SAP PM for logistic industry

Hi Experts,
I would like to design SAP PM for logistics company (Freight forwarding) with international operations.
Air, Sea, Land etc. Can I get power point presentation document or any other document for the same.
Please do the needful. Please update the documentation through Forum only.
Thanks and Best regards,
Praveen

resolved

Similar Messages

  • SAP BP for forging industry

    Hi,
      is there any SAP BP avilable for forging industry specific.
    kindly any body respond.

    Hi shiva,
                 thankyou for ur replay, i want to know is there available any BESTPRACTICE PACKAGE  all-in-one (ECC.6.0) FOR FORGING INDUSTRY

  • How to Map SAP B1  for retail industry

    hi every one,
    we r going to implement SAP B1 for a retail company which trades on shoes and bags. they have one Head office and 12 ware houses they simply buy finished goods from vendors and pack in their in house and sell it to customers. no production , MRP , how we can map it into SAP B1. iam thinking of using citixsys  Retail Add one is it possible ?  any other solutions?
    regards,
    rajan

    If they have store fronts (actual physical retail stores) then you will need the CitiXsys Addon.  Otherwise, you can handle this out of the box in B1.
    Suda

  • Assignment test in SAP for Logistic Invoice varification

    Hello Experts,
    We want to carry out Assignment Test in SAP for Logistic Invoice varification asp er the scenario:
    "The assignment text is a process step preceeding the invoice verification in background processing. The software checks cyclically whether an open goods receipt exists for the invoices entered in background processing. The software begins the invoice verification only when open goods receipts exist for an invoice. Effects on system administration are characterized as follows: the assignment test should be called in background processing before the report for the invoice verification, because the assignment test helps create the worklist for background processing. An assignment test is faster than a complete invoice verification in background processing, inasmuch as the software does not have to process as much data from the database and does not have to execute as many checks and reports. In addition, the software does not execute full assignment of the open goods receipts as in background processing; it executes only basic assignment"
    Please tell me if anybody has executed this and the required settings.
    Thanks,
    Radhakanta

    Hi
    The assignment filed material will be populated only for the documents after the Chnage in the G/L account.
    This change will not effect the Previous documents
    Mass change may not be posssible as accounting documents may not contain the same material.
    Thanks & Regards
    Kishore

  • SAP best Practice for Construction industry in GCC countries

    Dear Pals
    Pleas let me now the link for the SAP Best Practice document for Construction industry in GCC countries.
    Thanks & regards
    Rajaram

    Hi,
    Try the link gien below:
    http://help.sap.com/bp_bl603/BL_AE/html/index.htm
    Regards,
    Amit

  • SAP for Sugar Industry

    Hi
    I am working as SAP PM in a renewed US Group of Companies. After SAP deployment in two group companies we are extending SAP to our group sugar units.
    Expert opinion required,
    Which one is best to map Sugar production from Sugar Cane? & Why.  
    1) PP-PI
    2) Repetitive manufacturing
    3) Process Industry
    May be a reference Business Blueprint of SAP PP module for Sugar manufacturing will helpful for me to understand the things.
    I will keep it to my own.
    Thankful indeed.
    James

    Dear James,
    Check these links and I hope many of our experts have suggested for PP-PI,check these once and then
    decide.
    sugar industries
    Re: PP PI or REM?
    PPPI or REM  for Sugar industry
    Regards
    Mangalraj.S

  • SAP for Retail Industry

    Hi Experts,
    Could anyone tell me is there is any specific module in SAP fo Retail Industry.What is the reach of SAP in the retail market??For ex:a big retail stores like Walmart,costco...are they using SAP????

    Hi,
    Ofcouse , SAP has good practice in Retail industory .For more information you better contact SAP Marketing associates.
    http://help.sap.com/content/documentation/industry/docu_is_retail.htm
    http://help.sap.com/content/documentation/industry/docu_is_retail_retail.htm
    with rgds,
    Anil Kumar Sharma .P

  • Business senarios for shipping industry ........

    Hello Gurus ....
                      want help from you ..
                      what is the senarios in sap for shipping industry (cargo)
                      is comes under sap-scm or logistic service provider
                      please describe me the sales & distribution functionality in shipping industry ....means i am confused abut the sd
                      senarios  & scope for  shipping indusrty .
                       awaiting for your valuabe reply
                       tahnks

    i could'nt get any ans ........

  • What is the Best practice for ceramic industry?

