Sap pp -Production Version
Hello SAP-Guruu2019s
Pls tell me the Procedure or pre-settings for Maintaining Production Version
Any comments welcome & Thanks in advance
Hi,
Pls find the step by step procedure for creating / maintaining Production Version:
Creating Production Versions
1.On the MRP, Work Scheduling, or Costing screen, choose ProdVersions.
The Production Version Overview dialog box appears.
2.Enter the following information:
u2013 Version number
u2013 Text describing the production version
u2013 Validity period
3.If a run schedule can be created for the production version, set the RS indicator.
4.To specify more information on the production version, choose Details. The Production Version Details dialog box appears. Enter your additional information as required and choose one of the following options:
u2013 Continue to return to the overview
u2013 Next version to access the Production Version Details dialog box for the next production version
5.If you know from the start that you will need to enter more data than that offered in the Production Version Overview dialog box, choose New details. The Production Version Details dialog box appears.
6.To return to the MRP, Work Scheduling, or Costing screen, choose Continue.
7.Save your data.
Hope this helps.
Regards,
Tejas
Similar Messages
-
"Only assign one SAP NetWeaver product version to product system"
Greetings,
Somehow, after upgrading my PI system from NW 7.11 to NW 7.4, the SAP-XICONS component was left at the lower version. Everything else was upgraded and SUM didn't complain about this component. The component was present in the stack.xml file and the SCA was available. Yet somehow it was missed.
Now I am unable to use SUM to update the component. There seems to be no way to get the LMDB to reflect the actual versions of this system and have Maintenance Optimizer function.
After I assigned everything in the LMDB, the Verification Check says "Only assign one SAP NetWeaver product version to product system". And then MOPZ gives errors such as: "Wrong Netweaver product version found SAP NETWEAVER 7.4" and "Multiple Netweaver Product Version were found".
However, if I remove the assignment of 7.11, MOPZ is still unable to calculate the queue. It even gives the same errors.
How can I fix this? Is there some other way to generate the stack or get SUM to upgrade the component?The root cause was MOPZ marking the component incorrectly in the stack XML.
The resolution was to use telnet to 5xx08 to manually deploy the SAP-XICONS archive. -
SAP ERP6 product version missing in SMSY for EHP4 upgrade Solman 7
Hello
I am trying to install Ehp 4 but when i try to create the new system as SAP ERP6 in solution manager (SMSY )but product version is missing ?
iam now stuck any ideas will be welcome as i need to get the stack.xml inorder to proceed with EHP installerHi,
Check below notes before proceeding with EHP download in solman,sap has recommaned to apply these notes when we tried to download EHP,
Must Implemeted
1238929 MOPZ: Solution Is Not Selected in Work Center
1240389 Maintenance optimizer transaction with incorrect Java host
1243197 MOPZ: Add Caption for Product and Stack of Stack Delta XML
1246549 Status were reset to step 1 after Download Basket approval
1247550 present all avaliable systems in mopz step 1
1250781 SMSY: Error for Java system components from the SLD
1255219 Java systems w/o ABAP instance in maintenance optimizer
1262239 SMSY: Database name *LOCAL
1273095 SMSY: Incorrect database server (Java)
1306173 Maintenance Optimizer: Enhancement Package Stacks
1308152 MOPZ: Check configuration for stack delta XML generation
1311841 Maintenance Optimizer: Rename stack delta index file
1319083 Maintenance Optimizer: Technical corrections
1326123 MOpz: Error "Update product data in Solution Manager"
1357565 MOpz: Maintain a system where EHP is installed
1402615 Translate hostname in Mopz to lower case
1407905 MOpz: Error when withdrawing in step 4
Cannot be implemented, but manual steps must be performed.
1141296 Solution Manager: ERP product data missing
1165587 Maintenance Optimizer: Enhancement Package stack selection
1277035 Solution Manager: EHP4 product data missing
Between what is your present stack level of solman
Regards
Uday -
QC Activity based on Material Production Version
Hi,
Normally, we perform QC activity based on Material Code, i.e. in Material Master we maintain inspection type in QM View for material which needs QC activation during Good Receipt from Production
Is it possible to perform QC Activity based on Production Version of a material i.e.
For Example
Product A having 2 Production Versions
IF Product A with Production Version 1 then No QC required during goods receipt from production
IF Product A with Production Version 2 then QC required during goods receipt from production
So please tell me what feasible solution possible from your side
With Regards,
Kunal ShethDear Sap User,
Production version is nothing just a combination of Master recipe/Routing and BOM used for particular production or process.
