1165587 Maintenance Optimizer: Enhancement Package stack selection
1277035 Solution Manager: EHP4 product data missing
Between what is your present stack level of solman
Regards
Uday

Similar Messages

  • "Only assign one SAP NetWeaver product version to product system"

    Greetings,
    Somehow, after upgrading my PI system from NW 7.11 to NW 7.4, the SAP-XICONS component was left at the lower version. Everything else was upgraded and SUM didn't complain about this component. The component was present in the stack.xml file and the SCA was available. Yet somehow it was missed.
    Now I am unable to use SUM to update the component. There seems to be no way to get the LMDB to reflect the actual versions of this system and have Maintenance Optimizer function.
    After I assigned everything in the LMDB, the Verification Check says "Only assign one SAP NetWeaver product version to product system". And then MOPZ gives errors such as: "Wrong Netweaver product version found SAP NETWEAVER 7.4" and "Multiple Netweaver Product Version were found".
    However, if I remove the assignment of 7.11, MOPZ is still unable to calculate the queue. It even gives the same errors.
    How can I fix this? Is there some other way to generate the stack or get SUM to upgrade the component?

    The root cause was MOPZ marking the component incorrectly in the stack XML.
    The resolution was to use telnet to 5xx08 to manually deploy the SAP-XICONS archive.

  • Production version with status " locked for any use" being considered

    Dear All,
    while creating integration model for PDS , materials with production version locked for any use are being considered. Can any body put some light on it.
    My requirement is that in creation of integration model it should not take production version which are locked for use.
    Regards
    Arun Negi

    Check OSS Note 854561 - PDS does not recognize any locked production version in R/3
    "Symptom
    If a production version is locked in the R/3 System, this change is not transferred to the related production data structure (PDS) in APO. The PDS is therefore still used as a source in APO in the plan explosion. This causes errors during planning and results in terminations when an order is converted and subsequently transferred to the R/3 system."
    https://websmp130.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=854561
    Manish
    Edited by: Manish Kumar Rathi on Oct 10, 2008 11:46 AM

  • Sap pp -Production Version

    Hello SAP-Guruu2019s
    Pls tell me the Procedure or pre-settings for Maintaining Production Version
    Any comments welcome   & Thanks in advance

    Hi,
    Pls find the step by step procedure for creating / maintaining Production Version:
    Creating Production Versions
    1.On the MRP, Work Scheduling, or Costing screen, choose ProdVersions.
       The Production Version Overview dialog box appears.
    2.Enter the following information:
    u2013 Version number
    u2013 Text describing the production version
    u2013 Validity period
    3.If a run schedule can be created for the production version, set the RS indicator.
    4.To specify more information on the production version, choose Details. The Production Version Details   dialog box appears. Enter your additional information as required and choose one of the following options:
    u2013 Continue to return to the overview
    u2013 Next version to access the Production Version Details dialog box for the next production version
    5.If you know from the start that you will need to enter more data than that offered in the Production Version Overview dialog box, choose New details. The Production Version Details dialog box appears.
    6.To return to the MRP, Work Scheduling, or Costing screen, choose Continue.
    7.Save your data.
    Hope this helps.
    Regards,
    Tejas

  • Technical Usages for EhP4 upgrade for CP/WSD BP activation

    Dear All,
    I have installed EhP4 ready system. Now in the process of upgrading it to EhP4 system.
    This system is mainly for activation V1.604 Best Practices of Consumer Products/Wholesale Distribution.
    Please let me know which technical usages I can use for EhP4 upgrade.
    Thank you in advance
    Regards,
    Yuvaraj

    Hi Sunny,
    I have referred this note 1500688 SAP Best Practices CP/WSD US V1.604 (Consumer Products/Whole Sale Distribution).
    There it is mentioned to activate
    LOG_PP_LMAN
    LOG_PP_MIS
    LOG_PP_PRSP
    LOG_PP_SRN_CONF
    FIN_LOC_CI_1
    OPS_ADVRETURNS_1
    This business functions comes under the technical usage 'Central Applications'
    So does it mean that, selecting only the Central Application as the usage type, enough for BP activation
    Thank you
    Yuvaraj.

