I have 20 different components [Assigned to a header assembly] connected to a single operation 010 in general task list. Now I have sorted this components based on Item number as the default sort is based on material criteria.
After sorting the components based on Item even I save the task list, the sort doesn't get saved. Everytime I need to sort it based on Item , any reason behing this?
I tried to create the variant for this too, but seems like its not working?
Is there any way I save this sort criteria as default for the task list?
Regards
Prasad

Hello Venki,
Either manual or program/ LSMW. There is no standard mass change is task list available.
Regards,
Vaibhav Mishra

Similar Messages

  • Default item category for components in task list

    Hii all,
    I need one help. We need to maintain default item category for components in task list.
    Currently it comes as "L" and the field is non editable.
    Is there any way wherein i can edit the item category to "N" or any other. Also need to know why this category "L" appears?
    I can brint the default item category in the service order by the standard config.(PM/CS--> Maint & serv processing --> Main & Service orders --> General data --> define default values for component item categories)
    But i want it in the task list.
    Please help
    Regards,
    Vijay

    Hi Vijay,
    Just go to task list and then to component. go to item category field and press F1 (help)
    its mention
    Item Category (Bill of Material)
    Categorization of the items in a BOM according to set criteria, such as whether they refer to an object (for example, material master or document info record) or whether they are kept in stock.
    To my knowledge It wont be possilbe have item category N in task list by directly adding material.
    Hi Pete,
    Correct me if i am wrong that configuration setting for default material type and item category works for orders only.

  • Item category editable for components in task list

    Hi all,
    I need help to put the item category editable for components in task list.
    Currently it comes as "L" and the field is non editable. Do you have any ideas or solutions? I already tried SPRO but didn't find anything useful.
    Thanks in advance,
    MB

    Thanks Maheswaran,
    So if it isn't possible to make it editable, how can I change the category to 'N'?
    Does that configuration depend on the company? Because I want the item category to be 'N' for just some companies.
    Thanks
    MB

  • Delecting Components in Task List

    Hi
    I have around 1500 Equipment Based Task List and 200 General Based Task List.
    For all these Task List there are Components for each operation.
    Is there any way in standard SAP that i can DELETE or REMOVE only the components in the task list and remain with the operations only ?
    Venkat

    Hello Venki,
    Either manual or program/ LSMW. There is no standard mass change is task list available.
    Regards,
    Vaibhav Mishra

  • Mass change of component in Task list

    Hi Experts
    I have thousands of material and there are changes done for them to use them in maintenance order task list as stock or nonstock.
    The task is to change the item category (from L to N or from N to L) of those materials used as components in task list and also find out those materials in BOM , Equipment TL and FL TL and change the item category.
    1.can this be done using a BDC (checking all task list / BOM for that material and change the item category)
    2. table to check component assigned to which operation in task list.
    Any help for this requirement
    Thanks
    Jey

    There is no standard transaction for the changing of components in the task lists this would have to be a bespoke program.
    If you are looking to change the components allowcated to the Bills of Material you can use transaction CS20 where you can replace the exisitng component category N with the new component category L.
    There is transactions for changing the PRT and Work Center if you get your ABAP consultant to have a look at the PRT transaction/program (transaction CA77) he may be able to copy and ammend this to make things a little easyer.
    Jim

  • General Task List Components

    Does anyone know if there is a way to specify the item category for components when using a General Task List?  Equipment Task Lists allow this functionality but I've found no way to change from "L" when using general and would like to be able to select "N".  We are on ERP 6.0.
    Thanks for your assistance.
    Bob Stanza

    Looks like we can have plants set-up a repair parts assembly and assign it to the General Task List.  Then they can configure the BOM as required for ordering.
    Thanks all.
    Bob
    Edited by: Bob Stanza on Sep 4, 2008 7:30 PM

  • Customize Components Assignment on Task List

    Hello,
    I need to know how to customize the components assignment option on a general Task List. I need to activate field u201CStorage Locationu201D.
    Is this possible? Thanks a lot.
    Juliana Peña C.