If you are having so many production version then you have to choose which you want to choose but if you are having a single production version then it will be chosen automatically.
Do it once and revert in case of any query.
Rgrds,
Dheeraj Rawal
Edited by: Dheeraj89 on Feb 9, 2012 6:13 AM -
Best practices in choosing Product Version / App Comp Type
Unfornunaly I din't find a document like SAP XI Best practice.
I am a litle bit confuced in terms Product version, Software Component Version, Main Instance...
Are the following scenarios right?
1. <b>I want to integrate non-SAP System.</b>
a) I have to create SYSTEM and PRODUCT in SLD
b) I have to create integration scenario in my PRODUCT
c) Which type of Application Component do I have to choose?
(In help.sap.com <b>Choise Template if it is non-SAP product that it is not defined in SLD</b>)
It is non-SAP product <b>but it is defined</b> in SLD. Which type of App Comp is the best?
What sense is in Application Component Type?
2. <b>I want to integrate SAP SRM and Oracle DB of non-SAP application</b>
Do I need to use SAP SRM Product Version and to create Integration Scenarion there?
Which Application Component Type do I need to choose for non-SAP application? Template?Hi Sergey,
>>1. I want to integrate non-SAP System.
>>>> b) I have to create integration scenario in my PRODUCT
no you don't have to create integration scenarios
these are only created to show the flow of our processes
but you don't have to create/use them
take a look at this weblog if you really want to create it:
/people/siva.maranani/blog/2005/08/27/modeling-integration-scenario146s-in-xi
>>> Do I need to use SAP SRM Product Version and to create Integration Scenarion there?
you don't need integration scenario here too
but if you want you can create it
Regards,
michal -
Which SAP Product version to assign to a Logical Component in SMSY (SOLMAN)
Dear SAP Colleagues,
In our SAP environment, we do have 2 versions of ERP systems :
1. CON - SIF - CDP systems are 'SAP ERP Central Component 5.0' product version.
2. CDD - CDT - CDP systems are 'SAP ECC 6.0' product version.
Question :
When I want to assign these systems to a Z_LOGICAL_COMPONENTS, which product version do I have to choose ?
Example for CON - SIF - CDP systems :
1. They are 'SAP ERP Central Component 5.0' product version.
2. In SMSY in our SOLMAN system, logical component are created using
'SAP ECC 5.0' product version.
Example for CDD - CDT - CDP systems :
1. They are 'SAP ECC 6.0' product version.
2. In SMSY in our SOLMAN system, logical component are created using
'SAP ECC 6.0' product version.
Question :
What about 'SAP ERP 2004' and 'SAP ERP 6.0' product version ?
In which case must I use this product version to assign CON-SIF-CPS
or CDD-CDT-CDP to new Logical components ?
Are they OSS Note or any matrix which give me the right product version to choose ?
I have heard that 'SAP ECC x.x' product version should not used any longer ?
Thanks
Best regards
P.CHi,
Read the following document, the mapping for systems and component versions is described in here:
https://websmp202.sap-ag.de/~sapdownload/011000358700000074392009E/SP18_SolMan_Setup_Guide_V2.pdf
For ECC 6.0 you should select ERP 6.0
regards,
Jaap -
Differences between Product Version SAP ERP 2005 and SAP ECC 6.0
Hello Guys,
I have to setup an new XI interface between two R/3 system. During Integration Scenario setup you have to select under Application Component Type the Product version for the R/3 systems.
Now, i am able to select SAP ERP 2005 or SAP ECC 6.0 from menu
Could someone tell me the differences between SAP ERP 2005 and SAP ECC 6.0. Both are listed as Product Versions.
Thanks in advance!
JochenSAP ECC 6.0 is latest version 2005 is last year version . as you are intergatin between 2 . you need select accordingly our source and target.
let me know you still require any doubt
Thanks
Sreeram
Message was edited by:
Sreeram Reddy -
SAP ECC 6.0 Software component Versions or Product versions in XI (SLD)
Hi All,
please, let me know the solution for this problem,
Curently we r using PI 7.0 SPS 14 kernal Version 179.
Unable to find out SAP ECC 6.0 Software component Version or (Product version) in SAP XI 7.0 SLD.
how to solve this issue....
Advace thanks.
MaheshHi Volkar,
I am doing Plant driven procurement service enablement scenario by using XI 7.0, for this,
we are integrating MM & SRM SUS Through XI 7.0 (MM -- XI-- SRM SUS).