    Dear All;
    i would like to ask two questions:
    1- which manufacturing category (process or discrete) fit ceramic industry?
    2- what is the Best practice for ceramic industry?
    please note from the below link
    [https://websmp103.sap-ag.de/~form/sapnet?_FRAME=CONTAINER&_OBJECT=011000358700000409682008E ]
    i recognized that ceramic industry is under category called building material which in turn under mill product and mining
    but there is no best practices for building material or even mill product and only fabricated meta and mining best practices is available.
    thanks in advance

    Hi,
    I understand that you refer to production of ceramic tiles. The solution for PP was process, with these setps: raw materials preparation (glazes and frits), dry pressing (I don't know extrusion process), glazing, firing (single fire), sorting and packing. In Spain, usually are All-in-one solutions (R/3 o ECC solutions). Perhaps the production of decors have fast firing and additional processes.
    In my opinion, the curiosity is in batch determination in SD, that you must determine in sales order because builders want that the order will be homogeneus in tone and caliber, and he/she can split the order in diferents deliveries. You must think that batch is tone (diferents colours in firing and so on) and in caliber.
    I hope this helps you
    Regards,
    Eduardo

  • SAP  opportunity for IT/BPO services as well as airline domain

    Hi All,
    I need suggestions related to my career path that i am building. I am a consultant having around 4.5 +years of experience in sap consulting. I do for Mm/QM. I have support/implementation experience in manufacturing , process industry who were my clients during my professional tenure. Now i have decided to join a company (actually joined) which is into IT/BPO services ( they manage the activities through SAP( procurement being my part))and also has done sap implementation for airline domain. They do not do any other sap practice other than travel and airline. Now if i tell you , i have joined the company so that i can see how SAP is customized to  match the requirement of IT/BPO services. This is a new domain for me and i think i have lot to learn from it. However i also see that i have the chance of being dynamic (vertical wise) as i have knowledge in manufacturing, process, it services/ airline. So i am thinking of staying and learning the same. But 3-6 years down the line i might again change my job with/into consulting firms/ solution providers. In that case will it be a right decision to stay with this organization and work profile or leave and  move to the previous vertical in which i was (consulting firms/ solution providers)
    Regards,
    SS

    Hi Sen,
    as told by Vev Patra, if you thinks you are gaining knowledge about new things, please stay there because you will get a lot of things to be learn, when it comes to switch towards other side, it will not be a major issues for you, because after some years you will get domain knowledge in various module and your expertise also increased upto a level, and that will be sufficient for a vertical growth.
    But if you are thinking that, there is nothing more to learn, then you can move towards your previous role, as not gaining any new thing, means you are not learning new concepts, and in this way you get struck at one point, which in needless.
    So, it totally on your business aspects, if you thinks your previous role was good, then you can move onto it, but if you are enjoying the present role, please keep it with you, because it will also play a vital role in your vertical career growth in some manner.

  • PI sheet for pharma industry - step by step customization required very urg

    Hi,
    We are implementing sap PP-PI for pharma industry.Can some one please send some good document explaining the customization for PI sheet , custom pi sheet .
    any help is gretaly appreciated.
    sonia

    Hi,
    Please check with following Baseline Buliding Block link provided  by SAP. Here u can select industry type and contry type.
    <b>http://help.sap.com/bp_blv1470/BL_UK/index.htm</b>
    i hope this will help.
    regards
    pardeep

  • Best Practices for Chemical Industry

    I am searching for documentation for Best Practices Package for Chemical Industry
    e.g. file SMB18_XK15_O002_Q36_01.TXT but could not find it on SAP Marketplace.
    Can someone hint me where i can get those files.

    Yogesh,
    I suspect that the exact file you are looking for was part of an earlier release.
    Why not just download the latest version?
    https://websmp210.sap-ag.de/~form/sapnet?_FRAME=CONTAINER&_OBJECT=011000358700001465742009E
    US version/zip file format..
    Best Regards,
    DB49

  • SAP implementation in Utilities Industry

    Hi,
    What is the major difference while implementing SAP CO for a utilities industry? How does it differ with other industries?
    Any help is appreciated.
    Thanks

    Hi,
    What is the major difference while implementing SAP CO for a utilities industry? How does it differ with other industries?
    Any help is appreciated.
    Thanks

