Secondary costs planning on network activity

Is possible to plan secondary costs on network activity (without activity type on work center)?
Thanx

Hello Keshav
I have in CO Area currency          CHF
In Company Code I have             EUR
Then object currency for network activity                   field  AFVGD-OWAER  is                            u201CEURu201D
For Material planning in networks Currency Key     field  TKA01-WAERS is                               u201CCHFu201D
Before reporting, I would like see the above currencies as equal using CJ20N.
Thanks
Salvo50
Edited by: Salvo50 on Nov 7, 2011 11:33 AM

Similar Messages

  • EASY COST PLANNING at Network Activity Level

    Hi All
    I am using EHP4 system. I want to do easy cost planning at NWA level for this I already activate ECP for NWA in configuration setting and other necessary settings but still when I create ECP from CJ20N or CJ9ECP I can not able to do ECP on NWA activity level. Please give your inputs on same.
    Regards

    Hi Gokul
    All basic settings for ECP have been maintain. It allow me for ECP on WBS level but it not show me any activity or Network in ECP as I activate Planning for Network Activities with Easy Cost Plan in configuration.
    Regards

  • Easy Cost Planning at Network Level

    Hi All,
    I was able to implement ECP at WBS level, but not able to implement at network level. I am using SAP ECC 6.0 EHP 4.
    I have activated the business function ops_ps_ci_1 and also activated the 'Activate Planning for Network Activities with Easy Cost Planning' in the configuration settings in SPRO-IMG. I had gone through most of the threads on this topic like :
    Network Activity Easy Cost planning
    ECP at activity level not triggered
    I am not able to find the option for 'Create Alternate CO Version' and 'Activate Multiple CO Version' under the Easy Cost Planning and Execution Services in SPRO-IMG.Please advise me in implementing Easy Cost Planning at Network Level and correct me if I was wrong in completing the configuration steps.

    Thanku All,
    I have done all the steps as you mentioned
    1. Activated the business function OPS_PS_CI_1.
    3
    2.
    3.
    Activated Multiple Plan Version using the tcode RCNPRECP
    Still not able to view the options under SPRO-IMG Easy Cost Planning
    * Create Alternate CO Version
    * Activate Multiple CO Version
    Also not able to implement ECP at network level.

  • Is it Possible to do easy cost planning in network and acitivity level

    Hi,
    Is it possible to do easy cost planning in network and acitivity level
    Rgds
    Purna.M

    Dear Sanjeev,
    ECP not possible at Network or activities but it is not like that as you saying " any of cost planning not possible at activity level as per sap standard."
    It is possible to do Network Cost Planning, for that you have to make the settings required for to determining the plan costs in networks.
    In networks/activities the plan costs are:
    Calculated automatically on the basis of the defined price and quantity structures
    Planned using unit costings for general costs activities or material components
    for this make the setting in config of PS node Project System -> Cost -> Planned Costs -> Automatic Costing in Networks/Activities.
    Rgds
    Rajesh

  • Cost Planning on Network Activities

    Hi,
    Can any one help me to enter planned cost on network activities with out using capacity planning.
    Thanks
    Murtaza

    Dear Murtaza,
    Refer below sap help link for Cost planning in Network Activities.
    http://help.sap.com/saphelp_46C/helpdata/EN/86/98853478616434e10000009b38f83b/frameset.htm
    Click on above link follow the menu path
    Cost Planning > Cost Planning in Networks > Network Planned Costs > Basis Values for Network Costings
    Cost Planning > Cost Planning in Networks > Network Planned Costs > Unit Costing in Networks
    Hope its useful.
    Sandeep

  • Cost Planning for networks in a CO plan version other than 0

    Hi,
    We have a specific requirement of getting the planned cost in terms of $ and hours on a network activity getting posted to some other CO version other than 0 in certain cases.
    It would be great if anyone could suggest a FM or a BAPI to achieve this end?
    Please reply if you need any clarification on the requirement
    Regards,
    Jibat

    In Cj30 you will get the CO version '000 , If you want to  your can copy cost planning values of your version V01 & V02 to
    Version 0  and do the budgeting  Because you actual will happen to 0 only so,  to compare your plan should  be there idealy.
    Apart from that network  cost planning can only be done in 0 version. And system give you option of copying the your preliminary plannning  to version 0.
    Virendra - Thanks for the explanation. It made my understanding better as well.
    With Regards
    Nitin P.
    Edited by: Nitin  Patoliya on Dec 3, 2009 12:50 PM

