"Selected report cannot be loaded" when running published crystal analysis

Hi,
When running published crystal analysis reports (*.car) within Crystal Enterprise 10 i receive the message below. This is happening to all published crystal analysis reports. Can open the reports fine within Crystal Analysis Professional itself.
"Crystal Analysis Professional - The selected report cannot be loaded because one or more required parameters do not have an assigned value. "
any assistance would be appreciated
tks.

If I memory servers, you have to open the Crystal_Regwiz2003.msm in the .NET deployment project. One of the properties of the msm was Keycode (or similar). You entered the keycode here. To find your keycode; in VS2003 IDE, go to the Help | About screen. You will see one of the installed components as Crystal Reports and the keycode will be on the right of that. Copy the keycode from here, paste in the above.
For more details see the article Crystal Reports and Visual Studio .NET - Application Deployment.
- Ludek
Follow us on Twitter
Got Enhancement ideas? Try the SAP Idea Place
Share Your Knowledge in SCN Topic Spaces

Similar Messages

  • No data loaded when running publish/subscribe sample on Tomcat

    I have Tomcat 6.0 running as a .jsp handler with Apache 2.2 using the mod_jk connector. I've configured the samples/ context to be handled via Tomcat. Everything seems to be working fine -- I can access the files and launch .jsp files via my web browser.
    But when I try to fire up the DataPush example, I get no results from BlazeDS. Here's the procedure I am using:
    1. Start the feed by running http://localhost:8080/samples/testdrive-datapush/startfeed.jsp
    2. Run the Flex side: http://localhost:8080/samples/testdrive-datapush/index.html.
    3. Press the "Subscribe to 'feed' destination."
    Using Firebug within Firefox, I can tell that it's attempting to access a streaming channel. There are two requests:
    1) http://localhost:8080/samples/messagebroker/streamingamf
    2) http://localhost:8080/samples/messagebroker/streamingamf?command=open&version=1
    Request #1 comes back with a plain-text "Loading..." response.
    Request #2 returns an error message: The request sent by the client was syntactically incorrect ().
    Incase it matters, I have been playing around with the config files in previous tests. For this test, I deleted the samples.war, and samples/ directory from Tomcat. Then I copied the original samples.war back in and restarted Tomcat to redeploy. I would think that this erases all of my configuration settings -- but it does not seem to be doing that (The Data Push/Pull does NOT default to streaming from the Turnkey package, yet when I hit the service again, it always tries to perform streaming first -- as I had told it to do in a previous configuration).
    So I have two questions:
    1. Why doesn't the example work using streaming?
    2. Why aren't my configuration files being reloaded when I restart Tomcat?
    TIA
    Jonathon

    Hi,Alex
    Thanks for your advies, But it do not works.
    with a Apache Fronting Tomcat, the following config is work:
    channel 1 : Hi. Here are answers to your questions.
    >
    >>>1. Why doesn't the example work using streaming?
    >Some proxies buffer the response that is sent back to the client. This causes streaming connections to not work. This is a known issue with the mod_jk connector. Take a look at the  following bug for more info.
    >http://bugs.adobe.com/jira/browse/BLZ-84
    >
    >>>2. Why aren't my configuration files being reloaded when I restart Tomcat?
    >Did you recompile the sample application after changing the configuration? The configuration information is used by both the server and the client and is compiled into the client. You will need to recompile the client application using the new configuration files if you want your changes to be picked up. Note that is is possible to load the configuration information into the client application at runtime but that's not how the sample applications were built. If you are interested in loading the configuration information at runtime here is a blog posting that gives an example.
    >http://coenraets.org/blog/2009/03/externalizing-service-configuration-using-blazeds-and-lc ds/
    >Hope that helps.
    >-Alex
    >

