Stock in  transit scenario

Hi all
I need to configure the stock in transit scenario,
How I know whn the Client/Another plant reach the material.
From SD Side I know that when I make the PGI,i am sending the material from our plant,
but how tho get know when the client reach it?
Thanks in advanc ad best regards
L

Hi,
As per standard process, after going out from your plant, material is termed as in transit. There is no specific way to tell when it will reach to the end client. It will only have the reach date based on the route transit time. If client or the end plant will enter the time as soon as the material reached there. then only you can know the exact time. There is various add ons with Fedex, UPS and many courier companies which also provides shipping confirmations from the client upon reaching the material.
Thanks,
Raja

Similar Messages

  • ATP for 'Stock in transit' for 3rd Party scenario

    We have a scenario:
    For warehouse replenishments an STO is created and then a delivery is subsequently created for the STO. Once the delivery has been shipped out of the manufacturing facility (post goods issued) the materials on the delivery are transferred from unrestricted-stock at the manufacturing facility to stock-in-transit at the receiving warehouse. Once the stock is in transit to the third-party warehouses, ATP should then take it into consideration when deliveries are created from the third-party warehouses to customers.
    Now how to take the ATP check for 3rd party del. into consideration for STO?
    STO document type is UD
    Goods issue movement type is 641
    Goods receipt movement type is 101

    Some useful info here..
    http://help.sap.com/saphelp_47x200/helpdata/en/2b/b22d3b1daca008e10000000a114084/frameset.htm

  • Stock in transit using purchasing cube

    Dear Friends ,
    I would like to create a key figure  Stock in transit based on My purchasing cube.
    DSO 0PUR_O02
    Cube 0PUR_C02
    Not dilivered qty. of open Purchase order is considered as stock in transit in our
    scenario.
    1) I would like to know how can we determine the open PO. According to me its simple
       open qty = PO qty - GR qty and if open qty is more then 0 then its should be considered
    open po. But in our case some time supplier give us some less qty and even we said po is
    closed. and somtime supplier give us more qty and we said po is closed.
    now please advice me how can we determine that PO is closed or not.
    regards,
    Malik

    Hi,
    You can do it, but you need to create the keyfigure, which will inclued Movement types or Process keys,
    You just see the 0TRANSSTOCK key figure in 0IC_C03 cube, which is non-cumulative keyfigure and internally having two keyfigures, so in that way first you analyze the concept behind that and do.
    Thanks
    Reddy

  • Stock in Transit

    Hi All
    Scenario
    1. Purchase order quantity 9 units
    2. GR done for 8.999 Units
    3. Stock in transit showing 0.001 units.
    4. Purchase order is still open and cannot do DC as it throws an error that quantity does not match
    5. Purchase order is still open is reports and needs to be closed.
    Please guide me on the same as to whcih Tcode and movement type can be used to settle/adjust the quantity of 0.001 units and what would be its constraints or restrictions.
    Regards,

    Hi,
    As per note no 392205 : Note 389484 makes movement types 557 and 558 available.By 557 mvt type
    excess stock in transit can be removed or  and by 558 missing stock in transit can be created.
    Now as per standard SAP The R/3 system is designed so that the stock in transit can only be posted through stock transport orders (creation during goods issue, reduction during goods receipt).
    Purchase order and material master record can have different units of measure. The purchase order is then closed when the goods issue quantity and quantity of goods received are the same in order unit. However, in the material master record, the stock in transit is managed in the base unit of measure.
    On account of system-dependent and program-internal rounding effects which cannot be avoided, the open stock in transit quantities in order unit and in base unit of measure might not balance to zero at the same time.
    I think probably this will help you in devleoping better understanding as everything is self explanatory now as per note suggested by you.
    Regards
    Ankur