  • Missing Features Issue for custom upgraded solutions

    I have restored SharePoint 2010 database for migration and upgraded all my custom solutions to SharePoint 2013 using visual studio 2013 and deployed it successfully on SP2013 environment, but when I run
    Test-SPContentDatabase command it is giving feature missing as well as Setup file missing errors for all custom upgraded solutions.
    Interestingly the SP2010 WSPs that I don't have code for and I want them to run in SP2010 mode works fine and does not appear in missing feature list once deployed to SP2013.
    I also have verified that the custom upgraded features and web parts are available for other test application in SharePoint 2013.
    can anyone help why the  Test-SPContentDatabase is giving Missing Feature error for upgraded custom solutions.

    Hi - From the list of missing features returned by test-spcontentdatabase, can you try to find out whether they exist in far...get-spfeature powershell....
    -prs

  • ABAP/4 Keywords for all SAP R/3 Versions with Delta Documentation for abap

    Hello Experts,
          Do please provide me with the way to find out the Delta Documentations for ABAP for all version of SAP R/3 starting from 3.0 to 6.0
    points will be awarded if helpful.
    Thanks in Advance

    Log on to SAP.  Use transaction ABAP_DOCU.  Click on Keyword Help.  Don't enter an ABAP keyword, press cont. button.
    In the window that opens, in the tree on the left handside, you'll see ABAP Changes By Release.
    This contains all the information you need.
    matt

  • Product Version SAP ERP 6.0 Missing from solman 7.0

    Hi All,
    I have installed an ECC6 system and now  i need to configure the solution manager and download the support packs
    and xml file for EHP4 upgrade. I have done this before where in i configure the new system in SMSY as SAP ERP 6.0
    and then configure maintenance optimizer and it gives me the option of Enhancement Package Installation.
    However now in the current solution manager i dont see the product version  SAP ERP 6.0 when im clicking
    trying to creating a new system.
    Our Solman version is 7.0 . I tried creating my new system under SAP ERP EHP as ehp version 1 and used maintenace
    optimizer but it does not give me the option of EHP package installation. Can any one let me know how to address this
    issue??
    Regards,
    Ershad Ahmed.

    Hi,
    Goto Tcode SMSY
    1. Under Landscape Components --> Product Systems --> Select ERP --> Under that select your system ID and click on it,
        Goto --> Header Data on your right side, change the Product Version to SAP ERP 6.0 and SAVE.
    2. Goto System Groups and Logical Components --> Logical Components  --> SAP ERP --> Create NEW Logical Component for   your ECC system under this component and select Production version as SAP ERP 6.0 & assign ur system then SAVE.
    3. Goto System Groups and Logical Components --> Solution Landscapes-Operations --> Select your system landscape and REMOVE your ECC systen form the Solution and SAVE.
    4. Goto System Groups and Logical Components --> Solution Landscapes-Operations --> Select your system landscape and ADD your ECC system form the Solution and SAVE.
    Regards
    Kannan.K

  • QC Activity based on Material Production Version

    Hi,
    Normally, we perform QC activity based on Material Code, i.e. in Material Master we maintain inspection type in QM View for material which needs QC activation during Good Receipt from Production
    Is it possible to perform QC Activity based on Production Version of a material i.e.
    For Example
    Product A having 2 Production Versions
    IF Product A with Production Version 1 then No QC required during goods receipt from production
    IF Product A with Production Version 2 then QC required during goods receipt from production
    So please tell me what feasible solution possible from your side
    With Regards,
    Kunal Sheth

    Dear Sap User,
    Production version is nothing just a combination of Master recipe/Routing and BOM used for particular production or process.
    If you are having so many production version then you have to choose which you want to choose but if you are having a single production version then it will be chosen automatically.
    Do it once and revert in case of any query.
    Rgrds,
    Dheeraj Rawal
    Edited by: Dheeraj89 on Feb 9, 2012 6:13 AM

  • How to add new product version in Mopz?

    Hi,
    Can anyone guide me how to add a new product version in maintenance optimizer?
    I am going to get the stack file of Netweaver gateway 7.4, but without the product version, I could not proceed.
    Thanks in advanced.