  • How to resolve "Internal error: ABAP Report  cannot be loaded" error

    Hi All,
    I am new to SAP.Please help me out from this problem.
    When I am trying to debug BSP page, in debugging mode it shows "Internal error: ABAP Report  cannot be loaded" error and then dumps.
    In transaction ST22 it shows this dump something like this
    Runtime Errors         MESSAGE_TYPE_X
    The current application program detected a situation which really
    should not occur. Therefore, a termination with a short dump was
    triggered on purpose by the key word MESSAGE (type X).
        1 FUNCTION AC_SYSTEM_FLUSH .
        2 *"----
        3 ""Lokale Schnittstelle:
        4 *"  IMPORTING
        5 *"     VALUE(CALLED_BY_SYSTEM) TYPE  C OPTIONAL
        6 *"  EXCEPTIONS
        7 *"      CNTL_SYSTEM_ERROR
        8 *"      CNTL_ERROR
        9 *"----
       10   data: sysubrc like sy-subrc.
       11
       12   CALL FUNCTION 'AC_FLUSH_CALL'
       13        EXPORTING
       14             SYSTEM_FLUSH = 'X'
       15             CALLED_BY_SYSTEM = CALLED_BY_SYSTEM
       16        IMPORTING
       17             MESSAGE_NR   = sysubrc
       18             MESSAGE_TEXT = SY-MSGLI.
       19
       20   sy-subrc = sysubrc.
       21
       22   CASE SY-SUBRC.
       23     WHEN 0.
       24     WHEN 1.
       25 *     system_error
       26       MESSAGE ID 'CNDP' TYPE 'X' NUMBER 007 RAISING CNTL_SYSTEM_ERROR.
       27     WHEN 2.
       28 *     method_call_error
    >>>>>       MESSAGE ID 'CNDP' TYPE 'X' NUMBER 006 RAISING CNTL_ERROR.
       30     WHEN 3.
       31 *     property_set_error
       32       MESSAGE ID 'CNDP' TYPE 'X' NUMBER 006 RAISING CNTL_ERROR.
       33     WHEN 4.
       34 *     property_get_error
       35       MESSAGE ID 'CNDP' TYPE 'X' NUMBER 006 RAISING CNTL_ERROR.
       36     WHEN OTHERS.
       37       RAISE CNTL_ERROR.
       38   ENDCASE.
       39
       40 ENDFUNCTION.
    Thanks in advance
    Sunil Choudhury

    Hi Sunil,
    The reason for this could be anything, anyways look up for an OSS note with the error message first.
    As a workaround, you can try to use the classic debugger instead of the new ABAP debugger and see if it works.
    You should be logged into SAP via SAP GUI when you are debugging BSP.
    Regards
    Chen

  • I am getting this error message, " The URL is not valid and cannot be loaded" when I try to go to Firefox home. I have uninstalled add-ons, uninstaleed and reinstalled a fresh new firefox which did not help

    I am getting the following error message, " The URL is not valid and cannot be loaded" when I try to go to firefox home. I uninstalled add-ons , uninstalled Firefox and then installed a fresh version. Still have the problem.
    Thanks for the help

    That issue can be caused by a corrupted or incomplete Visual C++ installation (multiple versions can be installed side-by-side; SxS) that is missing some runtime components (Redistributable Packages) that Firefox depends on (problem with an embedded manifest file that specifies a specific runtime version).
    You need to install the missing components (e.g. VisualC++ 2005 Redistrbutable).
    * https://www.microsoft.com/download/en/details.aspx?id=5638
    *[[/questions/908165]] The URL is not valid and cannot be loaded
    *[https://bugzilla.mozilla.org/show_bug.cgi?id=713167 bug 713167] - Microsoft.VC80.CRT SideBySide errors, browsercomps.dll

  • DIM-00019 Cannot Create service (when running DBCA)

    DIM-00019 Cannot Create service (when running DBCA)
    Hello,
    I was trying to install Oracle9i and configure a DB instance (my first try at 9i, to be sure) and everything went ok until I was creating the DB instance. The dbca asked for all the parameters and when it was actually in the process of copying files/creating services it stops with the error
    DIM-00019 Create Service Error
    Then it tries to continue but another error comes up
    ORA-12560: TNS: Protocol Adapter Error.
    And then it aborts.
    Does anyone know what is going wrong here? I'm trying to install in Windows 2000 Server SP4.
    Thanks in advance for any help,
    --oswaldo santos.

    DIM-00019 Cannot Create service (when running DBCA)
    Hello,
    I was trying to install Oracle9i and configure a DB instance (my first try at 9i, to be sure) and everything went ok until I was creating the DB instance. The dbca asked for all the parameters and when it was actually in the process of copying files/creating services it stops with the error
    DIM-00019 Create Service Error
    Then it tries to continue but another error comes up
    ORA-12560: TNS: Protocol Adapter Error.
    And then it aborts.
    Does anyone know what is going wrong here? I'm trying to install in Windows 2000 Server SP4.
    Thanks in advance for any help,
    --oswaldo santos.

