Hi all
   What is the difference between Service Agreement & Service Level Agreement?
Your response asap is highly appreciated.
Thanks
Sonali

Hi Sonali,
Service agreement consist of all the pricing details agreed upon between the customer and organization. e.g. org. will provide so and so customer xyz service at 50 USD/Hour.
Service Level Agreement are the time details to perform the services offered to a customer. i.e. what should be the time duration within which first response should be done to customer query or service. What should be the time duration within which the serivce has to be completly delivered to a customer.
e.g Installing a water purifier at customer location. here SLA could be once customer place an order a service engineer should give him a call within a day to know at what time he/she could come an install purifier. Secondly serivce person should any how complete the installation process within 3 days of customer order.
If the SLA are missed penalty could be applied to organization by providing certain rebate to customer.
Best Regards,
Pratik Patel
<b>Reward with Points!</b>

Similar Messages

  • Service level agreement application

    we are considering investing in a service level agreement application through which we can better monitor and deliver more consistent, and predictable performance levels to our Oracle end users
    there are few applications that can do the job, including mercury, bmc, infovista.
    for the mercury solution there is a good online webinar coming up
    https://placeware.viewcentral.com/events/cust/single_event.asp?cid=mercint&pid=2&payment_type=USD&cbClass=16&signupkey=V-SLM
    has anyone used any of these applications for service level monitoring, and can share some thoughts on the selection process?
    thanks,
    Joe

    HI
    the BMC's Patrol is very goob monitoring, this work over OS, Oracle and more databases
    Check the BMC DBA tools, i don't remember the name, but yu can check it in
    http://www.bmc.com
    cheers
    Mario

  • Service level agreement

    what is meant by service level agreement in sap... i searched a lot but couldn't understand that...can any one explain clearly about this service level agreement..

    Hi,
    Service Level Agreements (SLAs), you work with customers to stipulate the form that the performance of a guaranteed service takes.
    The SLAs define the attributes (such as content, scope and means) for the service products (for example, maintenance, Hotline) agreed on with the customer in the service contract. Different parameters, such as response time or availability time, confirm a SLA.
    Examples of parameters within a SLA:
    ·         Response time (technician on site within a specified time)
    ·         Operating time/availability time (working time of the service or support center)
    ·         Downtime (maximum number of breakdowns per year)
    ·         Availability (assured system availability in %)
    ·         Solution time (maximum period of time allowed for the solution of a problems

  • Service Agreement and Service Level Agreement

    Hi
    Can anyone provide me a copy of Service agreement and Service level agreement which can used between sap partner and a customer.
    I am doing my first implementation in SAP B1 and i want to make this agreement with my customer before i start implementing the software.
    I searched the portal but couldnt locate it.
    Thanks and Regards
    C.Louis

    Hi,
    I think the first agreement document is EULA (end user license agreement). The second is your request.
    I think you can ask the sample of the agreement to SAP branch in your country. if not, let me know your e-mail.
    Rgds,

  • Service Level Agreements or Memo

    Hi,
    Is there a way I can store service level agreements or a memo field for each client? Trying to keep my field guys posted on what is with in scope of the contract when onsite.
    This topic first appeared in the Spiceworks Community

    Hey heatherfoeh!
    What a funny thing you ask because velocity has been on my mind recently. Just this past month, I wrote two blogs (here and here) on the topic of velocity and the last one I am going to write is about "How to measure it". So this question is perfect.
    Here is how we do it at ReadyTalk.
    1. We first define all of our transitions within the technology. Meaning which field is being flipped to signify a transition has occurred We capture this on several different records as the lead works its way through the system.
    On the lead record, we capture created date, first contact attempt, contact made, converted date. We do this by date stamping the relevant field each time the lead goes through a transition. Below you see our lead status. Each time this field is flipped, there is a corresponding hidden field that is stamped. The use of these fields allows us to then create reports in SFDC using a formula that calculates the number of days between two dates.
    On the opp records we have the same process but this time we are tracking the velocity through the pipeline. So we go from SAL>SQO>CW or CL. Each time the opp stage is flipped a corresponding date stamp is made. And, like above, you run formulas on this field to calculate # of days between two dates.
    Now in terms of adherence to an SLA, you obviously have dashboards that you roll this up to in the form of average time between stages. You can also segment on velocity be owner (to see which AEs are "johnny on the spot" with their leads) or you can do velocity by lead source. You can also create workflow that throws alerts when a lead/opp has sat at one stage for two long.

