STMS Configuration - Change Virtual System with Real System

Dear all,
My system, if I go in the transaction STMS in DEV system, was configureted in the following way:
DEV => QA => PROD (Virtual System)
Now, I want to change the PROD Virtual System in PROD Real System.
How Can procede?
Can you explain step-by-step the process?
Because the system was configureted from other people, and I'm new to using the STMS.
Thanks in advanced for your help.
Best Regards,
Giulio

Hi,
After the planned system is physically installed it is time to replace the Virtual System with the realized system.
The procedure for the same is as under:
1) Delete the Virtual System from the transport domain
. Login into Transport Domain system client 000
· Using STMS got to Overview=> Systems
· Chose SAP Virtual System=> Delete (confirm)
· Distribute configuration change.
As soon as the configuration change is distributed, the virtual system is deleted. The import queue for this system in TMS disappears but it is available as import buffer at the operating systems level.
Now add the new (physical system) to the transport domain:
If STMS is configured as standalone system then first delete STMS configuration on PRD system
login into PRD system client 000. (delete STMS configuration if present.)
run stms -> it's ask for set up STMS -> click on other configurition (F6)
Target Host -> host name of domain controller ( host name of transport domain system)
System number -> Instance number of domain controller ( instance number of transport domain system)
Now,
Go to the Transport Domain Controller and accept the system. (As the import buffer is available at the    operating system level, no change requests will be lost)
Distribute the configuration changes.
regards,
kaushal

Similar Messages

  • How to configure  a test sever with the system copy with prd data

    Dear All ,
    I need to configure  a test sever with the system copy with prd data.
    Please any one can suggest the step by step process to do the same configure and  system copy.
    Regards
    kumar

    Dear All,
    I am facing problem in system copy. I want to knoe the way after restore i  can move all the data and server data in one drive .
    Now the error is resolve by changing the initTAT.sap the value tape to disk but now stuck in the drive for restore it is asking which is not there at os level.
    BR0252E Function mkdir() failed for 'M:\oracle\TST\SAPDATA4\PRD33' at location
    BrDirCreate-1
    BR0253E errno 2: No such file or directory
    BR0252E Function mkdir() failed for 'M:\oracle\TST\SAPDATA4\PRD32' at location
    TO solve the above problem i have created ad network drive for this but once all the restore will be completed than how i can i move the data form network drive to on drvie.
    Please suggest
    Regards,
    Kumar
    Edited by: kumarmoh on Jul 21, 2009 1:43 PM

  • Virtual Channel with RT system

    I have configured many virtual channel on a RT system with the "Remote DAQ configuration" menu from MAX (I am not sure of the menu name because I am using the french version).
    Now I would copy all these virtual channel on the host system as virtual channel on a remote device. Is there a way to do this automaticaly ?
    If I try to create manually the virtual channel for the remote device, there is too a new virtual channel in the Remote DAQ configuration. As I want to use the same name for the remote device and for the remote DAQ configuration, I have 2 virtual channel with the same name in the remote DAQ configuration.
    A solution will be to suppress all the virtual channel from the remote DAQ configuration and to recreate the virtual
    channel on remote device from the "My System" folder. But in this case I will lose my work (I have more than 100 virtual channel).
    Thanks for your help

    Yes, I would have the same virtual channel configuration on the Windows machine as on the remote RT Engine.
    With the virtual channel configuration on the Windows machine, I can use the "Test" button (from MAX) which is an easy and very quick way to verify that the channel is working.
    In fact, as you mentionned in your answer, I just need to create a RDA device in the "Device and Interface" folder, and automatically all the virtual channels configured on this remote device are "imported" under the "Data Neigborhood" folder.
    I didn't see this functionnality in my first test because I had created the Remote Device entry before I created the virtual channel on this device.

