Setting Float before production (in day)

Hi,
How can I set the Float before production (in day) in Material master and in the BOM?
Thanks
Dede

Dear,
Schedule margin key includes,
1. Opening period
2. Release period
3. Float before production
4. Float after production.
Opening Period: It is the time to MRP controller to convert planned order to pur req.
For FERT & HALB opening period, release period, Float before production & float after production are applicable.
But for ROH only opening period & release period only applicable.
You need to assign schedule marging key in material master MRP2 view.
For Customizing for Shop Floor Control, by choosing Operations --> Scheduling --> Define Scheduling Margin Key .
Regards,
R.Brahmankar

Similar Messages

  • Scheduling Margin key ( Float before production - Float after production)

    Dear Expert ,
    I maintain in material master float before and after production
    When i rescheduling in house production in routing and display the result i found the time for float is calculated in Interoperation time
    And I as i know Scheduled start & Scheduled finish determined the production dates only & FBefProd is time between basic start and Scheduled start and FAftProd is the time between Scheduled finish date & basic finish date
    Why he put it there at the time it's not actually maintained in production date ?
    Regards
    Rami

    Dear,
    In the routing, click on scheduling result push button,
    Here you can see how this interoperatioon time is calculated
    how much is Float before and after production.
    example-
    schedule margine key - 001
    float before production - 2 day
    Float after production - 1 days
    Routing data- for 1 qty - 24 hrs
    After you schedule in routing and see the details of scheduling result, the following result
    Basic start date - 30.11.2008
    Basic finish date - 03.12.2008.
    Scheduled start date - 02.12.2008
    Scheduled finish date - 02.12.2008.
    base qty - 1 TO
    Processing time - 1 day
    interoperation time - 3(all inclding floats)
    Total inhouse production time - 4 days
    Now repeat it for 2 qty, results are as below
    Basic start date - 30.11.2008
    Basic finish date - 04.12.2008.
    Scheduled start date - 02.12.2008
    Scheduled finish date - 03.12.2008.
    base qty - 2 TO
    Processing time - 2 day
    interoperation time - 3(all inclding floats)
    Total inhouse production time - 5 days
    I hope you got the idea.

  • Float before production reg.

    HI dudes,
    one of my client is having one issue regarding floats, they are using float before production in the schedule margin key and they complaining that the total production time for production order according the basic start  and finish dates is lesser than the total activity time given in the routing. i have not checked in the system so far as its new client, can anybody suggest what might be the reason for this.
    regards
    Daniel.

    The following is the logic behind scheduling.
    In basic date calculation ( order start date/ order finish date ) the system always calculates backward scheduling.
    Steps:
    1. From the reqmts date the system subtracts the GR processing time to calculate the order fininsh date.
    2. From the order finish date the system subtracts the inhouse production time to calculate the order start date.
    3. From the order start date the system subtracts the opening period given in scheduling margin key to calculate the order opening date.
    Lead time scheduling :
    1.From the order finish date the system subtracts the float after production to calculate the production finish date.
    2.From the production finish date the individual operations in the routing are scheduled backwards to calculate production start date.
    3.From the production start date the system subtracts the float before productionto calculate order start date.
    Regards,
    nandha

  • I am using iCal on my iMac, iPad and iPhone using iCloud and when I set the alert for 1 day before and the second alert to 1 hr before, then save the alerts switched.  Was is this happening?

    I am using iCal on my iMac, iPad and iPhone and when I set the alert for 1 day before and the second alert to 1 hr before, then save the alerts switched.  Was is this happening?

    http://support.apple.com/kb/he57?viewlocale=de_de
    India
    (91) 1800 4250 744
    www.apple.com/in/support/
    hope it helps

  • Can I get free upgrade if I bought Adobe product 2 days before the release of the new version?

    Can I get free upgrade if I bought Adobe product 2 days before the release of the new version?