    Hi,
    It is not possible to activate storage location field on the task list so that it can be manually filled.
    Storage Location can be defaulted on the tasklist if you are assigning an assembly and the component from this assembly has the storage location filled.
    Also, exit CNEX0027 could possibly be used to determine a storage location.
    -Paul

  • PM - Task List Components with "Non-Stock" item Category

    Hi:
    I am setting the PM module, in concret the preventive task lists. For a certain operations I have to assign some components to certain operations, but the system only allows to add "Stock Items", I mean the item category of the material row is set automatically by the system as "L" (Stock Item).
    I am very interested in to assign "Non-stock items" (Item category = "N").
    Is it posiible??
    If the answer is yes, what I have to do? Have I to change some customizing settings?
    Thank you very much in advanced,
    Kind regards,
    Jordi Palau.

    hi
    In task list you cannot able to assign item category other than L which is stock item.there is no customization to allow the same
    but you can indirectly assign the material with item category N.create BOM for the equipment then while adding the material you have to select from the BOM which is having item category N
    regards
    thyagarajan

  • Tasks re-sorting in the MPP file when synching with SharePoint task list

    When synchronizing the MPP file with the ShPt task list, we have seen tasks re-sorting in the MPP file.  Very annoying, especially with schedules with a large number of tasks.  Just wondering if anyone has experienced this issue, and if you
    could point me in the right direction for solving it.  FYI, listing below my signature the columns we are synchronizing (in case you know of an issue with one or more of these).
    FYI, we are using MS Project 2013 Pro and SharePoint 2010.  We tried using the synch feature with MSP 2010 and it did not seem to be available.
    Greatly appreciate your help on this topic.  Sincerely,
    Michael.
    Columns to map:
    Text30
    Text15
    Baseline Start
    Baseline Finish
    Duration
    Baseline Duration
    Baseline Work
    % Work Complete
    Flag8
    Critical
    Number5
    Text19
    Work
    Actual Start
    Actual Finish
    Columns to uncheck:
    Priority
    Task Status

    Hi,
    The resource is created as a new resource with no security group and no loggin account, meaning it is strictly a resource and not a user. So this resource can be assigned on others projects but cannot connect to PS in any way (thus does not consume a CAL)
    unless you convert it into a user by adding a valid account and a security group.
    Hope this helps,
    Guillaume Rouyre, MBA, MCP, MCTS |

  • Problem While Adopting Task list having components, in  PM Order

    HI ,
          I am working in simple scenario in two landscapes
    I have created a general task list having some component  assigned to one operation. I am creating new PM order & adopting the task same task list using direct entry. The task list is getting adopted but when i am going in to component tab page
    the storage location is not coming. I have to enter the storage location manually. which  i dont want
    But in other system i am doing the same thing & i could see the storage location is coming up automatically.
    In both the system i have maintaned the stock of materials for plant xyz & storage location 0001
    Can you please help me in resolving this.
    Regards,
    Amar

    Hi,
    Probably you need to check the difference in two landscape.
    i.e. release patch,
    You need to take help of Basis person in this.
    Thanks,
    Rahul

  • Problems while uploading Task List - Service Pack with LSMW

    We are trying to upload General Maintenance Task List using LSMW. We are using Standard Batch/Direct Input method with Object 0490.
    We need to upload task list header, operations, maintenance pack, component and service pack for operations.
    We have created separate files containing data for different structures and they are linked using Group, group counter and operation number according below
    Header
    |----Operations
    .......... |----Long Text
    ..........|----Maintenance Pack
    ..........|----Components
    ..........|----Service Pack
    We have multiple operations per task list and multiple services per operation. The service pack is required only for a specific control key - PM03.  As per the configuration this screen (PROGRAM - SPLMLSP, Screen Number - 0200) is accessible only when the value PM03 is entered in the operation. We are able to upload all other details except service pack details. We have tried using structure IBIPBDCD for the same.
    While uploading the task list in foreground, when control key is entered as PM03 in an operation, service pack screen is displayed with error u201CNo batch input data for screen SAPLMLSP 0200u201D. The data provided in structure IBIPBDCD does not get processed at this time.
    On exiting the screen using back button, the data in IBIPBDCD structure is passed incorrectly to fields in screen 3400 (SAPLCPDI)
    Are we doing something incorrect? Is there a way to use this standard functionality to upload task lists with service packs?
    Thanks
    Edited by: jvalitp on Dec 15, 2011 12:46 PM

