Hi All,
I have the function module /ISDFPS/TASKLIST_CREATE which was used in my program under one more Z function module, we have a XI integration also here earlier we were using service pack SP10 so this program was working fine as integration with other interfaces was working fine.Now the client has upgraded to service pack SP14 and so the standard FM got one more parameter T_CUOB which was not mapped because in SP10 it was not available. Pls can anybody suggest me what is this parameter T_CUOB and what is the business significance of it.
The standard FM was used for creation of a task list in plant maintenance for Functional location, equipment etc.
Vishnu.

Hi Vishnu,
I am just wondering if you got an answer to this question. We are having the same problem, but we do not care what the value is for t_cuob, therefore we need to default it to something like null or blank.
Thanks

Similar Messages

  • No valid task list for material ""  plant "" for selection criteria

    I am getting the following error while creating a production order:
    No valid task list for material ""  plant "" for selection criteria
    Does anyone know how to fix this?
    thanks,
    Scott

    Dear,
    1. Check in Order type dependent parameter - OPL8, select your Plant & Order type. In this check the task list, it should be N. then selection priority in OPJF settings
    2. Chek the routing valid from date for this material by CA02. The production order start date must be between valid date.
    3)Kindly check the routing header.Whether it is for usage 1 and Release status '4'
    4) Task list we maintain in OP8B please check and come back.
    Regards,
    R.Brahmankar
    Edited by: R Brahmankar on Nov 19, 2008 9:57 AM

  • Set up of Task list across the plants

    Hello,
    I need to set up the task lists for 9 different plants. Essentially they are the same TL but used in different plants. I am looking for the best approach to set them up.
    Can we maintain a master task list at high level with central planning plant (without a counter) and then assign the same task list to different plants using group counters ? Whenever I am trying to use TL group counter, I have to set up a neww task list completely, this will result into maintaning 9 different task lists even when they are same. Also how do I set it up for a central plant without using counter ??
    Thanks
    Sarang

    Hello,
    Please have Look this Thread might you get some useful out of this [General tasklist across all plants.;
    Regards,
    Rakesh

  • Plant Maintenance - Doubts in Task List Creation

    Hai,
    This is the first time that I am doing some configuration regaring Plant Maintenance Module.
    Scenario:
    There is an equipment which has a Plan for maintenance. Support there are 8 maintenance activities which have to be carried for that equipment in an year. Each of this activity will be carried out in different periods. Some of them will have to be done once in a year. Some may be done once in 6 months.
    But all the acitivities will not be carried out at the same time.
    Can anyone tell me how this can done?. Should we create separate Task Lists for all the 8 activities and subseqently create a Maintenance Plan for each of them or Create one single Task List which has all the 8 activities by giving Operation nos. In th second case how to create Maintenance Plan for each of the individual Line item in a Task List and how can it be linked.
    In the first case can a single Task list be incremented by a Group Counter which can have the individual operation so that a Maintenance Plan can be created for individual Task List incremented by a Group Counter.
    In both the cases can someone give me the procedure.
    Please throw some light on this subject.
    Regards,
    R. Vijayakumar

    Dear Vijaykumar,
    Jus follow the below steps..
    Step-1 
    T-code IP11, Create maintenance Startegy with all required frequencies like 1, 2 3 4 u2026 12 months
    Step-2
    In T-Code IA01, On general header view  screen .Enter the datas like Work center, usage, status. Select ur required Maintenance Strategy which u already created.
    GO to  operation tab , enter ur list of operations one by one (all 8 operations).
    Select all operations and click Mntpack icon on bottom of screen , On package overview screen u can able to select different operation at different frequencies jus tick box and save
    Step-3
    In T-Code IP42, select the maint strategy which u have assigned already and fill required details and select Task list which u have created in previous step (link is available in bottom screen) & Save.
    Step-4
    In T-Code IP10, schedule the  Maintenance Plan
    Now you will get the Maintenance orders automaticaly  based on package u defined and schedule date.
    Revert back me in case if u have any doubt on this cycle. Else close this thread.
    Regards,
    Gunak

  • Strategy in task list and Strategy based Maintenance Plan

    Dear Gurus,
    I have some doubt about
    is it same if we create a single cycle plan with a task list in which maintenance strategy let say A is being used and a maintenance plan strategy based let say A and task list without any strategy
    can some one explain use of strategy in task list and maintenance plan
    Regards
    Armaan

    Hi,
         In Strategy Based Plans :- When ur entering strategy in initial screen of IP42 then inside the plan system will allow u to select tasklists created with that strategy only ...
    In Single Cycle Plans :-  Here even though if u select tasklist of a particular strategy , system copies all the operations of the tasklist to the order...
    From your above example :- Single Cycle Plan if cycle is monthly is equal to strategy based plan having only 1Month package .
    further package in strategy allows u to select which operations of tasklist u want for 1Month..
    regrds
    pushpa

  • Task list creation

    Experts
    I have an error message when I create a task list for an equipment. I have configured the number range for task list.
    Object ROUTING_E number range 01 does not exist
    Message no. CV711
    venkat

    Hi,
    Delete the no. range and again assign the same as
    No                       From No.                    To No.
    01       
    regards
    sunil

  • What is the use of general maintenance task list?