  • Error: PL Stock in transit exceeded by 112 SU

    Hi all,
    While doing MIGO, I get error message while trying to post goods receipt: "PL Stock in transit exceeded by 112 SU : XXXX (Material) XXXX (Plant)  XXXX (Storage locaion)"
    I have checked in MB5T transaction but it shows - 'List contains no data'
    What can i do to solve it.
    Awaiting for kind repy.
    Thank you!!

    hi ,
    i have a similar prob:
    the scenario is as below:
    Interplant movt from 1 plant to another with stock transport order (SA)
    qty 154 ea issued at the supplying plant and shows in the stock in transit (MB5T) same 154 ea.
    but while GR i get error "PL stock exceeded by 30 ea"
    please provide me a solution.
    p.si dont want to covert error message to warning message and go ahead
    regards
    jithu.

  • VMI and  reduce Stock in Transit - what are the right methods?

    Hi Gurus,
    We are using APO system to implement VMI functionality to replenish stock at customer location.  We need to build stock in transit at customer location after PGI happens in ECC.  
    Now, stock in transit is show up in 'Stock in transit' key figure, but the question is how to reduce stock in transit once it is received at customer location.
    SAP recommends following four methods to reduce:
    http://help.sap.com/saphelp_scm2007/helpdata/en/f1/f69a3dcbcfac53e10000000a114084/frameset.htm
    1.  Goods receipt information is not sent from the customer to the vendor
    2. The open purchase order quantity is sent from the customer to the vendor
    3. A proof of delivery is sent from the customer
    4.  The stock in transit quantity is sent from the customer to the vendor
    Out of these 1 and 2 methods are feasible in our scenario.
    Please share your experience if you have used any of these methods, I want to hear from someone who implemented any of these methods before deciding on a method.
    Thanks in advance,
    Niranjan

    Dear Niranjan,
    I have implemented SCM-APO VMI using Past Releases of SCM  (version 4.1) for upto 300 Customer Sites & 500-1000 Products.
    In my experience ... this is a Big Custom Development using EDI - IDOCs / ALE wherein you Receive from Customer the Data either as "Open Orders" or  "Goods Receipt" of VMI Order at Customer Store or "In-transits" as they view it.  There is a Facility to receive them in the PROACT IDOC but you have to write IDOC FUnction Modules to post the Data to the
    VMI Planning Area as well as at Product-Location you have to Daily Delete the In-transit Order (Category EI or AH for ASN) and Upload Intransit Quantity directly into Live-Cache as a Order.  The Development is also complex as you need to Map the VMI Customer Product to the Vendor/Manufacturer's Product COdes in SCM-APO.
    I have experience implementing VMI like this several years ago ... and I am not sure if SAP SCM-APO built anything Standard for the Interface over the years.    If you are not sure get a ALE/IDOC & ABAP Consultant or  XI Consultant to work with you on the Project. 
    You can Delete In-transit Quantities by using RLCDEL  Transaction for Category EI or AH (if ASNs are used).  You need a IDOC/ALE Development to Calculate and Upload In-Transits and Update into the VMI Planning Area as well as Download to a FILE which you can use via another ABAP Development to Upload In-transits at the Product-Location (Customer) in SCM-APO.
    Hope this helps.
    Regards,
    Ambrish Mathur

  • VMI: reduce Stock in transit - what is the correct method?

    Hi Gurus,
    We are using APO/SCM  system to implement VMI functionality to replenish stock at customer location.  We need to build stock in transit at customer location after PGI happens in ECC.  
    Now, stock in transit is show up in 'Stock in transit' key figure, but the question is how to reduce stock in transit once it is received at customer location.
    SAP recommends following four methods to reduce:
    http://help.sap.com/saphelp_scm2007/helpdata/en/f1/f69a3dcbcfac53e10000000a114084/frameset.htm
    1.  Goods receipt information is not sent from the customer to the vendor
    2. The open purchase order quantity is sent from the customer to the vendor
    3. A proof of delivery is sent from the customer
    4.  The stock in transit quantity is sent from the customer to the vendor
    Out of these 1 and 2 methods are feasible in our scenario.
    Please share your experience if you have used any of these methods, I want to hear from someone who implemented any of these methods before deciding on a method.
    Thanks in advance,
    Niranjan

    After research and testing  I found second method  looks good to me. I tested in our test system, this works pretty much they way it is described in the help (link in above message) .  The issue is resolved.

