BI Production System with R3 SYSTEM

Hello,
We are Installing the BI Production system we have to connect the R3 system or not?

Hi
             U have to definitely connect to R/3 system because if not from where u will load data to ur production system
   With Remote function call u have to connect these two systems
refer to link below
http://help.sap.com/saphelp_nw04/helpdata/en/fa/731a403233dd5fe10000000a155106/frameset.htm

Similar Messages

  • XI testing for two SAP R/3 systems with same system id/logical system

    Hi
    We are currently in the process of upgrading our R/3 4.7 to ECC 6.0 and plan to maintain dual landscape for DEV & QA (4.7 & ECC 6.0) for a period  for testing and maintaining existing applications for fixes etc. The second DEV & QA (upgraded to ECC 6.0) are copy of respective systems and these systems are created automatically under technical systems in SLD by auto update (RZ70).
    The question is, can we use the same XI system for testing inbound/outbound interfaces for both the systems i.e 4.7 & ECC 6.0 at the same time.  I am aware of the fact that XI Technical/Business sytems dependent on unique logical systems, so we cannot create new business system for the upgraded DEV-II ECC 6.0 system. 
    For your information, we have two slds (one for XID/XIQ and second one for XIP).
    What are the options without disturbing & maintaining the current XI system set up?
    1) Can we change current Business systems e.g DEV010 to use new technical system i.e DEV-II ECC 6.0 for testing for a period and switch it back to DEV-I 4.7 technical system?
    2) or change logitical system name of DEV-II ECC 6.0 and create new business sytem in SLD without interfering the existing setup and modify/create interfaces to use this new business system?
    3) Do we need to refresh cache from time to time in XI ?
    4) Any other implications
    We will be upgrading XI to PI 7.1 after ECC 6. 0 Upgrade.
    Any views on this would be highly appreciated.
    Regards
    Chandu

    Hi
    Technical System was created in the SLD automatically after RZ70 configuration in the new DEV-II system. We then modified Business System to use the new Technical system and carried out following steps:
    1)     Original Idoc metadata was deleted from XID
    2)     The port definition  was deleted
    3)     A new port definition was created for new system
    4)     The metadata for each idoc type used was re-created in IDX2 , using METADATA -> CREATE
    5)     This brought in all known versions of the idoc segments, including the 7.1 version.
    I have already checked the guides suggested for our upgrade and we are thinking of going ahead with fresh installation and migrating the interfaces.
    Regards
    Chandu

  • STMS Configuration - Change Virtual System with Real System

    Dear all,
    My system, if I go in the transaction STMS in DEV system, was configureted in the following way:
    DEV => QA => PROD (Virtual System)
    Now, I want to change the PROD Virtual System in PROD Real System.
    How Can procede?
    Can you explain step-by-step the process?
    Because the system was configureted from other people, and I'm new to using the STMS.
    Thanks in advanced for your help.
    Best Regards,
    Giulio

    Hi,
    After the planned system is physically installed it is time to replace the Virtual System with the realized system.
    The procedure for the same is as under:
    1) Delete the Virtual System from the transport domain
    . Login into Transport Domain system client 000
    · Using STMS got to Overview=> Systems
    · Chose SAP Virtual System=> Delete (confirm)
    · Distribute configuration change.
    As soon as the configuration change is distributed, the virtual system is deleted. The import queue for this system in TMS disappears but it is available as import buffer at the operating systems level.
    Now add the new (physical system) to the transport domain:
    If STMS is configured as standalone system then first delete STMS configuration on PRD system
    login into PRD system client 000. (delete STMS configuration if present.)
    run stms -> it's ask for set up STMS -> click on other configurition (F6)
    Target Host -> host name of domain controller ( host name of transport domain system)
    System number -> Instance number of domain controller ( instance number of transport domain system)
    Now,
    Go to the Transport Domain Controller and accept the system. (As the import buffer is available at the    operating system level, no change requests will be lost)
    Distribute the configuration changes.
    regards,
    kaushal

  • Risk Analysis with "ALL" systems

    Gurus,
         I have a scenario where we have a rule set (not global) built on a logical system with 8 systems in it. We are trying to run the analysis with "ALL" systems instead of individual systems as we are hoping that the analysis will be performed only on the systems that are part of the logical systems. My understanding on how the risk analysis run may be wrong but I need a second opinion on my assumption. Please do let me know if any one needs more explanation.