For doing this Scenario,
1. Downloaded XI Content for SRM
2. Imported XI Content into the IR
3.After importing, Plan_Driven_Procurement_SupplierEnablement Scenario was enabled.
Here, MM side SWCV is R/3 4.6 is available by default. but in my case i need to change to ECC 6.0(bcoz,currently we r using ECC 6.0 version )
In SLD, there is no ECC 6.0 version.
So, how to solve this issue.
Thanks in Advance.
Mahesh -
Product Version SAP ERP 6.0 Missing from solman 7.0
Hi All,
I have installed an ECC6 system and now i need to configure the solution manager and download the support packs
and xml file for EHP4 upgrade. I have done this before where in i configure the new system in SMSY as SAP ERP 6.0
and then configure maintenance optimizer and it gives me the option of Enhancement Package Installation.
However now in the current solution manager i dont see the product version SAP ERP 6.0 when im clicking
trying to creating a new system.
Our Solman version is 7.0 . I tried creating my new system under SAP ERP EHP as ehp version 1 and used maintenace
optimizer but it does not give me the option of EHP package installation. Can any one let me know how to address this
issue??
Regards,
Ershad Ahmed.Hi,
Goto Tcode SMSY
1. Under Landscape Components --> Product Systems --> Select ERP --> Under that select your system ID and click on it,
Goto --> Header Data on your right side, change the Product Version to SAP ERP 6.0 and SAVE.
2. Goto System Groups and Logical Components --> Logical Components --> SAP ERP --> Create NEW Logical Component for your ECC system under this component and select Production version as SAP ERP 6.0 & assign ur system then SAVE.
3. Goto System Groups and Logical Components --> Solution Landscapes-Operations --> Select your system landscape and REMOVE your ECC systen form the Solution and SAVE.
4. Goto System Groups and Logical Components --> Solution Landscapes-Operations --> Select your system landscape and ADD your ECC system form the Solution and SAVE.
Regards
Kannan.K -
SMSY: Product version SAP R/3 ENTERPRISE 47X200 keeps returning
Hi,
Last year we have upgraded our SAP R/3 ENTERPRISE 47X200 system to SAP ERP 6.0.
For downloading enhancement packages we need the product version to be SAP ERP 6.0. In SMSY however, SAP R/3 ENTERPRISE 47X200 is still mentioned in the product versions list. We can delete it manually (not used in any logical component anymore) and are able to download enhancement packages fine at that moment. However, when we refresh SMSY by reading data from the SLD the SAP R/3 ENTERPRISE 47X200 product version returns in the list of product versions and we have to delete it manually again.
Any ideas?
Thanks,
Regards,
Bart Groot.check the Note and one of the same threads
Note 1296512 - SMSY: Product version transferred from deleted system
Configure ECC 6.0 EHP4 in SAP Solution Manager SP15 -
Schedules for certifications based on new SAP product versions?
Are there any schedules available that show when SAP certifications and related curriculum will be updated to newer product versions?
I also have a current requirement from an end user to find certifications and classes based on Crystal Reports 2013. Everything I can find is based on the older version 2011. Is there any schedule for availability based on the newer version?
Regards,
Derek EwellHi Derek,
I am afraid I could not find any such handy information.
I would always refer to
https://training.sap.com
for any updates and the latest certification / curriculum details.
Hope this helps.
Kind Regards,
Ravi -
There is already a transaction for the systems of this product version(MOPZ)
Hello All,
I am trying to configure maintenance optimizer in Solution Manager 7.0
on Windows 2003 server and SQL 2005 server.
I am configuring this for SAP CRM 2007 server.
Created the server, database and system in SMSY
Created Logical Component in TA code SMSY
SM59 connection for SAP-OSS is OK.
S-User is assigned to a User.
Created a solution using TA code solution_manager.
Defined the product version for the solution created in the TA code
solution_manager.
When creating a Maintenance Optimizer transaction, I select the
product version and its logical component in the Plan Maintenance
(Phase) and click on Continue to go to Select Files Phase, I get below
warning:
Information Procedure 8000000130 Saved
Warning: Status was reset by system
Warning: There is already a transaction for the systems of this
product version
I cannot get pass this phase.
I have deleted and recreated the solution, carried out the same
activity again but its giving the same Warning
Warning: Status was reset by system
Warning: There is already a transaction for the systems of this
product version
Any help will be appreciated???
Regards,
Satish.Hello Ragu,
Thanks for your response.
