Sub-Contracting Reports_ Tracking of Inventory

Scenarion:-
To Send item for repair at vendor side, we prepared inventory transfer transaction from u201CTRC Warehouseu201D to u201CRestore Warehouseu201D and when material gets repaired then we booked the inventory transfer transaction from  Restore Warehouseu201D to u201CTRC Warehouseu201D.
We want to track all inventory transfer transaction which are done from u201CTRC Warehouseu201D to u201CRestore Warehouseu201D  and whether for the each inventory(from u201CTRC Warehouseu201D to u201CRestore Warehouseu201D  ) transfer we have booked corresponding return entry (from  Restore Warehouseu201D to u201CTRC Warehouseu201D).
Report Format Will be like this
Posting Date / Doc.Num/ Item code/Item Name/ Qty / Return posting Date/ Return Doc.Num/Return Qty.
If against one inventory Transfer entry from u201CTRC Warehouseu201D to u201CRestore Warehouseu201D for a particular item we have not booked the return entry then i.e from  Restore Warehouseu201D to u201CTRC Warehouseu201D then in report it should  these fields  (Return posting Date/ Return Doc.Num/Return Qty.) blank and skip to next entry and where there is match then we can  analyze  the report.
If there is any other format to analyze will be accepted.
Edited by: Paul Finneran on Oct 15, 2009 12:36 PM

As stated in your posting:
>We want to track all inventory transfer transaction which are done from u201CTRC Warehouseu201D to u201CRestore Warehouseu201D and whether for the each inventory(from u201CTRC Warehouseu201D to u201CRestore Warehouseu201D ) transfer we have booked corresponding return entry (from Restore Warehouseu201D to u201CTRC Warehouseu201D).
I do believe you only need the report that without match.  It means what you are looking for would be blank for all the last 3 fields.  Is that what you need?
Thanks,
Gordon

Similar Messages

  • Sub contracting components tracking against PO

    Hi
    Is there any way to track the components isssued against a PO.
    There are a couple if transactions to track the materials with vendor MBLB and ME2O
    But here we cant track the Materials issued against a PO.
    To be clear I want to track for the perticular PO component issues for subcontracting.
    Regards
    Rammohan.

    Hi,
    Compoenet issues to the sub contract willnot have any track of qty. with respect the PO.
    Only during the GR it will have relation with PO.
    you can issue a Part A to vendor X, qty 10 - day 1
    Part A  to same vendor X, qty 20 - day- 2
    You have Sub con Po's PO1 and PO2 with Vendor same vendor .
    Vendor can use any Part ( issues to him on day 1 or day 2)
    After the GR,the overall stock at vendor end will be perfect..
    BUu you can not relate the 1 issue to 1 receipt..
    If you have SAP CIN, any way you have to maintain the tract..and vendor also will supply along with reference..
    Thanks,
    Kumar arcot

  • Vendor+sub contract material tracking

    Dear all
    Please add your inputs for below requirements
    The users raising the PO no: 1 for some vendors, then they will despatch the ROH materials to another vendor. Then  2nd vendor will finish the materials and return back to the company. (This is 2nd PO as like job work for this vendor).
    While sending the materials at 2nd vendor location itself our company prepares the 101 movment for payment. Then again receiving at our location they are doing the 105 movement from the 2nd vendor.
    Now the thing is how to track the materails movement to various places? MBLB will not applicable. MB51 only giving the details for 1st movement. How to track the material movements from PO to final goods receipt at our location?
    Thenna
    Edited by: thenna arasu on Aug 1, 2008 2:38 PM

    Hi
    go with tcode me2o
    regards
    ram

  • Sub contract

    my client running fg sub contracting  (electro plating )cycle through the MRP
    after return from vendor with mvt type 105 (543) i check document list with MB51. i found following g/l account effects :
    SFG consumption for sub contract  account = 602026
    Gr/IR Clearing Account = 164335
    SFG-inventory account = 323055
    for sub contract account = 602130
    Inventory account = 320010
    Costs of goods mfg = 602200
    but if do whole sub contracting cycle without MRP i can see effect in following G/L a/C:
    Manual Cycle .
    Inventory account = 320010
    Gr/IR Clearing Account = 164335
    Price Differance Account = 602155
    change in stock = 603010
    Sub Contract expense = 603000
    SFG-inventory account = 323055
    SFG consumption for sub contract account = 602026
    my question is why this differance comes ?
    if i want gl accounts hit by manual process in MRP process what changes to be made ?