    Dear Friend,
    1.    Maintain Solution Manager information in the system’s SLD data supplier. In case of ABAP system using tcode RZ70 and incase of Java system using the Visual Administrator/NWA(for NW 7.3 onwards)àSLD data Supplier.
    2.    Once the data supplier jobs gets executed you system will appear under SMSY under Server, Database and (Technical System in case of Java systems).
    The ‘Data Source’ should be LMDB.Note: Please don’t changes to the system in SMSY
    3)Execute transaction code ‘LMDB’ in your solution manager system.Select Technical system(Give Application server ABAP and SID of the Server)
    4)Click on Edit and select Software
    Click ‘Add’ and it will show Product Version screen  and  search for your installed product.
    5)Select your relevant usage types and once done choose ‘Close’ and save the data.
    6)Assignment of Product System :
    Click ‘Assign to Product System’
    Now Product system does not exist, hence we have to create one. Choose ‘Create’ and confirm
    7)After that complete Landscape Verification check..it should be green.
    8)Go to Solman_setup and complete Managed system configuration.
    after that Create Maintainence transaction and generate stack file.
    Before doing all activities make sure that ST-PI and ST-A/PI Patched should be applied in Managed server(NW 7.4) and run rtcctoll.
    Regards
    Maruthi V

  • Best practices in choosing Product Version / App Comp Type

    Unfornunaly I din't find a document like SAP XI Best practice.
    I am a litle bit confuced  in terms Product version, Software Component Version, Main Instance...
    Are the following scenarios right?
    1. <b>I want to integrate non-SAP System.</b>
         a) I have to create SYSTEM and PRODUCT in SLD
         b) I have to create integration scenario in my PRODUCT
         c) Which type of Application Component do I have to choose?
            (In help.sap.com <b>Choise Template if it is non-SAP product that it is not defined in SLD</b>)
            It is non-SAP product <b>but it is defined</b> in SLD. Which type of App Comp is the best?
            What sense is in Application Component Type? 
    2. <b>I want to integrate SAP SRM and Oracle DB of non-SAP application</b>
         Do I need to use SAP SRM Product Version and to create Integration Scenarion there?
         Which Application Component Type do I need to choose for non-SAP application? Template?

    Hi Sergey,
    >>1. I want to integrate non-SAP System.
    >>>> b) I have to create integration scenario in my PRODUCT
    no you don't have to create integration scenarios
    these are only created to show the flow of our processes
    but you don't have to create/use them
    take a look at this weblog if you really want to create it:
    /people/siva.maranani/blog/2005/08/27/modeling-integration-scenario146s-in-xi
    >>> Do I need to use SAP SRM Product Version and to create Integration Scenarion there?
    you don't need integration scenario here too
    but if you want you can create it
    Regards,
    michal

  • Production version selection in MRP run

    Hi all
    here my requirment is to select the Alternative BOM in MRP run.
    i have three alternative BOMs. and two routings. to make different combinations i was created Production version. so now my requirment was while run MRP how to choose production version manually. i was mantained MRP 4 screen for selection method as 3.
    my All BOM validity dates r same and same lot size.
    can any one suggest me how to choose production version manually in MRP run. otherwise system by default it choosing 1st alternative.
    Regards
    Deviprasad

    Hi All,
    Thanks for all your suggestions. here my requirment was not matching with these.
    my req was
    1. want to select prod version while run MRP.
    2. my demand was MTS.
    3. i already marked in MRP 4 Screen as selection method as 3.
    Constrains
    my BOM validity dates r same.
    lot sizes r same.
    i am giving hints for this.
    In Customization - BOM selection ID, Selection priority and BOM usage, Alternative selection of BOM in MRP.
    i was tried to mantain this. still system picks the default as first production version.
    can u try for this. how we can configure in SAP.
    example.
    i have one material as M-20. it has differnt grads of mixing as R1,R2,R3 alternative BOMs. all alternatives have same materials with differnt Compositions. i want to choose one alternative while run MRP. But system by default picking first alternative BOM.
    regards
    Deviprasad

  • Automatic Production Version Selection

    Dear All,
    There are two production versions 0001 and 0002 for a finished material. When I create production order from planned order it automatically selects version 0001. If I want it to select version 0002 automatically what should I do?
    Regards
    Hammad

    Hi Hammad,
    As per your querry, you want production version 0002 should be selected automatically when you create production order instead od PV 0001. If you want PV 0002 should be selected automatically then,
    1. Maintain lot size of of PV 0002 to quantity which you usually use for the production. So when you create production order system will use PV0002 based on lot size.
    2. Or change validity period of PV0001 to a date which is outside the planning period. So it will be no longer valid in the period in which you are creating production order.
    3. As specified by experts, you can change PV selection to manual by going to transaction COR4. And change selection of PV to manual selection for your order type or you can change it by going to transaction MM02. Then lock production version by selecting locked for any usuage.
    Hope this resolve your issue, please reward if it is usefull.
    Regards,
    Avinash.