  • Service Level Agreements on Service Requests

    Hello,
    I was wondering if anyone had thoughts or experiences to share for the best way to manage Service Level Agreements for Service Requests. I have been requested to provide a report showing whether Service reqeusts (by Area/Topic) were answered within the agreed times.
    Eg Requests for New Business Cards are expected to be resolved in 3 days and it took 4 days so flag this request as having not met arranged timeframes.
    I'm not sure where is the best place to store the Service Level dayes by area? Is that just within the logic of the report? Appreciate any thoughts on this.
    thanks,

    Hi Venky,
    I'm new to On Demand and not that confident creating a custom object. I was wondering if I could achieve my SLA's by using a Workflow and custom SR field?
    I thought if I created a new field on the SR called 'Service Level Agreement' I could populate this field with SLA days based on Service Area.
    Eg:
    Trigger Event: Before modified record saved
    Workflow Rule Condition: PRE('<Area>') <Area>
    Action: Update Values
    Field Name: Service Level Agreement
    value: IIf([<Area>]="Allocations",'2')
    However I get an error message as I'm not sure if I have the expression correction.
    Function ‘IIf’ is invalid with 2 parameters(SBL-SBL-00000)
    Does this make sense as an approach? I thought I could then use this field on reports.
    thanks,

  • Workflow step by step configuration for scheduling level agreement release

    Hi All,
            I tried alot to configure step by step scheduling level agreement release using workflow.
            But, The release code I couln't pass using workflow.
            Plz guide me, or let me know some useful links for the same.

    /Use the user exit  M06E0005 to avoid all this problems.
    In this user exit you can add your custopm logic based on your org structure and then workflow will take to all of release one by one.

  • Sap&db services in os level to start n stop

    Hi All...
                 plz tell me the way how to start and stop sap & db services in os level (sun solaries) with commands plz do help in knowing this commands in detailed way.

    Dear Upendar,
    You can check out the required information provided at help.sap.com at the following link:
    http://help.sap.com/saphelp_nwpi71/helpdata/en/47/1d6feeff6e0d46e10000000a155369/content.htm
    Regards,
    Abhishek

  • Agreed to extend agreement at a new cost of $21.12 starting May but billed $34 instted

    On April 24 I called  AT&T to discuss extending the U-Verse agreement which was to expire in June 2015. I spoke with Liz and she offered to call back on 5/22 at 11 AM PST to confirm the new cost of $21.12 per month. On June 25th I found out the new monthly cost is $34 instead. How can one trust the ATT Customer Service representatives? I agreed to a $21.12 monthly cost and was acually charged $34. Now I have to call them again and spend another 40 minutes or more on the phone to talk about the new contract. Not sure how many more times I will need to call them about it. The $34 per month fee is for 768kbs internet speed!

    On April 24 I called  AT&T to discuss extending the U-Verse agreement which was to expire in June 2015. I spoke with Liz and she offered to call back on 5/22 at 11 AM PST to confirm the new cost of $21.12 per month. On June 25th I found out the new monthly cost is $34 instead. How can one trust the ATT Customer Service representatives? I agreed to a $21.12 monthly cost and was acually charged $34. Now I have to call them again and spend another 40 minutes or more on the phone to talk about the new contract. Not sure how many more times I will need to call them about it. The $34 per month fee is for 768kbs internet speed!

  • Sony Xperia Z1 Water Resistivity false advertising and poor service from service center