    Hi,
    When loading the tasklists you need to define a source structure as per the IBIP structure. You have different levels for example level 1 - header then below that level 2 - Operations, Header Long text then below that you have level 3 - Operation Long text, Operation Package assignments, operation component allocation.
    For each of these levels you need an identifier that links then together. In your source file specify identifier 1 for header, Identifier 1 and Identifier 2 for operations, identifier 1 identifier 2 and identifier 3 for packages. This way the system can create the correct structure when it reads the data from the text file.
    The identifiers are numeric and will dissapear once the files are loaded. specify then in the source structure as 2 characters and remember to set the xcel file up to have a 2 character field.
    For the header file each line will be a new identifier 1,2,3,etc.
    The operations are assigned to the header and have 2 identifiers. The first corresponds to the header identifier the next is a sequential number stating at 1 and incrementing for each line e.g Header 1 op 1, header 1 op 2, header 2 op 3, header 2 op 4, header 2 op 5 (this would be 2 header records. The first with 2 operations on it the second with 3 operations)
    The package is assigned to the operation and as such needs to have a third identifier. Header (identifier 1), Operation (identifier 2), Package (identifier 3) Example Header 1 op 1 pack 1, header 1 op 2 pack 2, header 2 op 3 pack 3, header 2 op 4 pack 4, header 2 op 5 pack 5
    I have a loading file for each of the items i.e. Header file, Operation file, maintenance package file. This is then assigned to the respective source structure.
    Regards,
    ravi

  • Add component in task list

    Hello All,
    I have an issue with adding component in task list (for example task list number EIMN-68) via transaction IA05.
    When I try to add component to operation, I get the message *
    Standard BOM PAEIMN-68  4 already exists
    Message no. 29771
    Diagnosis
    You want to create a standard BOM for standard object PAEIMN-68 with usage .
    A BOM already exists for this standard object and usage. You cannot extend a standard a standard BOM.
    Procedure
    Check whether the standard BOM is suitable for standard object PAEIMN-68 and usage . If it is not, you need to create the BOM for another standard object.
    Is there any special way to create material master for such components.Whats the solution.
    Please help
    Cheers
    Sunny

    Hi Pithan, how are you..
    I want to add components.
    Just now I was able to add components. I explain how:
    When i added component number in operation, and press enter, system gave me the error that standard bom already exist. In the same screen I changed the BOM usage to 3 as universal usage. After this usage only, system allowed me to add components. No other bom usage allowed me to do so.
    Also, why system took me to BOM screen if I just want to add components.
    I wait for your reply.
    thanks and regards
    Sunny

  • Copy General Task List from one service order to another one

    Dear Guru,
    I have the following questions:
    1- From a service order in IW32, how can I see the link between the operations and components?
    2- I want to be able to copy all the operations and all the components contained in a service order into another service order for a similar type of equipment. Can someone help me step by step on what needs doing?
    KR
    Christian