    Hi,
    Price diffrences arise during valuation @ GR if the material is managed at standard price in MMR.
    Also there is one more setting in customizing that for a plant that price differences should or not be posted during GR.
    spro-IMGMMInv MGmtGR--price differences for subcontracting at GR
    Regards,
    Deepak.

  • Sub Contracting Process

    my client running fg sub contracting  (electro plating )cycle through the MRP
    after return from vendor with mvt type 105 (543) i check document list with MB51. i found following g/l account effects :
    SFG consumption for sub contract  account = 602026
    Gr/IR Clearing Account = 164335
    SFG-inventory account = 323055
    for sub contract account = 602130
    Inventory account = 320010
    Costs of goods mfg = 602200
    but if do whole sub contracting cycle without MRP i can see effect in following G/L a/C:
    Manual Cycle .
    Inventory account = 320010
    Gr/IR Clearing Account = 164335
    Price Differance Account = 602155
    change in stock = 603010
    Sub Contract expense = 603000
    SFG-inventory account = 323055
    SFG consumption for sub contract account = 602026
    my question is why this differance comes ?
    if i want gl accounts hit by manual process in MRP process what changes to be made ?

    Hi
    Kindly check with the following:
    In customizing  for that plant price differences should or not be posted during GR.
    SPRO->IMG>MM>Inv MGmt>GR-->price differences for subcontracting at GR
    Thanks

  • Sub Contracting-Inventory GL shoule be P&L or Clearing Account?

    Hi,
    I am facing problem in Sub contracting. Please any one can clarify me whether Sub Contracting-Inventory GL should be P&L or Clearing Account?
    Thanks
    KB

    it should be clearing account. Because we receive the goods,These goods are need to transfer to toher party.

  • URGENT-Sub-contracting of equipment for maint.

    HI,
    I want to send a motor for maint.work to my vendor. The motor has been defined as a equipment & some parts would be replaced by new parts. How i am suppose to map the process in SAP. Some says Sub-contracting PO is to be made & Some says service PO is to be made.Which would be perfect method.
    Regards,
    Deven

    hi
    Subcontracting is nothing but you give some raw materials ,with which  vendor will make the finished product,hence on confirmation your raw materials will consume and while MIGO finished product inventory will increase
    since the above case if you create Subcontract order with respect to finished product ,your inventory level will go up ,only material issued for producing will be reduced. hence the best way is service PO,but in which equipment tracking is not possible
    regards
    thyagarajan

  • Quantity reconcilation of sub-contracting challan error

    Hi Experts,
    I am facing problem while doing Quantity reconcilation of sub-contracting challan.
    Challan material is different from material document
    Message no. 8I572
    Thanks in advance

    hi..
    please go to spro>log general>tax on goods movement>india>business transaction>subcontracting>maintain movment type group
    and maintain as given
    0001 102
    0001 122
    0001 541
    0001 544 O
    0002 542
    0002 543 O
    and
    Also This can be solved as under. ( check for following also)
    You will have to activate PO number as a required field for 541 mvmt.
    Materials Management -> Inventory Management and Physical Inventory ->
    Goods Issue / Transfer Postings -> Define Screen Layout.
    For movement type 541 the purchase order field has to be maintained as
    an optional entry or as a required entry here. (under normal condition it will be suppressed)
    This has not been done, otherwise the error message would appear as the mseg-ebeln would not hold the PO number.
    After doing this carryout a new cycle. you will not get any error.
    Edited by: Kedar Kulkarni on Nov 12, 2009 6:06 PM