  • VMI: Reduce Stock in transit - what is the right method?

    Hi Gurus,
    We are using APO/SCM  system to implement VMI functionality to replenish stock at customer location.  We need to build stock in transit at customer location after PGI happens in ECC.  
    Now, stock in transit is show up in 'Stock in transit' key figure, but the question is how to reduce stock in transit once it is received at customer location.
    SAP recommends following four methods to reduce:
    http://help.sap.com/saphelp_scm2007/helpdata/en/f1/f69a3dcbcfac53e10000000a114084/frameset.htm
    1.  Goods receipt information is not sent from the customer to the vendor
    2. The open purchase order quantity is sent from the customer to the vendor
    3. A proof of delivery is sent from the customer
    4.  The stock in transit quantity is sent from the customer to the vendor
    Out of these 1 and 2 methods are feasible in our scenario.
    Please share your experience if you have used any of these methods, I want to hear from someone who implemented any of these methods before deciding on a method.
    Thanks in advance,
    Niranjan

    hey
    I don't think this is related to XI.
    Please post it in correct forum
    https://forums.sdn.sap.com/index.jspa?categoryID=1
    Thanks
    Aamir

  • Interco- Stock in Transit

    Hi Experts
    Scenario: Intercompany STO. Shipping plant posted the Goods issue and the material is in Transit.
    Now how do i get the stock in Transit  Material cost (Std Cost) in Report.
    I used the MB5T it shows the Purchase Order Net Value only and not the STD cost of Recieving plant. MB52 not clear as well.
    Could any one advise...
    regards
    RG.

    Hi,
    Stock in transit keyfigure will display only EI orders (incase of VMI
    scenario) and AH orders (if you create inbound delivery).
    If you integrate stock,CS orders only will be available in /sapapo/RRP3.
    The root of the problem is in the setting from Intransit key figure:
    from a planning area management point of view it reflects
    the setting used in the standard SNP planning area  but the customizing
    of the category group used there is different from the one used in
    standard systems.
    Actually you added category CS there. But category CS has a atp category
    type 0, which means stocks actually. In the SNP planning books by design
    stocks are read separately from other orders because  have to be
    considered in the ATD computation.
    Therefore if you need to read orders with category CS you should
    consider it in the category group assigned to the ATD receipts key
    figure and to the stock key figure.
    This customizing could be applied at the planning area level, as
    described above or at the master location level, SNP tab.
    In this case you can specify there the category groups which have to be
    used in order to consider stocks, ATD receipts and ATD issues about all
    products assigned to the used master location. Please refer to the
    related F1 helps in order to get more information about.
    You can get more information at note 591310.
    Regards,
    Sunitha

  • STO stock in transit

    Hi,
    We have a scenario where we have 2 step STO process involving stock in transit. At the time of PGI there should be debit entry in stock in transit which is knocked off at the time of GR at receiving plant. Please suggest the OBYC configuration.

    MM records the stock as in-transit, but from the FI perspective:
    Dr.  Inventory, receiving plant
    Cr.  Inventory, shipping plant
    In PCA:
    Dr Invenotry, receiving profit center
    Cr Inventory, shipping profit center
    Dr Deliveries from other profit centers, receiving prctr (i.e., purchases)
    Cr Internal business, shipping prctr (i.e., sales)
    Dr change in stock, shipping profit center
    Cr change in stock, receiving profit center
    FI doesn't care about in-transit.  MM does, so you can see it in the various stock overview transactions.

