Schedule line item link to delivery qty

dear all,
I used the function module RV_SCHEDULE_CHECK_DELIVERIES to find for a sales order all the shedule lines with the delivery qties.
I faced to a problem to link schedule and delivery for this case :
schedule item _______date ____________order. qty ___confirmed qty___deliver. qty
1 ________________11.02.2009 ___________4  ___________4   ___________4
2 ________________ 12.02.2009      __________7 ___________3 ___________3
3 ________________15.02.2009 ___________7 ___________0  ___________ 0
6 ________________16.02.2009 ___________0 ___________0   ___________4
7 ________________16.02.2009 ___________0  ___________0   ___________7
4 ________________20.02.2009 ___________9  ___________0  ___________ 0
5 ________________21.02.2009 ___________9  ___________9   ___________ 0
I need to keep only the delivered lines, how to remove only the "real" line with no confirmed qty or with no delivered qty.
How to distinguish the line 3 and 4 because the 3 is delivered with line 7 but the line 4 is not delivered.
Thanks for your quick answer .
Véronique
Edited by: veronique pinelli on Feb 13, 2009 11:22 AM

Kindly share the solution so as this can be used in future,if any one faces same problem

Similar Messages

  • What is the direct link between Schedule Line item and Delivery line item?

    Hi SAP SD Gurus,
    The question is simple.  I would like to calculate the Open order quantity for a particular month based on the Schedule Line Date.
    I am taking all the Schedule lines falling below the running date of the month and sum up that and look for the deliveries happened for that Schedule lines.
    I am unable to link that Schedule line with that Delivery line item.
    The only link is Schedule Line Number in VBEP table which is not available in LIPS.  I would like sum up the Schdule line Quantities and Subtract the sum of the Delivery quantities which will give me the Open orders for the particular day of the month.
    Can anyone help me to link this VBEP table to LIPS table to connect the Schedule line number with the Delivery line item?
    Thanks in advance for your help..
    Augustine

    Anuj,
    I am aware of the Functional Modules. 
    I wanted to know for this Schedule Line, this is Delivery document created.
    Where in SAP through Tables it is linked?  Because, I need to source the Tables to calulate the open orders by way of external report through Business Object.
    The table link from VBEP to LIPS is not directly linked.  It is linked from Sales order line item level.  Because we are capturing all the Sales order Line tiems through the Delivery Status which is not equalled to C. But if there are partial deliveries against the Scheuld Line item level, we need to identify.  The only common joint should be Scheldule line number which is not available in LIPS.
    If we are developing report inside SAP, we can use the said Functional Modules to capture through Structures VBEPD.  Since it is a external reporting , we need to give correct tables and the joints.  Hence I am looking for any other way to solve this.
    Thanks
    Augustine Ponraj

  • SCHEDULE AGREEMENT-DELIVERY SCHEDULE LINE ITEM PRINTING

    Scheduling agreement is created in ECC.
    Delivery schedule line items are generated using APO and CIFed over to ECC.
    Upon displaying in ME38 in ECC, the delivery schedule line items are appearing as required. The problem is that no output type is displayed for condition type LPET even though the settings are done & condition records are maintained.
    Can someone throw some light on this?

    Hi Anil ,
    Goto Transaction NACE , Select Application EL and then Click on O/p Types.
    Select your o/p and click on Processing routines.
    Make a copy of medium 1 and change it to 5. The program , Form , Form routine would remain the same.
    Maintain condition records with medium 5 in MN10.
    Ensure that email address exists in Vendor Master.
    Check with ur Basis to make sure that the setting are done in Transaction SCOT for sending document via PDF.
    Create a new Agreement and test it.
    Regards
    Ramesh Ch

  • Schedule Line Item 100001 delivery date is missing

    Hello Sirs,
    After created a sales order in ECC and transferred to TM via XI, the queue remains with STOP status. Entering in transaction /SAPPO/PPO2 I’m facing the error “Schedule Line Item 100001 delivery date is missing”. The delivery date is filled in ECC side.
    Is there something that I need to check in TM regarding delivery date?
    Thanks.

    Please try to edit the PO[Change date] and process it again. This issue happens when we use a conversion program to create PO instead of creating it from UI.

  • How to identify open schedule line item?

