Significance of renumbering in task lists  in spro

Significance of renumbering in default values in defining default values for task list data and profile assignments.
Edited by: Pallavi Kakoti on Jun 27, 2011 2:40 PM

Hi,
You defined task list and this task list having 5 operations
10 - Inspection
20 - Change Oil
30 - Check Engine
40 - Adjust engine volves
50 - Washing
Now when you create maintenance/service order in that you want to call this task list but you want only operation 10,30,50
So when you select these three operation and click on copy then this numbers can rearranged as 10,20,30 in order operation tab.
Kapil

Similar Messages

  • External number for Task list group

    Dear experts,
    I want to give external number(actually name) to all the groups for equipment task lists.In SPRO , number ranges for task lists, I have created one external along with internal number range. But as soon as I want to create the equipment task list, the " group" picked its value from internal range.
    Is there any setting to do , so that I can get external number for the group for equip. task list.
    Regards,
    Rajesh

    Hello Rajesh,
    It is not possible to have external numbering for equipment or functional location task lists. Only possible for general task lists.
    -Paul

  • Significance of configurable task list

    Please explain the significance configurable task list and how this is done in the system?

    For Ex.  Pulsar  servicing center
    Pulsar 135 and 150  are coming for maintenance
    Operations to be done
    Lube oil flushing  - common for 135 & 150
    Piston 135 replacement - only for 135
    Piston 150 replacement - only for 150
    We can input 135 or 150 in the order to select the operations related to 135 or 150
    If you select 135, Lube oil flushing & Piston 135 replacement wiill appear in the order operations
    This is the configurable task list.
    For this
    Create Equipment  IE01
    Create class characteristics with class type 300 CL04 & CT01
    Create dependency Cu01
    Create General task list and assign dependency for operations IA05
    Create configuration profile for general task list CU41
    Create order and select the task list

  • Change Request Management  "There is no task list for this project"

    Hello!
    I would like to use the functionality of CharM in SOLMAN 4.0.
    When I enter the Tcode /n/tmwflow/proj I receive the waring/error "There is no task list for this project" (/TMWFLOW/TRACK_N114)
    If I create my own task list via Task list --> create
    I get the warning "You cannot change task lists in the SAP namespace"
    What are the steps to define task list for my project?
    Do I need to configure SPRO ... --> Extended Configuration --> Schedule Manager?
    The second warning I get: "NO CTS projects created yet" or
    "The Solution Manager project does not have an active CTS project yet".
    How can these warnings/errors be corrected?
    Thank you very much!
    regards

    Hi,
    Pls click the check button(next to activate button)
    see the SLG1 log generated remove the errors shown in red.
    One it is done u press the refresh button & thn u cn create the task list
    chk
    https://websmp202.sap-ag.de/~sapdownload/011000358700000657692007E/ECTS_CHARM_SP12.PDF
    /people/dolores.correa/blog/2008/07/26/first-steps-to-work-with-change-request-management-scenario
    http://help.sap.com/saphelp_sm32/helpdata/en/0c/5b2160f6fa4b83a3674a210b1cdeb0/content.htm
    Regards
    Prakhar

  • Inspect with Task list not visible in QM view

    In Material master QM view, for 01 inspection type, inspect with tast list is not visible.
    Please advice how to make visible.

    Hi
    SPRO-->Quality Management->Quality planning->Inspection planning----> Assign task list type to Material type
    Definitely u get th lot.
    Regards

  • Item category editable for components in task list

    Hi all,
    I need help to put the item category editable for components in task list.
    Currently it comes as "L" and the field is non editable. Do you have any ideas or solutions? I already tried SPRO but didn't find anything useful.
    Thanks in advance,
    MB

    Thanks Maheswaran,
    So if it isn't possible to make it editable, how can I change the category to 'N'?
    Does that configuration depend on the company? Because I want the item category to be 'N' for just some companies.
    Thanks
    MB

  • Inspection task list usage is not picking automatically?

    Hi all,
    whenever I create inspection lot for source inspection (for PO) through Qi07, in the inspection lot, task usage assigned as a 6(goods issue), but i will assign 3 (universal) later on for the source inspection ( with respect to PO)in qa32 & later on i will proceed. But i want the system to assign the  3 (task list usage) automatically for all the inspection lots, how to enable the same?
    regards,
    Sanju

    Hi
    In the SPRO setting for inspection type, you can assign default usage. I am not having system access right now, so cant give you exact path. But approx. QCC0--insp lot creation-maintain insp type/default values for inspection type.
    Try if this solves your issue.

