Subcontracting with BOM

Dear all,
Can anyone tell me the method of creating PO with BOM
i mean what are the additional fields should be maintained in Material Master???
How to create Material BOM using Tcode CS01??
Is CS01 Tcode is for to create for maintaining Bill of Materials for a Finished product??
pls tell me in detail step by step to Create BOM and subcontracting BOM
Thanks a lot in advance??

Sub Contracting Cycle
(1) You have a material that can be procured externally, and you have maintained BOM with components. Any waste generated and received during subcontracting process can be maintained as component with negative quantity.
(2) You create a subcontracting PO (PO with Item Category L). You can also maintain Purchase Info Record for Subcontract category for material and subcontractor.
(3) You make a transfer posting to issue components for SC PO. Material is sent to subcontractor. As material remains under your ownership, system does not make any value entry. But quantity is shown as "Material Provided to Vendor"
(4) You receive finished material against SC-PO. You also specify components consumed in manufacturing of finished goods. Additionally, if you have negative components in BOM, now you'll also receive subcontracting by-products. There are three events, so three accounting entries are generated:
DR FG Stock/ SC By-Product Stock
CR Change in Stock (FG/ SC By-Product )
(for finished goods received)
DR Subcontracting Charges
CR GR/IR Clg
(for moneys payable to Subcontractor)
DR Consumption (Components)
CR Change in Stock (FG/ SC By-Product )
(material provided to Vendor is now charged to expense)
(5) You do the IV for SC Invoice, and the process is complete.
Process of Subcontract in MM
Sub-contract business process:
You want to buy material from the supplier (processed material/ assembled item) , but for some reason (quality of certain item / price ) you will give some component to vendor .
Vendor shall process the item / use the item provided & supply the final item.
SAP process:
1.Create the finished goods material code.
2.Maintain the BOM for the material.
3.Create PO with item category as "L" .
4.Issue material to vendor with movement type 541
5.Receive the material against the PO with movement type 101.
6.MIRO to account for vendor's invoice for the service charge& material used by him.
Can anybody tell me how a process has to be given to subcontracting?
Suppose, I have 3 operations 1)weaving 2)dyeing 3)cutting & packing
if no 2 process (i.e Dyeing) has to be given to subcontracting, what process should i follow ?
The following process to be followed for subcontracting.
1. Item code(material master) to be created at the stage of before dyeing.
2. Item code(material master) to be created after Dyeing as subcontracted item.(F30)
3. Bill of material to becreated for the material(2) calling for material(1)
4. Inforecord and source list to be created for material(2) with the corresponding vendor
5. PO to be released for material (2)
6.Along with PO the material(1) to be issued to vendor
7.On receipt of material when GR is made the stock with vendor will get updated.
How to Create a Subcontract Order?
To create a subcontract order, proceed as follows:
Enter the material you want to order and the item category for subcontracting (L) in the order item.
Press ENTER to display the screen for component processing.
Enter the components that the vendor requires to manufacture the product.
Please note:
– You do not need to enter the date required for the components. This date is proposed by the system when you press ENTER.
It is calculated as follows:
Delivery date of the item - Planned delivery time
– If you do not want the quantity of the components to be changed if the order quantity of the end product is altered, set the indicator Fixed quantity (column F).
– You can determine whether the components are available on the date required by selecting Edit -> Availability check.
If you entered a bill of material as the material in the subcontract order, the components are created automatically.
If you want to determine the components in the bill of material at a later date (for example, if the bill of material is subsequently changed), choose Item -> Component -> New BOM explosion. The existing components are deleted and redetermined in the bill of material.
Save the purchase order.
When you print the purchase order, the components are printed per order item
Subcontracting - Key Points
Special Procurement Process.
Item category: L
Order type: NB
In info record vendor should be maintained as subcontractor.
Vendor (Subcontractor) receives the components used to manufacture a finished product directly from your company or through third party.
Your company should place a purchase order for the finished product. In this manually you can enter the required individual components or it can be determined via the explosion of BOM (if exists).
Stock check at vendor level: ME2O
Company stock check: MMBE
GR for individual components through movement type: 501 or 561 (if with out PO or without reference).
GI to subcontracting vendor: through movement type 541.
GR from sub contracting vendor: through movement type: 101
Movement type 543 is displayed to cancel the material cost account.
If the subcontracting order has to be generated through materials planning,the special procurement key has to be set in MRP 2 screen.
- To create the Subcon Info Record : Tcode ME11 - Info Category - Click Subcontracting
- To create Material BOM : Tcode CS01
- With the Info and Material Setup, you can then create the Purchase Order in Tcode ME21N
Regards
Ravi