    Hi,
    I have a requirement for identifying open schedule line items. I want to identify any indicator or any field in any table which will tell me that the schedule line item is complete. Can anyone tell me how can I know that?
    Ex. Sales Order 1 has 3 materials (line items) in it A, B & C.
           For A the quantity is 10 and for which 3 schedule line have been created.
           Out of the 3 schedule lines, 1 schedule line item is complete that is the delivery has been done and the rest 2 are open.
    For B and C there are 4 & 5 schedule lines created and all are open.
    How can i identify that total 12 schedule line 1 is completed and 11 are open.
    Please suggest tables, field names / indicators.
    Regards,
    Vishal

    Hi Vishal,
    You can not identify the open line items directly, rather you have to calculate the delivered quantity and copmare it with the ordered qty for each line item. The ordered qty can be idenitfy from the table VBEP and the deliverd qty can be found out by calling the function RV_SCHEDULE_CHECK_DELIVERIES.
    Follow the link for more details to calculate the delvierd qty.
    http://scn.sap.com/thread/279862
    Rgards,
    Rutvik.

  • Mulitple line items with partial delivery in IDOC

    Hi,
    This is the scenario
    I am testing 855 inbound PO confirmation using we19. How can I test with multiple line items for partial delivery. I have created new segment for each line item(E1EDP01). For one line item the scheduled quantity is less than the ordered quantiy.
    Guys Please can u help me on this
    Regards
    Andy

    Enable 'Del Date' in Form Settings of the Delivery.
    In the First Row, select the Item, Qty 5 and type Del Date Immediately
    In the Second Row, select the Same Item, Qty 10 and type Del Date after 10 Days
    In the Thrid Row, select the Same Item, Qty 5 and type Del Date after 15 Days

  • MRP - Auto creation of del schedule lines based on planned delivery time

    Hi,
    We have activated MRP (type PD) where Purchase requiesition is auto created by system for requirement quantity. We require to optimize delivery schedule in such a way that entire PR quantity is broken into various delivery schedule based on planned delivery time and requirement.  Scenario can be further explained with following example.
    Material Requirement for a month is say 1,25,000 units
    Closing Stock say 25,000 units
    PR Generated by system for 1,00,000 units. The entire quantity is schdulled with only one delivery schedule line as per planned delivery time. 
    The requirement is to generate multiple delivery schedule lines automatically in Purchase requisition based on planned delivery time so that Purchase orders can be placed with system generated delivery schedule lines.
    How can it be achieved ?
    Regards,
    Nirav Kinkhabwala

    Nirav,
    This subject has been discussed repeatedly in this and other forums.  I must assume that you overlooked the rules of engagement, which state that you should first search the forums and other public sites, before posting questions here.
    Standard SAP MRP cannot be made to generate multiple items in a Purchase requisition.  The functionality you seek is usually achieved when converting purchase reqs to Purchase orders, where many single purchase reqs can be adopted into a single Purchase order.
    You also might want to investigate use of Vendor Scheduling agreements.
    Best Regards,
    DB49

  • Schedule line date vs actual delivery date

    Hi All,
    Is there any standard report or work around available to compare customers schedule line date vs actual delivery date
    Thanks & Regards,

    Hi Abir,
    I think your talking about a "On time Delivery report" to track actual delivery against the quoted delivery.
    There is no standard report available in SAP for this.
    This is hard to track if you have maintained multiple schedule lines for a one single line item.
    (Where you maintain multiple delivery dates in schedule line level to quote  multiple delivery dates. If you have maintained multiple line items to quote multiple delivery dates, this would have been easy)
    Because you do your delivery based on your sales order line item. Not based on your schedule lines. Therefore in your delivery line item table (LIPS) you cannot see Schedule line number. Therefore you cannot compare quoted delivery against actual delivery date.
    Assuming you have maintained your multiple delivery dates in Schedule line level, this is how you have to proceed.
    - Use VL10E transaction to create delivery against schedule lines.
    - Create append structure in the LIPS table to accommodate to carry the schedule line item of sales order in each delivery document + Line Item combination.
    - Use this user-exit u2013include  MV50AFZ1. Can save the particular sales order schedule line in the LIPS, earlier created append structure field.
    Then you have the schedule line number available in the LIPS table, Now you can code your report to capture quoted delivery against actual delivery date.
    Hope this helps you !
    Anupa

  • BAPI FOR Deleting a Schedule Line Item from EKES and EKET tables

    Dear All,
    I would like to for deleting one of the line item from EKES (Po Confirmation ) and the respective line item from the EKET(PO Schedule Line Item Table).
    Assume that am allowing the user to select the lineitem from zprogram screen and collecting the PO and Its LIne Item details in an internal table.
    Can i Use
    <b>BAPI_PO_Change</b> , if so , can anybody tell me the steps to follow to use this bapi for deleting the PO lineItems, since i m going to try BAPI for First time.
    pls help me out
    Message was edited by: Raja K.P