  • Material specification and Inspection plan - Task list usage

    Dear Friends,
    In inspection type  Task list usage is assigned
    For Example
    inspection type 01  -  usage - 03
    inspection type 05  -  usage - 05
    inspection type 06  -  usage - 07
    inspection type 10  -  usage - 06
    In my scenario i want to use all the above inspection type for a product
    if i use mateial specification there is no any problem with my  Task list usage
    If suppose i use inspection plan do i need to create different inspection plan with different usage
    or is it possible to create one inspection plan with all the above usage
    what about universal usage 03  can i use it
    i try to use but system does not triggering inspection lot
    can any one Suggest some ideas
    Many Thanks & Regards
    Raj

    Hi Raju,
    All of first pls understand the concept of Task list and specification.
    If you need to inspection any material in very systematic manner, where you will have well segregated operations where the appropriate Work Centers will be bind and under that hierarchy MIC will be attached. The inspection will be governed by some inspection points. And according the the same Samples will be calculated. When you wanna go with all these functionality then you must have to use Task list (Inspection plan).
    And if you don't wish to have these functions then simply go with the material specification.
    Now it comes the actual query about task list usage.
    If there is a common inspection plan is supposed to be used for all the inspection types for your material then you can prepare only one inspection plan, put ant of the Usage to it it can be 05 or 03 universal. But what you have to do is,
    Go to SPRO->Quality Management->Quality Inspection->Inspection Lot Creation->Maintain Inspection Types Execute and set the Task list usage as the same it is set in the inspection plan for all those Inspection types for which that common inspection plan is supposed to be used.
    Note:- There is no any link between inspection lot creation and task list usage of inspection plan.
    Regards,
    Shyamal

  • User defined fields in task list

    What is the significance of adding user defined fields in task list operation?

    Dear Maniaba
    We have used user fields in task list to capture quantity in terms of nos & its weight for each operation. This we used as a work around to capture the repair jobs quantity & tonnage. While mapping repair of a particular machine with out any reference to material(that is we have not created them as serialised material as in the case of refurbishment) we have created task list for its repair and user wanted to capture the quantity of repair (say how many & also its weight) so we have maintained the tonnage per 1 no in these fields. later when order is being created user selects the task list & changes the quantity field then we have developed report where we calculate the total tonnage of that job & also no of items repaired.
    Regards
    S P Behera

  • Task list creation in plant maintenance.

    Hi All,
    I have the function module /ISDFPS/TASKLIST_CREATE which was used in my program under one more Z function module, we have a XI integration also here earlier we were using service pack SP10 so this program was working fine as integration with other interfaces was working fine.Now the client has upgraded to service pack SP14 and so the standard FM got one more parameter T_CUOB which was not mapped because in SP10 it was not available. Pls can anybody suggest me what is this parameter T_CUOB and what is the business significance of it.
    The standard FM was used for creation of a task list in plant maintenance for Functional location, equipment etc.
    Vishnu.

    Hi Vishnu,
    I am just wondering if you got an answer to this question. We are having the same problem, but we do not care what the value is for t_cuob, therefore we need to default it to something like null or blank.
    Thanks

  • Task List flow configuration

    Is there a way in Planning 11.1.2 to configure the Task List flow in such a way that it is not possible for a user to go to the next task if the Web form in the current task has any validation errors?
    Regards,
    Pablo

    hi
      you can find this in configuration path
    spro->Quality Management> Quality Inspection> Result Recording--> Enter Identifier for Units To Be Inspected.
    Here you can define the data that will be appear in that field.
    Regards,

  • Task list usage inspection plan - Universal 3 and GR 5

    Dear Friends,
    while creating Inspection plan for GR inspection from Procurment it is advisable to use Task list usage 5 or usage 3 which is universal
    may i know what is the difference
    Please advise also
    There is task list type  Goods receipt model  -    501  which  is Material, vendor and manufacturer what that mean and where it  is used
    Thanks & Regards
    Raj

    Hi Rajkumar,
    While planning an Inspection,which Task List gets assigned to which Inspection Lot is linked through combination of TaskList Usage and Lot Inspection Type
    In spro (at the location as suggested above) we assign TaskList usage to the Inspection Type. When any Lot is created based on the setting in QM view of MM, it looks for this link for automatic assignment to the lot.
    For your question "while creating Inspection plan for GR inspection from Procurment it is advisable to use Task list usage 5 or usage 3 which is universal"; both options will work as long as the above config in spro is maintained.
    It is however advisable to use the standard option of TaskList Usage of  05 as it is easier to segregate and analyse TaskList / Inspection Plans based on their usage; in case any need arises.
    Hope this helps,
    Thanks,
    RKM.