Similar Messages

  • PO with BOM

    Hi everyone, pls. I need your advice related with PO with BOM.
    I explain the process:
    I always buy a kit containing 350 items, so the PO have only 1 ítem because the manufacturer bills 1 item, but the GR have to be for 350 items. After GR I have to assemble the kit. This process it´s related with motorcycle production.
    I trie to use a PO with item cat. L but before MIGO I have to do ME2O to send materials in subcontracting, so this process is similar to subcontracting but is not the same.
    Thanks for your cooperation.
    Regards.

    Sorry, I think I misunderstood your question. The kit contains not 350 pcs but 350 items (different components).
    In SAP Retail you can use the structured article scenario.
    If you don't use IS Retail you can still have one item on the PO. After GR you can split it into components (e.g. MB1A + 201 for the main item and MB1A+202 for the compoenents - you can of course automize this via development that these technical bookings should be triggered by the GR).
    But sorrowfully standard SAP cannot handle BOm on PO except subcontracting and IS Retail...(as far as I know)
    (More exactly: IS Retail structured article means an additional movement, so it's not really BOM on the PO.)
    Edited by: Csaba Szommer on Jul 7, 2011 9:34 PM

  • PS subcontracting with external activity

    Hi,
    I have a couple of questions about "PS subcontracting with external activity" I have not found any information about this for PS subcon flow, I was looking for a subcon PS Wiki but no succeed.
    The scenario is to use a  external activity to a subcontractor and put the material components to deliver in the  external activity and check the subcon check box. Then use the valuated project stock for holding the materials.
    For material components there is an option in tab "Proc. Param" and fiel "Mat. Prov. Ind." = "Material Provision Indicator", do you know if this option can be use or be available in PS? This field is grey so I can not do anything with it, so my guess is that option use only by a BOM, could you confirm that for me?
    Right now I have a problem in the system so I can not save a project when creating a external activity and use the subcon check box, this is at OSS right now. But I was wondering if I put the material components in a external activity, how will it be represented in the PO?
    Will it be only one item in the PO, the service from the external activity? and inside this item will hold all my material components? this can be found in tab "Material data" -> "Components".
    Please share if you have some information about this,
    Regards
    Jose
    PS Note that this scenario is not a MM subcon

    abdul,
    I'm talking what you can do in the system, there is 3 posibilities I have in mind:
    Alternative 1 
    Is when I will send all the parts, thats right separated parts to be one. The material which will be the final material, is not in my stock/company. It is a new material Im manufacturing with the help of a subcontractor.
    In PS I want to create a subcontracting external activity, create a PR from PS, create a PO and deliver it to the receiver in other words the subcontractor who will put it together to the final material.
    For this alternative I think I have to create the material which the subcontractor will put together and have it as a head material in a BOM. The BOM will represent the parts Im sending for assembly, so when the material is deliver back to me, I will do a goods receipt of the head material.
    My question is in this if I have thought this right, if you have experience of this please contact me.
    Alternative 2
    Is when I will send a existing material and all the parts which will be use to maintain/repair this particular material from my stock/company to a subcontractor who will do the work. This material will have the same material no. when I do the goods receipt.
    In PS I want to create a subcontracting external activity, create a PR from PS, create a PO and deliver it to the receiver in other words the subcontractor who will maintain/repair the material.
    For this alternative I think I can use a BOM, create a BOM of this existing material which will be maintain/repair with the parts I will send.
    My question is in this if I have thought this right, if you have experience of this please contact me.
    Alternative 3
    This alternative is almost the same as alternative 2 with the exception that the material Im sending will change the material no when its back from the subcontractor. So I will send a existing material and all the parts which will be use to maintain/repair this particular material from my stock/company to a subcontractor who will do the work. This material will get a new material no. when I do the goods receipt.
    In PS I want to create a subcontracting external activity, create a PR from PS, create a PO and deliver it to the receiver in other words the subcontractor who will maintain/repair the material.
    For this alternative I think I can use a BOM, create a BOM of this existing material which will be maintain/repair with the parts I will send. Then I have to put the new material in my external activity as a material component with negative quantity as part of the subcontracting delivery
    My question is in this if I have thought this right, if you have experience of this please contact me.
    I hope my question is now clear for you, we are using the defence and aero solution so what I know I do can use the subcontracting with valuated project stock