    I have bought Sony Xperia Z1 from eBay on 31 October 2013. I have been using this phone for nearly a year. The phone was good in performance but comes to water resistivity it will resist water for a few months but after few months even though the card slot and all flops are closed, the water gets in.I have faced this on 7th September when i was about to take a photo in pool, the water gets in and the phone was dead. And i took it to the service center ( Repair and Return Technology (I) Pvt Ltd) Egmore, chennai, on 9th September 2014. On 15th September i got a call that i have to pay nearly 20000 to rectify the phone. Then i called the service center and also sent mail to [email protected] and said that i was not satisfied with the reply. Then few days i again got mail like below
    We understand your concern towards the service of your Sony XPERIA Z1.
    We had received your Sony XPERIA Z1 at our Authorized Service Centre – M/S Repair and Return Technology, Egmore, vide Work Order No.W114090906449 with the nature of complaint “Cannot Power On”.
    Upon physical inspection of the product by our engineers, the phone was found to be damaged due to external cause of liquid regression. As we mentioned in our Warranty Terms and Conditions, this service is not covered under Warranty. The Main Board needs to be replaced for satisfactory working of the product. The estimate for this service is Rs 12,488/- and Service charge is Rs.350/-.
    This matter has been discussed with our management.
    We regret that we are unable to comply with your request for free of cost service. We would once again request you to kindly approve the estimate so that we can proceed for service.
    We solicit your kind understanding in this regard.
    Thanking you and assuring you of our best services always.
    Warm Regards,
    Sony India Pvt. Ltd.
    They just mention the flags turn red and so the water has got in. They were unable to explain how the water got in. I have seen several forums that many users facing this kind of issues even all the flaps are closed. I was completely stressed and depressed to hear this. I halfheartedly asked the service center to do the service on 1 October 2014. Today's date is 11 October 2014 but still now i haven't heard any update from SONY. When i asked SONY customer care or service center, they dont even know the status of the product, they saying that the phone has been given for service to next level, I have to wait for few days, But i have been waiting for 1 month. I was completely fed up with Sony Service as they are not even called me once regarding this. I have to call each and every time and not even get proper reply. Its very irritating.
    If SONY is viewing this do necessary action or else you'll lose a premium customer and more customers in future.
    Even though i got the phone how can i use this phone in water ? I completely lost trust in SONY and never buy any SONY product again. I'll go for Micromax next time.
    Order No.W114090906449
    Sony XPERIA Z1, Model No. C6902,
    IMEI No. 
    I see many users here are suffering the same problem,
    Beware of buying Xperia Water resistant products as it may not guarantee waterproof and they don't even give warranty if your phone got water.
    Regards,
    Narayanan
    Solved!
    Go to Solution.

    I have had the same problem I have wrote to customer services and I keeping the same reply, that the phone has to be less than 1.5 meters, less than half an hour....... blah blah blah.
    My phone failed in water and I had met all the conditions but they keep fobbing me off I have asked why they advertise the phone as waterproof when obviously its not.  The last reply I got was well it might not be waterproof.
    Absolute rubbish the phone and the customer service.  and dont get me started on the smartwatch that failed in water as well it never worked I threw it in the bin.
    Aviod sony products absolute junk I say.

  • SLA for service request\service order  without create a service contract

    Hello Experts,
    We are using CRM 7
    Is there a possibility to determine SLA for service request\service order  without create a service contract?
    We have defined:
    1. Trasaction Code: CRMD_SERV_SLA-  Response Profile / Response Times
    2. In Customizing we have defined our date profile with the relevant duration
    3. In  Customizing for transaction types  we defined  SLA Prof. Det. Proc= IT000001
    4. we assign the Service Profile and Response Profile to BP (from "service levels" block) .
    Everthing seems ok but the SLA time is not determined automatically.
    Hope you can help me out.
    Thanks,
    Tal

    Hi Tal Tal
    Your steps are correct and i hope you did these too
    a) In the SLA determination procedure ,you have defined the access sequence for service product item or org
    b) If service product item ,take any service product for ex INVESTIGATION assign the two Service and response profile in the service tab
    c) if org the above two profiles can be assigned to org attributes.
    d) In my opinion the date profile you should have assigned it to item category as I think the SLA date calculation is done at the item level
    e) You should assign the SLA det prof to the transaction type in the service process business category - customizing header.
    f) when you create a transaction type sla dates will be determined as follows
        a) you have to enter service product entered in the item ,then dates will be visible,and also if your access sequence is based on service product,the respons profile and service profile will be determined.
        b) if you have given indicators as all these three "category,priority,codes' in your response profile, then you have to enter all three and then hit enter
       c) After hitting enter,the response profile determined above,will use the above 3 inputs of category,priority etc and determine the duration times ,which should be maintained in your date profile.hence the durations determined will be used in the dates calculation.
    Let me know if you have any other questions.