  • Costs on internal network activity

    Hi,
    I use SAP ECC6, actually.
    I created an internal network activity and I linked it a work center and an activity type.
    When I run a report, every report, I don't see the costs relative to this network activity.
    Please, could you help me?
    Thanks a lot in advance
    Regards

    Hi,
    Please ensure you have followed following steps:
    1. Assigned cost center and activity type on costing view of workcenter. After this assignment when you assign work center to activity, the activity type gets automatically populated.
    2. Maintain rate for activity type in Tcode KP26. Take help of your FI consultant.
    3. If your system is not calculating cost during saving of project, you need to manually calculate cost. Click on activity and press CtrlF10 to calculate cost and CtrlF11 to display cost.
    Hope this helps.
    Regards

  • Work Order Cost/Planned data by Activity Type

    Does anyone know the cube that would contain planned and actual cost for work orders using the work order activity type (AUFK-ILART)
    Will reward points as always.
    Richard

    Hi Ashish Jain,
    I have planned activity type/price with the transaction KP26, but the system doesn't return any value in planned costs of WBE.
    Why?
    Thanks
    Nicola

  • Error occured during budget check while planning in network activity

    Dear All,
    i have created a project with 4 WBSE. i have assigned budget to one of these WBSE and released that project. than i want to do planning in next WBSE this is giving error while saving this planning as Error occured during budget check, see cost.
    i have created user status for budgeting like if we have not budgeted than WBS is not able to release. i have added availability control as Forbidden while not budgeted but this not effective.
    please suggest me some thing to remove this problem
    thanks
    Sunil

    hi,
    In WBS you can Plan and budget to group WBS , the below wbs will consume budget form top.
    Proj>WBS1(Group WBS- Plan/Budget) it is applicable for below all wbs elements say WBS2>WBS3
    When you are determining Hierarchy you should create WBS in same levels then only you can allocate Budget.
    If you wan to allocate budget for WBS2 and WBS3 separately.
    Proj
    WBS1
    WBS2                    WBS3
         WBS2A                   WBS3A
              WBS2B                    WBS3B
                   WBS2C                         WBS3C
    Proj>WBS1 (it will no more act as Group wbs element) then  you can directly plan and budget for below wbs elements WBS2 and WBS3.
    Below hierarchy will consume budget from as displayed above.
    Note: In you case as per my understanding return budget make zero, then plan and budget the same it will work.
    Thanks and regards
    Sadiq

  • Easy Cost Planning version 0 cannot be used in DP81

    Dear SAP Expert,
    Please advice.
    We have requirement to do sales pricing in DP81 with project and inquiry.
    Some steps that we are doing :
    1. Create Inquiry : VA11
    2. Create Project : CJ20n
    3. Create cost planning with network activity in CJ20n and use Planning cost version 1. ( We are trying to use more than 1 version, not only version 0)
    4. Run DP81. It shows error message no expenditure.
    In the config ODP1 ( DIP Profile) , version has been activated.
    Is there any solution to use ECP with version more than version 0?
    Appreciate for the advice.
    Thank you.
    Nies

    Hi Sanjeev,
    Sales Pricing (DP81) can read ECP with standard version 0. The issue is that DP81 cannot read version other then 0.
    I need to do planning cost using version other than version 0 ( Actual/Planning version)
    Thank you for your advice.

  • Project system network activity cost distribute

    it is possible that i distribute the plan cost of external network activity to period wise. if yes then how ..........
    thanks

    Hi
    You can't plan the cost of external network activity period wise. The lowest level you can plan period wise is WBS Element level.
    Regards,
    Suraj

  • Manual cost planning

    Hi PS Gurus,
    Do you know of any way for a user to set a custom distribution of costs for a network activity? For example, a cost activity is created for $100,000 which runs for 12 months. In current design, this value will be evenly distributed over the 12 months according to the factory calendar. What the user would like to do is manually adjust the profile by which these costs are planned.
    Many thanks, and I hope you all are well.
    Cheers, Diana

    I can suggest two options:-
    1. Create as many distribution profiles as possible and let the user select as per the project need.
    2. Create invoice plan for general cost activity as per your distribution requirement.