  • Project Sub contracting

    Dear All,
    We are following project sub-contracting process.
    As per SAP recommendation, we have created a new storage location for vendor as XXXX u2013 Vendor storage location.
    And we are sending material to vendors with movement type 311 u2013 Q. 
    While posting material to vendor, we are able to track Purchase Order number and Vendor Code.  But we are not able to track Purchase Order Line item.
    Hence it is difficult to reconcile PO, line item wise, how much material is sent to vendor.
    Here, same material is sent to vendors in different line items of the PO.
    1. It is not possible to reference purchase order and line items, while posting the document through t code MB1B with movement type 311 Q
    Error: "Combination of movement type 311 & function selected not possible"
    2. It is not possible to add PO line item (EBELP) field for movement type 311 in t code OMJJ.
    Error: "Field EBELP is not allowed for transaction type 311.
    In such cases, I would request you to give your inputs on how to track PO line item while posting material to vendor storage location.
    Thanks & Regards,
    sap.mm.consultant

    Hello Mahesh,
    Thank you very much for your response.
    We are already maintaining Purchase Order. My question is about how to track PO line item. I have added PO number and vendor for movement type 311 but i am not able to add field (EBELP) PO line item, while posting material to vendor storage location.
    Thanks & Regards,
    sap.mm.consultant

  • Project Sub contracting - 311 Q - Message no. M7 019

    Dear All,
    We are using project sub contracting with movement type 311 Q.
    While posting stock to vendor storage location through t code MB1B, I am not able to post the stock with reference to Purchase Order.
    System is giving below error:
    Combination of movement type 311 Q and function selected not possible
    Message no. M7019
    We have maintained the movement type "311 Q", in confirguration for "Maintain Movement Type Groups" under "Subcontracting"
    and assigned the movement type group to excise grouop under "Subcontracting Attributes".
    I have searched through sdn but couldn't find any answer.
    Would request you to please help.
    Thanks & Regards,
    MP

    Hello,
    Thanks for your inputs.
    But in this case, how will I track with reference to Purchase Order, how much material i have sent. I can enter Purchase order number also in the screen layout for movement type 311.
    But still i am lossing the line item relevant details while sending material to vendor.
    Please help.
    Thanks & Regards,
    Mihir Popat

  • Freight error for Sub Contracting PO

    Dear All
    I am adding freight conditions in Sub Contracting PO. I want to add that freight value to inventory. So in Schema i have maintained account key as blank for that freight condition type. but while doing GR system is asking GL for FRN key. Why it is asking like this?
    What are the setting i have to maintain for above requirement.
    Kindly kind me.
    Shobana

    Hi,
    Even if you maintain account key, frieght value will add to the inventory  account.  You need to maintain GL for FRN, since it is automatic posting.
    NOTE: FRN is for delivery costs particularly for subcontract
    Definition:
    External service, delivery costs (FRN)
    This transaction is used for delivery costs (incidental costs of procurement) in connection with subcontract orders.
    If the account assigned here is defined as a cost element, you must specify a preliminary account assignment for the account in the table of automatic account assignment specification (Customizing for Controlling) in order to be able to post goods receipts against subcontract orders. In the standard system, cost center SC-1 is defined for this purpose.
    Regards,
    Prabu

  • Cancellation of 122 for Sub contracting PO

    Dear Sir/mam
    Child item send to vendor through 541and when Parent material is received we do migo 101 for Parent Material and stock is posted to quality,if accpeted it is in unrestricted but if rejected we post to return delivery and mvt type 122.Can i cancel the this document can i get some filed of identification that its it sub contracting PO.Problem is we have received the parent but we have send the child so if i had done 122 so child item po is open and i want to send the parent back through 57A4.So please throw some light how to track and resolve .
    regards
    kunal

    dear
    Kunal
    Lets' Understance the situation.
    You have send some material to vendor by 541(Child)
    Now when material is returned
    Assembly Number-Parent is 101
    But all sub-assemblied-child items are with 543 mvt tye.
    When you do return delivery to vendor
    that is 122 mvt type Parent item has 122 mvt but child items has 544 mvt type(Reversak of 543)
    So you can camcel the document MBST or send back material by 122 mvt (pareent +chield-544) by MBRL
    In Document geenrated it will show 122 of Parent & 544 of Chield items.
    I hope you are clear.
    Regards
    Sujit