    Hi expert,
    I want know What is the use of general maintenance task list in SAP plant maintenance & how to use this step by step.
    Regards,
    Ram Rathode

    Hi
    A task list in PM is created to perform a specific repair or maintenance task. The task list consists of work operations and components needed to complete the job. Often a task list will be associated with a functional location or equipment, where not tied to a specific technical object it is known as a general task list.
    Task lists can be assigned to a order, the operations/components are imported into the order. Task lists are also assigned to maintenance plans - once orders are generated from the plan the task list is transfered to the order.
    -Paul
    Please use [Enterprise Asset Management (EAM)|Enterprise Asset Management (SAP EAM); forum for PM/CS specific topics

  • Plant independent general maintenance task list

    Hi, All,
    Can it be possible to create a general maintenance task list without maintenance planning plant & which can be used for all plants in same client?
    This is required to reduce the common task list data per plant existing in the system.
    Regards,
    Sanjay

    Hi Sanjay,
    maintenance Planning plant & Work Centres may differ according to the Centralised & decentralised maintenance.
    Hence not only maintenance planning plant but alos work centres may also needs to changed.
    Logically each work centres planned activity cost may differ so if u create a common task list it will not serve the purpose too.
    Ref link
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/5b/ae33e04b8611d182ba0000e829fbfe/frameset.htm
    Ramesh

  • Plant Maintenance Schedule Calls not creating Maintenance Order

    Hi,
    I have created a maintenance plan that is schduled on a weekly basis. This worked fine initially but now calls are not being generated and therefore no orders are also being generated. The process I used is:
    1. Create Equipment
    2. Create Task List
    3. Create Maintenance Item
    4. Create Maintenance Plan
    5. Schedule Maintenance Plan
    Can you help?
    Also can you tell me which program you use to create orders for an entire maintenance planning plant, I know IP10 can be used for maintenance plans? For example you schedule your maintenance plans but I assume a periodic job must run to actually create the orders

    Hi Gary,
    I had an issue with calls not being generated and was browsing similar issues when I came across yours. I note that you also asked how you could create orders for a whole maintenance planning plant.
    This can be done by using the sort field on a maintenance plan. You need to define sort fields (config) for the maintenance plans for each of the plants required and then insert them on each plan. You can then use the sort field as a selection when scheduling.
    Hope this helps.
    John

  • Web Form in Task List and Security

    Hi,
    I have a couple of specific questions regarding Task List; below is a simplified example of my questions
    1. Say, I have a 2 web forms (X,Y) that are part of a Task List 1. Group A has been given access to both web forms X and Y. Group A also has access to Task List 1. Group B has been given access to only web form X. Group B also has access to Task List 1. Now, everything is good for users belonging to Group A. However, users belonging Group B has a specific issue. They still see the "Web form Y" in the Task List Selection on the left. However they cant open the web form Y on the right side which is good.
    My question is, is there a way to prevent users from even seeing this "Web Form Y" in the selection list? The problem is they shouldnt even see that particular web form as a choice and moreover this web form that they havent been given access to becomes part of the Task List completion status, forcing them to click on "Complete" for an empty web form.
    Is there some setting that could prevent unassigned web forms based on security from showing up in the Task List for various groups (similar to security restricted members not showing up in web forms)? Or is creating several different Task List the only work around?
    2. I have started a WorkFlow via FILE->WORKFLOW->MANAGE PROCESS and defined required Scenario and Version members. This seems to work just fine for my created Task Lists with Web Forms. Is there another intermitent process to connect the WORKFLOW with the created Task Lists? Or does Hyperion Planning automatically assume the Task List belong to available WorkFlow?
    Another question I have is in the Task List creation menu, when creating an individual Task, there are several options for "Task Type", one of which is WorkFlow. What is the difference between this WorkFlow option and the WorkFlow under the File menu? Is is that the WorkFlow created as Task becomes part of a Task List? Is that the only difference, ie make WorkFlow creation part of Task List versus not part of a Task List?
    Appreciate all your inputs
    Thanks

    Hi,
    1. Probably you may try "Manage Security filters", but im not sure. If it doesnt work then no way other than creating two tasklists.
    2. FYI, workflow will not promote either tasklist nor the webform. it only promotes the "DATA". u shud be careful creating forms for different level users ex: A basic user entry form cant be created for Next level user say manager. he l want to see only his entity level data not the level 0 in our terms.
    3. File->Workflow : will be used to start the workflow by the administerator.
    Tasklist Type-> workflow : Will be used by the "users" to promote their subsequent data entered or loaded at their level
    Regards