  • Subcontracting with delivery

    Hi,
    Can anybody send me step by step configuration of subcontracting with delivery to my mail id:[email protected]
    The following is my scenario.
    We are sending raw materials to one vendor in batches.And in turn that vendor will send back the finished goods to the company.It is an urgent please.
    Thanks in advance
    kumar
    Message was edited by:
            MANUPATI KUMAR

    Hi,
    First Create BOM in Transaction code: CS01, for your Finished product which you want to procure from the SC Vendor........in items you can give the Raw materials you are providing to SC Vendor.....Very Importanly, for the component you want to send to SC Vendor also should have the Sales view....then only the Shipping point determination and all takes place...
    Then in Transaction code ME11, create Sub Contracting Inforecord
    Then in OLME-->Purchase Order>Set up Sub Contract Order--
    > For your Plant from where you are shipping the material to SC Vendor,  Assign Delivery type LB....
    Then for your Suppling Plant Sales Area, Create one Customer master and in that customer master assign your SC Vendor in General Data->Control Data Tab>In Vendor Field  and In Sales Area Data-.> Shipping Data tab--
    >Maintain entries in  Delivery Priority,Shipping Conditions,Delivering Plant fields.
    Then Create SC Purchase Order with Item catogary "L"....In Item details--->Material Data Tab--
    .>Components,  you can view the details of the material you have to send to SC Vendor.... then save the PO
    Then Goto, Transaction Code, ME2O, choose the component and choose create Delivery....then Delivery no will be created.....then you goto VL02n and do the PGI...The components will be automatically transferred to SC Vendor in  541 movement type...
    After completion of work, you can do GR Normally...
    Hope I have explained in detailed manner
    Reward if useful
    Regards
    S.Baskaran

  • Subcontracting with slaes order

    hi i want to know
    how can we do the subcontracting with sales order
    i got a process using 311 e movemnt when i search on SDN
    plz let me know if this process is correct how can i  have subcon challan
    Subcontracting scenario(Sale Order wise)
    Subcontracting For Sales order.
    Subcontract Account assigned PO
    how can i create storage loc as vendor
    plz help
    regards
    raj