  • The fonts I select don't show up when I publish the site.

    The fonts I select don't show up when I publish the site.

    Are you using one of the Web_Safe_Fonts  Web Safe Fonts? If not then any computer that does not have it installed as Kirk pointed out will substitute some other similar font and change the appearance of the page.
    Happy New Year

  • Ooh  When I select Reporting Scorm, project won't run

    I can run my course fine in the published version and in preview.  BUT  When I select, Reporting, Standard Scorm and then try and preview the project the course is a foggy colour and it wont run.  I haven't got a SCORM LMS link until next week and wanted to get a test course ready.

    Hi Devon,
    One way that you could run a test would be to use SCORM TestTrack from Rustici Software. You can learn more about SCORMTestTrack and SCORM itself by clicking on the link I have included below. Note: Registration to SCORMTestTrack is free.
    SCORM TestTrack 
    Best - Mark
    Visit the macrofireball blog

  • SSRS 2005 report: Cannot bulk load Operating system error code 5(Access is denied.)

    I built a SSRS 2005 report, which calls a stored proc on SQL Server 2005. The proc contains following code:
    CREATE TABLE #promo (promo VARCHAR(1000))
    BULK
    INSERT #promo
    FROM '\\aseposretail\c$\nz\promo_names.txt'
    WITH
    --FIELDTERMINATOR = '',
    ROWTERMINATOR = '\n'
    SELECT * from #promo
    It's ok when I manually execute the proc in SSMS.
    When I try to run the report from BIDS I got following error:
    *Cannot bulk load because the file "\aseposretail\c$\nz\promo_names.txt" could not be opened. Operating system error code 5(Access is denied.).*
    Note: I have gooled a bit and see many questions on this but they are not relevant because I CAN run the code no problem in SSMS. It's the SSRS having the issue. I know little about the security of SSRS.

    I'm having the same type of issue.  I can bulk load the same file into the same table on the same server using the same login on one workstation, but not on another.  I get this error:
    Msg 4861, Level 16, State 1, Line 1
    Cannot bulk load because the file "\\xxx\abc.txt" could not be opened. Operating system error code 5(Access is denied.).
    I've checked SQL client versions and they are the same, I've also set the client connection to TCP/IP only in the SQL Server Configuration Manager.  Still this one workstation is getting the error.  Since the same login is being used on both workstations and it works on one  but not the other, the issue is not a permissions issue.  I can also have another user login into the bad workstation and have the bulk load fail, but when they log into their regular workstation it works fine.  Any ideas on what the client configuration issue is?  These are the version numbers for Management Studio:
    Microsoft SQL Server Management Studio 9.00.3042.00
    Microsoft Analysis Services Client Tools 2005.090.3042.00
    Microsoft Data Access Components (MDAC) 2000.085.1132.00 (xpsp.080413-0852)
    Microsoft MSXML 2.6 3.0 5.0 6.0
    Microsoft Internet Explorer 6.0.2900.5512
    Microsoft .NET Framework 2.0.50727.1433
    Operating System 5.1.2600
    Thanks,
    MWise

  • Error when running the Crystal Report 9.1 (visual studio 2003) in the deployed server

    Hello,
    1) I am suddenly getting an error message ‘Load Report failed’ in a production server (where the VS2003 application is deployed) when the Crystal Report is executed. This has happened maybe because of the Windows/Crystal Report Updates!
    I am able to see the same report perfectly fine in the development computer using VS 2003.
    I am using the 9.1 version which is part of the Visual Studio 2003.
    The event logs show 'Either the keycode library is not registered or it cannot be loaded ...EventID=10029'. See attached screen shot.
    Please help?
    2) Since I was getting a registration suggestion window  for using Crystal Reports, I registered twice using different email address and it said that it will send me the KeyCode for the Crystal report but after successful registration I never got any keycode but just an email acknowledging the Registration.
    I believe the KeyCode is required to use it in the server to execute/run a report.
    Can SAP representative email the keycode to my gmail account?
    My product key is: 
    Please help to resolve both my problems
    Thanks in advance,
    Sanjay Chudasama