  • SAP Solution for Mini steel plant with DRI Process

    Dear all,
    I am a metallurgist who spent couple of years in steel and process Industry and then moved to IT Consulting as SAP consultant / business analyst mainly working in the area of solution designing.
    Here i will like to describe SAP solution for Mini steel plant with DRI proces.
    u201CManufacture Productsu201D Description
    The series of operations performed upon material to convert it from the raw material or a semifinished state to a state of further completion. This includes the establishment and maintenance of a CAPEX plan, the planning, scheduling and execution of production activities, the dispositioning of produced goods, the maintenance of production data, the monitoring of production performance and the implementation of engineering changes.
    u201CManufacture Productsu201D Objectives
    M-010
    Compile 3-year CAPEX Budget     Establish the overall manufacturing goals and metrics that the organization will use to measure performance and progress towards objectives. These goals should be consistent with overall organizational strategy/value propositions. Develop long-term goals for production capabilities and manufacturing. These goals should align with the overall goals and objectives of the organization.
    M-050
    Perform Long Range Production Planning     u201CBudgetingu201D. Long range planning of production quantities based on planned available capacities and known or estimated customer demands. This process may include planning for different capacity and/or demand scenarios. Approved capital expenditures from the 3-year CAPEX budget may influence the budget. Range and frequency for budgeting is yearly.
    M-060
    Perform Medium Range Production Planning     Medium range planning of production quantities based on planned available capacities and known or estimated customer demands. This process may include planning for different capacity and/or demand scenarios.  Range and frequency for planning is quarterly.
    M-070
    Perform Short Range Production Planning     Short term planning of production quantities based on capacities and demands as previously planned in the longer terms, actual customer demand and actual capacities. The result from short range production planning will run into the operational plan for the current and following days.  Range and frequency for planning is monthly.
    M-080
    Schedule Production     This sub-process enables detailed scheduling by resources over the planning horizon. Planned orders that fulfill demands (Stock Transfer Requisitions, Sales Forecasts and Customer Orders defined by due-dates and due-quantities) come from the short range plan. This results in a feasible schedule, optimizing utilization of the production resources. It is based on production process constraints as well as labor resources in order to minimize production costs and also taking into account constraining raw materials availability.
    M-090
    Execute MRP     The purpose of this sub-process is to generate a Materials Requirements Plan (MRP) for all materials, which are produced or purchased. The MRP process involves looking at current material inventory, planned inbound material deliveries, requirements, lead times and stock levels to generate a detailed plan for future material requirements. The materials requirements will be generated with respect to the three planning horizons, short-term, medium-term, and long term. If an over stock of raw materials occurs as a result of a planning change production and marketing personnel will be informed. This would allow for the cancellations of any unneeded shipments.
    M-100
    Perform Setup / Changeover     Perform set-up and changeover activities on production equipment as necessary, to prepare for the production of specific materials/grades. Set-up and changeover activities will enable the production equipment to perform operations on materials, as per the specifications called out on the production order. Ensure time is allocated for first off inspection requirements after changeover.
    M-110
    Execute Production     Insure that the production plan is met by converting raw materials and component supplies into finished and semi-finished products. Batch/lot documentation will be created for individual production orders to provide traceability throughout the process. Each step of the production process is continuously monitored to identify mechanical, quality, and productivity issues and suggest solutions when problems arise. Data collection for performance and financial reporting enables management to take immediate action on manufacturing processes as well as conduct historical analysis.
    M-120
    Perform Quality Management     Quality management refers to the entire supply chain process. Process activities are related to the evaluation and inspection of key characteristics of semi-finished and finished materials. These evaluations are recorded and acted on based on the results. Report/manage internal quality problems or issues. Install and manage quality control systems to insure product quality. For supplier or subcontractor based issues this data should be used as a performance measure during the vendor evaluation process.
    M-130
    Manage Product Disposition     This process ensures those semi-finished and finished products that do not meet quality requirements, are prevented from being used and distributed in good finished product to customer, or released for the next step of the production process. A semi finished product is any material that needs to have another operation on line before being shipped to the customer. Finished goods are defined as any material that can be shipped to a customer; in house produced finished goods, subcontracted materials and trading goods. The information required to make decisions regarding disposition comes from the Quality Management system of each production facility. The first step ensures that raw material and returnable goods are dealt with in another subprocess. The reason for the goods not meeting quality standards is recorded along with the results of any investigation to find the cause of the fault. Information is sent to all other parties who need to know: order fulfillment, inventory management and shipping. The process ensures that the most appropriate action is taken to either dispose of, or rework the goods. Disposal or rework may be either through the original materials supplier or subcontractor, or Mittal Steel Point Lisas.
    M-140
    Maintain Product Related Data     u201CMaterial Master Maintenanceu201D. The Sub-Process 'Maintain Product Related Data' is the list of activities that identify the steps and decision points related to the request for and performance of additions, changes, and deletions to the Material Master file or files. This sub-process begins when a need to create, change or delete a material is identified and ends when the request is either actioned or refused. The sub-process is intended to cover all material types, including finished goods, raw materials, bills of materials, equipment and service, POS, Sundry Items etc. In fact, any product which the company wishes to inventory or purchase. A number of key strategic decisions, including a clear definition of when we issue a new material, will affect this sub-process.
    M-150
    Maintain Production Related Data     u201CMaster Data Maintenanceu201D. This subprocess identifies the activities related to requesting changes or additions to production related master data. Once a need for master data maintenance is identified, a request is submitted for approval. Data defining production capacities and performance standards (e.g. line efficiencies, material yields, etc.) require Corporate level approval prior to maintenance. Other data that is more specific to internal planning functions are maintained at the plant level. Maintenance requests are returned to the originator whether the request is approved or not to improve communication throughout the system. This subprocess may be triggered by: annual operations budgeting process process/production equipment upgrade or replacement change in facility work schedule (i.e. planned hours or days) change in personnel required to operate process/production equipment new products, formulations, or packaging.
    M-160
    Operations Execution Reporting     Gather manufacturing information at various points in the production process. Prepare management reports both at the detailed level for plant management and summary level for senior operations management. Reports will be available on-demand and will include - volume, efficiencies (mechanical, line, and labor), yields, downtime, asset utilization, environmental, safety, quality, and financial data. A major goal of this sub-process is to define a consistent method of calculating operations metrics. Some plants will use line information systems and PCSs to collect information. Not all plants are equipped with these systems and the where they do exist, the level of sophistication varies.
    M-170
    Manage Process Reliability     Optimize capacity by reducing process downtime and ensuring compliance to quality expectations by the reduction of rejects. Install tracking systems to measure line time utilization, quality results, process settings. Conduct root cause analysis, and use the data to develop and implement improved operating procedures.

