Scheduling in the project systems

Dear all
Can anyone explain me about the scheduling what is the path we have to follow for scheduling please help me for my query its very urgent
Regards&Thanks
P.Srinivasan

Dear Srinivasan,
Scheduling in PS can very complicated and difficult to understand, if its not studied extensively. A lot of trial and error needs to be done on this subject.
In PS, the scheduling will take place by means of the normal duration of the activity which you specify and the relationship of the various activities.
Basically there are two types of scheduling. One is WBS scheduling and another one is Network Scheduling. You have various settings in Customizing wherein you set whether WBS determines dates or Network determines dates.
If you want that the WBS dates shall fall under the dates of the activities, then you need to choose " Network determines date". On the other hand if you want that the dates of the activities shall fall under the WBS dates , then you can choose setting " WBS determine dates".
In a simple scenario, you can create a project along with WBS elements and network activites. Give only start date of the project in the project definition.Then Give duration to each of the activities. Additonally give relationship between trhe activities. Now, Scheduling can be done a Network header level as well as Project definition level. Schedule the network at Project definjition level. You will see that the dates of all the the WBS elements and scheduled dates of the activities will be populated. These dates will based on couple of parameters i.e Scheduling scenario & planning method ( which you can find in the Control data of project definition and Scheduling type ( in the network header ).
A very important note which will be befinicial to study is a consulting note from SAP , note no. 151551 " Scheduling of Network"
Depending upon the Patch level of your component, you may need to implement note no. 591833 and 945671 to get the correct scheduling data.
I hope I have given a basic overview of Scheduling in PS.
Please reward points, if you feel that this explaination was helpful.
Warm regards,
Srinivas Potluri

Similar Messages

  • Database design for the Project System!

    Hi
    I need the database design schema for the Project System .
    For example with the transaction code CJ20N at the left side all the Project Hierarchy is tabulated.
    I want to  know the relations between tables ?
    Would you please help me ?

    look logical database PSJ with tcode SE36
    grx. A.

  • ABAPER for the project system

    Dear Friends  ,
    i am ABAPER having 3 years of experience . Major developments are related to the MM SD  HCM PP etc . Module
    i am working in the user company  .
    Now there is a offer from another user company  who is offering me a job of ABAPER specifically for the Project SYSTEM  , plus onsite (Germeny ) for interaction with the Functional Consultant .
    Now dear Gurus please suggest , Is is rite to shift myself specifically for the PS System  or shall i go for other company like HCL , IBM who is offering me less pacakage as compare to above user company .
    Dear Gurus , u'r Response will be appreciated and will also be rewarded .

    Hi Sharma,
    adding to Vetri,
    I hope so this is not right place to discuss about careers.
    And one more thing try to avoid Company names
    Coming to your career path as you have good exposure with various modules, deffinetly it will be good if you work with PS Consultant.
    Packages is totally personal.
    Try to post same thread in
    SAP Community Network Forums » Community Discussions » Career Center
    Regards
    Guruprasad

  • Multiple Project Scheduling for the project at a same time

    Hi Experts,
    Is it possible to schedule multiple projects together at a same time. As my client is having more than 5 customer project running all together and he wants to schedule all the projects together so that there is no dates overlapping for similar activities for multiple project. As the activities are dependent on labour and machine and at one particular time the resource could be devoted either on one activity of the project.
    I look forward for your revert
    Thanks and Regards
    Simon

    Hi
    One more thing, when i am changing the dates of the activity due to delay from customer end, then where can i see the comparison of old dates and new dates.. though i can see the report in CJ29 but when i change the date in the activity then in the report it shows new date in the new and old date column and does not display the old date in report in the old date column..
    Please let me know if i need to do any configuration for that
    Regards
    Simon

  • Crystal Report failed scheduling onto the File System

    Hi,
    We have set up a Crystal report file for scheduling via file system. This report has been running fine with regards to generation all through last few months, but has started failing to generate the report at the scheduled time onto the file system from the last few days. When I checked the logs of the Instance Manager, it shows an error like this 'Unable to connect: incorrect log on parameters. Details: [Database Vendor Code: 1017 ]'.
    Please note, I was able to run the report from InfoView without any issue, so I don't believe there is any issue with stored procedure/report/database connection but something else.
    Can someone please provide some insights on this.
    Thanks.