    If I memory servers, you have to open the Crystal_Regwiz2003.msm in the .NET deployment project. One of the properties of the msm was Keycode (or similar). You entered the keycode here. To find your keycode; in VS2003 IDE, go to the Help | About screen. You will see one of the installed components as Crystal Reports and the keycode will be on the right of that. Copy the keycode from here, paste in the above.
    For more details see the article Crystal Reports and Visual Studio .NET - Application Deployment.
    - Ludek
    Follow us on Twitter
    Got Enhancement ideas? Try the SAP Idea Place
    Share Your Knowledge in SCN Topic Spaces

  • Report returns wrong data when run on server

    Hi,
    I'm runing CRS XI R2 on Windows Server 2003 SP2.  When I refresh a report in the Crystal Reports XI Designer, I'm getting correct data.  But when I schedule the report to run on the server it returns wrong data.  The data is different from what I see when I refresh it from the designer.  In the report I have running totals set up to count customers that meet a certain criteria.  The report is very large.  It take almost 2 hours to refresh.
    I was wondering what is causing the difference in running total data between refreshing it on the designer and running it on the server.  Is it returning wrong data b/c of it not reading all the records?  Should I be making any changes to the server settings?  I saw that under pageserver, there are options for  setting the 'Minutes Before an Idle Report Job is Closed' and 'Database Records To Read When Previewing Or Refreshing a Report".  Do either of those have anything to do with the report returning incorrect data when being scheduled to run on the server?
    Thanks,
    Kim

    Hi Xuandao,
    You would need to Use Cell Binding and Trigger concept to accomplish this.
    Its simple, however, you would have to work on a trial and error basis to understand this concept as implementing the same is subject to your dashboard and WEBI Design.
    Open you LiveOffice.
    Insert your WEBI, Now, go to Object Properties of your WEBI, select the second tab that says Prompt, Here, it lists the prompts that you have for your WEBI. This would also enlist your BEx variables as well. Select this BEx variable and click on the button that says Prompt at the bottom of this window. Here, select choose Excel Data Range and click on the cell select button on the right (small button that lets you choose what cell you want to bind this prompt to), Now select a free cell that would not be even populated later on when you run the dashboard say A1 (remember the value that you select). Click on OK and again OK. The WEBI Refreshes and you can see all the prompt values at the cell A1. These are all the possible values stored for your BEx prompt variables (these values are fetched from BW system dynamically).
    Now, save this LiveOffice, Go to you dashboard. Connect your dashboard to your Live office. Go to Data-> connections-> Now, select the WEBI and in the right hand pane  go to Usage tab, here, Click on Trigger cell button on the right hand side and select A1 in you LiveOffice.
    It should work fine.
    Let me know.
    Rgds,
    Sreekul Nair