    Hi Varma,
    The Risk Analysis System "ALL" is really all connectors and is not tied to the Logical System (LS). The LS defines which systems are applicable for the rules. If your LS has fewer systems than all the connectors, just keep in mind that this impacts the results.
    Example:
    Existing connectors = A, B, C, D, E, F (ALL = A-F)
    LS-1 = A, B, D, F
    Run the report for "ALL" systems/connectors and lets assume that every system has SOD issues. Your results would look like this:
    A = SOD violations
    B = SOD violations
    C = "no violations found"
    D = SOD violations
    E = "no violations found"
    F = SOD violations
    You would either need to add C & E to LS-1 or create a LS-2 with connectors C & E and create/upload rules for LS-2. Then ALL would find SOD violations for connectors A - F.
    Hopefully I didn't over explain the question. Short answer is system "ALL" = all connectors and there is no choice to run the SOD report based on a specific LS.
    -Dylan

  • Is it possible to install two SAP system with same SID but different instance numbers on one host?

    Is it possible to install two SAP system with same system ID (SID) but different instance numbers on one host?
    If yes, then how?
    If no, then why?
    Thanks in advance.
    Regards,
    Sarim

    Is it possible to install two SAP system with same system ID (SID) but different instance numbers on one host?
    Yes, it is possible. If one is CI (PAS) and the second one is an AS (AAS). In this case there will be only one database.
    If you are talking about two separate SAP systems with separate databases (Eg: A BI and an ECC) with the same SID then the problem will be with the database (Eg: Oracle)
    The database will be installed under /oracle/SID/112_64 (ORACLE_HOME) unless one database is running on 10 G and in that case the ORACLE_HOME will be /oracle/SID/102_64
    The next issue will be with the SAP file systems like /sapmnt/SID
    The most important problem will be with the switch to the sidadm and orasid users and the conflicts there. If there is a need to stop one of the SAP systems and if you do a switch to sidadm and issue a stopsap command which system will be stopped ?
    These are few of the many problems I can think of.
    So if we are talking about two separate systems with their own databases I would rule out the possibility of having two systems with the same SID.
    Regards
    RB

  • On Windows 7 Ultimate, desktop with C (system) drive, D K and L drives, can I install Adope Creative Suite 6 Production Premium (from cd's) to Drive D (not C). Thank you.

    On Windows 7 Ultimate, desktop with C (system) drive, D K and L drives, can I install Adope Creative Suite 6 Production Premium (from cd's) to Drive D (not C). Thank you.

    you can but there may be some issues and a lot of files will be saved to your c drive, anyway.

  • Can DPM share a remote SQL Instance with other System Centre Products?

    Firstly, apologies if this has been answered elsewhere but I can't seem to find a definitive line on it.
    I am about to install and start implementing DPM 2012 R2 and have restricted access to SQL instances and the creation of. Can DPM share a SQL instance? Mainly can it share an instance shared with other System Centre products?
    Does it really need a dedicated DB engine and Reporting services instance?

    Hi,
    No, Each DPM server requires it's own dedicated instance name.  You can have a single remote SQL server, but with seperate instances for each DPM server, or other System Center products.
    Make sure that names of your instances does not contains an underscore in the instance name.
    http://technet.microsoft.com/en-us/library/dn554221.aspx
    Hope this helps.
    Note: This posting is provided 'AS IS' with no warranties or guarantees, and confers no rights. Please take a moment to "Vote as Helpful" and/or "Mark as Answer", where applicable. This helps the community, keeps the forums tidy, and
    recognises useful contributions.

  • Replacing development system with copy of production system during upgrade

    Hello Guru,
    We are planning to replace our development ECC 5.0 system with a copy of production system, and to perform upgrade to ECC 6.0.
    SAP upgrade guide stating that:
    "If you have modified SAP objects, make sure that you keep your development sysetem.  Do not copy your production  system to your development system for test purpose."
    If we are planning to "Reset to original" for majority of SAP's objects during SPAU, are there other reasons we need to consider the impact of replacing development system with a copy of production system?
    Thanks in advance!