As of now, we do not have ChaRM in place. Secondly, we use a single customer number.
I would like to let you know that in our landscape we have two CRM server, one ECC sever, one SOLMAN7.0 server.
I tried to configure MOPZ for CRM, ECC, SOLMAN server to download the respective STACKS.
I was successful in configuring CRM and SOLMAN.
But when I tried to configure in ECC, it failed due to RFC erros.
So I deleted the transaction for the ECC system and deleted the system itself in Solution Manager.
Reconfigured the Systems in "SMSY", RFC connections are correctly defined to configure MOPZ between SOLMAN7.0 and ECC6.0.
When I start configuring the MOPZ, I cannot get pass the first phase and this is when I get an error: There is already a transaction for the systems of this product version.
Please let me know if you need further information.
Regards,
Satish. -
Different fix lot size depending on the production version
Hi all,
I have the next scenario:
2 production versions. 2 different fix lot size por each. So:
Prod Version 1 - Fix lot size 200
Prod Version 2 - Fix lot size 300
I created the Quota Arrangement just to make SAP to take my favourite version. And trought the quota, I can define the lot size for each version. BUT.
If I change the version in the order or in the planned order, the quantity don't change.
So: How can I manage 2 different fix lot size for 2 different product versions? If I change the version once the order is created, how can I do the system change de quantity to the right one?
Thanks in advante
<< Please do not offer points >>
Edited by: Rob Burbank on Oct 1, 2010 2:53 PMI have n't tried this scenario,
This is my Idea
Create a two production version
for ex: lot size 100 to 1000, set the rounding profile qty as 1000
for lot size 1001 to 99999, set the lot rounding profile value to 5000
BY this way u can get the two lot based on the rounding profie
Expert; please correct if i am wrong
Edited by: Sundaresan . E. V on Oct 1, 2010 4:12 PM -
Production Version in R/3 & PDS in APO
Hi Team,
I have below master data settings in R/3:
1. Material Master
2. BOM
Note:
I do not have work center & routing in R/3. I have set the default operation for my order type in OPJG.
But as per system landscape, the planning will be performed in APO. Hence i need to CIF the production version to APO from R/3. But i do not have routing in R/3. Is it possible to create the production version without routing (in R/3)?
ThanksYes, It can be transferred. You need to create CIF integration model(CFM1) with "BOM" option selected.
SAP Help says following -
Material BOM in Integration Model
If you set this indicator, all bills of material that correspond to the
stated selection options are indcluded in your model.
Dependencies
The material BOM filter object can only be used in connection with the
production data structure (iPPE) and it is used to map phantom assemblies.
Only those bills of material are transferred for materials for which no
production production versions have been created.
Hope this will help.
Thank you
Satish Waghmare -
Function Modules for creating production version.
Hi,
Is there any function module available in SAP to create Production version?
I'm aware of CM_FV_PROD_VERS_MAINTAIN function module but this one works on dialog mode.
Please let me know if there are any other function module/class available to create production version.
Many Thanks!
James....Dear,
For C223 production version,
CM_FV_PROD_VERS_MAINTAIN
CM_FV_PROD_VERS_SAVE
Please refer this thread,
Re: Create "Production version".
Regards,
R.Brahmankar
Maybe you are looking for
-
Discoverer Plus associate with the Oracle Application Server Infrastructure
Hi Everyone, I just install the Oracle BI (v 10.1.2.0.2) into my 2003 server so I could use the Discoverer Plus and Viewer. This is a stand alone BI installation (I guess, I have little knowledge about Discoverer plus or Oracle AS). My question is ho
-
what is the limit in voicemail? I have a new iphone4 and have been told my voicemail box is full but I also deleted voice mail before 13 June
-
How to include a Screen Print in a reply here?
I understand that by pressing Command-Shift-4 you can call up a box to make a screen print of a window in Lion. Now, when I do that my iMac saves a file location of the image to my desktop, NOT the image itself. I would like to know how to paste th
-
Determining Ver number on WRT54G for firmware upgrade
I can find no version number in the config or on the box. How do I determine which version of firmware to use 1.0, 1.1, 2.0, 2.2, etc thanks
-
Deployed a 2 nodes Windows 2008 R2 SP1 Failover Cluster on a HyperV 2012 Server cluster deployed on IBM HS23 blade. Disk susbsystem is IBM Storwize V7000. MPIO driver installed plus IBM DDSM. Lun presented to the VM are connected with Virtual FC Adap