    Hi raja ,
    loop at iekko1.
        w_index = sy-tabix.
        item-po_item   = itemx-po_item   = iekko1-ebelp.
        item-quantity  = iekko1-mng01.
        itemx-quantity = iekko1-mng01.
        if iekko1-wamng = iekko1-wemng.
        itemx-no_more_gr = item-no_more_gr = 'X'.
        else.
        itemx-no_more_gr = item-no_more_gr = ''.
        endif.
        append item.
        append itemx.
          clear return[].
          call function 'BAPI_PO_CHANGE'
               exporting
                    purchaseorder = iekko1-ebeln
               tables
                    return        = return
                    poitem        = item
                    poitemx       = itemx.
          if return[] is initial.
          commit work and wait.
          call function 'DEQUEUE_ALL'.
    search for deletion fields which u have to mark 'X'.
    before calling  this BAPi u have to lock the PO by using ENQUEUE.
    <b>
    FU BAPI_PO_CHANGE
    Text
    Change purchase order
    Functionality
    Function module BAPI_PO_CHANGE enables you to change purchase orders. The Change method uses the technology behind the online transaction ME22N.
    Alternatively, the IDoc type PORDCH1 is available. The data from this IDoc populates the interface parameters of the function module BAPI_PO_CHANGE.
    Functionality in Detail
    Authorization
    When you create (activity 02) an Enjoy purchase order, the following authorization objects are checked:
    M_BEST_BSA (document type in PO)
    M_BEST_EKG (purchasing group in PO)
    M_BEST_EKO (purchasing organization in PO)
    M_BEST_WRK (plant in PO)
    Controlling adoption of field values via X bar
    For most tables, you can use your own parameters in the associated X bar (e.g. PoItemX) to determine whether fields are to be set initial, values inserted via the interface, or default values adopted from Customizing or master records, etc. (for example, it is not mandatory to adopt the material group from an underlying requisition - you can change it with the BAPI).
    Transfer
    Purchase order number
    The PurchaseOrder field uniquely identifies a purchase order. This field must be populated in order to carry out the Change method.
    Header data
    The header data of the Enjoy purchase order is transferred in table PoHeader.
    Item data
    The item data of the Enjoy purchase order is stored in the tables PoItem (general item data). Changes regarding quantity and delivery date are to be made in the table PoSchedule.
    Use the table PoAccount to change the account assignment information.
    Services and limits
    Changes to existing items cannot be carried out with the Change method. It is only possible to create new items.
    Conditions
    Conditions are transferred in the table PoCond; header conditions in the table PoCondHeader. A new price determination process can be initiated via the parameter CALCTYPE in the table PoItem.
    Vendor and delivery address
    The vendor address in the table PoAddrVendor and the delivery address in the table PoAddrDelivery can only be replaced by another address number that already exists in the system (table ADRC). Changes to address details can only be made using the method BAPI_ADDRESSORG_CHANGE.
    Partner roles
    You can change all partners except the partner role "vendor" via the table PoPartner.
    Export/import data
    Export/import data can be specified per item in the table PoExpImpItem. Foreign trade data can only be transferred as default data for new items. Changes to the export/import data of existing items are not possible.
    Texts
    Header and item texts can be transferred in the tables PoTextHeader and PoTextItem. Texts for services are imported in the table PoServicesText. Texts can only be replaced completely.
    Version Management
    You can make use of the Version Management facility via the table AllVersions.
    Return
    If the PO was changed successfully, the header and item tables are populated with the information from the PO.
    Return messages
    Messages are returned in the parameter Return. This also contains information as to whether interface data has been wrongly or probably wrongly (heuristical interface check) populated. If a PO has been successfully created, the PO number is also placed in the return table with the appropriate message.
    Restrictions
    With this function module, it is not possible to:
    Create subcontracting components (you can only use existing ones)
    Create configurations (you can only use existing ones)
    Change message records (table NAST) and additional message data (this data can only be determined via the message determination facility (Customizing))
    Attach documents to the purchase order
    Change foreign trade data
    Change service data
    Change or reexplode BOMs
    A firewall prevents the manipulation of data that is not changeable in Purchasing according to the business logic of the purchase order (e.g. PO number, vendor, etc.).
    PO items with an invoicing plan cannot be created or changed using the BAPIs
    In this connection, please refer to current information in Note 197958.
