Scheduling PC twice a day

hi,
i need to schedule my PC to run twice a day:
once in the morning and the second time at noon, how can i perform it ?
thanks a lot
Nir Kaminsky

Nir,
If you want to schedule periodically means daily, weekly or every 12 hours(hourly) you can do this from Process Chain start variant settings as already explained.
But if you want to execute 06:00 and 12:00 then you can do using those settings.
Its better to start process chain through an Event. create an abap program to raise an event.
Check: [how to ... start process chain through an event|http://sapbwneelam.blogspot.com/2007/09/how-to-start-process-chain-through.html]
Hope it Helps
Srini
[Dont forget to close the call by assigning points.... - Food for Points: Make a Difference through Community Contribution!|https://www.sdn.sap.com/irj/sdn/index?rid=/webcontent/uuid/007928c5-c4ef-2a10-d9a3-8109ae621a82]

Similar Messages

  • User Profile Syncrhonization Scheduling twice a day

    Client wants to schedule User Profile Synchronization from AD scheduling twice a day at 12.00 AM and 12.00 PM which includes any update in the AD photos also. How can I achieve this ?

    You cannot set multiple single run schedules for timer jobs within SharePoint. You can only do one of the following:
    Run every X minute
    Run between X and N minute every hour
    Run daily [between times]
    Run weekly [between days/times]
    Run monthly [days/times]
    There is nothing in CA that will allow you to input 'run at noon and midnight', so the other option is to control it via PowerShell/Task Scheduler.
    Trevor Seward
    Follow or contact me at...
    This post is my own opinion and does not necessarily reflect the opinion or view of Microsoft, its employees, or other MVPs.

  • Need to schedule PC twice in a day

    Hi Experts,
    As per new requirment i need to run my process chain twice in a day, for this i can do manually but i want run automatically. so how to do this/
    Thanks
    David
    Edited by: david Rathod on Oct 18, 2011 7:28 AM

    David,
    This could have been easily acheived, if only the requirement is tweaked a bit.
    The current timings that u mentioned are like 6:30:00 and 18:00:00, the difference is 11 hrs 30 mins.
    If you can make the difference to 12 hours, i.e make the first shcedule at 6:00:00 so that the difference would be come 12 hours. or change the second schedule to 18:30:00 by having the first schedule still at 6:30:00 even in this case the difference is 12 hours
    Case1: 6:00:00 and 18:00:00
    Case2: 6:30:00 and 18:30:00
    If you can change the shcedule runs to any of the above cases, the solution is simple.
    As, i said in my prev post maintain the value in Other period as "12" hours. and schedule the process chain with the time 6:00, so that the process run the second time exactly at 18:00 and again at 06:00 next day.
    This simply means the process run every 12 hours and as per our timing requirement. There will not be any need of manual intervention and the chain runs exactly twice a day. You don't even need to reschedule manually. Just schedule once and the cycle continues...
    As far as i'm concerened this can be the easiest way to implement the requirement.
    Regards,
    Sudheer
    Edited by: Sudheer Kumar Kurra on Oct 19, 2011 6:38 AM

  • Schedule to run twice a day at different times.

    Hi
    I am trying to write a schedule to run twice a day, 7 days a week at 11.30am and 0.01am (i.e one minute after midnight).
    I have tried setting the repeat_interval = 'FREQ=DAILY;BYDAY=MON,TUE,WED,THU,FRI,SAT,SUN;BYHOUR = 11,0;BYMINUTE=30,1';
    However, this causes the job to run at 11:01; 11:30, 00:01 and 00:30. Can some please show me how to get it to run only at 11:30 and 00:01?
    Thanks.
    jov

    Hi Joe
    Thanks for your reply.
    Unfortunately, your suggestion still causes the app to run 4 times a day, 11:01; 11:30, 00:01 and 00:30. I am trying to avoid writing two schedules but it looks like I'm going to have to.
    jov

  • Since I updated to iCloud, Mail on my MacBookPro 10.6.8 has been unable to connect to MobileMe more than once or twice per day. Mail on my iPhone 4 has no problems. What's wrong?