    Hi,
    Subcontracting for Project Stock: -
    Purpose: - Subcontracting is also possible in conjunction with Project stocks. The subcontracting orders are account-assigned to a Project. Thus, the components are not transferred (using a transfer posting) to the "stock of material provided to vendor" but are directly withdrawn from the Project stock the time of the goods receipt. The material manufactured is also posted to the Project stock.
    The cost of subcontracting is then debited to the Project.
    Since the components are not transferred to the "stock of material provided to vendor", it is recommended that you use a transfer posting to transfer the provided components to a new storage location (for example, 9999). This enables you to obtain an overview of those stocks that are physically located at the subcontractor. This information is particularly important when you carry out a physical inventory of the Project stocks.
    Features: -
    Withdrawal from Stock of Mat. Provided for Project: -
    For components that are managed in Project stock, you can define whether the components are to be withdrawn directly from each Project or from the stock of material provided to vendor. You manage this via the dependent requirements indicator for individual customer requirements and collective requirements (MARC-SBDKZ).
    You can maintain this indicator in the following places:
    In the MRP view of the material master record (MRP 4)
    In the explosion types for the BOM item (in Customizing for Production in the step Basic Data -> Bill of Material -> Item Data -> Define explosion types)
    Configuring the explosion types has priority over the configuration in Inventory Management.
    If the indicator is set at Collective requirements only (2), the materials are withdrawn from the stock of material provided to vendor. If this indicator is set any other way, the system withdraws materials from Project stock.
    Regarding Subcontracting Challan: -
    Go to OMJJ, select the field "movement type" and press enter
    Enter movement type "311" and double click on "Field selection (Enjoy)" under Dialog Structure on left side.
    here "New Entries" and add field "LIFNR" (Vendor)
    Now in MIGO, at the time of transfer posting of components using movement type "311 Q", specify the vendor code of the Subcontracting PO (i.e. Subcontractor)
    Now create Subcontracting Challan in J1IF01 for material document of 311 Q movement type.
    Also check in SPRO > Logistics - General > Tax on Goods Movements > India > Business Transactions > Subcontracting > Maintain Movement Type Groups > here for Movement Type Group "0001", Movement Type "311 Q" should be maintained.
    Then do GR against PO and refer the Subcontracting Challan here.
    And then do reconciliation in J1IFQ for the GR Document against Subcontracting Challan.
    Also check in SPRO > Logistics - General > Tax on Goods Movements > India > Business Transactions > Subcontracting > Maintain Movement Type Groups > here for Movement Type Group "0002", Movement Type "543 Q" should be maintained.
    Follow the below mentioned process;
    Process Steps: -
    1. OX09 - Create Storage Location as "9999" for Subcontractor Location
    2. MB1B - Do Transfer Posting of material from RM Warehouse to this Storage Location via movement type "311 Q" (Instead of doing 541)
    3. Now go to J1IF01 - here use material document of movement type "311 Q" and create Subcontracting challan. (If required)
    Prerequisite: - In SPRO > Logistics - General > Tax on Goods Movements > India > Business Transactions > Subcontracting > Maintain Movement Type Groups > Here for Movement Type Group "0001" (For issues), maintain movement type "311 Q" also along with 541.
    Rest all, refer subcontracting challan during GR and then reconciliation and completion, etc... will be same as usual.
    Note: - At the time of GR, consume components from storage location "9999" (for 543 movement type)

  • PO  with BOM component issue?

    Dear Gurus,
    Po updation and creation will go to third party system.
    In PO, the material X carries Y BOM component with different grid sizes like 26 26, 26, 28 etc...
    But, in PO, I am not finding any of these grid sizes coz these r not subcontracting...
    The idoc carries PO informations also BOm component.
    But, how third party system gets these grid sizes value which are maintained in BOm componet i.e.; Y.
    Please help..

    Hi,
    Check on it:-
    Purchase Order With BOM (Components)
    Table for BOM components of Purchase Order
    pherasath

  • Error in Rush Order type with BOM item!!

    Hello,
    I am facing a very strange error while creating a rush Order with BOM item.
    System Error:
    1. No item category available (Table T184 SO ERLA TAQ).
    I except the error. I get next error as
    2. Structure explosion for item 000010 is not possible.
    After this BOM explodes with only first 2 Sub Items ( Item cat for main item is determind as TAQ and Sub Items as TAE) , where as the complete BOM has 7 Sub items.
    I have made the required configs in item cat determination in T184 table for order type SO, as follows.
    SO ERLA - TAQ for Main Item of the BOM
    SO NORM TAQ TAE for the Sub Item of the BOM
    The same item (BOM ) works very well in OR/BV kind of sales order types, by exploding the BOM to full level(i.e all the 7 sub items are determined).
    Has any one come across such an issue. Please let me know what could be the solution?
    Thanks in adv,
    Shripad

    Hi,
    Thanks,
    In vov7 for TAQ Item Cat. the structure scope is maintained as 'A'. And that's the reason for Standard order 'OR' , the BOM is exploding properly.
    It is only with Rush Order , the BOM is not exploding correctly.
    BR
    Shripad