  • General Task List- Query Log Out Tag Out

    Hello,
    We are uploading new Gereneral Task List. Some task required Log Out Tag Outs for a prcedure:
    For example: 1) Schedule  with operations 2) Flush unit 3) Lock out tag out procedures 4) Pull unit and clean propeller.
    For reporting purpose we want to identify all the Task List that require LogOut TagOuts. Is there a way to query those items.
    Thanks

    Create Different Control Key " LOTO" going to Spro - PMCS - Maint & Service Orders - Function & Settings of Order types - Control Key - Maintain Control Key - Create New Entries , Create New One With Name" LOTO" , Assign Parameters( tick sheduling if needed )or Keep Every thing Blank , Save it
    Now in Creation of Task list , For Lock out & tag out Operation , Maintain this Control Key "LOTO " & rest is same.
    Use IW37 or IW37N , with Control key Entered in Order to monitor the Order , Operation with this LOTO Control Key,
    I think this solves ur problem , there is already a default Control Key "WCM" in Ideas , which Activates Work Clearance Application you can check it.
    or
    you Can maintain System Condition Manually in Order Operations when you get Maintenance Order from Plan , You Cannot  maintain this in Task list individual Operation.
    Regards,
    Edited by: Srinivas Narayana Gowda on Jun 11, 2009 10:17 AM

  • PM TASK LIST PRINTING

    Hi All
    I need to print the PM Task List in the New developed Layout , for that the ABApers have developed a new FORM / SCRIPT.
    I tried to attach this FORM in the SPRO , but the Task List is still picking the SAP FORM with name "SYSTEM" which a default FORM for the TASK List.
    Can you guide where can I change this assignment to change from SYSTEM to Z FORM>
    Thanks in advance.
    Manish

    Hi All
    I am Printing the Task List Long text from the IA05 . I need the get the Printout the developed Layout.
    Can anybody tell me where I can assign ZFORM to the IA05 long text Printout.
    Thanks in advance
    Manish

  • CHaRM : unable to create Task List

    Hi All,
    we are trying to configure Charm in our Solman 7.0 sp16.
    when i create a project and and click on "Create Task List" under SystemLandscapte>>ChangeRequests Tab
    error "The Project is not released. Hence cycle cannot be released.
    Now when i click on the check button. the following errors are displayed
    Check Logical Components
            No Consolidation System found for XXX-XXX(SM2-200) (Project Charm_Test)
            +No Tract for Project Charm_test with log. system SM2/200
    Check Consistency of project CHARM_TEST
          + CTS Projects in production systems for project CHARM_TEST+
    can anyone help me out here.
    Thanks!
    Regards,
    Pradeep L

    Hi Pradeep,
    This issue is because of Solution Manger TMS is not configured properly.
    Use this blog for STMS configuration: /people/dolores.correa/blog/2008/07/26/first-steps-to-work-with-change-request-management-scenario
    OR
    Better use SPRO to configure STMS, Just follow SPRO step by step process.
    SPRO->SAP Solution Manager->Configuration->Scenario-Specific Settings->Change Management
    ->Change Request Management->Standard Configuration->Transport Mnaagement System(TMS)
    1. Do you try to activate ChaRM for any satellite system landscape(DEV->QAS->PRD?
    OR
    2. Do you try to test ChaRM in Solution Manager itself(SM100(DEV)->SM200(QAS)->SM300(PRD)?
    If your test belongs to point 2, then follow the blog that i mentioned above. It gives a step by step details.
    Note:
    1. For anycase, DEV to QAS should be consolidation route and QAS to PRD should be delivery route.
    2. SM TMS should have SAP transport layer as well as atleast one customized transport layer.
    3. ChaRM supports only client specific transport management system.
    Let me know if you need more help on this.
    Regards,
    Sanjai

Maybe you are looking for

  • I have data caps and need to do a clean mavericks install

    Hello. I recently bought a used Mac mini and not realizing the new Mac OS installation options are over the internet, I erased the hard drive and tried to do the system recovery.  Unfortunately I'm on rural broadband, I have a small data cap and my c

  • Post-Processing Screen Hang

    Trying to Direct Link from PPRO 2014 to SG 2014. It's a C300 file. It's only maybe 20 seconds long. However, speedgrade hangs at Post-Processing. GPU: Quadro 5000 + Tesla C2075 64GB RAM, Hex Core i7

  • BPM Performance tuning

    Hi, I have a synchronous BPM that has 1.receive (open s/a bridge) 2.transform 3.sync send 4.transform 5.sync send 6.transform 7.send (close s/a bridge) working (except for some merge issues in step 4). The BPM takes too long (up to a minute) to execu

  • HELP:Miltiple nested level in xml file & Oracle 8i

    Hello, I have xml file with multiple nested level. How can I load the xml file data in Oracle 8i. Thanks.

  • BAPI for Pricing & Conditions

    1. what is the use of Function     Module "BAPI_PRICES_CONDITIONS"? what value we have to pass to BAPI BAPI_PRICES_CONDITIONS"? 2. Which function Module will use to Extract the Pricing & conditions Details (from SD) ? 3. Can anyone help me how to ext