    Hello Satish,
    Is this issue specific to FileSystem location? What about default enterprise location?
    When you view the reprt in InfoView, click on Refresh button to get current data. If the repot was published with Saved Data option, then you would see data in the report but it would be old one.
    Above step would confirm that there is no issues with database user credentials specified with the report.
    Also, open the report in Crystal Reports 2011, refresh it and publish without saved data in BI 4 repository and schedule it.
    Regards,
    Mahesh

  • In which tables (ABAP) the Project System Information Will be stored

    Dear Guruu2019s
    Happy New Year
    In project systems can we able to see, against the projects and against WBS what all the sales orders, Employees and material etc... That we assigned, in which STD report we can check all these assignments, from which tables (ABAP) it picks up the data to populate in the STD report.
    I need the Tables for preparing the Z- Report. Please help meu2026
    Regards,
    Bhanu Prathap

    The most common overviews with respect to sales and distribution can be obtained from CN54N/ CN55N or you can also use CNS54 / CNS55. Tables for the same are VBAK/ VBAP.
    For materials you can refer to CN52N overviews for material components and CO24 for missing parts.
    For resources, CN50N provides the capacity requirements and CMP9 workforce planning.
    Venu

  • How to Customize the project system

    Hi,
    I have created a custom project system using
    this
    walkthrough  .  But this walk through is targeting Visual C# project system.  But I need to create my custom project
    is web project. How can I achieve this?
    Thanks,
    Abbas 
    - Abbas K

    I don't have the exact answer (I am not familiar with this topic), but after some investigation it seems that:
    The docs about custom debugging are here:
    Visual Studio Debugging Extensibility
    https://msdn.microsoft.com/en-us/library/bb161718.aspx
    And I think that the following projects implement what you want (the keyword when searching the source code is "Launcher" or "IProjectLauncher"):
    Node.js Tools for Visual Studio
    https://nodejstools.codeplex.com/SourceControl/latest#Nodejs/Product/Nodejs/Project/NodejsProjectLauncher.cs
    Python Tools for Visual Studio
    https://pytools.codeplex.com/SourceControl/latest#Python/Product/PythonTools/PythonTools/Project/DefaultPythonLauncher.cs
    * My new blog about VSX: http://www.visualstudioextensibility.com * Twitter: https://twitter.com/VSExtensibility * MZ-Tools productivity extension for Visual Studio: http://www.mztools.com.

  • Currencies in the Project System

    If you have assigned a number of company codes to a controlling area and the company codes have different currencies, you cannot allocate the object currency. The system automatically uses the local currency of the respective company code.
    Our customer required to Know what's the reason for this limitation?
    How to overcome this limitation ?
    Regards

    hi ,
    you mean planning is being done in company code currency ...?
    you can change your settings in OPSB where u can select object curreny and define exchange rate types also ...
    regards
    pushpa

  • Project System  for Construction of Apartments

    Has  any  hands on  how the Project system works in construction of Apartments. If any body has, please share me their views how the leasing of the land should be done, how the  project should be structured, how the sales of the apartments have to be done how the revenue would be booked.etc. Quick views would really appreciated.
    Regards.
    VaraPrasad

    A lot of answers can be derieved from how they are managing it today
    1) whether they want to manage every single land that they buy and sell
    or they just want to know how the company on the whole is doing
    2) whether they buy stock in bulk to supply to subcontractors or they just buy it project by project or land by land for development
    3) Are dates important whether there are financial implications if there is delay in terms of development , do they stand to loose and how they want to integrate schedule to cost and progress , how they want their profits to be realised will lead to the answer you need
    4)Company asset and production resource tools will have to be looked at.
    Regards,
    Anshvinder

  • Project systems integration with portal (EP)