  • SAP AIS Latest Version and License Cost

    I would be greatful if any one can guide me on SAP AIS Latest version and license cost for it.  As we are using SAP ERP ECC 6.0.

    Hi,
    I checked SAP Note 77503, and as per the information:
    As of SAP release 4.70, the AIS tool is integrated into the SAP_BASIS component. So logically you would not need a seperate license for the usage. The license for SAP ECC 6.0 should cover the same.
    Also the latest version of AIS would be dependent on SAP_BASIS component version. As per Note 754273  the following PFCG roles are required for usage of the AIS tool
    SAP_AUDITOR_SA  System audit
    SAP_AUDITOR_SA_CUS_TOL  System audit - Tables
    SAP_AUDITOR_SA_CCM_USR  System audit - Authorizations
    For more information, suggest you to contact security(at)sap.com.
    Hope it helps.
    Regards,
    Srikishan

  • Which SAP Product version to assign to a Logical Component in SMSY (SOLMAN)

    Dear SAP Colleagues,
    In our SAP environment, we do have 2 versions of ERP systems :
    1. CON - SIF - CDP systems are 'SAP ERP Central Component 5.0' product version.
    2. CDD - CDT - CDP systems are 'SAP ECC 6.0' product version.
    Question :
    When I want to assign these systems to a Z_LOGICAL_COMPONENTS, which product version do I have to choose ?
    Example for CON - SIF - CDP systems :
    1. They are 'SAP ERP Central Component 5.0' product version.
    2. In SMSY in our SOLMAN system, logical component are created using
        'SAP ECC 5.0' product version.
    Example for CDD - CDT - CDP systems :
    1. They are 'SAP ECC 6.0' product version.
    2. In SMSY in our SOLMAN system, logical component are created using
       'SAP ECC 6.0' product version.
    Question :
    What about 'SAP ERP 2004' and 'SAP ERP 6.0' product version ?
    In which case must I use this product version to assign CON-SIF-CPS
    or CDD-CDT-CDP to new Logical components ?
    Are they OSS Note or any matrix which give me the right product version to choose ?
    I have heard that 'SAP ECC x.x' product version should not used any longer ?
    Thanks
    Best regards
    P.C

    Hi,
    Read the following document, the mapping for systems and component versions is described in here:
    https://websmp202.sap-ag.de/~sapdownload/011000358700000074392009E/SP18_SolMan_Setup_Guide_V2.pdf
    For ECC 6.0 you should select ERP 6.0
    regards,
    Jaap

Maybe you are looking for

  • Copying information from one repeating table to another repeating summary table?

    Hi, I have designed a dynamic form with a Table 1 (Investigator details) to be completed at the start to provide a list of investigators. This is a repeating table, and I have added buttons to add / delete an investigator (i.e. add/remove a row). I a

  • Officejet Pro 8600 Plus Paper Tray Jammed crooked in printer

    Paper tray is jammed crookedly in printer.  It will not come all they way out of printer and will not completely close (remains 1 1/2" Exposed.  How do I remedy?

  • Problem deploying web service with the deploy tool (J2EE)

    Hello, I am trying to deploy a sample Web Service on the Sun Java System Application Server Platform Edition 8.1 2005Q1. I run into a deployment problem ("jaxrpc compilation exception") when I have one of the web methods declared (in the endpoint int

  • Problem exporting uncompress AVI

    Problem exporting uncompress AVI. The output file will have in-between frames that appear like this: Help!

  • Safari 6 can't find webpage

    Since installing Mountain Lion, Safari 6 reports the error message "Cannot find webpage" particularly if there is any script after .com in the web address. Is anyone else experiencing this problem and can anyone suggest an solution? Firefox works per