  • One time service's service order

    Dear All,
    One time service order's service is giving error msg that " enter all mandatory fields and asking for service code"
    Actually we have configured that in 1 time service's service order , SO wont ask for service code and it will work without master data,
    Please hlp.
    Shreya

    Hi,
    The Service Procurement process for Services without Service Master Record is described below:
    FOR CREATION OF SERVICE PO:
    1. Enter the Transaction ME21N, with Standard Document Type.
    2. Choose Item category D and Account Assignment (say) K.
    3. Enter the Short Text describes the Service at Item level in the field Short Text
    4. Enter the Plant, Material Group, Organizational data etc.
    5. At Item Detail screen, go to SERVICES Tab and maintain there also Short Texts which give some description that describes the Services for the Item Service activity.. maintain Qty, Value, UoM. when you proceed furher, system prompts you to enter the Cost center and G/L Acct for each service item. Then save the PO.
    FOR SERVICE ENTRY:
    1. Go to Transaction ML81N, choose Other Purchase Order tab, enter your PO Number, select Create Tab.
    2.Under the PO No, in the Short Text field, maintain a short text Like "Fist part Entry"
    3. At the item level, at the bottom of the screen, click Service Sel. Tab. System prompts a sub screen and there you select "From Purchase order radio button". Automatically navigates into Service selection screen, there you select your required Services.and click on Copy Services Tab.
    4. With this action, your Services from the PO will be copied to the Service Entry Sheet. There you can change Quantities accordingly.
    5. After this, click Flag icon on the top of the screen for Acceptance of Services and save the Entry sheet. Ure traffic light turns to Green and you'll get a Matl Document No.
    After this you can proceed to MIRO for Invoice posting, just like normal PO.
    Regards,
    Kanth
    K

  • Need to stop the pop and Imap receive connectors to be able to start the pop and Imap services in Service Manager

    Hello All,
    I am hoping that someone else has run across this issue (may have started after CU5 was installed).
    Upon every reboot I have found that the "Microsoft Exchange IMAP4" and "Microsoft Exchange POP3" services in the service manager will not start... basic reason in the event viewer is that the ports are already in use.
    If I go into the ECP and disable my POP and Imap receive connectors I am able to then start the services.
    After the services are started I can then go back to ECP and enable the receive connectors again and everything is fine .
    Can anyone shed any light on this?
    Thanks in advance ;)
    Chris

    Hello Winnie,
    I bounced the Transport service tonight (adjusting spam filter levels)... so I was able to issue a stop and re-start of the IMAP4 and POP3 services in the service manager.
    I stopped both the IMAP4 and POP3 services in service manager.
    I issued the start of the services with PowerShell as requested:
    PS C:\Users\administrator.XXXXXXXX> Start-service MSExchangePOP3
    WARNING: Waiting for service 'Microsoft Exchange POP3 (MSExchangePOP3)' to start...
    WARNING: Waiting for service 'Microsoft Exchange POP3 (MSExchangePOP3)' to start...
    WARNING: Waiting for service 'Microsoft Exchange POP3 (MSExchangePOP3)' to start...
    Start-service : Failed to start service 'Microsoft Exchange POP3 (MSExchangePOP3)'.
    At line:1 char:1
    + Start-service MSExchangePOP3
    + ~~~~~~~~~~~~~~~~~~~~~~~~~~~~
        + CategoryInfo          : OpenError: (System.ServiceProcess.ServiceController:ServiceController) [Start-Service],
       ServiceCommandException
        + FullyQualifiedErrorId : StartServiceFailed,Microsoft.PowerShell.Commands.StartServiceCommand
    Then I first stopped the receive connector in ECP and issued the command:
    PS C:\Users\administrator.XXXXXXXX> Start-service MSExchangePOP3
    WARNING: Waiting for service 'Microsoft Exchange POP3 (MSExchangePOP3)' to start...
    WARNING: Waiting for service 'Microsoft Exchange POP3 (MSExchangePOP3
    With the receive connector disabled in ECP it was successfully started.... then I enabled the receive connector in ECP and all is fine now
    repeated the same with  IMAP4
    to recap....
    If I stop the IMAP4 and/or POP3 service in service manager, I must first disable the IMAP and/or POP receive connector in the ECP, then start the service in service manage.. and then finally go into ECP and enable the receive connector.
    Thanks,
    Chris
    Chris

  • What does this mean? Service "Bonjour Service" could not be installed...