  • Problem in Delivery with BOM

    Dear Experts,
    I have problem with delivery with BOM
    The steps are:
    1. I create Sale Order with BOM A (which consist of material AA 1 PC, AB 1 PC and AC 1 PC) 75 ST
        So Sale order shows:
        Item           Material         Qty    Unit
        10     A     75      ST
        20     AA                75      PC
        30     AB     75      PC
        40     AC                75      PC
    2. I create Delivery reference sale order from 1 so Delivery will be:
        Item           Material         Qty    Unit
        10     A     75      ST
        20     AA                75      PC
        30     AB     75      PC
        40     AC                75      PC
        But I want to delivery only 25 ST so I change quantity in Item 10 from 75 to 25 but the system show:
        Item           Material         Qty           Unit
        10     A     25             ST
        20     AA                25             PC
        30     AB     25.004      PC
        40     AC                25             PC
    What happen with Item 30 why system determine to 25.004. Please help me

    Hi,
    if you want change the item quanty like TAP or TAN plz goto VOV7 select TAP Item category  under bill of material/configuration Maintainstructure scope A and application SD01 put the check mark for *manual alternativs  and same to TAN also
    Your Itemcategory determination should be IN VOV4
    QT-LUMF--TAP
    QT-NORM-TAP-AGN
    If your using BOM item categories is showing gray mode only.
    regards,
    sreenivas

  • Problem with BOM (packaging material) in order change

    Hi Gurus,
    In my b2b shop, i have created an order with BOM material and that order contains one main material and a sub item material after update or order. When i open the same order and click on change, when i click on update, a new sub item is getting added as a main item.
    Details:
    item 10 is 12007492 (main material)
    item 20 is 12007491(sub item for the main material)
    when i click on update,again one more sub item 30 is getting added.
    When i check the logs, all the items guids are getting passed to IN of crm_isa_basket_changeitems functions module. But when check it in runtime using external debuggin mode, the sub item guid is blank.
    Then the main material is again getting exploded and the sub item is coming at item 20 and actual sub item before update is shifting to item 30 as new item.
    Please help me in this regard why it is happening like this.
    Thank you
    Lakshman

    Hello Lakshman,
    I had the same issue, however my backend system was ERP and not CRM. In any case, the logic might be the same.
    When a BOM material is sent to the backend system for simulation/save, only the header needs to be sent. By this, backend system will explode the material and send 2 items back. I guess in your case, ISA is sending both items to SAP and that is the reason you are getting back 3 items.
    Simplest approach is to write some logic in your backend class to avoid sending this subitem to SAP. You can achieve this by manupulating the items table sent to SAP
    Suppose salesDoc is the ISA document and itemsTable is the JCO table that is sent to SAP as a table parameter:
                   ItemList itemList = salesDoc.getItems();
                   for (Iterator iter = itemList.iterator(); iter.hasNext();) {
                        ItemSalesDoc itemSalesDoc = (ItemSalesDoc) iter.next();
                        TechKey parentKey = itemSalesDoc.getParentId();
                        if(null!=parentKey){
                             if (!parentKey.getIdAsString().equalsIgnoreCase("")) {
                                //Here remove it from the tables parameter which is sent to SAP
                                               itemsTable.deleteRow(i);
    I am not too sure how it would work for CRM, but works in ERP.
    Pradeep

  • MRP run for header material with bom usage-3

    Dear All,
    We have header material with bom usage-3.We maintain the stock at child components only ,not at header
    I have created the planned independent requirement for header material.I have created a sales order but sales order is not shown in md04.
    What can be the further setting  I am missing for mrp run of above scenario.
    with regards,
    pradeep