  • SAP B1 Closes when Running the Crystal Report

    Hi SAP Expert,
    I have a problem during running the customized report i've created in Crystal. I created a stored procedure please see my code below. The Crystal Report is running during development but when i exported to SAP B1 and run the report. The SAP Business One will terminated. Any help please...
    CREATE PROCEDURE [dbo].[SP_ACTUALPURCHASESV3]
         -- Add the parameters for the stored procedure here
         @FROM DATETIME,
         @TO DATETIME
    AS
    BEGIN
         SET NOCOUNT ON;
         SET @FROM = CAST(CAST(MONTH(@FROM) AS NVARCHAR) + '/' +
                        CAST(DAY(@FROM) AS NVARCHAR) + '/' +
                        CAST(YEAR(@FROM) AS NVARCHAR) + ' 00:00:00:000' AS DATETIME)
         SET @TO = CAST(CAST(MONTH(@TO) AS NVARCHAR) + '/' +
                        CAST(DAY(@TO) AS NVARCHAR) + '/' +
                        CAST(YEAR(@TO) AS NVARCHAR) + ' 23:59:59:000' AS DATETIME)
         SELECT
              (SELECT DocEntry FROM OPOR WHERE OPOR.DocNum = PDN1.BaseRef) as  PODocentry,
              PDN1.BaseRef AS PONum,
              OPDN.DocEntry,
              OPDN.DocNum,
              OPDN.DocType,
              (select ocrd.lictradnum from ocrd where ocrd.cardcode = opdn.CardCode) as LicTradNum,
              OPDN.CardCode,
              OPDN.CardName,
              OPDN.DocDate,
              CASE WHEN PDN1.WhsCode IS NULL THEN PDN1.AcctCode ELSE PDN1.WhsCode END AS WhsCode,
              CASE WHEN PDN1.WhsCode IS NULL THEN (SELECT OACT.AcctName FROM OACT WHERE OACT.AcctCode = PDN1.AcctCode) ELSE (select OWHS.WhsName from OWHS where OWHS.WhsCode = PDN1.WhsCode) END AS WhsName,
              CASE WHEN PDN1.ItemCode IS NULL THEN 'N/A' ELSE PDN1.ItemCode END AS ITEMCODE,
              PDN1.Dscription,
              PDN1.Quantity,
              PDN1.unitMsr,
              PDN1.Price,
              PDN1.PriceBefDi,
              PDN1.PriceAfVAT,
              CRD4.WTCode,
              OWHT.RATE,
              (case when pdn1.quantity > 0 then (pdn1.Price * pdn1.Quantity) else PDN1.Price end ) * (OWHT.rate/100) as EWTVALUE
         FROM OPDN JOIN PDN1 ON OPDN.DOCENTRY = PDN1.DOCENTRY left join CRD4 on OPDN.CardCode = CRD4.CardCode left join OWHT on OWHT.WTCode = CRD4.WTCode
         WHERE OPDN.DocDate BETWEEN @FROM AND @TO  and OPDN.CANCELED = 'N'
         --WHERE OPDN.DocNum = 2542
         ORDER BY OPDN.DocDate
    END

    Hi,
    Does it means we are allowed to create stored Procedure inside the Company Database. We only use selecting and joining tables and somehow some complex sql procedures to meet our requirements.
    Thanks, but my question is if there's nothing wrong with it why my SAP B1 Closes when previewing the Crystal Report. Im running on Windows 7 64-bit, i will not imagine that the capacity of memory of my Terminal Unit is not enough because my memory is 8GB. I run crystal report but it shows the record, but when running the Cystal Viewer inside SAP B1 it illegally terminated.
    Thanks for clarifying the creation of Stored Procedure.
    Ben

  • Sub report parameter prompt appears when running Visual Studio 2008 with Crystal Reports 2008

    Post Author: relliott
    CA Forum: .NET
    If I build a simple Crystal Report that contains another simple Crystal Sub Report, the report will print preview fine in Crystal 2008.  The problem happens when add this report to a Visual Studio 2008 Web Application Project and I build and debug the application, the Crystal Viewer is prompting the user for the parameter used to link the sub report to the main report.  This should never happen as the user is not supposed to see this parameter.  If I type in some value for this sub-report parameter prompt, the Crystal Report Viewer gives an error message about not finding the field.
    I was having the same problem in Vs2005 with Crystal 10 which is why I upgraded.  Business Object's official fix for this problem was published under their KB article number c2018840 and c2019047.  These hot fixes ended up causing general exception errors in Visual Studio so I scrapped these solutions.
    Support had me install SP0 for Crystal 2008 (which did not fix it).
    Any ideas?
    Any help is greatly appreciated.
    Thanks,
    Rich Elliott

    Hi Bontrager,
    Thank you for posting in MSDN forum.
    According to your description, I agree with pvdg42's suggestion, so I suggest you can try pvdg42's suggestion to install the version of
    Crystal Reports 10.5 to check this issue again.
    Reference:
    http://forums.asp.net/t/1236730.aspx?Which+CR+version+is+in+Visual+Studio+2008+
    In addition, since this forum is
    to discuss: Visual Studio WPF/SL Designer, Visual Studio Guidance Automation Toolkit, Developer Documentation and Help System, and Visual Studio Editor. So if you have any issue about the
    Crystal Reports, I suggest you can ask the issue to the
    SAP Crystal Reports website:
    http://scn.sap.com/community/crystal-reports/content?filterID=contentstatus%5bpublished%5d~objecttype~objecttype%255bthread
    as pvdg42 pervious suggestion, it will be better support.
    Thanks for your understanding.
    Best Regards,
    We are trying to better understand customer views on social support experience, so your participation in this interview project would be greatly appreciated if you have time. Thanks for helping make community forums a great place.
    Click
    HERE to participate the survey.