    To change addresses with numbers from Business Address Services (cantral address management), please use the function module BAPI_ADDRESSORG_CHANGE.
    To change variant configurations, please use the function module BAPI_UI_CHANGE. More information is available in the BAPI Explorer under the Logistics General node.
    In the case of changes that are to be made via the BAPI_PO_CHANGE, a firewall first checks whether the relevant fields are changeable. This approach follows that of the online transaction. Here it is not possible to change the vendor or the document type, for example.
    Example
    Example of changes made to a purchase order with:
    1. Change in header data
    2. Change in item
    3. Change in delivery schedule
    4. Change in account assignment
    5. Change in conditions
    6. Change in partners
    Parameter: PURCHASEORDER 4500049596
    Parameter: POHEADER
    PMNTTRMS = 0002
    PUR_GROUP = 002
    Parameter: POHEADERX
    PMNTTRMS = X
    PUR_GROUP = X
    Parameter: POITEM
    PO_ITEM = 00001
    CONF_CTRL = 0001
    Parameter: POITEMX
    PO_ITEM = 00001
    PO_ITEMX = X
    CONF_CTRL =  X
    Parameter: POSCHEDULE
    PO_ITEM = 00001
    SCHED_LINE = 0001
    QUANTITY = 10.000
    PO_ITEM = 00001
    SCHED_LINE = 0003
    DELETE_IND =  X
    Parameter: POSCHEDULEX
    PO_ITEM =  00001
    SCHED_LINE =  0001
    PO_ITEMX =  X
    SCHED_LINEX =  X
    QUANTITY =  X
    PO_ITEM =  00001
    SCHED_LINE =  0003
    PO_ITEMX =  X
    SCHED_LINEX =  X
    DELETE_IND = X
    Parameter: POACCOUNT
    PO_ITEM = 00001
    SERIAL_NO = 01
    GL_ACCOUNT = 0000400020
    Parameter: POACCOUNTX
    PO_ITEM = 00001
    SERIAL_NO = 01
    PO_ITEMX = X
    SERIAL_NOX = X
    GL_ACCOUNT = X
    Parameter: POCOND
    ITM_NUMBER = 000001
    COND_TYPE = RA02
    COND_VALUE = 2.110000000
    CURRENCY = %
    CHANGE_ID = U
    Parameter: POCONDX
    ITM_NUMBER = 000001
    COND_ST_NO = 001
    ITM_NUMBERX = X
    COND_ST_NOX = X
    COND_TYPE = X
    COND_VALUE = X
    CURRENCY = X
    CHANGE_ID = X
    Parameter: POPARTNER
    PARTNERDESC =  GS
    LANGU =  EN
    BUSPARTNO = 0000001000
    Help in the Case of Problems
    1. Note 197958 lists answers to frequently asked questions (FAQs). (Note 499626 contains answers to FAQs relating to External Services Management.)
    2. If you have detected an error in the function of a BAPI, kindly create a reproducible example in the test data directory in the Function Builder (transaction code SE37). Note 375886 tells you how to do this.
    3. If the problem persists, please create a Customer Problem Message for the componente MM-PUR-PO-BAPI, and document the reproducible example where necessary.
    Customer Enhancements
    The following user exits (function modules) are available for the BAPI BAPI_PO_CREATE1:
    EXIT_SAPL2012_001 (at start of BAPI)
    EXIT_SAPL2012_003 (at end of BAPI)
    The following user exits (function modules) are available for the BAPI BAPI BAPI_PO_CHANGE:
    EXIT_SAPL2012_002 (at start of BAPI)
    EXIT_SAPL2012_004 (at end of BAPI)
    These exits belong to the enhancement SAPL2012 (see also transaction codes SMOD and CMOD).
    There is also the option of populating customer-specific fields for header, item, or account assignment data via the parameter EXTENSIONIN.
    Further Information
    1. Note 197958 contains up-to-date information on the purchase order BAPIs.
    2. If you test the BAPIs BAPI_PO_CREATE1 or BAPI_PO_CHANGE in the Function Builder (transaction code SE37), no database updates will be carried out. If you need this function, please take a look at Note 420646.
    3. The BAPI BAPI_PO_GETDETAIL serves to read the details of a purchase order. The BAPI cannot read all details (e.g. conditions). However, you can use the BAPI BAPI_PO_CHANGE for this purpose if only the document number is populated and the initiator has change authorizations for purchase orders.
    4. Frequently used BAPIs for purchase orders are BAPI_PO_CREATE, BAPI_PO_CREATE1, BAPI_PO_CHANGE, BAPI_PO_GETDETAIL, BAPI_PO_GETITEMS, BAPI_PO_GETITEMSREL, and BAPI_PO_GETRELINFO.
    5. For more information on purchase orders, refer to the SAP library (under MM Purchasing -> Purchase Orders) or the Help for the Enjoy Purchase Order, or choose the path Tools -> ABAP Workbench -> Overview -> BAPI Explorer from the SAP menu.
    Parameters
    PURCHASEORDER
    POHEADER
    POHEADERX
    POADDRVENDOR
    TESTRUN
    MEMORY_UNCOMPLETE
    MEMORY_COMPLETE
    POEXPIMPHEADER
    POEXPIMPHEADERX
    VERSIONS
    NO_MESSAGING
    NO_MESSAGE_REQ
    NO_AUTHORITY
    NO_PRICE_FROM_PO
    EXPHEADER
    EXPPOEXPIMPHEADER
    RETURN
    POITEM
    POITEMX
    POADDRDELIVERY
    POSCHEDULE
    POSCHEDULEX
    POACCOUNT
    POACCOUNTPROFITSEGMENT
    POACCOUNTX
    POCONDHEADER
    POCONDHEADERX
    POCOND
    POCONDX
    POLIMITS
    POCONTRACTLIMITS
    POSERVICES
    POSRVACCESSVALUES
    POSERVICESTEXT
    EXTENSIONIN
    EXTENSIONOUT
    POEXPIMPITEM
    POEXPIMPITEMX
    POTEXTHEADER
    POTEXTITEM
    ALLVERSIONS
    POPARTNER
    Exceptions
    Function Group
    2012
    </b>
    regards
    prabhu
    Message was edited by: Prabhu Peram