    If you bought CS6, then there is no upgrade. CS6 is the last standalone version. whether or not you may be entitled to some CC discounts, if you want to go that route, is only something sales support can tell you. If they're feeling generous, they may give you one or two months completely free, but realyl, you have to contact them....
    Mylenium

  • Quality Inspection before Production

    Hi All,
    We are using Production resource tools(PRT) in Production Order. We want to do the quality inspection of the PRT before one day of Production.
    How can we map the following scenario so that Quality check can be done for PRT before Production??
    Thanks,
    Sanjay

    Dear
    1) Create Equipment under the category Test Equipment (Q)
    2) Go to inspection plan and assign the PRT in the opertion overview. When you click on PRT normaly it will ask for material, you can choose equipment and then add the Equipment there. You can assign multiple PRTs
    3) In inspection characteristic - make sure that Test Equip is ticked in the control indicator of the mic
    4) In inspection charactertistic overview for each mic you can select and the PRTs maintained in the operation view is visible here and you select the one which is require
    Refer : Re:PRT Inspection
    Regards
    JH

  • Top Margin Woes: Setting the "Before" Margin for Every Page in a Section

    Hi,
    I've scoured the forums to no avail on this one. I am trying to create a document where the text in Section 1 appears 1 inch from the top of each page and 2 inches from the top of each page in Section 2. Should be pretty straightforward, right? Please tell me it is! I'm using Pages '09 (version 4.0.5).
    Right now, the document margin is set to 1 inch from the Top, so Section 1 is fine. For Section 2, when setting the Before margins after a Layout Break (in the Layout Inspector under the Layout tab), only the first page of that section gets a Before margin of 2 inches. Every page after that in Section 2 is still 1 inch from the top.
    Suggested Workaround Attempted
    I tried the "Move Object to Section Master" workaround, but the menu item "Format > Advanced > Move Object to Section Master" is disabled when performed on an "inline" object, which is what is required to force the text down from the top of each page in Section 2. Turning it into a "floating" object enables the "Move Object to Section Master" menu item, but since it is floating. the text for that section is not pushed down, the rectangle is just displayed in the background of each page in Section 2.
    Any ideas on how to solve my Top margin woes would be much appreciated!

    Hello
    To push a text down in the text body using the clean way which means setting space after, requires that we have already a paragraph which means a chunk of text ended by a paragraph break.
    It's exactly what I do.
    Most of the time, we don't put a paragraph break at the end of a header so it's not a paragraph and so, we can't define the space after value.
    My tip just gives it the status of paragraph allowing me to define space after the clean way. The dirty one was to insert several returns to adjust the height which I carefully rejected.
    It's exactly what we discovered some months ago:
    we can't set space before (above) at top of a page because there is no paragraph before (above) in the page.
    As far as I know, the  "Use Previous Headers and Footers" must always be set correctly. I'm remembering a thread which became huge because the OP can't understand that he had to define these properties correctly to get correct results with his captured pages.
    I wish to add that at this time we don't know exactly what the OP want to achieve.
    Maybe he want to move down the top of the print area and the header.
    You can't do that with your tip.
    With mine, I just insert a paragraph break at the beginning of the header.
    Yvan KOENIG (VALLAURIS, France) vendredi 8 juillet 2011 17:50:30
    iMac 21”5, i7, 2.8 GHz, 4 Gbytes, 1 Tbytes, mac OS X 10.6.8
    Please : Search for questions similar to your own before submitting them to the community
    To be the AW6 successor, iWork MUST integrate a TRUE DB, not a list organizer !

  • ICal timezone : set floating as default

    This is the biggest headache I have ever had with a Mac and I am really fed up. Why is it not possible to simple set "Floating" as a timezone preference in iCal?. My appointments get thrown out of whack every time I change the timezone in Date & Time. I have missed appointments because of this. Never mind trying to synch to iPhone. MAKE IT STOP!