    Thanks for your response. 
    When we first implemented SAP system 3 and half years ago, the consultants and the developers were using the development system like a sandbox system, they tried out features or developed programs for learning purpose.
    Hence, the development system and production system are very different.  
    There are many repair transport requests that will never transport into production.
    Also, we developed client strategy (different client numbers for each system u2013 Dev, QA, Prod) during the initial implementation.  
    We were told by the upgrade consultant, it is standard that the development system replaced by a copy of production system during upgrade.  The client number in development system will be the same as the production system after upgrade.  If I want to avoid confusion for the developer & testing users, I would have to create a new client using the previous development client number, and then perform client copy.
    As I review the SAP upgrade guide, I saw the statement about not to replace development system with production system, I would like to know the reasons behind SAP's statement.
    By the way, we will replace our QA system with a copy of production system during the upgrade.

  • Hp pavilion dv6 recovery system with win 7 dvd image not found

    Hello everyone, I have a hp pavilion dv6 I going to restore the operating system win 7 that I previously saved in an image of the system in 2 DVDs. I need to restore the entire computer because I do not want to lose all installations made within a year , including software installations regularly purchased online which do not have the original CDs . I tried to go in :
    1 - "Backup and Restore Computer"
    2 - Control Panel and select the " Restore system settings or your computer "
    3 - then " advanced recovery methods "
    4 - next page select " Use a system image you created earlier to recover your computer "
    5 - At this point it asks me to do a backup, but I do not care because the computer is pretty much with the factory settings as has just returned from assistance hp and after ignoring the message I restart the computer in recovery mode expecting to reinstall the system with the image .
    After a series of steps at the time to reload the image from the second DVD that I had previously saved , the computer can not find even one image to be restored where am I wrong?
    Thanks Acitano

    Hi Acitano,
    I understand you are having issue with restoring your computer. Here is a document on how to do that when windows 7 will not start normally.
    http://h10025.www1.hp.com/ewfrf/wc/document?cc=us&dlc=en&docname=c01835735&lc=en&product=5218386&tmp...
    Hope this helps.
    Thanks
    Please click “Accept as Solution ” if you feel my post solved your issue, it will help others find the solution.
    Click the “Kudos, Thumbs Up" on the bottom to say “Thanks” for helping!

  • RFC\BAPI to login into remote system with user id's in that system

    Dear Friends,
    I have a requirement to run a job .In that job, i need to login into other remote system with the user id's in that system.
    May I know, is there any remote function module or BAPI available.
    Let me know how to solve this issue.
    Regards,
    Madhu..!!

    Hi Divakar,
    As far as I know, there isn’t this feature of remote test in VS2013.
    I suggest that you could submit this feature request:
    http://visualstudio.uservoice.com/forums/121579-visual-studio. The Visual Studio product team is listening to user voice there. You can send your idea there so the others can vote it. If you submit this suggestion, you might post that link here which will
    benefit others who has the similar issue
    Regards
    Starain
    We are trying to better understand customer views on social support experience, so your participation in this interview project would be greatly appreciated if you have time. Thanks for helping make community forums a great place.
    Click
    HERE to participate the survey.

  • XI 2.0: HowTo connect Bus.-Systems with different Releases to XI (RFC-Ad.)

    Hi,
    can anybody help me solving this problem:
    I have Business-Systems connected to XI by RFC-Adapter. Everything works fine. Now I want to upgrade some of these Business-Systems to a newer Release --> RFCs are changing! (For both Releases I have separate Developing-Systems)
    Does the following work?
    - Creating a new Product-Version
    - Creating new Software-Component-Versions for the new Product-Version
    - Creating Namespaces with the same names (as in the older Software-Component-Versions)
    - Tools/Release-Takeover for every Software-Component
    - Connecting Develop-System of the new Release to the new Software-Components (Interface-Import of RFCs)--> in the new Software-Components only new RFCs can be uploaded.
    - Business-Systems with old Release keep connected with old Product-Version. Business-Systems with new Release are connected with new Product-Version.
    Does it work? Is this the best approach or are there other possibilities?
    Thanks in advance,
    Max.