    Hello Sebastian,
    Many thanks for your quick reply indeed on this.
    Now this is the catch: I know that I could create a new service order based on a previously created one using IW31, however in my department they are creating sales orders for equipments in the normal SAP SD flow.
    In one the material line they enter a service material which is converted into a ZC03 (Service order) when saving the normal sales order which creates automatically a Service Order number.
    Because they create a lot of those service order in that way, they want to be able to populate them with the same list of operations and relevant components all the time.
    If they would be using IW31 to make copies, they would have to cancel the previously generated service order deriving from the regular Sales Order in SD which we want to avoid simply because it alters the original sales document flow.
    Question:
    1- I tried to copy the description of the task lists present in my service order thinking that would also copy the list of relevant and subsequent components defined for each task. The system has only copied the description of the tasks but not the components.
    Is there a way we could copy a list of general tasks to automatically have those coming with the relevant components?
    Please advise
    KR
    Christian

  • Upload Task List Operation long Text using SAVE_TEXT-Urgent

    Hi ,
    I am trying to create Task List Operation Long text using the function module ..
    SAVE_TEXT .I am passing the following keys
    Text Name       300ATEST057 0000000900000009
    Language        EN
    Text ID            PLPO Long Text
    Text Object     ROUTING    Texts for task list types
    But the long texts are not getting updated in the Task lists operations .
    Can anyone please suggest whether SAVE_TEXT will work for Operation long Texts or not Are we missing something
    .This is pretty urgent requirement .Award points are assured.
    Regards
    Sam

    hi,
    use function module create text
    check the sample code
    DATA: BEGIN OF itab OCCURS 0,
          asnum LIKE asmd-asnum, " Service No
          text(5000)  TYPE c, " Long Text
          END OF itab.
    *DATA: itab1 LIKE itab OCCURS 0 WITH HEADER LINE.
    DATA: BEGIN OF itab1 OCCURS 0,
          asnum LIKE asmd-asnum, " Service No
          sequ  type i,          " Text Sequence
          text(5000)  TYPE c, " Long Text
          END OF itab1.
    To create Long Text lines for CREATE_TEXT function module
    DATA:BEGIN OF dt_lines OCCURS 0.
            INCLUDE STRUCTURE tline. " Long Text
    DATA:END OF dt_lines.
    Variable declarations for CREATE_TEXT function module
    DATA : dl_name TYPE thead-tdname, " Object Name
           dl_lan TYPE thead-tdspras. " Language
    Constants
    Object ID for Long Text of Service Master
    CONSTANTS:c_best TYPE thead-tdid VALUE 'LTXT',
              c_material TYPE thead-tdobject VALUE 'ASMD'. " Object
    for file splitting.
    DATA: start TYPE i,
          len   TYPE i VALUE 92,
          totlen TYPE i,
          n TYPE i.
    PARAMETERS p_file LIKE rlgrap-filename."input file
    At selection-screen on Value Request for file Name
    AT SELECTION-SCREEN ON VALUE-REQUEST FOR p_file.
    Get the F4 Values for the File
      CALL FUNCTION 'F4_FILENAME'
        EXPORTING
          program_name  = syst-cprog
          dynpro_number = syst-dynnr
        IMPORTING
          file_name     = p_file.
    Start Of Selection
    START-OF-SELECTION.
    *To Upload Flat file
      CALL FUNCTION 'UPLOAD'
        EXPORTING
          filename                = p_file
          filetype                = 'DAT'
        TABLES
          data_tab                = itab
        EXCEPTIONS
          conversion_error        = 1
          invalid_table_width     = 2
          invalid_type            = 3
          no_batch                = 4
          unknown_error           = 5
          gui_refuse_filetransfer = 6
          OTHERS                  = 7.
      LOOP AT itab.
        itab1-asnum = itab-asnum.
        CLEAR: totlen,n, start.
        totlen = STRLEN( itab-text ).
        n = totlen / len.
        n = n + 1.
        DO n TIMES.
          itab1-text  = itab-text+start(len).
          itab1-sequ  = sy-index.
          start = start + len.
          APPEND itab1.
        ENDDO.
      ENDLOOP.
      delete itab1 where text is initial.
      SORT itab1 BY asnum sequ.
      LOOP AT itab1.
        dt_lines-tdformat = '*'.
        dt_lines-tdline = itab1-text.
        APPEND dt_lines.
    Call the Function Module to Create Text
        AT END OF asnum.
          dl_lan = sy-langu.
          WRITE : / itab-asnum.
          CALL FUNCTION 'CONVERSION_EXIT_ALPHA_INPUT'
            EXPORTING
              input  = itab1-asnum
            IMPORTING
              output = itab1-asnum.
          MOVE itab1-asnum TO dl_name.
          CALL FUNCTION 'CREATE_TEXT'
            EXPORTING
              fid         = c_best
              flanguage   = dl_lan
              fname       = dl_name
              fobject     = c_material
              save_direct = 'X'
              fformat     = '*'
            TABLES
              flines      = dt_lines
            EXCEPTIONS
              no_init     = 1
              no_save     = 2
              OTHERS      = 3.
          IF sy-subrc <> 0.
            WRITE:/ 'Long Text Creation failed for Service No'(001),
            itab1-asnum.
          ELSE.
            WRITE:/ 'Long Text Created Successfully for Service No'(002),
            itab1-asnum.
          ENDIF.
          REFRESH dt_lines.
        ENDAT.
      ENDLOOP.
    in text file give first field records in capitals
    regards
    siva