  • Product Costing - Planning & Actuals

    Hi All
    I'm new to Product Costing. I dnt have much of functional knowledge aswell. I want to how the Planning Values & the actuals values are calculated in SAP thru PC. May be if you can explain me with an example, it wld be of grt help to me. I want PC for Make to Stock scenario. Expecting your reply.
    Regards
    Rajaram

    Dear,
    I will explain with an example.
    Main product is A, Raw materials are B,C & D. Let us assume that relationship between FERT & ROH   is 1:1 ,
    So for manufacturing 100 EA of A we need 100 EA of B,C & D.
    Next let us assume that there is one operation involved in the shopfloor. The machine rate per hour (200 Rs) & the Labor rate per hour (300 Rs) . Let us say for manufacturing 100 EA it involves 2 hours of M/C & Labor.
    The overhead costs of the company is 50 % of the operation cost (this percentage is maintained in the costing sheet against the secondary cost elements of the activity types).
    Say there is a sub-contracting process involved which costs around 100 Rs per 100 EA of A.
    Given the above conditions ,when you do the cost estimate the system will arrive at the cost of the product as follows.
    Product A
    Material Cost
      Component                  Qty               Per unit Cost               Total Cost
          B                           100                      2                              200
          C                           100                      1                              100
          D                           100                       2.5                           250
    Operation Cost
      Activity                      Hours           Per hour Rate              Total Cost
       Machine                     2                        200                           400
       Labor                          2                        300                           600    
    Overhead
    Overhead is 50 % of total operation cost       = 1000 * 0.5      =    500
    External Processing Costs
    Sub-contracting                                                                 =    100
    Total Cost of Goods Manufactured                                       =  2150
    Price of 1 A is 21.5 Rs.
    Hope this explains you the four main segments invovlved in the product costing clearly.
    Thanks &  Regards,
    Vijaya Bhaskar A
    Edited by: Vijaya Bhaskar A on Jan 11, 2009 1:01 PM

  • How to check plan line items for plan cost at network activity level?

    Dear all,
    How to check plan line items for plan cost at network activity level? The plan cost is done in network activity in CJ20N.
    I am not able to check using CJI4 or CJI9 report.
    Kindly advise.
    Thanks and regards,
    Jessie

    Hi Jess,
    Have you checked the navigation part which is being displayed on left hand side of report S_ALR_87013565 and S_ALR_87013533.? There you have option to check transaction currency and object currency when you double click on it.
    In case if it is not being displayed under navigation. Then you can bring them on from transaction code CJE2. For eg: Report group for S_ALR_87013533 is 12KST1C. Double click on it and it will open up to do changes in report layout and many more. There you also have options to bring on transaction currency too. Similarly, you can check for other report groups as well just by checking the report description.
    But I am not sure if suits your requirements. Wait for other experts to comment on this.
    Regards,
    Amit

  • Actual Activity allocation and Planned and actual activity comparison issue in Product Costing