  • XI testing for two SAP R/3 systems with same system id/logical system

    Hi
    We are currently in the process of upgrading our R/3 4.7 to ECC 6.0 and plan to maintain dual landscape for DEV & QA (4.7 & ECC 6.0) for a period  for testing and maintaining existing applications for fixes etc. The second DEV & QA (upgraded to ECC 6.0) are copy of respective systems and these systems are created automatically under technical systems in SLD by auto update (RZ70).
    The question is, can we use the same XI system for testing inbound/outbound interfaces for both the systems i.e 4.7 & ECC 6.0 at the same time.  I am aware of the fact that XI Technical/Business sytems dependent on unique logical systems, so we cannot create new business system for the upgraded DEV-II ECC 6.0 system. 
    For your information, we have two slds (one for XID/XIQ and second one for XIP).
    What are the options without disturbing & maintaining the current XI system set up?
    1) Can we change current Business systems e.g DEV010 to use new technical system i.e DEV-II ECC 6.0 for testing for a period and switch it back to DEV-I 4.7 technical system?
    2) or change logitical system name of DEV-II ECC 6.0 and create new business sytem in SLD without interfering the existing setup and modify/create interfaces to use this new business system?
    3) Do we need to refresh cache from time to time in XI ?
    4) Any other implications
    We will be upgrading XI to PI 7.1 after ECC 6. 0 Upgrade.
    Any views on this would be highly appreciated.
    Regards
    Chandu

    Hi
    Technical System was created in the SLD automatically after RZ70 configuration in the new DEV-II system. We then modified Business System to use the new Technical system and carried out following steps:
    1)     Original Idoc metadata was deleted from XID
    2)     The port definition  was deleted
    3)     A new port definition was created for new system
    4)     The metadata for each idoc type used was re-created in IDX2 , using METADATA -> CREATE
    5)     This brought in all known versions of the idoc segments, including the 7.1 version.
    I have already checked the guides suggested for our upgrade and we are thinking of going ahead with fresh installation and migrating the interfaces.
    Regards
    Chandu

  • How to configure the virtual path with our web listener

    Oracle Apps Version: 11.5.10.2
    Oracle database: 10.2
    platform: Windows server 2003
    while applying developer 6i patch ( 61954129 ) i got following error which says configure the following virtual path for your web listener
    following is the output of forms6iconfig.txt file which oracale suggest to check
    Configuration Steps for Oracle Forms installation of 06:21:33 2010/12/01
    This file gives details of the configuration steps done for you by the installation process
    (marked '[INFO]') and of any actions you need to do manually (marked '[ACTION]'). Please read
    this file and perform the requested actions.
    [ACTION] If you are installing in a new Oracle Home, please reboot the machine after the installation.
    [ACTION] Please configure the following virtual path with your web listener: /dev60temp for
    physical directory D:\CLONE\cloneora\8.0.6\tools\web60\temp.
    [INFO] NT service Oracle Forms Server [Forms60Server] has been created and started for
    the Forms Server.
    [ACTION] Please configure the following virtual path with your web listener: /forms60java for
    physical directory D:\CLONE\cloneora\8.0.6\FORMS60\java.
    [ACTION] Please configure the following virtual path with your web listener: /dev60html for
    physical directory D:\CLONE\cloneora\8.0.6\tools\web60\html.
    [ACTION] Please configure the following virtual path with your web listener: /dev60cgi for
    physical directory D:\CLONE\cloneora\8.0.6\tools\web60\cgi.
    [INFO] An internet shortcut to run a standard test form, or any form of your choice, has been
    created for you in the Oracle Forms program group.
    [ACTION] Please configure the following virtual path with your web listener: /jinitiator for
    physical directory D:\CLONE\cloneora\8.0.6\JINIT.

    Hi,
    while applying developer 6i patch ( 61954129 ) i got following error which says configure the following virtual path for your web listener
    following is the output of forms6iconfig.txt file which oracale suggest to check
    Do you mean (Patch 6194129)? How do you get this error? Is it at the beginning or the end of the installation?
    Configuration Steps for Oracle Forms installation of 06:21:33 2010/12/01
    This file gives details of the configuration steps done for you by the installation process
    (marked '[INFO]') and of any actions you need to do manually (marked '[ACTION]'). Please read
    this file and perform the requested actions.
    [ACTION] If you are installing in a new Oracle Home, please reboot the machine after the installation.
    [ACTION] Please configure the following virtual path with your web listener: /dev60temp for
    physical directory D:\CLONE\cloneora\8.0.6\tools\web60\temp.
    [INFO] NT service Oracle Forms Server [Forms60Server] has been created and started for
    the Forms Server.
    [ACTION] Please configure the following virtual path with your web listener: /forms60java for
    physical directory D:\CLONE\cloneora\8.0.6\FORMS60\java.
    [ACTION] Please configure the following virtual path with your web listener: /dev60html for
    physical directory D:\CLONE\cloneora\8.0.6\tools\web60\html.
    [ACTION] Please configure the following virtual path with your web listener: /dev60cgi for
    physical directory D:\CLONE\cloneora\8.0.6\tools\web60\cgi.
    [INFO] An internet shortcut to run a standard test form, or any form of your choice, has been
    created for you in the Oracle Forms program group.
    [ACTION] Please configure the following virtual path with your web listener: /jinitiator for
    physical directory D:\CLONE\cloneora\8.0.6\JINIT.Please make sure you source the application env file before applying this patch, and select 8.0.6 ORACLE_HOME.
    Thanks,
    Hussein