    I posted this to a user that wants floating events on his iPhone. It also helps with laptops. OK it is not as good as those arrogant #^% @#(%*#$% at Apple not listening to us for 3 years asking for this, but it is the best I can do.
    This might work. Create a whole lot of floating events in iCal on your laptop / desktop and put them at the end of your day. You can do this quickly by creating one event in iCal that is floating and then copying it. You do that by dragging the event with your finger on the Option Key. This gives you floating events in your iCal which you are not using yet. Then when you want to use your iPad just drag one of these events from the end of the day to where you want it and use it.
    It should work. I tested it just now on my iPad and laptop and it worked perfectly. I use Lion as an operating system. I don't know for Leopard. I use a weekly view. On Lion you cannot drag from the end of one week into the next. This has been corrected in Lion. I use ONLY floating events as I travel a LOT. It is the best way for me.
    For creating floating events on my laptop I don't create new events, I always copy an existing event. This way all new events are automatically floating. It took a little while to get used to it. Now it is second nature to me. Since many events are the same as past events, it also saves time not typing in the event details.
    For example I might schedule playing badminton at irregular times in a week. I simply create one event and then drag a copy to the new event's locaiton. It is already floating and named correctly. Otherwise I drag a different event and just rename it.
    This does not work on the iPhone / iPad / iPod as you cannot copy events. That is why you need to create extra floating events on your laptop at the end of the day so that you can drag them down when you want to use them.

  • CRM 7.0: set up IPC product configuration

    Dear experts,
    we set up a CRM 7.0 with ERP 6.0 backend integration. In the ERP we apply ERP variant configuration (Materials). Quite simple: some configurable materials (material type KMAT) with a few characteristics and product variants of them (material type FERT) which are maintained in order processing. Variant conditions are maintained and automatically determined for product items. Now we need this in CRM for opportunity processing.
    Therefore we have created Knowledge Base and Runtime Version for the configurable products in ERP and downloaded test materials (one KMAT and one FERT (product variant) into CRM (download objects MATERIAL and SCE). In CRM product master data maintenance for the KMATconfigurable tab with the configuration profile is displayed. Afterwards we downloaded condition master data into CRM, among others variant condition VA00 with condition table A057. Everything looks fine.
    In CRM we want to set up opportunity management. In the opprotunity transaction processing pricing is working already besides the determination of variant pricing. As we intend to maintain only FERT materials (product variants)we do not need interactive product configuration in CRM sales order or product simulation in CRM product master data. We only want the variant prices to be determined automatically for the product variants (FERT) in opportunity processing. That is why we are not sure if it necessary to set IPC configuration settings (XCM etc.). This is my first question. Nevertheless we started to maintain settings for product configuration in order to find out if this is solves our problem:
    1.) XCM configuration (IPC): we set up a customer application for "crmproductsimulation" and defined customer components jco (RFC test worked) and productvariants and restarted J2EE Instance in TX: SMICM
    2.) We set up product configuration customizing:
    table: COMM_IPC_PROP:  caller; crmproductsimulation; scenario.xcm; ZCRMproductssimulation
    table: COMM_IPC_URL: UI_CFG; http://<host>:<port>100/ipc/ipc/command.do
    When starting simulation of product model for configurable product in TX: COMMPR01 I get following error message: "HTTP500: ISA Framework: The [XCM application configuration]='ZCRMproductssimulation' does not exist. Check XCM configuration.
    Details:   No details available". This application is maintained in XCM so I assume something else is missing.
    To sum up my questions:
    1.) Is it necessary to set up IPC product configuration as described above when we only want to maintain FERT products which are product variants and determine corresponding variant prices (VA00). No interactive product configuration is necessary.
    2.) If it is necessary to set up IPC product configuration to active product configuration (to see product variants in product master data maintenance and opportunity processing and corresponding variant condition data), what did I do wrong?
    Thank you very much for your help.
    KInd regards,
    Mark