    Friends,
    I have tried to explain the issue i am facing currently under Product Costing......
    1.Cost Component Structure
    10 – Material
    20 – Labour
    30 – Diesel
    40 – Electricity
    2.KP26 – Planned under Fixed Price
    Labour – 2.0 HR
    Diesel – 1.0 HR
    Electricity – 5.0 HR
    3. When I run CK11N system collecting correct rates for all activities (Costing Lot Size- 1)
    Like;
    1              E              LAB10    994310                  2.00        2.00        AED        1.0          HR Labour Cost New
    2              E              DIE20    994320                  5.00        5.00        AED        1.0          HR Diesel Cost New
    3              E              ELE30    994330                  1.00        1.00        AED        1.0          HR Electricity Cost
    4              M            1100000042                          5.00        0.00        AED        1              PC RAW MATERIAL BAKERY CONSUMED
    5              G            994201                                0.00        0.00        AED                        Depriciation Cost
    6              G            994202                                0.00        0.00        AED                        Sales & Distribution Cost
                                                                              13.00                    AED       
    4.When I do process order Cost analysis for the produced goods it shows me different figures as my
    BOM – RM is 1100000042 1 Quantity
    Routing – All activity time is 1 Hr
    40002                    RAW MATERIAL BAKERY CONSUMED          1005/1100000042            5.00
    40015                    COST OF GOODS MANUFACTURED              1005/4400000071            13.00-
    994310                  Labour Cost New                                              CBAKYPDDXB/LAB10      1.33
    994320                  Diesel Cost New                                              CBAKYPDDXB/DIE20      3.33
    994330                  Electricity Cost                                                CBAKYPDDXB/ELE30      0.67
                                                                                                                                              2.67- AED
    Note :- As per my understanding it should be
        Labour Cost New                                            2.00
                    Diesel Cost New                                              5.00
                    Electricity Cost                                                1.00
    5.Now after Process Order confirmation
    40002                    RAW MATERIAL BAKERY CONSUMED          1005/1100000042            5.00
    40015                    COST OF GOODS MANUFACTURED              1005/4400000071            00.00
    994310                  Labour Cost New                                              CBAKYPDDXB/LAB10      4.00
    994320                  Diesel Cost New                                              CBAKYPDDXB/DIE20      5.00
    994330                  Electricity Cost                                                CBAKYPDDXB/ELE30      2.00
                                                                                                                                              16.00
    6.For Month end actual Activity calculation and load the activaty actual rates on product
    I have configured the system in below manner
    1 Work center = Mapped to 1 Production Cost center
    Three Different Activities mapped to Secondary Cost Element with 43 Category
    For Electrictity Activity assesment from Primary to secondary 1 more cost element created with
          Category 42 Like; 994215-Electricity Cost All
    One Actual Assessment has been configured to allocate Electricity cost from Primary Cost element to
          Product/Order
    7.Assessment Cycle Details
    Controlling Area      1000 Controlling Area
    Cycle                ZELE01                  Status    Reviewed
    Start Date 01.01.2014  To  31.10.2014
    Text                  Elec. Cost Allocation to PROD
    IND- Interactive
    Assessment CEle       994215      Electricity Cost All
    Sender
    Cost Center    CBAKYDXBAD
    Cost Element 40204
    Receiver
    Cost Center    CBAKYPDDXB
    Tracing Factor
    Var.portion type – Actual Activity
    Selaction Criteria
    Activity Type - ELE30
    Receivers Tracing Factor
    Cost Ctr Factor per        100
    CBAKYPDDXB 100
    8.I have received the actuall electricity bill for 1100 AED and the same has accocated through KSU5
    After Cycle run when I follow below procedure
    KSS2 Actual cost splitting
    CBAKYPDDXB                    Production Dxb                LAB01                    183.33
    CBAKYPDDXB                    Production Dxb                DIE02                    183.33
    CBAKYPDDXB                    Production Dxb                ELE03                    183.33
    CBAKYPDDXB                    Production Dxb                DIE20                    183.33
    CBAKYPDDXB                    Production Dxb                ELE30                    183.33
    CBAKYPDDXB                    Production Dxb                LAB10                    183.35
                                                                                                                    1100.00
    Issue – System Split Electricity cost between all the activities assigned to Workcentres Cost Centre.
    But I want to post that cost only to ELE30 Activity and not for all
    When I RUN KSSI for actual Price determination system shows
    OTy        Object                                  Name                  AUn                Act Qty      Total price    Price (Fixed)              PUnit
    ATY        CBAKYPDDXB/DIE20        Production Dxb      HR                  5.0          366.66                  366.66                    10
    ATY        CBAKYPDDXB/ELE30        Production Dxb      HR                  2.0          916.65                  916.65                    10
    ATY        CBAKYPDDXB/LAB10        Production Dxb      HR                  2.0          916.75                916.75                    10
                                                                                                                                                          2200.06
    2200.06 is almost double than 1100.00 which is actual electricity cost and the same is actually determined for all the activities.
    After revaluation of the process order system posting below values
    40002                    RAW MATERIAL BAKERY CONSUMED          1005/1100000042                            5.00        5.00
    40015                    COST OF GOODS MANUFACTURED              1005/4400000071                            13.00-    13.00-
    994310                  Labour Cost New                                            CBAKYPDDXB/LAB10                      1.33        183.35
    994320                  Diesel Cost New                                              CBAKYPDDXB/DIE20                      3.33        183.33
    994330                  Electricity Cost                                                CBAKYPDDXB/ELE30                      0.67        183.33
                                                                                                                                                              2.67-      542.01
    Production Variance is posted as 542.01….
    I strongly believe there is some issue in configuration for activity allocation….
    Main issue is
    Point No. 4 – Different Figures in Process Order Cost Analysis
    Point No. 7 – Assessment cycle run
    Point No. 8 – KSS2 and KSII for Actual cost Allocation and Production variance…
    Friends… I have tried to explain maximum please help me to understand the concept or missing configuration/Process.
    Thanks
    Sagar Chinchkar