    Hey
    are u suppose to do an IDOC(R/3 system A)-Xi-IDOC(R/3 system B) scenario,of u have to collect IDOC's from both the R/3 systems and send it to a single file?
    in any case u have to maintain separate Business system and logical system name for both R/3 systems
    thanx
    ahmad
    Message was edited by:
            Ahmad

  • [Fwd: Re: Integration with CM Systems ...]

    -------- Original Message --------
    Subject: Re: Integration with CM Systems ...
    Date: Thu, 10 Aug 2000 15:47:21 -0600
    From: Cindy Eldenburg <[email protected]>
    Organization: BEA Systems, Inc.
    Newsgroups: weblogic.developer.interest.personalization
    References: <398f3c55$[email protected]>
    Prashanth,
    The are a lot of differences in what the Documentum does as compared to
    Interwoven Teamsite. Comparing these items is like comparing apples and
    oranges.
    Normally in Teamsite, during the document capture process, a Teamsite
    user
    categorizes documents by specifying the documents' metadata attributes
    using
    Teamsite templates. Once the documents are captured, the Interwoven
    OpenDeploy
    workflow mechanism is used to publish the content to the WLCS database.
    Unlike Interwoven Teamsite, Documentum products manage the metadata and
    documents in their own repositories. Thus, with this integration, WLCS
    queries
    the Documentum system at runtime via a specialized JDBC driver supplied
    by
    Documentum. Once the Documentum user captures a document and tags it
    with
    metadata attributes, the document may be immediately available to WLCS
    (depending on administrative options in Documentum, such as whether
    staging is
    involved).
    Please contact your sales person for a more detailed overview of what
    these two
    products do and how they interface to WLPS.
    Cindy Eldenburg
    Prashanth A wrote:
    Can anyone explain to me clearly what does Weblogic mean when it says it
    integrated with Interwoven and Documentum. Is there any difference in the
    way it interacts with Interwoven as compared to Documentum. As in a run-time
    interaction with Documentum whereas a static integration with Interwoven

    Prashanth,
    The are a lot of differences in what the Documentum does as compared to
    Interwoven Teamsite. Comparing these items is like comparing apples and
    oranges.
    Normally in Teamsite, during the document capture process, a Teamsite
    user
    categorizes documents by specifying the documents' metadata attributes
    using
    Teamsite templates. Once the documents are captured, the Interwoven
    OpenDeploy
    workflow mechanism is used to publish the content to the WLCS database.
    Unlike Interwoven Teamsite, Documentum products manage the metadata and
    documents in their own repositories. Thus, with this integration, WLCS
    queries
    the Documentum system at runtime via a specialized JDBC driver supplied
    by
    Documentum. Once the Documentum user captures a document and tags it
    with
    metadata attributes, the document may be immediately available to WLCS
    (depending on administrative options in Documentum, such as whether
    staging is
    involved).
    Please contact your sales person for a more detailed overview of what
    these two
    products do and how they interface to WLPS.
    Cindy Eldenburg
    Prashanth A wrote:
    Can anyone explain to me clearly what does Weblogic mean when it says it
    integrated with Interwoven and Documentum. Is there any difference in the
    way it interacts with Interwoven as compared to Documentum. As in a run-time
    interaction with Documentum whereas a static integration with Interwoven

  • Steps to connect a CRM system with MDM

    Hi everybody,
    I've got a problem here : I should build a connection between a CRM system and MDM (get the data in several tables in the CRM system, normalize them in MDM and then put them back in the CRM).
    What would the steps I've got to do to achieve that ? Do I need XI between the two systems ? Do I have to map the tables before sending them in MDM (and how could I do that ?)
    Thank you for all the help you can give me
    Seb