  • Stock transport order /stock in transit

    Hello
    For a stock Transport order scenario { Recieving Plant , Delivering plant } , the documented procedure is:-
    1) stock transport order>Goods issue by delivering plant--
    >stock in transit(valuated)   -- >Unrestricted/inquality/blocked/consumption
    just sticking to the above method, how many Material documents & accounting  documents would be generated ?
    Thanks

    Hi,
    It depends on your setting, whether you go for 2-step Stock Transport or 1-step.
    If It is 1-step then 1 material document and 1 accounting document.
    This material document will be of movement type 647 and stock will not come in transit, stock will directly get moved from Supplying Plant to Receiving Plant.
    And if it is 2-step then 2 material documents and 1 accounting document.
    1 material document for GI from Supplying Plant to Stock in Transit (Movement Type - 641), and another from stock in transit to receiving plant (Movement Type - 101).
    And it will update PO History in both the cases.
    You can config. this in SPRO > MM > Purchasing > Purchase Order > Setup Stock Transport order > Assign Document Type, One-Step Procedure, Underdelivery Tolerance > here activate "One-step" indicator if you want 1-step otherwise keep blank for 2-step.

  • Stock in transit problem (351 Movement type)

     

    In standard system you have two options concerning stock transfer:
    - one step process
    - two step process
    Concerning mvt 351 scenario you can use only the two step process - please see SAP online help:
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/52/38f741a47dc517e10000000a155106/frameset.htm
    Standard SAP concept is that when posting GI the ownership of the stock changes. Of course in real life it is not (always) true because the ownership change of the goods doesn't depend (generally) on the fact the goods leave the WH or not. Ownership change is controlled by the agreement of the parties (contract, incoterms) - but sorrowfully SAP cannot manage this (maybe it would be very difficult to solve each and every case in ERP system).
    So, please check the link and choose a solution that suits your business requirement, else you have to choose a workaround or go to development.
    (E.g. you can define a "stock in transit" storage location for the supplying plant --> first you move the goods into this stock in transit storage location and when the goods arrive at receiving plant you can post them to receivng's plant storage location. Dummy solution...)
    Regards,
    Csaba

  • Stock in transit loss

    Hello All,
    Suppose i order for 100 kg material from vendor A...But wen i received the goods it is 95 kg of material...
    But i will do the invoice for full 100 kg material.
    Now somewhere i will have to adjust the 5 kg of material for accounting entries...
    So how to map this scenario in SAP..?
    How the accounting entries will be...??
    1.should i go with MB1A.mov type 561-withdrawl for scrapping-it is gng to any/gain or loss account
    2. or should i make new mov type as a stock in transit loss and connect it with new gl account as per user requirement..
    plz suggest me regarding above situations or suggest new one..
    regards
    Nainesh

    Hi,
    Do Invoice reduction.
    Use
    This function is best used for vendors that often send overpriced invoices.
    Reducing an invoice usually means more work for you. The vendor will usually have queries about why an invoice was reduced or will send an invoice for the difference.
    Before you use total-based invoice reduction, you should carefully consider:
    Which vendors you can use the total-based invoice reduction function for
    Whether you can be really sure that the difference is due to a vendor error
    Cases in which manual invoice reduction would be more appropriate
    Whether total-based acceptance would not be better than total-based invoice reduction for small differences, in cases where the costs of searching for the error are greater than the gain.
    Prerequisites
    You only use total-based invoice reduction when all of the following conditions are fulfilled:
    The invoiced amount is larger than the planned amount.
    You have not reduced the invoice manually.
    You have not yet accepted the difference in the invoice manually.
    The difference exceeds the positive small difference set in Customizing for Logistics Invoice Verification.
    An invoice reduction tolerance has been set for the vendor and company code in Customizing for Logistics Invoice Verification.
    The difference lies within the invoice reduction tolerance limits set.
    Features
    This function automatically generates a credit memo when an invoice is posted. As a result, the vendor is only paid for the amount minus the invoice reduction. The vendor receives a letter of complaint detailing why the invoice was reduced.
    This letter of complaint does not, however, contain any information on which items were reduced, since invoices are only reduced automatically at header level and not at item level.
    When an invoice is posted with total-based invoice reduction, the system posts the amount invoiced that you entered to the vendor account. In addition to the other postings, it also creates a posting line for the difference and posts it to the "invoice reduction clearing account". In addition to the invoice, the system also posts a credit memo to clear the balance on the "invoice reduction clearing account". The offsetting entry is posted to the vendor account. The invoice and credit memo together amount to the open item on the vendor account that is to be paid.
    It will solve your issue.
    Uts
    Award if helpfull