  • Inserting new line item into existing delivery using BAPI

    Hi
    can you send me the code for inserting new line item into existing delivery either using BAPI or
    Function module.
    We are using SAP 4.7 version

    Hi Sreekanth,
    Refer to this links
    New item for outbound delivery via FM/BAPI?
    /message/3976349#3976349 [original link is broken]
    BAPI_OUTB_DELIVERY_CHANGE Help - Add new line item
    hope it is useful to you.
    Regards!

  • Re : schedule line item date change

    HI
        How to change schedule line item date. Default 5 days inadvance its coming. i want to change that into 8 days.
    thanks
    mani

    Hi,
    Please go to t-code VOV8,select your s.doc type and double click it.Pl check no of days in "Requested delivery date/pricing date/PO date" -Lead time in days.
    If it is 5,change it to 8.
    Schedule line date is also determined after system carry out availability check.
    thanks,
    vrajesh

  • Regarding Schedule line category for Reverse delivery

    Can any one pls let me know what will be the schedule line category for reverse delivery after cancellation of invoice?

    FYI-
            reversal of delivery only reverse the stock & accounting doc's. To do this seperate mov type is used which is linked with the actual Goods issue mov type i.e. 601 ( ref: Tx-OMJJ)
    for every mov type there is reversal mov type is assigned to reverse the transaction.
    for reversal no schedule line category is required.
    Regards,
    Reazuddin MD

  • Not Printing Item Schedule line items in SAP Script

    Hi ,
    I modified  copied sap standard script(MEDRUCK) and copied my Zprogram to standard program.
    But here every thing is fine but i am not getting schedule line items and item text  in items data for every item
    thanks,
    sriram

    Hi
    Pls Check in the Line item Ur using the syntax properly or not..In SAP if it ios syntax error it won show..Pls chk the syntax properly ...POr try to debug the script and see whether item text is coming or not.
    If it is not coming check me23n whether tat PO has item text or not..if it is there Problem is in ur Include text.