  • I frequently get a "url is not valid and cannot be loaded" when I know the URL is valid

    When searching or using previously validated bookmarks I frequently get an error message "url is not valid and cannot be loaded" How do I fix this?

    You can modify the pref <b>keyword.URL</b> on the <b>about:config</b> page to use Google's "I'm Feeling Lucky" or Google's "Browse By Name".
    * Google "I'm Feeling Lucky": http://www.google.com/search?btnI=I%27m+Feeling+Lucky&ie=UTF-8&oe=UTF-8&q=
    * Google "Browse by Name": http://www.google.com/search?ie=UTF-8&sourceid=navclient&gfns=1&q=
    * http://kb.mozillazine.org/keyword.URL
    * http://kb.mozillazine.org/Location_Bar_search

  • Min Mx planning report gives an error when run with RE-Stock yes.

    Hi All,
    We are going to implement Min Max planning for the first time.However when we test it at org level with Re-Stock parameter YES it gave an error.
    what are the additional setups need to be done for it?
    It works fine when running with re stock no.and gives the out put of the report accurately.
    Thanks.
    MPH

    Hi Garry,
    These are the parameters and error codes are also given.
    P_ORG_ID='328'
    P_LEVEL='1'
    P_SELECTION='3'
    P_CAT_SET_ID='1'
    P_CATG_STRUCT_ID='101'
    P_SORT='1'
    P_D_CUTOFF='2009/07/03 00:00:00'
    P_D_CUTOFF_REL='0'
    P_S_CUTOFF='2009/07/03 00:00:00'
    P_S_CUTOFF_REL='0'
    P_USER_ID='5411'
    P_RESTOCK='1'
    P_DD_LOC_ID='32488'
    P_NET_UNRSV='1'
    P_NET_RSV='1'
    P_NET_WIP='1'
    P_INCLUDE_PO='1'
    P_INCLUDE_MO='1'
    P_INCLUDE_WIP='1'
    P_INCLUDE_IF='1'
    P_INCLUDE_NONNET='2'
    P_LOT_CTL='3'
    P_DISPLAY_MODE='1'
    P_SHOW_DESC='2'
    P_PUR_REVISION='2'
    *MSG-00069: Calling INV_MMX_WRAPPER_PVT.exec_min_max from Before Report Trigger
    MSG-00070: INV_MMX_WRAPPER_PVT.exec_min_max returned an error:
    REP-1825: Before Report trigger returned FALSE.*

  • CRIO application works in interactive mode but broken VIs reported in error log when run built application on target