  • BI Production System with R3 SYSTEM

    Hello,
    We are Installing the BI Production system we have to connect the R3 system or not?

    Hi
                 U have to definitely connect to R/3 system because if not from where u will load data to ur production system
       With Remote function call u have to connect these two systems
    refer to link below
    http://help.sap.com/saphelp_nw04/helpdata/en/fa/731a403233dd5fe10000000a155106/frameset.htm

  • Intergrating Change Request management with satellite systems

    Hi,
    We are using SOLMAN with SCM functionality.We have integrated it r/3 and now integrating with XI.I have created the logical componenet for the system and added to the maintenance project.But when i enable the project for change request management it gives a warning and when checked in SLG1 it shows error message as no consolidation system for XS1(Developement sys) and no export system for XP1(production sys).All the configurations to be done in the TMS are done as per the instruction in the configuration guide and R/3 is configured in the same way which is working fine.Please give your comments on this.
    Thanking you in advance,
    Avinash

    CLOSED

  • Configuring a Virtual Server with static IP problem - please help me

    Hi,
    I have a 2012 R2 server which has 1 Ethernet NIC adapter configured using a static IP (Web server).
    Using Hyper-V on this dedicated server, I want to host 4 virtual servers, each with their own external static IP.
    I figured I could set these up using this same NIC adapter (Shared)?
    Every time I create an 'External network' in the 'Virtual Switch Manager' using this selected NIC adapter - it loses web connection and I have to switch to a KVM to reset the NIC adapter back to its original config.
    I've tried enabling and disabling:
    'Allow management operating system to share this network adapter'
    But each results in the host server losing web connection entirely.
    What am I doing wrong?
    Many thanks for anything you can suggest or recommend me reading would be much appreciated.

    The error is a very basic one - the sapmsPRD service is not known. You will have to go to <NT_ROOT>\system32\drivers\etc and add the entry sapmsPRD 3600 to this file.
    This is basically telling the requester at what port to look for the message server.
    C

  • Risk Analysis with "ALL" systems

    Gurus,
         I have a scenario where we have a rule set (not global) built on a logical system with 8 systems in it. We are trying to run the analysis with "ALL" systems instead of individual systems as we are hoping that the analysis will be performed only on the systems that are part of the logical systems. My understanding on how the risk analysis run may be wrong but I need a second opinion on my assumption. Please do let me know if any one needs more explanation.

    Hi Varma,
    The Risk Analysis System "ALL" is really all connectors and is not tied to the Logical System (LS). The LS defines which systems are applicable for the rules. If your LS has fewer systems than all the connectors, just keep in mind that this impacts the results.
    Example:
    Existing connectors = A, B, C, D, E, F (ALL = A-F)
    LS-1 = A, B, D, F
    Run the report for "ALL" systems/connectors and lets assume that every system has SOD issues. Your results would look like this:
    A = SOD violations
    B = SOD violations
    C = "no violations found"
    D = SOD violations
    E = "no violations found"
    F = SOD violations
    You would either need to add C & E to LS-1 or create a LS-2 with connectors C & E and create/upload rules for LS-2. Then ALL would find SOD violations for connectors A - F.
    Hopefully I didn't over explain the question. Short answer is system "ALL" = all connectors and there is no choice to run the SOD report based on a specific LS.
    -Dylan

  • Is it possible to install two SAP system with same SID but different instance numbers on one host?