    Thank you for your prompt response. I'm assuming you are still proposing to use Sales order -> purchase order -> invoice verification -> Customer billing process flow. Is that correct?

  • Standerd BI Content DataSources and Cubes used for Cement industry

    HI,
        Kindly any one sugest the list of standerd BI Content DataSources,
       and standerd BI Content Cubes used for Cement industry
       related projects.
      Standerd BI Content Datasources and cubes for modules
      SD, Product costing , Inventry, and GL.
      Kindly Sugest.
      Regard,
      prasad.

    Hi,
    You can use normal InfoCubes/DataSource for the Cement Industry, recently I saw the design of the Cement Industry BI system, there also same InfoCubes and DataSourecs they used.
    For Cubes and DataSource details see in SDN..
    https://wiki.sdn.sap.com/wiki/display/BI/BWSDMMFIDATASOURCES
    Thanks
    Reddy

Maybe you are looking for

  • How do I control a servo-valve to open and close with Dasylab?

    I am currently using a servo-valve to run an endurance test and would like to control it to open a close  at a set frequency rate and set pressure rate (6000psi). Is there a controller that I can use to do that?  I am using Dasylab with a NI Daq boar

  • Unable to open the document when combining files.

    We have a user that gets an error when combining files. It says Unable to open the document: <Filename and path> Please check to see if you have read permission for the above file. Retry and cancel buttons. We get this error on every subsequent file,

  • Have you ever come across this ?

    Hey there, Every time I record a midi region, all the the the regions before are glued together with the one just recorded.....it's GrrrrrREALLY anoying ?? I've used Logic for years and it's never done this before. Is it a bug or just me seeing thing

  • LUM, integrated login, roaming profile

    Re-reading many message threads in this and other forums, I'm confused. For SLED, LUM creates users accounts on-the-fly after eDir login (like DLU on ZEN on Windows), the Novell client reads login scripts and maps drives (like on Windows) but integra

  • Anonymous calls, Unknown Callers and 10 number limit on call blocking feature

    I have FIOS Digital Voice. I hope that someone can give me information to help me out - because like many others here, right now I am regretting having this and have it unplugged more than plugged in - for a service I am paying for. My number is unli