  • Shortage qty  - sub-contract process

    hi,
    In sub-contract process:
    Vendor  suppose to return - 10 qty
    but, we received only 8 qty.
    Vendor has accepted to pay For shortage 2 qty.
    1. How to address the above scenario?. (exciseable material)
    reg
    mrs

    Dear ,
    case 1) IF GR NOT DONE YET:
    do the GR and , at the time of GR increase consumption qty.from 8 to 10.
    that means u have comsumed more than required .then raise the debit note for loss.
    reconcille the challan by the same GR doc and complete the same.
    Case 2)IF GR is allready done.
    reconcille the challan by GR document,then do 542 for remainning 2 qty.re4concille the challan by dat document.and complete the challan.
    then take a physical inventory of that material for perticular storage location and post the negative difference .syatem showa that as a loss for u then raise the debit note for the same.
    regards,
    sujit borse

  • Sub Contracting Values are not flowing in to COPA

    Hi,
    PP guy has run Sub-Contracting scenario, later when i see the postings in COPA, those are not flowing into COPA. Amount is showing only in FI.
    510085 Consumption - Subcontracting =800
    520085 Inventory Change - Subcontracting = -5800
    How to bring them into COPA report. Please advise me..
    Thanks
    KB

    Add those cost elements to the automatic account assignment table (t-code OKB9) ans click the profitability segment assignment box.  If using cost based COPA, assign these cost elements to a PA transfer structure (KEI2) so that they are assigned to the correct value field.
    thanks,

  • Sub contracting scenarios

    Hi gurus,
    I have a question on Sub contracting.
    My present scenario is---
    -I have CD which have some content in that.when I go for printing of that content,I will give that CD to the vendor and i will ask him to print 100 books.In this case the CD has to be tracked when ever this is given to the vendor for printing.
    -In sub contracting we give raw materials to the vendor.the vendor converts the raw material in to finished good.
    Here in my scenario if I treat the CD as raw material then at the time of goods reciept i will recieve the fininshed goods as printed books and what will happen about the CD.My requirement is to get back the CD aswell and the value of that cd has to be updated in the GL A/C.
    Can any body suggest me which scenario it will work and tell me the process stepts.
    Sri devi.

    step1 goto tcode cs01 and create a BOM material will be cd only as parent as well child one.
    step2 create info record for sub contracting category in me11
    step3 create Po with 2 line item 1 for cd item category L
    and 2nd for the service you are incurring.
    for accounting u need to test it your self  . if you feel that 2nd line item is not required then u can skip this one.
    step4 issue cd to vendor
    step 5 do GR against this PO
    please run and test scenerio to get an insight
    well i am also learning sap..............

Maybe you are looking for

  • How to make a form to submit on the dropdown selection?

    Hi I have a form(jsp)that needs to call a servlet when a value is selected in the dropdown list. Does anyone have an idea on how that can be done? Thank you!

  • Pdf file in my nokia 5233

    pdf file in not working my phone since i updated it

  • Disable Second Monitor Mac Pro

    I have a nice new Mac Pro system with the standard Nvidia 7300 Video card. I connected a second dipslay to it today to watch some videos on my 32" HDTV. However I noticed that the video really suffers when both displays are active in extend mode. The

  • Role Authorization using DSO

    Hello Gurus, I have a requirement, where some Roles have to be assigned to some roles only for some period. what i did is - built a DSO with direct update from a table. - the super user can maintain this table for the 2 fields Role             Status

  • SQL Server 2014 installation using command line fails to remove the extraction folder when complete

    We need to install SQL Server 2014 Express in /QS mode (shows progress through the UI, but does not accept any input or show any error messages) as my setup-Prerequisite. I passed my installation parameters to SQLEXPRWT_x64_ENU.exe, when I ran my app