    Hi
    The Universal Worklist (UWL) iView is part of the KMC (Knowledge Management and Collaboration), capability of SAP NetWeaver. The integration of the SAP NetWeaver MDM workflow with UWL will be provided with SP04. This will provide the ability to expose SAP NetWeaver MDM workflow steps in the SAP Universal Work List (UWL). These jobs may run from the BPM process or can be launched inform within SAP NetWeaver MDM. UWL is defined as the main consolidated ”Inbox“ for SAP users, being the main location to monitor jobs directly activated in SAP NetWeaver MDM, or connected to a process that integrates with SAP NetWeaver MDM.
    Using the SAP NetWeaver Portal UI, show a summarized list of all workflow (WF) jobs/tasks from all systems of SAP NetWeaver MDM Landscape per user - one single UI for all my tasks. The UWL is already integrated with other major SAP products, like R/3, SAP CRM, mySAP ERP, etc.
    https://sapportal.wdf.sap.corp/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/infocenters/ws%20ptg/ptg/platform%20ecosystem/industry%20standards/projects%20and%20programs/business%20process%20management/index.html
    First of all, you must set a RFC connectivity between CRM and backend system:
    o     Create system users for remote connection (RFC_CONN). This user must have SAP_ALL authorization.
    o     Create RFC connections in CRM system.
    Go to transaction SM59 on CRM side and click on 'create' button. Set RFC destination name to the back-end system <sid>CLNT<client> (eg. R3DCLNT200), connection type to 3 (abap / R/3 connection) and fill the target host to your back-end system. On the Logon/Security tab, add the RFC_CONN user created in the previous step. Save your settings.
    o     Create RFC connections in the back-end system.
    Go to transaction SM59 on the back end and click on 'create' button. Set the RFC destination name to CRM system <sid>CLNT<client> (eg. CR1CLNT300), connection type to 3 (abap / R/3 connection) and fill in the target host to your back-end system. On the Logon/Security tab, add the RFC_CONN user created in the previous step. Save your settings.
    o     Create a logical system name in CRM.
    Go to transaction SPRO -> SAP Implementation Guide -> Customer Relationship Management -> CRMServer -> Technical Basic Settings -> ALE Settings -> Distribution -> Basic Settings -> Logical Systems -> Define Logical System Add a new value:
    Save your settngs.
    o     Create a logical system name in the back end.
    Go to transaction SPRO -> SAP Customizing Implementation Guide -> SAP Web Application Server -> Application Ling Enabling -> Sending and Receiving Systems -> Logical Systems -> Define Logical System Add a new value:
    Save your settngs.
    2.     
    3.     Middleware parameters setup Go to transaction SM30 on backend system and choose table CRMCONSUM. Add the following values:
    4.     Next, choose CRMSUBTAB for subscription table for the Up and Download Object and add the following values
    User     ObjectName     U/D     Obj. Class     Function     Obj. Type     Funct. Name
    CRM     empty     Download     Material     empty     empty     CRS_MATERIAL_EXTRACT
    CRM     empty     Download     Material     empty     empty     CRS_CUSTOMIZING_EXTRACT
    CRM     empty     Download     Material     empty     empty     CRS_SERVICE_EXTRACT
    Next, choose CRMRFCPAR for definitions of RFC Connections and add the following values
    User     ObjectName     Destination     Load Type     INFO     InQueue Flag     Send XML
    CRM     *     SR1CLNT300     Initial Download     SR1CLNT300     X     Send XML
    CRM     *     SR1CLNT300     Request     SR1CLNT300     X     Send XML
    CRM     MATERIAL     SR1CLNT300     Initial Download     SR1CLNT300     X     Send XML
    Leave all other field empty.
    Now, configure filtering for the material master:
    Choose the CRMPAROLTP table for CRM OLTP Parameters and add the following values:
    Parameter name     Param. Name 2     Param. Name 3     User     Param. Value     Param. Value 2
    CRM_FILTERING_ACTIVE     MATERIAL     empty     CRM     X     empty
    Now we must edit the table for the application indicator. Go to transaction SE16N on the back-end side and choose table TBE11. Search or add an application component BC-MID and edit activity settings (field AKTIV = X).
    Save your settings.
    8.     Enterprise buyer with/without CRM In this activity, you define whether you are running the Enterprise Buyer and CRM in the same system. This might accelerate the Master Data download performance. If you are using CRM in the client, then skip this activity.
    In the CRM system run transaction BBP_PRODUCT_SETTINGS, deselect 'Test mode' and choose the Execute button.
    The system generates a report containing all tables that have been deactivated.
    9.     Generate repository objects With this procedure, you generate the middleware function modules (BDoc Object Type) for the material master.
    Go to transaction SMOGGEN and choose object PRODUCT_MAT and PRODUCT_SRV. Generate services for all object categories.
    Please let me know your email id, i shall send you this document
    Regarsd
    Rehman
    Reward Points if Useful