    Since I updated to iCloud, (which may or may not be related) Mail on my MacBookPro 10.6.8 has been unable to connect to MobileMe more than once or twice per day. Mail on my iPhone 4 and my old iMac has no problems. When there is no service a yellow warning triangle appears adjacent to the Inbox and Connection Doctor reports,"Trying to log into this MobileMe IMAP account failed. Verify that username and password are correct."  Since it does fetch Mail from time to time they cannot be wrong.... can they? Should I update to 10.7 and if so what does that entail?

    You have been using MobileMe's email settings, which sometimes continue to work for a time after migration but then get turned off. iCloud's mail server settings are different. Strictly speaking Lion 10.7.2 is required for iCloud, and on that Mail is set up automatically.
    Snow Leopard cannot access most of iCloud's facilities, however you can set Mail up manually to access your email. The method is described here:
    http://www.wilmut.webspace.virginmedia.com/notes/icloudmail.html
    The situation with iCloud and Snow Leopard is described in detail here:
    http://www.wilmut.webspace.virginmedia.com/notes/icloudSL.html

  • In GATP would like to push schedule delivery date+1 day

    Hi Experts:-
    We have below requirement  in GATP:-
    Can we maintain a condition record for pick /pack time  = 1 day against Shipping Point in particular Location.? In other word we would like to push schedule delivery date+1 day.
    In APO we can see control data :- Plan (LEAD), load (LOAD), pick/pack (PICK), transport (TRAN), unload (UNLD)
    In APO We have maintained  value = 24:00 for location XXXX ( as per below steps)
    1.     In the SAP Easy Access screen choose Master Data ® Master Data for Transportation and Shipment Scheduling ® Create Scheduling Step.
    2.     Select a condition type.
    3.     Enter concrete values for the key combination.
    4.     Enter a duration (external display: hhhhhhh:mm).
    While checking order, When the process branches into APO ATP, can see time 24:00 This seems to indicate that Pick/Pack record has now been found, but the scheduled delivery date is not being pushed out by one extra day.
    Looking at the condition log in APO shows the following;;
    Lead Plan:304 Access for Access sequence LEAD missing(Usage U)
    Pick Pick : 208 Condition record has been found
    Load Load: 304 Access for Access sequence LOAD missing(Usage U)
    TRAN Transport: 009 Condition record is missing
    UNLD Unload :  002 Access not made ( Initialized field)
    Can you suggest.

    Hi DB,
    Thanks, Very helpful links.
    I did some testing on various sets of data change in APO for PICK and TRAN :-
    Parameters :-     
    Order creation date     2-Nov
    Route YR0004= 4 days     
    Calendar :-Sat and Sun holidays  & 11th Nov bank holiday     
    Test 1 with 0 Day pick time, No TRAN maintained :-
    Delivery date     8-Nov
    Gi Date     7-Nov
    Loading date     7-Nov
    MAD     7-Nov
    Transportation planning date     7-Nov
    Test 2 with 1 day pick time, No TRAN maintained :-
    Delivery date     8-Nov
    Gi Date     7-Nov
    Loading date     7-Nov
    MAD     4-Nov
    Transportation planning date     7-Nov
    Test 3 with 3 day pick time, No TRAN maintained :-
    Delivery date     8-Nov
    Gi Date     7-Nov
    Loading date     7-Nov
    MAD     2-Nov
    Transportation planning date     7-Nov
    Test 3 with 5 day pick time, No TRAN maintained :-
    Delivery date     9-Nov
    Gi Date     9-Nov
    Loading date     9-Nov
    MAD     2-Nov
    Transportation planning date     9-Nov
    Now next scenario only TRAN without PICK
    Test1 with 1 day TRAN time
    Delivery date     8-Nov
    Gi Date     4-Nov
    Loading date     4-Nov
    MAD     4-Nov
    Transportation planning date     4-Nov
    *with 2 day and 3 day result is same as test1
    Test2 with 4 day TRAN time
    Delivery date     8-Nov
    Gi Date     3-Nov
    Loading date     3-Nov
    MAD     3-Nov
    Trasnportation planning date     3-Nov
    Test3 with 7 day TRAN time
    Can see Delivery Date moving ahead one day.
    Delivery date     9-Nov
    Gi Date     2-Nov
    Loading date     2-Nov
    MAD     2-Nov
    Trasnportation planning date     2-Nov
    Now next scenario  is to maintain data in both PICK and TRAN
    Test 1 with 1 days pick time+ 1 day Tran
    Delivery date     8-Nov
    Gi Date     4-Nov
    Loading date     4-Nov
    MAD     3-Nov
    Transportation planning date     4-Nov
    Test 2 with 1 days pick time+ 6 day Tran
    Delivery date     9-Nov
    Gi Date     3-Nov
    Loading date     3-Nov
    MAD     2-Nov
    Trasnportation planning date     3-Nov
    Would like to know is this the correct standard behaviour or something wrong with our system config.
    regards
    Samir
    Edited by: Samir Ali on Nov 3, 2011 4:07 PM