  • Problem with material group in task list

    Hi Experts,
    We have created a task list with external operation assigned with specific material group, say 'x'. This task list  is assigned to maintenance strategy which in turn assigned to maintenance plan. This Scheduled maintenance plan has generated many maintenance orders. After that we deleted the material group which was assigned to task list and assigned new material group to the task list. But now system is not generating maintenance orders from this task list as it is giving error message that "the old material group does not exist"  Message no. SE419
    Even though we changed the material group in that task list system still considering old material group.
    Could you please help us to get ride of this problem?
    Thanks and Best Regards,
    Praveen

    Praveen,
    The change that you had made on the task list is effective from the" Key date"date that's entered on the initial screen.That Is probably why this is causing an issue at your end.
    Try changing the task list once again by back dating the "KEY DATE" on the initial screen of the transaction ,to a date before the "Plan date" of the MP. This should solve your problem.If you are not able to change this, then create a new task list with a back dated "key date" with all the other details remaining the same and and assign it to the plan.
    Regards
    Narasimhan

  • Plant Maintenance Tables

    Hello All,
    I am curious to find a list of SAP Plant Maintenance (Preventive Maintenance) tables. Ideally, I would like to see a relational diagram too.
    Thank you in advance,
    Sasa

    hi
    CSKS      Cost Center Master Data
    CSSL      Cost Center / Activity Type Assignment
    T001W      Plant
    T006      Unit of Measure
    T024I      Maintenance Planner Groups
    T352B      Catalog Profile
    T357      Plant Section
    T370C      ABC Indicator
    T370F      Functional Location Category
    T370S      Functional Location Structure Indicator
    T399I      Planning Plant
    T430      Operation/Activity Control Key
    T499S      Location Codes
    TC21      Standard Value Key
    TC23      Work Center Usage
    TC24      Work Center Person Responsible
    TC25      Work Center Capacity Other Formula
    TC26      Work Center Capacity Category
    TC27      Work Center Capacity Planner Gorup
    TC30      Work Center Category
    TC38A      Work Center Shift Sequence
    TGSB      Business Area
    EQUI     Equipment Master Data
    EQUZ     Equipment Time Segment
    EQKT     Equipment Short Texts
    MPLA     Maintenance Plan
    MPOS     Maintenance Item
    PLWP     Alloc of Maint. Packages to TaskList Operatoins
    T351P     Maintenance Packages
    MHIS     Maintenance Plan History
    Regards
    Sujit

  • Transaction for replacing material in task lists

    Hi
    Do anyone now a transaction that can be used for replacing material no. in already created task lists.
    Regards
    Tom

    Hello TOM,
    You can change the material in task list by choosing the change task list transaction and these are :
    IA02:Change Equipment Task List
    IA06:Change General Maintenance Task List
    IA12: Change FunctLoc Task List
    Thanks
    Naveen

  • Create Task List - fileds

    Dear Experts,
    While creating Task List, there are fields in user defaults box --- Profile and Change Number, please guide whats the use of these ? And if we will not use these fields will it hamper any scenario ??
    Plz guide
    rgrds
    DM

    hi
    The profile is one which you have created in IMG settings which is used for repeated values which you don't want to enter.and the change number is used if you have activated the Engineering change management.
    these fields will not hamper any process.if you have specified the profile there is no need to enter the values in the task list creation which you have already maintained
    regards
    thyagarajan

  • Making task list field mandatory in creation of maintenance plan?

    Dear All,
    I need your help in configuration of Making task list field mandatory in creation of maintenance plan. I checked with sceen variant config but that also not giving me any option to make the field mandatory.
    Is there any note or user exit for it?
    Regards,
    Kaushal Rai

    Dear,
    Pls check the exit IPRM0004:Maintenance plan / item: Customer check for time "SAVE".
    Regards
    Sunil

Maybe you are looking for

  • I tried to sync my iPhone 4S to new work laptop and it keeps buzzing, won't sync

    I just got a new Dell laptop for work and installed iTunes.  When I hooked up my iPhone 4S to my laptop, Windows first showed that it was installing some driver and then iTunes opened, and then my phone just kept repeat buzzing.  I noticed the batter

  • ATV2 - Can I connect via HDMI to TV and connect to outdoor speakers also?

    Currently have an airport express on my mac and i just bought Apple TV (2nd Generation). Essentially I would like to connect ATV2 via HDMI to my TV to play movies, see photos, and play music but I would also like to connect ATV2 (perhaps via optical

  • Howto create special level based measure

    Hi all I have a geography dimension : All -Region --coutry ---store I'm reporting the sales per year: I need to create a measure that able the user to display 'shareof sales' for every level in the hierarchy. In other words In need a logical column t

  • Print text AND pictures

    Hi, I have a psc 1355 AIO. When I have written a document in Open Office Writer with text and pictures and want to print the document, it suddenly comes out with text and an empty space where the pictures should have been. It has never done that befo

  • Load testing on SAP

    Hi All, Is there any tool or any custom tool created by anyone in SAP to do the load tesitng in the SAP. My requirement is to test the system with simulation of multiple user and multiple transactions. Please help...