  • Second Dev. Client not appearing in Project Task List

    Hi,
    While defining the CHARM Maintenance Project  in systems tab is it necessary to add all the logical components ( I have 2 development clients 130 as workbench & 100 as customizing so i need to add two logical components) before clicking 'Create Task List' button.
    I created the task for one logical component 130->330->720 first time & project defined successfully with consistency check.
    Now when I am adding 2nd logical component 100->330->730 & created IMG Project. But If I go to 'Show Task List' I am not able to find 100 client under source system development. Means 100 client is not in the Task List of Project.
    Is there any way to add the Dev Client 100 in Task List of the Project under Source Systems->Development System
    Regards
    PK

    Hi,
    While defining the CHARM Maintenance Project  in systems tab is it necessary to add all the logical components ( I have 2 development clients 130 as workbench & 100 as customizing so i need to add two logical components) before clicking 'Create Task List' button.
    I created the task for one logical component 130->330->720 first time & project defined successfully with consistency check.
    Now when I am adding 2nd logical component 100->330->730 & created IMG Project. But If I go to 'Show Task List' I am not able to find 100 client under source system development. Means 100 client is not in the Task List of Project.
    Is there any way to add the Dev Client 100 in Task List of the Project under Source Systems->Development System
    Regards
    PK

Maybe you are looking for

  • DVD Player won't play some DVDs

    My DVD Player won't play certain DVDs. Presumably all commercial DVDs should be playable in the software. Fox discs are a problem. I can get Player to turn on, but after the menu, the screen flashes a reading error, from which it could not recover. Y

  • EHP 7 upgrade & Mopz in Solman 7.1 SP 8

    Hi Everyone, I am currently working on EHP 7 upgrade for my ECC 6 EHP 6 system. I began my work in ECC with SLD data push and SMSY, LMDB config, in Solman now moved on with MOPZ config to download EHP SPS. I have a query here, is it important to have

  • Single date dimension while creating Aggregate tables

    hi Guys , I have single date dimension(D1-D) with key as date_id and granularity is day-level. I have fact table(F1-D) which gives daily transactions . Now i created three aggregate tables with F2-M(aggregated to monthly),F3-Q(Aggregated to quarterly

  • BI Content setup in SMD SPS17

    We are running a solution Manager with SPS17 on Linux and want to monitor a ECC6 HR system with EP and XSS (dual-Stack System). The solution Manager configuration worked fine. All setup wizard finished sucessfully. The agents are running and the Java

  • Grant user to user......

    I thought that at one point I had heard of the ability to grant all privileges that one user had to another user and I'm trying to figure out if that was a figment of my imagination or not. The scenario that I have is that I have two users that have