  • Looking for dual wireless rechargeable headphone system with dual docks

    I'm looking for a pretty specific product, and was wondering if anyone knows of a product that'll fit the bill.
    I want a wireless dual headphone system with a charging dock for each headset. Transmitter should accept line level signal from dual RCA plugs. I'd prefer a 900mhz transmitter, but IR is acceptable. Either the system should come with two headsets or it should be a system with a transmitter/headset with the option to add a charging dock and an additional heaset.
    My old system was a Sony which is on its last legs, and I found a replacement from another manufacturer with dual headsets but it lacks charging docks - you have to plug the heaset into the transmitter and both heasets can't be charged at once. Also, the manufacturer says not to charge a headset for more than 24 hours or you can damage the battery.
    Anyone know if Sony or someone else makes what I want?
    Solved!
    Go to Solution.

    Hi Verne,
    Sony does not have manufacture dual Wireless Headphones. You can perform an Internet search and check for any third party dual headphones.
    If my post answers your question, please mark it as an "Accepted Solution."

  • Version that will work with my system?

    OS = Windows XP Professional with (SP3)
    Processor = AMD Phenom(m) II x 4 820  (32-bit)
    3 gigs ram
    500 gig HD
    What would be the newest (full) version of Dreamweaver that would work with my system as shown above?
    I read that CS5.5 requires a 64-bit processor so I guess I have to rule that version out.

    The only version available is CS5.5 and it runs fine on Win XP.
    There's no 64 bit version of DW and nothing about that mentioned in the System Requirements
    http://www.adobe.com/products/dreamweaver/tech-specs.html
    Only After Effects and Premiere Pro are 64 bit at the moment
    http://www.adobe.com/products/dreamweaver/faq.html#64bit-support
    Download the free DW CS5.5 Trial and try DW out for 30 days (after that you have to make a purchasing decision)
    http://www.adobe.com/cfusion/tdrc/index.cfm?product=dreamweaver
    Although subscription version are now available, consider carefully if that purchasing model is suitable for your needs.
    All's well while you're paying your monthly or annual fee. When you stop paying, you cannot use the product.
    Subscription FAQ
    http://www.adobe.com/products/creativesuite/faq.html#subscriptions

Maybe you are looking for

  • How to restrict document types in hierachy

    Hi My scenario is For DIR of document type A only DIRs of document type B and C should be attached in the document hierarchy. How to restrict the user from attaching other type of documents? What will be the best solution for this scenario? Thanks in

  • Speed disappointment

    I talked my sister into getting a iMac 24" 2.16GHz. (Her first Mac) After showing her how to use it, I decided to do a test to see how much speed I would gain if I got one. I brought along a copy of an iMovie/iDVD project on a FW disk and copied the

  • Invoice for purchase that I never purchased

    I got a email today of a invoice itunes bill for bunch of Ibook's which I don't have. And one song. I am so ******. I removed my card info from the account. I also sent a email to the billing support. Pretty stupid there isn't someone you can call. I

  • Issue in Creating Vendor using the IDOC

    Hi Gurus, I have an IDOC coming from PI interface from which a vendor is to be created in ECC. I am  using the basic IDOC  type CREMAS01, the message type CREMAS and inbound function module as IDOC_INPUT_CREDIATOR.I am concern only about the Inbound

  • Image Caching

    Hi I'm trying to implement Image Caching on an Oracle XE database following Tyler Muth's blog post http://tylermuth.wordpress.com/tag/oracle-plsql-images-caching/ Has anyone managed to implement this successfully? I've run the following as sys : begi