  • How to schedule a job every day night 12:05AM EST in the KnowledgeManagemen

    I have created the scheduler to run every day night 12:05AM EST in the KnowledgeManagement->ContetntManagement->Globelservices->Schedulertask. But it was running every day mid day at 12:05PM. I have created the new entry in the scheduler timetable as 'EveryDayAt2405' I have selected the Hour as '12AM' Minute as '5' and Time Zone-'GMT-05:00 (America/New York) Eastern Standard Time'.
    Please help on this issue
    Thanks In Advance
    Regards,
    srini

    I have fixed this issue to run the scheduler at 12AM need to select the 12PM . Internally it will take the 12AM as Zero hours

  • Is there a way to have longer battery life on a 4s iPhone?  Brand new iPhone 4s out of the box I have to charge twice a day.

    Is there a way to have longer battery life on a 4s iPhone?  Brand new iPhone 4s out of the box I have to charge twice a day.

    Absolutely.  Search this forum or look in the "More Like This" box to your right.

  • Oracle 10g Database Hanging twice a day

    My database server has 10g with MS 2003 server as OS.
    Twice a day the database hangs and does disconnects all the users from local and remote locations.
    Current SYSTEM tablespace has a size of 470 MB and is 98.86 in use, when I try to add another datafile as 'SYSTEM02.DBF' in the same path where other system data files are, I kept this operation running during weekends but datafile was not added.
    Has it anything to do with the MS 2003 server no. of users.
    Any other suggestions for SYSTEM Tablespace to be free.
    Please reply.
    Thanks
    Ajaz Ahmed

    Hi friends / sameer,
    Sorry for the delay. Here is the attached alert.log file Since the data from foxpro was loaded into oracle on to oracle 10 g from 7th may the problem of database hanging started from the next day. I joined the organization on 22nd july.
    Current SYSTEM tablespace has a size of 470 MB and is 98.86 in use, when I try to add another datafile as 'SYSTEM02.DBF' in the same path where other system data file is, it does not add. I kept this operation running during weekends but datafile was not added.
    Has it anything to do with the MS 2003 server no. of users.
    Any other suggestions for SYSTEM Tablespace to be free.
    If you can get me your mail id then I can send the
    attachment of alert.log file as [email protected] bounces back.
    Thanks
    Ajaz Ahmed

  • My daughter's phone racks up data usage every 12 hours, twice a day, even though she isn't using it. Anybody know why this would be happening or how to track it/stop it?

    My daughter's phone racks up data usage every 12 hours, twice a day, even though she isn't using it. Anybody know why this would be happening or how to track it/stop it?

        Its all good, TimN8128! Mrhelper is corret with regards to making sure that mobile data is turned off when on WiFi or when not connected to WiFi, if you do not want the phone to access data services to update or refresh app services. These applications can all be configured by going to Settings and reviewing all apps that appear in that area. You can also configure a bit further by going to Settings>Cellular.
    NicandroN_VZW
    Follow us on twitter @VZWSupport

  • I recently upgraded to Mavericks and the time machine is failing to backup.  Time Machine began only backing up twice a day and now has stopped.

    I recently upgraded to Mavericks and the time machine is failing to backup.  Time Machine began only backing up twice a day and now has stopped.