    Hi Arup,
    thank you very much for your reply.
    Concerning XCM / CRM customizing I have done the steps you recommended:
    1. XCM:  I created customer applications for crmordermaintain and crmproductsimulation and maintained customer component JCO for both of them (Assigned JCO User has SAPALL / SAPNEW, test run was successful) Active and default are ticked. Are there any further steps missing.May be in General Application Settings > Customer > ipcwebappconfig - I changed nothing there (SSLenabled: true)
    2. In CRM customizing I maintained tables as follows:
    COMM_IPC_PROP:
    caller   crmordermaintain  scenario.xcm   Zcrmordermaintain  (name of customer xcm app -case sensitive)
    caller   crmproductsimulation  scenario.xcm  Zcrmproductsimulation (name of customer xcm app -case sensitive)
    COMM_IPC_URL:
    Destination: UI_CFG ;Appl.  <blank>; URL: http://<host>:<J2EEport/ipc/ipc/command.do
    Calling the IPC product configuration e.g. from the CRM product master (simulate model), I get the already mentioned HTTP error:"ISA Framework: The [XCM application configuration]='Zcrmproductsimulation' does not exist. Check XCM configuration.".
    That's why I am thinking that something is missing concerning the communication between CRM application and IPC,because XCM applications do definitely exist.
    Is the URL correct .../ipc/ipc/commando.do which I maintained in table COMM_IPC_URL?
    Is it possible to check if communication between CRM Online and Java does work respectively what  do you exactly mean by "IPC URL must be available for UI_CFG"? UI_CFG ist a RFC-connection which has to be maintained additionaly and if so what has to be maintained exactly?
    You mentioned a RFC_USER (This is the JCO-User I suppose?)and J2ee user. Is the J2ee user just the admin user of the J2EE engine or do you mean something different?
    Thanks in advance for your further help.
    Best regards,
    Mark
    Edited by: Mark Willhoeft on Jun 4, 2010 8:36 PM
    Just one further thing: After changing XCM config I restarted J2EE by TX SMICM (Administration - J2EE Instance local - Send soft shutdown - with restart). Is this enough to restart J2EE and activate changed XCM settings or has the restart to be handled different?

  • How to set background color for selected days in DateChooser

    How to set background color for selected days. I created
    checkbox for each day [Son,Mon,Tue,Wed,Thu,Fri,Sat] and a
    DateChooser, I want to change the background color for the selected
    day when i click on a button after selecting the desired checkboxs
    [ monthly wise/yearly wise]
    Thanks in advance

    There is no button involved in the following code, but it may
    be of use to you:
    <?xml version="1.0"?>
    <mx:Application xmlns:mx="
    http://www.adobe.com/2006/mxml"
    creationComplete="init()">
    <mx:Script>
    <![CDATA[
    private var origColor:uint;
    private function init():void {
    origColor = dc.getStyle("selectionColor");
    public function setBackGrdColors(newColor:uint):void {
    dc.setStyle("selectionColor", origColor);
    if(dc.selectedDate){
    var dayOfWeek:Number = dc.selectedDate.day;
    else{
    return;
    switch(dayOfWeek) {
    case 0:
    if(sun.selected)
    dc.setStyle("selectionColor", newColor);
    break;
    case 1:
    if(mon.selected)
    dc.setStyle("selectionColor", newColor);
    break;
    case 2:
    if(tue.selected)
    dc.setStyle("selectionColor", newColor);
    break;
    case 3:
    if(wed.selected)
    dc.setStyle("selectionColor", newColor);
    break;
    case 4:
    if(thu.selected)
    dc.setStyle("selectionColor", newColor);
    break;
    case 5:
    if(fri.selected)
    dc.setStyle("selectionColor", newColor);
    break;
    case 6:
    if(sat.selected)
    dc.setStyle("selectionColor", newColor);
    break;
    default:
    break;
    ]]>
    </mx:Script>
    <mx:VBox horizontalAlign="center" verticalGap="20">
    <mx:DateChooser id="dc" textAlign="left"
    change="setBackGrdColors(cellColor.selectedColor)"/>
    <mx:HBox width="100%" horizontalAlign="center">
    <mx:CheckBox id="sun" label="Sun"/>
    <mx:CheckBox id="mon" label="Mon"/>
    <mx:CheckBox id="tue" label="Tue"/>
    <mx:CheckBox id="wed" label="Wed"/>
    </mx:HBox>
    <mx:HBox width="100%" horizontalAlign="center">
    <mx:CheckBox id="thu" label="Thu"/>
    <mx:CheckBox id="fri" label="Fri"/>
    <mx:CheckBox id="sat" label="Sat"/>
    </mx:HBox>
    <mx:HBox width="300" horizontalAlign="center">
    <mx:Label text="Background Color" />
    <mx:ColorPicker id="cellColor"
    selectedColor="#FF00FF"/>
    </mx:HBox>
    </mx:VBox>
    </mx:Application>

  • I have an old itunes act with a lot of songs that i set up before i owned an iphone. now that i have an iphone i have a new act. my question is how do i get the songs from the old act onto my new iphone?

