Source systme fial in production sys

Hi All.........
i got source systme fail  in bw production system.
whare i need to activate remotly like Dev or Production sys.
please let you know.
Thanks,
Chal

Hi
You need to first replicate the relevant data source, by right click on the source system of D/s -> Replicate Data sources.
During such occasions, we can execute the following ABAP Report Program u201CRS_TRANSTRU_ACTIVATE_ALLu201D. It asks for Source System Name, Info Source Name, and 2 check boxes. For activating only those TR/TS which are set by some lock, we can check the option for u201CLOCKu201D. For activating only those TR/TS which are Inactive, we check for the option for u201COnly Inactiveu201D.
thx
vijender

Similar Messages

  • Sources of supply for product

    Hi all
    Why can i remove assigned vendor in the shopping cart (Sources of supply for product/Service Agent) when i choose a product from the "Internal Good/services" way, but i can´t remove it when i choose it from the SRM-MDM Catalog way???? the thing is that we have a contract for this product but in different ways we can remove and another way we can not...
    We dont know if this is a bug... or what.
    Obviously we are testing with the same product.
    Note: we are using SRM 5.0. (SRM_PLUS - SAPKIBK012; SRM_SERVER - SAPKIBKT12; ST-PI - SAPKITLQI5); SRM-MDM Catalog 2.0 SP03 Patch01.
    Plase help.
    10x
    Pp.

    Hi Jose,
    the catalog consists the agreed price list of the products with one specific vendor, therefore neither the vendor can be removed nor the price can be changed.
    This is the standard behavior.
    Regards,
    Peter

  • Mapping new product code from source system to old product code in Oracle COA

    Mapping new product code from source system to old product code in Oracle COA
    Here is the situation:
    One of our legal entities is changing their product codes in their COA segment. We are not changing the code structure in the global SOB. Is there a workaround to pull the source system information into ADI (or any other tool) and map it to the current Oracle product code?
    Thanks and regards,
    [email protected]

    Only The  Data of Your Code will Change
    then if you are trying to copy a standarad sap-code , you need to copy
    every include, FM
    there is a Copy option over there in program
    you can do tat
    thnkx bhanu

  • Source system assignement in production

    Hi all
    Before importing any requests which are related to infosource , cubes and update rules into production, do we need to make any source system assignment in production system?
    I have directly imported into production but there were no source system / data source assignments to these infosource.
    can you please suggest what to do for these souce system assignments in production.
    thanks in advance
    AN

    Hi,
    you have to assign the production source system to your BW system. After replication of the DataSources, you can import your development from the BW development system.
    Important is the conversion in the SPRO Transaction - Change source system name after transport. In this view you have to type in the source system name of the source system linked to your development system and the name of the source system linked to your production system. During import to production system, BW will automatically change the source system names.
    regards
    Juergen

  • Vendor error message in sourcing cockpit when change product category

    Hi there
    We are having a problem when changing the product category in the sourcing cockpit.
    The product category is linked to a vendor list. When you change the product category in the sourcing cockpit and choose a vendor by doing a vendor search and then click create purchase order, it still gives the error message "please choose vendor". Somehow it is not reading the vendor.
    Is there any way to solve this with a note or something?
    Kind regards
    Deepa

    Hi
    when you display the cart in work area , the vendor would have picked .i think you can see in one of the basic data .
    dont you try to prosose a source of supply and assign sos.
    i am not sure where mistake has happened ?
    can your business allows you to complete the cart and create a new cart since all our data is different
    once you change the product category.  for eg. it linked with purchasing group upon responsibility of product group and this purchasing group linked with purchase organisation internally and vendor....so..on .
    one small change product category impact data more..
    it is not recommend to change the product category here. product category may link with responsible purchase group and purchase group is linked with purchasers w.r.t purchase group .
    regards
    muthu

  • Display Datasource in Source System -- connects to Production ERP

    Hello,
    We have performed a System Copy of BI Prod. In the copied system on one of the Generic DataSource (ZBIP_VKDFSEXT) when I right click and say "Display Datasource in Source System", it is connecting to Production ERP, supposedly it must be connecting to Dev ERP.
    I have tested RFC COnnections and Logical System Settings in WE20 and 21, but they are pointing to DEV ERP.
    Correct replies appreciated.
    Thanks
    SM
    Edited by: SM on Jul 9, 2011 5:32 AM

    Dear SM,
    I guess we have faced same kind of issue earlier,
    at that time we just removed RFC connection between production system because we are not using Production system connection any more.
    and then just clicked on connection parameter of source-system, there we defined new RFC destination.
    Hope it will solve your issue.
    Regards,
    Ashish