    Dear all,
    I have to integrate the projects systems module with Portal.(EP)
    In portal transactional I views can be used to create projects which can be store in the R/3.
    Now the issue is to create projects with out using Transactional I views. This should be a simple entry through portal, where in the user keys in the key fields and there by the project is created and scheduled.
    For this I have tried with using business packages given by SAP to integrate with portal.
    Now the issue is I can display the projects that are created in R/3 through portal and display the necessary fileds required for viewing (I views). Now the main problem is to create the project using these business packages so that the same get updated in the R/3.
    But business packages do not have the option of creating the project. I am using the business packages for projects 50.3.1
    Has any body come across this type of issue which has to be integrated with portal and subsequent creation of projects through portal
    If any body has done this in any other way please kindly share on this.
    Experts please throw some pointers on this.
    Regards.
    Vara Prasad

    Hi Aman,
    You may try creating transaction iViews of the desired PS Transaction.
    For more help you can take help of your Portal Administrator.
    Else, see if this link may help:
    http://help.sap.com/Business_Packages/EN/06/3ED93BE53BCD29E10000000A114084/frameset.htm
    Regards,
    Vivek Pandey

  • Project System Cash Management in combination with statistical WBS element

    Hi,
    within  a customer project, we have to solve the following issue:
    Customer runs projects and statistical projects in combination with internal orders.
    We want to use the PS Cash Management for planned and actual payments.
    With statistical projects we have the following problem:
    Invoice and actual payments will be processed with the transaction CJFN.
    Actual payments are shown only on the internal order (transaction CJIA), but not on the statistical WBS element.
    We want the information about the actual payments with in the project system reporting (S_ALR_87013574).
    Projects, not flagged as statistical will deliver the expected results.
    Many thanks for your ideas, to solve this problem.
    Steffen

    are u posting to some other cost object also. normally they wud have to be posted to a COPA also with the cost element being 11 category.
    the wbs will receive the statistical posting, so there needs to be a real object also.
    see whether the real object is getting derived.
    the system is nt finding the real object and trying to post with the WBS in real, but since its statistical, the error.
    any other calrifications. plz post.
    regards
    anantha

  • Project system: Purchase requisition coming from PS

    Dear Experts,
    I have a tricky problem. I want to exclude a specific number range for purchase requisition coming from the Project system.
    The current number range I have for the purchase requisition is let say: 10000000 - 19999999.
    I want to use another number range (50000000-59999999) for the purchase requisitions as an impact of material components of an network activity.
    What I've tried but it is not working properly:
    1. TC: OMH7 - I created a new number range as I mentioned above
    2. TC: OMEB - I've copied the document type NB to a new document type ZNB (NB = ZNB)
    3. TC: OPTT - as last step I've assigned the document type ZNB to the order category 20 (network)
    Please advice ASAP
    Thanks a lot in advance

    It should work as it works fine for me.
    1. You create the Internal number range (50000000-59999999) first and number it with an ID.
    2. Create the ZNB document type and assign the number range number (i.e., two-character ID)
    3. Assign this ZNB in OPTT
    If I've repeated what ever you've done/said, check the settings once again. It should work.
    Regards
    Sreenivas

  • Settlement within the Project

    Hi All,
    There is an error during settlement -
    > CJ88 from a long time. My settlement structure is like Network to WBS, Lower WBS to Superior WBS, Level1 WBS to AuC and finally to FXA.
    My availability control is active after CJ30.
    Now when settling within the project system throws error.... Budget exceeded for items and exceeded by the assigned value. Fine I found out OSS Note--->159850 which details the reason why it is behaving so.
    Now after reading this note I am trying out both the possibilities mentioned there...
    1.Deactivate availability control which is not recommended.
    2.In CJ30 only do budgeting for top WBS..
    3.Exempt Settlement Cost element from Availability Control(but we are using Cost Element groups -
    > All Primary and Secondary Cost Elements) Tr--OPTK.which is also a problem
    I need a work around if anybody can help...the simplest way to remove such error during settlement.