    Is it possible to install two SAP system with same system ID (SID) but different instance numbers on one host?
    If yes, then how?
    If no, then why?
    Thanks in advance.
    Regards,
    Sarim

    Is it possible to install two SAP system with same system ID (SID) but different instance numbers on one host?
    Yes, it is possible. If one is CI (PAS) and the second one is an AS (AAS). In this case there will be only one database.
    If you are talking about two separate SAP systems with separate databases (Eg: A BI and an ECC) with the same SID then the problem will be with the database (Eg: Oracle)
    The database will be installed under /oracle/SID/112_64 (ORACLE_HOME) unless one database is running on 10 G and in that case the ORACLE_HOME will be /oracle/SID/102_64
    The next issue will be with the SAP file systems like /sapmnt/SID
    The most important problem will be with the switch to the sidadm and orasid users and the conflicts there. If there is a need to stop one of the SAP systems and if you do a switch to sidadm and issue a stopsap command which system will be stopped ?
    These are few of the many problems I can think of.
    So if we are talking about two separate systems with their own databases I would rule out the possibility of having two systems with the same SID.
    Regards
    RB

  • Replacing development system with copy of production system during upgrade

    Hello Guru,
    We are planning to replace our development ECC 5.0 system with a copy of production system, and to perform upgrade to ECC 6.0.
    SAP upgrade guide stating that:
    "If you have modified SAP objects, make sure that you keep your development sysetem.  Do not copy your production  system to your development system for test purpose."
    If we are planning to "Reset to original" for majority of SAP's objects during SPAU, are there other reasons we need to consider the impact of replacing development system with a copy of production system?
    Thanks in advance!

    Thanks for your response. 
    When we first implemented SAP system 3 and half years ago, the consultants and the developers were using the development system like a sandbox system, they tried out features or developed programs for learning purpose.
    Hence, the development system and production system are very different.  
    There are many repair transport requests that will never transport into production.
    Also, we developed client strategy (different client numbers for each system u2013 Dev, QA, Prod) during the initial implementation.  
    We were told by the upgrade consultant, it is standard that the development system replaced by a copy of production system during upgrade.  The client number in development system will be the same as the production system after upgrade.  If I want to avoid confusion for the developer & testing users, I would have to create a new client using the previous development client number, and then perform client copy.
    As I review the SAP upgrade guide, I saw the statement about not to replace development system with production system, I would like to know the reasons behind SAP's statement.
    By the way, we will replace our QA system with a copy of production system during the upgrade.

  • Log configuration changes to syslog on Nexus 7000?

    I need to be able to log any configuration changes to syslog on our Nexus switches. On IOS this is easy with the archive commands, but I'm a little stuck trying to do this on our Nexus gear. On the IOS gear I run the commands:
    archive
    log config
    logging enable
    logging size 100
    hidekeys
    notify syslog
    How do I do the equivalent on NX-OS?

    ​Cisco NX-OS can log configuration change events along with the individual changes when AAA command accounting is enabled.
    With command accounting enabled, all CLI commands entered, including configuration commands, are logged to the configured AAA server. Using this information, a forensic trail for configuration change events along with the individual commands entered for those changes can be recorded and reviewed.
    Because of this capability, it is strongly advised that AAA command accounting be enabled and configured.
    Refer to the “TACACS+ Command Accounting” section of this document for more information.
    The Nexus 7000, by default keeps a local accounting log of all the configuration commands entered on the device; you can view this with the 'show accounting log' command.
    In NX-OS, we changed the way logging works.  We keep a local accounting log of all the
    configuration changes ("show accounting log"), but if you want to send those logs to a
    server, it must be done with through a TACACS server.  Please see the below documentation:
    Configuring AAA on Nexus
    TACACS command accounting
    -Thanks
    Vinod
    **Encourage Contributors. RATE Them.**

  • How to replace the virtual system as the real system in the TMS?

    Hi,
    I have a standard 3 systems TMS, which is 1 development system (real system, transport domain) and 2 virtual system(QAS and PRD).
    And now, I will install the QAS system and replace the virtual system as the real one, How can I do in TMS?
    I should delete the old TMS and rebuild the TMS with 1 DEV, 1 QAS and 1 virtual PRD? or just replace the QAS as the real one? What the operation should I do in t-code:STMS?
    Many thanks.
    BR,
    Randy

    Hi,
    Do it as follows.
    1. Remove transport routes (i think it is not mandatory)
    2. Remove your Virtual system that you want to replace with physical system
    3. Include the Physical system into Domain and accept it from Domain Controller
    4. Configure the transport routes.You can see all the transports that were in the import queue of virtual system are now in the import queue of the Physical system that you added.
    Only condition is, both Virtual System and Physical System should have same SID.
    All the above will be done through STMS
    Thanks,
    Giri

  • How to Configure a oracle R12 with RAC on two different  system .