  • Fresh source system clients in production BW system

    Hi,
    In my production BW system,all transfer rules currently point to 400 clients of source systems.
    Now requirement has changed and test data is being created in 310 clients of source systems,and not the 400 clients.
    I know about new source system creation and RFC connections in sm59,but how to (in a simple way) make all transfer rules to point to the 310 clients,instead of the 400 clients.
    Thanks,
    Vishvesh

    Hello,
    This issue got resolved by using below steps..
    The requirement is that Clients 400 connection should no longer exists in BW and  replaced by clients  310
    Below steps would hold good if the datasources of
    CLNT310 & CLNT400 are identical.
    1) Delete CLNT310 in BW (no Datasources of this system is  used  in BW)
    2) run BDLS in BW change CLNT400 to CLNT310
    3) Run RSAP_BIW_DISCONNECT in 310 clients ..
    f) Restore connection CLNT310
    Cheers,
    Vishvesh

  • Create followup transaction where source doc has only product category

    Hi all,
    I have configured the system to allow creation of follow up sales order from opportunity. I have done all the necessary configuration relating to copy copy. When the opportunity has products, I was prompted the sales order transaction type for selection and all works well. However, if my opportunity only has product category maintained, I only get appointments and tasks list and the sales order transaction type that I created was not on the list. Is this standard or that there is something I can do with it with further configuration?
    Appreciate any help on the above.
    Cheers!
    SF

    Thanks Ganesh,
    This is pretty much what I guess too but just want to be double sure Just want to clarify, there is however an item category assigned for the source document. This is based on the configuration in Item Category Determination with the transaction type being assigned a blank item category group.
    Regards
    SF

  • How to check released request transported to Production sys or not

    hi,
    Iam not a Basis guy, so waiting for your replies.
    I have around 200 released requests in my dev system and i want to check wether these requests have reached my production system or not as a mass. I can able to check on one by one but how to do it in mass. ie..i load these requests and find withwether it has reached my target system.
    Thanks,
    Suresh

    One simple  ms excel  method described below.
    1.Take list of transport entries from E070 table ( SE16)in production method ( you can select a particular time period).
    2. take a list of all the released request from Dev system.
    In excel , use Red color for production entries and some other  color for Dev entries. Then paste them in a single column and sort them according to name. If a request has been imported in Production , you will find two entries for the request number.

  • Change production sys. SID in LMDB for an ongoing Charm project

    Hi all,
    We are in the process of configuring Charm on Solman 7.1 SP12
    In our current scenario, BSD and BSQ have been already upgraded. So they are in the same release. Production system (BSP) however has been not upgraded yet. Therefore, in LMDB there is a system with the above-mentioned SID (BSP). The point is that BSP it is in different release from the rest of the system in the maintenance track (BSD and BSQ).
    Considering the above described scenario, we are not able to add current BSP in logical component (LC) for BSD and BSQ, and that it is being used within the Charm project, since it has a different product version from the rest of the system in maintenance landscape. Unfortunately we are not able to delete nor modify BSP in LMDB either since is being used in BPmon among other things.
    We are planning to create a Virtual production system with a different SID (eg BS2) and with the correct release, product versions, in order to be able to include it to the LC currently added to the Charm project.  Work this way until the upgrade process on BSP ends. Then, when BSP is upgraded, and after closing the maintenance task lists, production system will be updated from BS2àBSP in LC. Do you see any constraint
    in using this strategy? 
    Please let me know if was clear enough. 
    Thanks in advance

    Hi Sid,
    There is a concept called transport of copies (ToCs) which will help you in this situation.
    Transport of copies can move the changes to TEST environment when ChaRM project is "in development".
    Transport of copies can move chang only to next system i.e. TEST and cannot move further to production system.
    Developers can test and revert back the change untill test is successful without any effect on the flow of the change documents. Once development is as per requirement, regular transport request can be released from D -> Q -> P.
    Thanks,
    Ambarish

  • Change source systems after a production to development copy

    Hi all, does anybody have a detailed document on all changes for source systems to work correctly after a P to D copy.
    Thanks

    Hi,
    Here you will find all the details go through the link below
    http://help.sap.com/saphelp_46c/helpdata/en/2e/d9530294f911d283d40000e829fbbd/content.htm
    http://help.sap.com/saphelp_nw04/helpdata/EN/26/4b0d0930034b73aa3332ddc8c75e9d/content.htm
    It may help you
    Regards,
    Marasa.