    This is the error message I got:
    2014-03-18 17:02:30 -0400 com.apple.backupd[4971]: Error: (22) setxattr for key:com.apple.backupd.HostUUID path:/Volumes/TOSHIBA EXT/Backups.backupdb/Quincy’s iMac size:37
    2014-03-18 17:02:30 -0400 com.apple.backupd[4971]: Backup failed with error 2: 2

  • E2500 - Needs to be Power Cycled Once or Twice a Day.

    Brand new E2500, needs to be power-cycled once or twice a day. Already reinstalled Cisco Connect and updated the Firmware.
    Having some problems with my brand new router and customer service is being of VERY LITTLE help! What should I do?

    Let me know the concern that you have, is with the wired connection or with the wireless connection?
    You said that you have upgraded the firmware, but after upgrading the firmware you didn’t reset the Router… So reset the Router, power cycle the whole network… Then follow the steps:
    If you want to configure the router with the help of the CD so for that you need to uninstall the existing Cisco Connect Software from the computer if there...
    Reset the Router and power cycle the network...Make the following connectivity – Connect the Modem with the Router’s Internet port and then connect the Computer with any one of the Ethernet port of the Router [Numbered 1, 2, 3 and 4]... Then install the Cisco Connect Software... It will help you in configuring the Router...
    Otherwise you can configure it manually as well…For Let me know the name of the ISP [Internet Service Provider] – means the connection is a DSL connection or cable connection…
    So if you have a DSL connection you can refer to this link:
    http://www6.nohold.net/Cisco2/ukp.aspx?pid=93&login=1&vw=1&app=search&articleid=4020&userrole=Linksy...
    So if you have a Cable Internet Connection you can refer to this link:
    http://www6.nohold.net/Cisco2/ukp.aspx?pid=93&vw=1&articleid=3686
    As far as the wireless is concern:
    # Open up the browser and on the address bar type “IP address of the Default Gateway” that will open up the Router setup page…
    # Then Click on wireless Tab create the Wireless Network Name SSID and select the channel to 6, 9, and 11… Click Save Settings...
    # Then Click on Wireless Security sub tab and select the security mode and provide the password as per the requirement… Click Save Settings...
    After doing the settings try to connect the preferred network on the wireless devices and check the connectivity….

  • To create a script and schedule which purge 30 days old files

    Hi Friends,
    Very new in Unix and i got a requirement like writing a script and schedule it, so that it removes 30 days old files from all the log locations of a unix box.
    Suppose i have a unix server ltbamdev1 and in this server i have a mount point opt/bam. In this mount point i have 3 different folders like
    /ltbamdev1/oracle/install/product/10.1.3.1/OracleAS_1/opmn/logs
    /ltbamdev1/oracle/install/product/10.1.3.1/OracleAS_1/bpel/domains/default/logs
    /ltbamdev1/oracle/install/product/10.1.3.1/OracleAS_1/bpel/domains/support/logs
    Please help me in writing a script which runs once a week and removes all 30 days old files from these three folder locations.
    Thanks in advance
    Duos

    Moderator Action:
    The discussion is in the duplicate cross-post:
    To create a script and schedule which purge 30 days old files
    @O.P.
    For the future, only make one post.
    If it is in the wrong forum, it will likely get relocated by moderators.
    This duplicate is now locked to prevent responses getting fragmented all over the place.

  • Planned orders scheduled on Non working days

    Hi,
           Planned orders scheduled on Non working days no Planning calnder assigned to the Material

    Hi
    Just go to transaction code MD26 and check the what calender is assigned to plant and validity period of the calender. If the calender is not valid in the MRP run period then also planning may differ
    Krishna

  • Update SharePoint list programatically twice a day with SQL 2008 r2

    How complicate is to sustain the update  SharePoint list programatically twice a day by using SQL job?
    the data need  to be update twice a day and it is going o be use to feed a share point form...where the user(S) will be choosing by lookup in infopath form.
    BTW..I do not have control of the SharePoint farm, I have MS SQL 2008 R2 and SharePoint version is 2010. 
    Or Also I am considering to use  MS access 2010 and SharePoint version is 2010.
    CRISTINA&amp MICROSOFT Forum