  • BAPI_GOODSMVT_CREATE Closing scheduling line items when errors

    Hello all,
    I have an issue when running BAPI_GOODSMVT_CREATE.  If someone for instance is in a scheduling agreement when running my code.  I get a locked by user return error from the BAPI.  This is fine but the problem is the line item is closed not allowing for reprocessing when the entry is no longer locked.  When reprocessing I will get a PU Ordered quantity exceeded by 1 EA : MS9556-08 2 error message
    Any advice? Is there a way to reopen a scheduling line item?
    Here is what Im sending the BAPI  Its looped so one Goods receipt per line in my custom z table.
      ls_header-pstng_date  = sy-datum.
       ls_code-gm_code       = c_01.
       LOOP AT i_ztab ASSIGNING <lfs_ztab>.
         IF <lfs_ztab>-zgr_status IS NOT INITIAL.
           <lfs_ztab>-zgr_status  = SPACE.
           <lfs_ztab>-zgr_error   = SPACE.
           <lfs_ztab>-return_code = SPACE.
         ENDIF.
         lv_index = sy-tabix.
         ls_header-doc_date  = <lfs_ztab>-zload_dt.
         lw_goods-material   = <lfs_tab>-ematn.
         lw_goods-plant      = <lfs_ztab>-werks.
         lw_goods-stge_loc   = s_loc-low.
         lw_goods-move_type  = c_101.
         lw_goods-mvt_ind    = c_b.
         lw_goods-vendor     = <lfs_ztab>-lifnr.
         lw_goods-entry_qnt  = <lfs_ztab>-menge.
         READ TABLE li_ekpo INTO lw_ekpo
             WITH KEY ebeln = <lfs_ztab>-ebeln
                      ebelp = <lfs_ztab>-ebelp
             BINARY SEARCH.
         IF sy-subrc = 0.
           lw_goods-po_number  = <lfs_ztab>-ebeln.
           lw_goods-po_item    = <lfs_ztab>-ebelp.
           lw_goods-entry_uom  = lw_ekpo-meins.
         ELSE.
           <lfs_ztab>-zgr_status  = c_f.
           <lfs_ztab>-zgr_error   = TEXT-003. "Contract not found error
           <lfs_ztab>-return_code = c_e.
           MOVE-CORRESPONDING <lfs_ztab> to w_ztab_up.
           APPEND w_tab_up TO i_ztab_up.
           CONTINUE.
         ENDIF.
         APPEND lw_goods TO li_goods.
         CALL FUNCTION 'BAPI_GOODSMVT_CREATE'
           EXPORTING
             GOODSMVT_HEADER               = ls_header
             GOODSMVT_CODE                 = ls_code
           IMPORTING
             MATERIALDOCUMENT              = lv_matdoc
           TABLES
             GOODSMVT_ITEM                 = li_goods
             RETURN                        = li_return.

    Hi Vinod,
            Actually there are two line items in the PO and manually when I try to create a GR for both line items,  it creates a GR but when I pass it thr' BAPI, it is generating a GR only for one Line item.
    Thanks,
    Prasad

  • Relation between movement type and Schedule Line Item Cat

    I have a situation for Return Sales Order, there's two lines items with
    *Item Cat                      Schedule Line Item Cat         Stock
    REN(Normal)                 YN (Returns 657)                 Blocked
    RENN (Free Goods)      DN (Returns)                        Return Stock
    Question is, the user would like all the return stock to be posted to Block stock which should be using movement type 657. How can I configure this.

    Hello Sarvanand
    Assign Sched Line category YN to item category RENN using this path:
    SPRO/IMG/Sales and Distribution/Sales/Schedule Lines/Assign Schedule Line Categories
    Don't change movement type of standard Item cat DN.
    Thanks.

Maybe you are looking for

  • Why is my computer so slow? Not sure how to read etrecheck info.

    My computer is slow to start up for inter Problem description: computer slow EtreCheck version: 2.1.6 (109) Report generated January 27, 2015 11:29:22 AM EST Download EtreCheck from http://etresoft.com/etrecheck Click the [Support] links for help wit

  • Create database in sharedmod, but has to connect by special mod?

    oracle817 for linux ; create a instance with sharedmod, shared pool activated, multiuse; when i built a net8 connection, i has to choose specail mod rather than default or shared, furthermore, normal java connection can not connect this instance; wha

  • Archive to JPEG feature

    Yes, we all love non-destructive editing with dng's. However, there are times I don't really need to keep RAW files around anymore. (random pictures - dog, food, etc). I wish there was a way to archive DNG's to JPEG. Yes, we would lose all the edit h

  • Ipod nano has only an apple on the screen all the time, but still plays???!

    i was using my nano as usual 2day, and then i notices the screen wasn't doing anything, so i reset it and all i get is the apple, it still plays music, and syncs with itunes, and u can get into the diagnostics on it, and they display properly, and it

  • ACS configuration/database consolidation

    Hello, I have two ACS servers. One is version 2.4 and the other is version 3.0.2. My wish is to install a third server with ACS 4.0 that will replace the other two. I planned the following steps: 1- upgrade versions 2.4 (srv1) and 3.0.2 (srv2) for 3.