    this has nothing to do with the cost element group
    when you settle
    you can either use the original cost element OR you can use settlement cost element (type 21 or type 22) - these are usually one or 2 and not the same as your chart of accounts
    these settlement cost elements should be entered in OPTK
    if you use original cost elements then you have an issue as you cannot use OPTK else the original cost itself would become exempt from budget check

  • Revenue Recognition in Project System

    Hello All,
    At my current client, they are using the Project System (i.e. WBS) only for Cost and Revenue collection. POC,RA,Milestone billing,Network, Activities are out of scope. Keeping the above thing in mind, I need to know how I do the Revenue recognition thru WBS.
    Mu understanding is that If I assign a WBS element on a Sales Order line item, as an account assignment it should collect the Revenue. The only requiremnt should be that WBS should be a billing element and Cost/Revenue profile should carry SD relevant settings. Once the billing is done and invoicing is done, the Revenue should appear against the WBS on running the report S_ALR_87013563/64/65/66.
    Please let me know if this will work or do I need to do some more configuration from PS perspective.
    Thanks
    Sarang

    Hi Sarang,
    1. Mark WBS as billing element.
    2. Assign the sales order line item to the WBS in point 1 or any WBS below that in the hierarchy.
    3. Create a billing plan for the sales order line item.
    4. The billing plan amount would appear as planned revenue against the WBS element (provided no credit hold useVKM3 to release).
    5. Once the line item has been billed ie. Billing document has been created using VF01 or VF04, the Actual revenue would appear against the WBS element.
    In terms of Config:
    Creat a planning profile that allows Automatic Revenue planning form Sales Order (tcode: OPSB)
    Ensure that the planning profile is attached to your project profile (Controlling tab) (tcode:OPSA).
    Please let me know if this helps.
    jibat
    Edited by: Jibat Sankar De Sarkar on Jan 21, 2009 2:49 PM

  • Project system: Purchase requisition coming from Networks

    Dear Experts,
    I have a tricky problem. I want to exclude a specific number range for purchase requisition coming from the Project system.
    The current number range I have for the purchase requisition is let say: 10000000 - 19999999.
    I want to use another number range (50000000-59999999) for the purchase requisitions as an impact of material components of an network activity.
    What I've tried but it is not working properly:
    1. TC: OMH7 - I created a new number range as I mentioned above
    2. TC: OMEB - I've copied the document type NB to a new document type ZNB (NB = ZNB)
    3. TC: OPTT - as last step I've assigned the document type ZNB to the order category 20 (network)
    Please advice ASAP
    Thanks a lot in advance

    It should work as it works fine for me.
    1. You create the Internal number range (50000000-59999999) first and number it with an ID.
    2. Create the ZNB document type and assign the number range number (i.e., two-character ID)
    3. Assign this ZNB in OPTT
    If I've repeated what ever you've done/said, check the settings once again. It should work.
    Regards
    Sreenivas

Maybe you are looking for

  • ACE - Timeout application

    Hi, we have ACE 4700 installed for load balancing. We are facing an issue with one of our application. When client tries to communicate with VIP of load balancer we get the response as timed out. Also on the client in netstat connections observed som

  • R/3 configurations (Idoc to File)

    Hi, while we create RFC Destination (SM59) in R/3 System, in logon security tab do we need to provide R/3 credentials or XI credentials??!! Note: Scenario-- Idoc to file Thanks., abhi

  • Possible to save files in My Documents using JavaScript?

    I have a customer who wants his users (service technicians) to be prompted to save a PDF form they fill out, print, and sign for their customers. It's easy to set the File>Save As action for the form button, but my customer wants to know if it's poss

  • Client Server Thread Problems

    When I invoke the method getNextJob() in my Client. This sends a this message (CLNT::GETNEXTJOB) to the server which then triggers the Server to invoke the corresponding method and send back another message. (Which as far as I know it does). My probl

  • External Backup

    Oracle 11g on Linux. The FRA is configured based on ASM diskgroup +FRA.  The backups are scheduled to be saved there at 2:00am daily. Now I want to backup the db to a second location (external USB hard drive), in addition to the FRA.  So I'll get two