    >DRAFT IDEA<
    Is this will corrupt SharePoint if I try this?
    The two data list that I want to update twice a day come from other database sources
    One is from Human Resources roster list. (The result of the query) –amount of records >> 600
    UNREAL
    example
    Unique ID
    domain name
    Region
    Badge
    Full Name
    email address
    Manager
    Director
    EUROPE
    EMEA
    123456
    Bear, Charles
    [email protected]
    Hanc, Juilan
    Cano, Oscar
    AMERICAS
    ABU
    223456
    Ros, Adrian
    [email protected]
    Knight, Dexter
    Brown, Dexter
    ASIA-PACIFIC
    APJ
    323456
    Chen, Andy
    [email protected]
    Ducann, Scott
    Ginger, Jeff
    (JOIN) From the roster list connect with the User Information List "user
    credential"(/_vti_bin/UserProfileService.asmx) to allow me Create dependent drop-down by using these articles:
    https://claytoncobb.wordpress.com/2009/06/21/userprofileservice-extended/
    http://sharepoint911.com/blogs/laura/Lists/Posts/Post.aspx?ID=172
    http://blogs.msdn.com/b/infopath/archive/2004/03/24/95529.aspx
    http://www.dotnetcurry.com/showarticle.aspx?ID=794
    http://www.codeproject.com/Articles/155829/SQL-Server-Integration-Services-SSIS-Part-Basics
    The second one comes from Account list. (The result of the query) –amount of records >> 22,000
    FAKE
    example
    Unique ID
    email_address
    account_id
    account_lk_id
    account_name
    subdivision_region_name
    subdivision
    support_model
    [email protected]
    22650
    22649
    NANA Web Skills
    AP
    Martial Law
    PunkingSPlus
    [email protected]
    16624
    16624
    ELECTRIC FOOD
    AMER
    Short Circuit Blue
    PunkingSPlus
    [email protected]
    12538
    12538
    100 Got drunk
    EMEA
    100 Got drunk
    PunkingSPlus
    [email protected]
    22206
    22205
    911 Hospital Ghost
    AP
     Hospital AP
    PunkingSPlus
    [email protected]
    6886
    6886
    Administration for UFO LAND
    AP
    Xiamen
    PunkingSPlus
    [email protected]
    22242
    22241
    ACT  Recording
    EMEA
    ACT  Recording  Orange
    PunkingSPlus
    (JOIN) In this list I will need to do the same connect with the User Information List "user
    credential"(/_vti_bin/UserProfileService.asmx)
    To narrow these lists to what they are only responsible to work..
    These two tables are going to be part of InfoPath form ...
    with these draft idea , Do I need to be considering to be using what you suggest ? >>>"PowerShell
    availabe in SQL and the CSOM to interact with SharePoint "
    Could be possible that you can also provide an article?? relate to ....
    "Firstly you must not update SharePoint content databases directly from SQL. Doing so may
    corrupt your farm and will render it unsupported by Microsoft."
    Thanks in advance
    CRISTINA 

Maybe you are looking for

  • Return exc inv to vendor process

    Hi, I done Return del against this I create j1is(out going exc inv) is it necessary update the reg? my case i didn't update the reg j1i5..part 1 get updated but part 2 level no entry..y? Rgs, Priya.

  • Live View and Inspect BROKEN in DW CS5 & Drupal

    I successfully navigated through the confusing instructions for setting up a local Drupal website in Dreamweaver's site manager and was very excited the first time I did a "discover" and DW found all the Drupal files on my local testing server.  Yay!

  • International calls. iPhone 4

    Hi. What did I not do? Just got back from Costa Rica- had checked with AT&T and was assured iPhone 4 would work there ( if I needed to make calls). No such luck. Phone detected the cellular network but still showed "no service". Is this a sim card is

  • Can we declare a Cursor in Package Specs?

    Dear buddies Can I Declare a Cursor in Package Specs so that I can call that cursor and use its data in some procedures and functions of package. Otherwise I've to write that cursor for every sub-program of a package which I don't feel a smart way to

  • Import sequential tiffs files

    Hi all, This is my first post on this site, being fairly new to FCP, Having expanded to FCP after many years as an Avid editor. Recently I was stumped when presented with a folder containing 24 sequentially names giffs each with an alpha channel. I a