    Dear Rajneesh,
    I have made the changes as suggested....
    It seems now my Order Cost analysis and Product cost analysis are showing the same figures.
    I have also maintained cost center splitting structure for ELE30 Activity allocation.
    Structure Z1
    Splitting structure for AT
    Assignment 10
    Electricity Cost
    100
    Allocation for ELE
    Cost Element
    994215
    Activity Type
    ELE30
    Splitting Rule
    100
    Allocation for ELE
    12
    Activity quantity
    Version 0
    In my case actual activity confirmed is 3.1 for 2 orders in period 5
    Order 1 - QTY 2
    Order 2 - QTY 1.1
    Total actual Electricity exp is 1150 in period 5
    followed procedure to post actual activity on product is mentioned below
    KSS2 Actual cost splitting - Result as expected 1150 for ELE30
    KSII Actual price determination - Result as expected 3.1 actual confirmed QTY for ELE30 with actual price
           QTY 3.1         Tot Price 3,709.68        Planned(FIX) 3,709.68     Per Units 10
           (System is doing 1150/3.1*10=3709.68)
        3.CON2 Actual revaluation of orders
          Here while reevaluating the Process Orders system calculation is different
    Order 1 - QTY 2 -   558.00
    Order 2 - QTY 1.1 - 407.56
    Total -                    965.57
         4. After CON2 system is changing the value of other activities like
         LAB10 - Actual confirmed Value 10  to 0 
         DIE20 - Actual  confirmed Value 10  to 0
    Which should not be the case....
                                                                                                                  PL     Act     Var
    40002
    RAW MATERIAL BAKERY CONSUMED
    1005/1100000042
    10.00
    15.00
    50.00
    40015
    COST OF GOODS MANUFACTURED
    1005/4400000074
    26.00-
    26.00-
    994201
    Depriciation Cost
    WMBDDEP01
    1.00
    0.00
    100.00-
    994202
    Sales & Distribution Cost
    WMBDS&A01
    1.00
    0.00
    100.00-
    994310
    Labour Cost New
    CBAKYPDDXB/LAB10
    4.00
    0.00
    100.00-
    994320
    Diesel Cost New
    CBAKYPDDXB/DIE20
    10.00
    0.00
    100.00-
    994330
    Electricity Cost
    CBAKYPDDXB/ELE30
    2.00
    408.06
    20,303.00
    If we want to just post Electricity cost based on actual Electricity expenses and Labor and Diesel are based on planned activity rates.
    What setting is required in current system.....
    Million thanks in advance....
    Regards
    Sagar Chinchkar

Maybe you are looking for

  • Applicaton power consumption

    Perhaps this app already exists. If not, would someone please write one. I want an app that monitors each application's run time/power consumption (or whatever you want to call it. I want to be able to open this app and instantly see which app is con

  • Consolidation Dilemma

    I have a some pieces of equipment that I'm looking to consolidate into fewer pieces but am having trouble deciding. I have an ibook g4 867, dual g5 2.7, and 2 20" cinemas. I am considering selling off the laptop and 20" displays to make room for a 30

  • I need to get rid of a calendar alert

    I keep getting a calendar alert that I need to delete (it's a medication prompt that is now a week off from the proper schedule.)  It says it is attached to the home calendar at my me.com account, but when I sign into the cloud to check, there is no

  • How much disk space is needed to run Boot Camp using Windows XP?

    How much disk space is needed to run Boot Camp using Windows XP?

  • Update Global Temp Table in Oracle 11g

    Hi Experts, Scenario: I have stored  procedure A which calls procedure B. Procedure B uses Global temp Tables(With On Commit Preserve Rows)  to work with the data. I am trying to update one of the GTT in Proc B but unable to do it .. via SQL or via P