  • Stock in Transit Inventory Difference

    Hi SAP Gurus,
    We have a scenario such that, "there is some quantity of stock has been showing in Stock in transit".
    When we verify the documents(PO, Delivery) pertaining to that stock in transit, all are very old(2004) and have been archivied already.
    Now, How to reconcile the difference...?
    Please suggest.
    Rgds,
    Shravan.

    see OSS notes
    389484 - Movement types 557/558 for the stock in transit correction
    392205 - Analysis of stock in transit/correction for split valuation
    Didn't you ask this already?:
    Stock in Transit Inventory Difference

  • Stock in Transit to Unrestricted

    Hi SAP Gurus,
    Good day.
    I need your help on this issue. Here is the scenario.
    We have a custom program where it automatically creates PO to Delivery (until PGI).
    In this transaction, the user have entered a non maintained pallet. So the Delivery is created. They can be able to create the delivery, do the transfer order and picking. However, they cannot PGI. So they realized that pallet is incorrect. In VL02N, they change the pallet to a correct one and did PGI, but as Delivery date had already passed, the materials were sent from SLoc 1000 to B019, but in B019 they were kept as Stock in Transit Status.
    Do you know a way to change the status either return them to SLoc 1000 and then do the PO and Delivery again. or do you know how to change from Stck in transit to Unrestricted. Or any other way to solve the issue - to do PGI.
    I have suggested the user to cancel the delivery LT0G but as per to them, they are unable to do so. I also suggested to transfer back the stock  using LT01, still they were unable to do so. I also suggested them to do MIGO. But they were unable to do it also.
    Thank you and hoping for your response.
    Regards,
    Bluetag

    Hi
    The process should be as follows
    At supplying plant
    Create STO with ME21N
    Create deliveru with VL10B
    Pick delivery and Post goods issue
    Stock leaves supplying plant and is in 'Transit' and you will see it in MB5T with STO number.
    In receiving Plant
    GR against either STO or Outbound delivery using MIGO
    Save
    Stock moves from Transit in to Receiving plant.
    One tip
    Receive what is sent and sort out any anomolies with stock adjustments
    This keeps MB5T 'clean' which can be a pain to 'fix' when you start to get red minuses in there.
    I hope that this helps

Maybe you are looking for

  • IPhone 5 power button doesn't work

    My power button doesn't work and I still have the warranty and I wanted to know that if apple replaces my iPhone will I have to renew my contract with Verizon

  • Is there a maximum file size for Quicktime files?

    I am trying to make a Quicktime file of 40 gig size, but it keeps failing

  • Photos are fuzzy

    my photos look good on the ipad but low resolution when printed or shared. how can i change the setting to take more high resolution pictures?

  • Manufacturing with a third party, How to control cost and automate

    JDE E1 v8.12 will be upgrading to 9.0 I am new to this so if someone has ideas or point me in the right direction. You see we Order a supply of Wrappers, Trays(Boxes) and Master Shippers(Cases). This is put into inventory . We Only ship out amount ne

  • Existing Flex App With Air

    I have been working on a large Flex App using CFM as the db access layer. Essentially I understand that AIR will allow my RIA which is currently solely used in a browser run off line as a desktop app. However, my question is what's involved in modify