  • How to change date selections at Infopackage data selections in production sys

    Hi All ,
    we are loading data into Infocube from datasource ,one process chain for delta init with data transfor  ,which has data selections at infopackage say 06.2014 and other process chain for delta which has same selections at infopackage . Now I want change this data selections  at Infopackage level .
    I Have tried to change these dates in data selections at infopackage level , tho I have changed and saved to future date at delta initial with data transfor ,it's keep coming back to 06.2014. Of course data selection at delta Infopackage level is faded .
    I Want to set future date with delta int with disturbing delta loads . How to do it please .
    regards
    hari

    Hi Ram,
    We will  load delta Intial with data transfer every weekend , and we run delta everyday , because we do delta init with data transfer with selections say ( 01.20011 to 12.2003 ) every weekend , hope I need to create new delta infopack  with new data selections say ( 01.2004 to 12.9999) only  to get update data in Infocube.
    Please correct me if I am wrong .
    Regards
    hari

  • Integration from customer's ecomm site to their SAP ECC 6.0 Production sys

    I'm trying to find the right forum for my inquiries
    I'm a Web developer and have a client that wants a small ecommerce site (that's the easy part) but also wants to track sales on their SAP ECC 6.0 system by integrating with the ecommerce.
    Where do I start? The SAP enterprise is huge and overwhelming so not sure where I need to go first. Are their API guides for this type of thing?
    Thanks for any help you can give.
    Breadwild (Brad)

    Sagar Bhosale wrote:
    Hi Markus,
    >
    > I tried by generating new Migration key from Service market place also... But no luck.
    > Don't know about the errors in R3trans and R3load.. Is that an issue??
    >
    > Thanks,
    > Sagar
    This will not work. You have to use migration key from the note mentioned above. latest R3load still cannot handle digital license keys.
    Thanks
    Sunny

  • Performance Point Services data source pointing towards wrong datasource after production instance copied in development

    Hi
    We have copied our Project Server 2010 production databases to development server. We have few reports created by using Performance Point Services, but here when we try to open the reports the data source is  pointing towards production data source
    instead of dev.
    We are getting some issue while executing the reports
    Request you to let me know what exactly the cause and steps to rectify the issue.
    Thanks 
    Geeth If you feel that the answer which i gave you is Helpful please select it as Answer/helpful.

    As you have copied data from Prod to Dev reports are pointing to production data sources and reports are unable to display data. Whenever we copy the data from one environment to other then this kind if issue occurs.
    We need to modify the data source of all the reports manually so that report point to dev data source.
    You have to open data source for your reports and change it from prod to dev then reports will display correct data.
    http://blogs.msdn.com/b/performancepoint/archive/2011/09/19/performancepoint-data-connection-libraries-and-content-lists-in-sharepoint.aspx
    http://www.networkworld.com/community/node/57687
    kirtesh

  • Set a productive ECC as source for two BI's?

    Hi,
    I don't know if this is an obvious question (sorry if it is)... but I've looking for related info and found nothing.
    I have my productive ECC system working as source system for the productive BI. Now I'd need to connect this ECC as source for my development BI system also. When setting the connection I get errors RSAR 371, RSAR 373, RSAR 374, RSAR 8 and E0 414. I found some threads about these errors but related to system changes. I don't want to change source systems but add a new one.
    Is it possible to have an ECC as source for several BI systems?
    Regards,
    J.

    Hi
    Yes you can set up 2 BI system after ECC6 system.
    Check that the set up of the logical source system in ECC is done correctly with specific idoc segments, specific ports of communication, etc.
    You may haveto ask a basis expert for that
    The only issue you might face is linked to the delta sources not target system dependant.In thatcases you might loose the delta data into one of your BI system
    PY

Maybe you are looking for

  • How many devices can I link to AirPort Extreme?

    How many devices can I linked to an AirPort Extreme.  It seems that whenever I have more than 3 devices (all iPhone and iPad), I can't link the fourth one.

  • Document related to PP module

    hello experts, I need some good documents related to PP module like functionality and flow. If any one can explain some real time scenarios related to abap in pp module that would be really gr8 help  for me and I need some important topics in the PP

  • Bw first Data Load

    Hi people, i'm new user of this very exciting forum. I have some problem. I have two connected system (r3 and BW), i have activated the business content but i don't know how to load the data from r3 to BW. Can anyone help me? The content activated ar

  • Music OK, but no vocals?

    Did anyone had this problem to? After using it for a few weeks, only the music seemed to be left on my Ipod, vocals disappeared or could only be heard in the background, very quietly... How can I fix this?

  • QT Pro - Installation and Use

    I'm using Quicktime 7.4.5 on a Windows XP machine with Service Park 2 installed. 1. The installation program said I had successfully installed QuickTime Pro, but there is nothing on the menu bar or the "Help | About" screens that indicates Quicktime