    I have an old itunes act with a lot of songs that i set up before i owned an iphone. now that i have an iphone i have a new act. my question is how do i get the songs from the old act onto my new iphone?

    Hello brjdunn,
    Thanks for using Apple Support Communities.
    You are able to change your Apple ID by following the instructions below.  That way you will still have access to all of your previous purchases:
    Change your Apple ID
    http://support.apple.com/kb/HT5621
    Take care,
    Alex H.

  • HT1212 My ipod is disabled and the message requests to try again in 223004 minutes.  I think it might have something to do with the date being set wrong before it went into disabled mode.  Can you assist in enabling.

    My ipod is disabled and the message requests to try again in 223004 minutes.  I think it might have something to do with the date being set wrong before it went into disabled mode.  Can you assist in enabling.

    You'll need to connect it to the iTunes library you normally sync it with and restore it.  If iTunes asks you for this passcode before it will let you proceed, connect the iPod to iTunes in recovery mode instead using the instructions in this Apple support document.
    iOS: Unable to update or restore
    B-rock

  • I'm trying to get a refund for the additional storage I purchased yesterday accidentally. How do I get someone to refund me before the 15 days? Everything I try fails.

    I'm trying to get a refund for the additional storage I purchased yesterday accidentally. How do I get someone to refund me before the 15 days? Everything I try fails.

    Call the Apple online store at the number listed at the bottom of this page.

  • Client setting option for Productive solution manager

    Dear all expert,
    I've set in transaction code SCC4 (client setting) for my productive solution manager:
    1. "No changes allowed" for changes & transport for client-specific object
    2. "No Changes to repository and cross-client customizing objs" for cross-client object changes
    However with above setting, when execute Tcode SOLAR01 & edit the structure/document, I am not allowed to save it, getting the error "Changes to Repository or cross-client Customizing are not permitted".
    could anyone please advise what is the correct setting for the solution manager?
    please help
    thank you

    Hi Pradeep,
    User just need to edit/upload new documentation to the project SOLAR01, and this is not allowed because of the system setting
    By the way, do you know any method that I can restrict user to edit the 'Structure' tab, but only allow them to upload & edit the documentation under 'project document' tab?
    the recommendad way will be we always setup the project & complete in development system & then finally transport to productive solution manager without any further changes anymore?
    please advise.
    thank you

  • Set JAVA_HOME before running cloudscape -start

    Hi
    after i installed J2EE , i have made the following steps through DOS :
    1- set J2EE_HOME=C:\j2sdkee1.2.1
    2- set PATH=%PATH%;C:\j2sdkee1.2.1\bin
    3- cloudscape -start ---- in this step i have got an error saying "set JAVA_HOME before running this script" how can i solve this error
    with best regards

    Hi
    after i installed J2EE , i have made the following
    steps through DOS :
    1- set J2EE_HOME=C:\j2sdkee1.2.1
    2- set PATH=%PATH%;C:\j2sdkee1.2.1\bin
    3- cloudscape -start ---- in this step i have got an
    error saying "set JAVA_HOME before running this
    script" how can i solve this error
    with best regardshello,
    You did not set the variable JAVA_HOME. Set it to the home directory where the jdk is installed. For that give the command like set JAVA_HOME=C:\jdk1.3.1 in the DOS Prompt along with setting the J2EE_HOME and PATH variables...
    you may also make a new system environment variable JAVA_HOME and assign the jdk home path to it so that u need not set it everytime for a new DOS Window..
    hope that helps..
    -Jer

Maybe you are looking for