    I have been getting more than my fair share of grey hairs the past few days because of this. Over the past few months this almost never happened. Lately, after a seemingly minor change to some serial communications code, hardly a single build works without throwing errors like this:
    #OSVers: 6.3
    #OSBuild: Jun 6 2014, 09:14:16
    #AppName: /c/ni-rt/system/lvrt.out
    #Version: 14.0
    #AppKind: AppLib
    #AppModDate:
    InitExecSystem() call to GetCurrProcessNumProcessors() reports: 1 processors
    InitExecSystem() call to GetNumProcessors() reports: 1 processors
    InitExecSystem() will use: 1 processors
    starting LabVIEW Execution System 306708506 Thread 0 , capacity: 1 at [3507679466.00933790, (19:24:26.009337710 2015:02:24)]
    starting LabVIEW Execution System 306708507 Thread 0 , capacity: 1 at [3507679470.59560204, (19:24:30.595601929 2015:02:24)]
    starting LabVIEW Execution System 2 Thread 0 , capacity: 24 at [3507679481.25993776, (19:24:41.259937648 2015:02:24)]
    starting LabVIEW Execution System 2 Thread 1 , capacity: 24 at [3507679481.25993776, (19:24:41.259937648 2015:02:24)]
    starting LabVIEW Execution System 2 Thread 2 , capacity: 24 at [3507679481.25993776, (19:24:41.259937648 2015:02:24)]
    starting LabVIEW Execution System 2 Thread 3 , capacity: 24 at [3507679481.25993776, (19:24:41.259937648 2015:02:24)]
    Thread consumption suspected: 3 Try starting 4 threads
    starting LabVIEW Execution System 2 Thread 4 , capacity: 24 at [3507679515.59324312, (19:25:15.593243004 2015:02:24)]
    starting LabVIEW Execution System 2 Thread 5 , capacity: 24 at [3507679515.59324312, (19:25:15.593243004 2015:02:24)]
    starting LabVIEW Execution System 2 Thread 6 , capacity: 24 at [3507679515.59324312, (19:25:15.593243004 2015:02:24)]
    starting LabVIEW Execution System 2 Thread 7 , capacity: 24 at [3507679515.59324312, (19:25:15.593243004 2015:02:24)]
    Thread consumption suspected: 8 Try starting 1 threads
    starting LabVIEW Execution System 2 Thread 8 , capacity: 24 at [3507679515.73854351, (19:25:15.738543576 2015:02:24)]
    and 
    #Date: TUE, FEB 24, 2015 04:47:22 PM
    #OSName: VxWorks
    #OSVers: 6.3
    #OSBuild: Jun 6 2014, 09:14:16
    #AppName: /c/ni-rt/system/lvrt.out
    #Version: 14.0
    #AppKind: AppLib
    #AppModDate:
    InitExecSystem() call to GetCurrProcessNumProcessors() reports: 1 processors
    InitExecSystem() call to GetNumProcessors() reports: 1 processors
    InitExecSystem() will use: 1 processors
    starting LabVIEW Execution System 306708506 Thread 0 , capacity: 1 at [3507670087.84041262, (16:48:07.840412710 2015:02:24)]
    starting LabVIEW Execution System 306708507 Thread 0 , capacity: 1 at [3507670092.45153570, (16:48:12.451535843 2015:02:24)]
    starting LabVIEW Execution System 2 Thread 0 , capacity: 24 at [3507670103.11840487, (16:48:23.118404925 2015:02:24)]
    starting LabVIEW Execution System 2 Thread 1 , capacity: 24 at [3507670103.11840487, (16:48:23.118404925 2015:02:24)]
    starting LabVIEW Execution System 2 Thread 2 , capacity: 24 at [3507670103.11840487, (16:48:23.118404925 2015:02:24)]
    starting LabVIEW Execution System 2 Thread 3 , capacity: 24 at [3507670103.11840487, (16:48:23.118404925 2015:02:24)]
    VI_BROKEN (0): [VI "NC serial comms protocol.lvlibet Lower Temperature Limit.vi" (0x04667310)]
    VirtualInstrument:etOrClearBadVILibrary - now VI is bad on [VI "NC serial comms protocol.lvlibet Lower Temperature Limit.vi" (0x04667310)]
    this->flags=33563136, compilerError=6
    VI_BROKEN (0): [VI "Heater Control HAL.lvclass:Write Heater Control Active.vi" (0x058c4e98)]
    VirtualInstrument:etOrClearBadVILibrary - now VI is bad on [VI "Heater Control HAL.lvclass:Write Heater Control Active.vi" (0x058c4e98)]
    this->flags=50340352, compilerError=6
    VI_BROKEN (0): [VI "NI_LVConfig.lvlibave Config File.vi" (0x047b7e90)]
    VirtualInstrument:etOrClearBadVILibrary - now VI is bad on [VI "NI_LVConfig.lvlibave Config File.vi" (0x047b7e90)]
    this->flags=33563136, compilerError=6
    and so on.
    This is using a cRIO 9074 running CompactRIO recommended software set  14.0.1 .
    These errors happen right at startup. Memory use is steady in interactive mode, about 20 MB contiguous memory is unallocated out of 128 MB. I have taken pains to prevent allocation and follow cRIO besta practices non concatenated strings array building in loops etc). CPU is 50-60% when running interactive mode.
    Really at my whit's end here, I have tried the various combination of enabling / disabling debugging in the RTEXE, disconnecting typedefs etc. I have not noticed a pattern. 
    Regards,
    MarkCG

    Hello MarkCG,
    What minor changes did you make to the serial communication code? Posting the VI or a screenshot of the VI with the modifications which caused the RTEXE to stop functioning could be useful to troubleshoot the issue. 
    Regards,
    J_Bou

Maybe you are looking for