    Service "Bonjour Service" could not be installed. Verify that you have sufficient privileges to install system services. How do I "Verify" that I have "sufficient privileges." I have tried unistalling and reinstalling Bonjour. But everytime I try to download the new version of Itunes this error message pops up. I first encounter the problem when I was trying to preview a song on itunes. I clicked the song but it would not play. I then tried playing music previoulsy pruchased music and it still wouldn't play. So far I have removed Itunes and Bonjour and then reinstalled them, but I am still recieving this message. Can anyone help.

    Im getting the same thing..
    Source: MsiInstaller
    EventID: 1013
    This is the XML view from details..
    - <Event xmlns="http://schemas.microsoft.com/win/2004/08/events/event">
    - <System>
    <Provider Name="MsiInstaller" />
    <EventID Qualifiers="0">1013</EventID>
    <Level>2</Level>
    <Task>0</Task>
    <Keywords>0x80000000000000</Keywords>
    <TimeCreated SystemTime="2010-12-27T14:17:51.000Z" />
    <EventRecordID>30032</EventRecordID>
    <Channel>Application</Channel>
    <Computer>JohnJ</Computer>
    </System>
    - <EventData>
    <Data>Product: iTunes -- Service 'Bonjour Service' (Bonjour Service) could not be stopped. Verify that you have sufficient privileges to stop system services.</Data>
    <Data>(NULL)</Data>
    <Data>(NULL)</Data>
    <Data>(NULL)</Data>
    <Data>(NULL)</Data>
    <Data />
    <Data />
    <Binary>7B38383146354445382D393336372D344238312D413332352D453931424243363437324 6397D</Binary>
    </EventData>
    </Event>
    Message was edited by: TexasRulezNCAA

  • XML Publisher with Service Module - Service Request Reports -- URGENT

    Hi all ... any pointers/help/guidance with the problem listed below would be much appreciated.
    I'm working in the context of the Oracle Service Module & Service Request Reports.
    I'm required to configure the XML Publisher Responsibility seeded functionality with the service module reports.
    Listed below are the two reporting requirements that I'm considering , corresponding to the following seeded XMLP Responsibility seeded components:
    (I'm quoting an extract from the Oracle TeleService Implementation & User Guide here).
    Detailed Report
    Data Definition: Service Request Detail Definition (CS_SR_DETAIL_DEF)
    Corresponding Template: Service Request Detail Report Template (CS_SR_DETAIL_TMP.en)
    Template Description: Includes all of the available service request attributes including charges, the two descriptive flexfields, and extensible attributes.
    Summary Report
    Data Definition: Service Request Summary Definition (CS_SR_SUMMARY_DEF)
    Corresponding Template: Service Request Summary Report Template (CS_SR_SUMMARY_TMP_en)
    Template Description: Includes a subset of the detailed report attributes including the same charges information as the detailed report.
    When I log into the EBS >> XML Publisher Administrator Responsibility >> Service Application ... I find these seeded XMLP components, together with the preview data, downloadable templates & sample output.
    The question is:
    Where (responsibility/application/navigation/etc.) do I find the seeded EBS Service Reports to provide the expected XML input to the seeded XMLP Service Request Data Definitions & Templates????
    Notes ...
    I have found the following two reports, under the Service Application in EBS, set their output type to XML and viewed the output of the submitted request:
    - Service Request Detail Report
    - Service Request Summary Report
    ... but each of these two reports produce XML output of a different data model/structure to that expected by each of the corresponding seeded XMLP data-definitions/templates.
    Additionally, I cannot find any corresponding concurrent program definitions on the system with the same SHORT-NAME/CODE as the seeded XMLP data definitions themselves i.e. CS_SR_DETAIL_DEF and CS_SR_SUMMARY_DEF.
    Are the necessary reports not actually seeded within EBS? Do the seeded XMLP data definitions & templates require development of new Concurrent Programs from scratch to access the database tables and provide the necessary data/input, or am I missing something here??

    I am sure you found a solution to your problem. If not, to give a pointer to this issue, I guess these reports are gererated right from the service request screen and this definition is used there.This report can be generated from several places based on where you are within SR scree.
    Thanks
    Nagamohan