    I have one laptop and one desktop
    Laptop----
    on laptop I have install vmware 8
    Host OS --win7
    Guest OS---linux 4
    Desktop ---
    On Desktop I have install Vmware 8
    Hosts OS --- Win XP
    Guest OS ---Linux 4
    Plz suggest How configure oracle R12 with RAC using both system .

    Hussein Sawwan wrote:
    on laptop I have install vmware 8
    Host OS --win7
    Guest OS---linux 4
    Desktop ---
    On Desktop I have install Vmware 8
    Hosts OS --- Win XP
    Guest OS ---Linux 4
    Plz suggest How configure oracle R12 with RAC using both system .If you want to configure RAC, then you must have the same OS installed on all RAC nodes -- See (RAC: Frequently Asked Questions [ID 220970.1], Does Oracle Clusterware or Oracle Real Application Clusters support heterogeneous platforms?) for details.
    Once you have the same OS, please refer to:
    Oracle E-Business Suite Release 12 High Availability Documentation Roadmap [ID 1072636.1]
    Using Oracle 10g Release 2 Real Application Clusters and Automatic Storage Management with Oracle E-Business Suite Release 12 [ID 388577.1]
    Using Oracle 11g Release 2 Real Application Clusters with Oracle E-Business Suite Release 12 [ID 823587.1]
    Thanks,
    HusseinHi Hussein,
    For Rac I am using both same OS (linux 4) for both nodes .
    Plz suggest its possible to install two nodes on different machine(diiferent virtual machine on different system ) .Can communicate both machine without any problem if its possible plz provide links.

  • X121e bios loop : "configuration changed - restart the system"

    After changing some settings in BIOS i got stuck in a reboot - loop.
    * Cannot access the BIOS any more - pressing F1 changes the message to "Entering BIOS Setup Utility" followed by the message "configuration changed - restart the system"
    * F12 changes the message to "Preparing Boot Device List" followed by  "configuration changed - restart the system" and the system reboots again.
    * Tried to remove the battery, pressing the power button for 10-15 sec. and reboot with AC Adapter connected
    * Tried to remove the battery and unplug the bios battery for 3 days the reset the bios - doesn't work
    * Tried to boot via USB (BIOS update, FreeDOS with BIOS update, Ubuntu-Live-USB) - nothing worked .. didn't change the boot-order - i always prefer USB boot
    * Removing hard-disk produces the message "no operating system found"
    Are there any tricks for resetting the BIOS to defaults, flashing BIOS without booting from USB?
    see
    * http://forums.lenovo.com/t5/ThinkPad-Edge-S-series/E-325-bios-settings-changed-keeps-rebooting/td-p/...
    * http://forums.lenovo.com/t5/X-Serie-ThinkPad-Notebooks-inkl/x121e-Configuration-changed-Restart-Syst...
    - there are several people with this issue ...

    In service center they said that motherboard is glitchy and needs replacement.
    So it was a hardware fault.

Maybe you are looking for

  • How to get information from SOAP header in weblogic without handlers

    I need to retrieve information from SOAP header without handlers. Any ideas how to do that?

  • Error building gnomad2, missing libraries?

    Hello! Im trying to build the new version of gnomad2, which is a GTK based app for interacting with the Creative zen jukebox I have. I have been using version 2.6.3 for a while, and today they released a new version, 2.7.0. I have build the previous

  • SharePoint 2013 Blog - Modify Summary View

    I am using SharePoint 2013.  I need to modify the blog posts to show extra fields and exclude others.  When I initially tried to edit the "Current View" for the web part, I got an error. I switched the view to "All Posts", then switched back to "Summ

  • [AS] Saving a file without creating an idlk file

    Hi there, I have an AppleScript that open an InDesign template (indt), import a XML file and then save the document to another folder than the one where the XML file and the template are living. The problem, and I don't see how to resolve it, is that

  • Fill complex elements using Java class

    Dears, I worked in ADF based Human task .in payload. it have complex elements. and elements have list of elements. for example company have many of mangers. and every manger have many Employees. every employee have id and name all these elements in b