    Dear ,
    Couple of checks points for you :
    1.Check the material master Sales Org Veie-Item Categoery .As you have mentioned Item Categoery -TAQ which is not relevent for requirement planning throgh schedule line category -CT ( CT means there will not be any inventory or good movement and requirement will not be passed for MRP ) .Only CP -line item categoery does requirement passing through MRP and it will show u in MD04. So the summery is if you want to generate an MTO order for the same FG material , you should matian the Sales Line item categoery as MTO in sales Org View and it will pop up in VA01 whiel logging Sales Order .
    Generally , TAQ item categoery are used in Project Billing or Delivery .ok  and they will not be having any availabilit check so it KP ( no check ) .
    But for MTO order , you should have availablty chek 02/01 in MRP3 view and also MTO Sales Item categoery .
    Based on the above information logg an sales order , release credit chek in VKM3, SAVE and check in MD04.
    Create PIR in MD61 and Run MRP on the both cases .I have tested its working .but noit with TAQ item categoery ok
    2.Why do you need to create Sales Order for dependent Item-Y because it will be in X-BOM item  ? Make sure that Y- should have Sales Item categoery in material master -MM02-Sales Org View as NORM item .If you really want to create sale sorder for this item , it should TAN or NORM .
    3.Other PIR detail is fine .
    Try and revert back
    Regards
    JH

  • BAPI_SALESORDER_CREATEFROMDAT2 with BOM

    Hi,
    currently I'm using the BAPI_SALESORDER_CREATEFROMDAT2 to create sales order via .NET, it works beautifully when the materials used are not BOM. However, when I test the BAPI out with BOM materials, it does not get exploded.
    Please help. Thanks.
    Regards,
    Norman

    Hi Maxim,
    thanks for the replay. But was looking through the notes, still don't understand what I need to do. I tested the BAPI via ABAP program, it works fine. The BOM get exploded as expected. However, when I try it via .NET program, it did not work.
    BTW, what's configuration? Any idea what are the data I need to put in to make the BAPI work with BOM?
    Regards,
    Norman

  • UTF-8 files with BOM chrashes DOMParser?

    Hi.
    We are storing XML-documents in an 8i databse with UTF-8 encoding (in CLOBS).
    Problem: If the Unicode XML-document contains a BOM the oracle.xml.parser.v2.DOMParser's
    parse()-method throws an exception.
    I get the following output when using the ParseXMLFromURL.java class supplied in JDeveloper 3.2 samples directory:
    Sample output >>>>
    System Output: XML parse error in file http://localhost/UTF-8_With_BOM.xml
    System Output: at line 1, character 1
    System Output: Start of root element expected.
    <<<<<<< Sample output
    If I change the XML-file not to include a BOM the parser works fine.
    (I set/unset the BOM using EmEditor from http://www.emurasoft.com/ if you'd like to try for yourselves).
    To me it looks like DOMParser interprets the BOM at the start of the XML-file as XML-content instead of a Unicode signature.
    IE 5.5 can handle both formats, shouldn't DOMParse also be able to handle that?
    Any ideas how I can get DOMParse to work with UTF-8(BOM) XML-files?
    Regards,
    Jan-Erik
    Sample XML:
    <?xml version="1.0" encoding='UTF-8'?>
    <newsdoc>
    <news>
    <newstitle>
    Document contains no BOM
    </newstitle>
    <introduction>
    See http://www.unicode.org/unicode/faq/utf_bom.html for info on BOM
    </introduction>
    </news>
    </newsdoc>
    null

    I have the same problem when trying to store UTF-8 encoded XML files with BOM marks in iFS version 1.1.9.0.7.
    The database is 8.1.7.1.1 created with UTF-8 charset.
    I have loaded the XDK for PLSQL 9.0.2.0.0A into the database and replaced the original %ORACLE_HOME%\lib\xmlparserv2.jar with the one distributed in this XDK.
    I get the following error message:
    Wed Aug 01 10:10:06 GMT+02:00 2001: \public\CV-Bank\CV_Patrik_Johansson_intDTD_BOM.xml:
    oracle.ifs.common.IfsException: IFS-12608: Error while pre-parsing with the SAXParser: at line (1), column (1): oracle.xml.parser.v2.XMLParseException: Start of root element expected.
    at oracle.ifs.beans.parsers.IfsXmlParser.preParse(IfsXmlParser.java, Compiled Code)
    at java.lang.Exception.<init>(Exception.java, Compiled Code)
    at oracle.ifs.common.IfsException.<init>(IfsException.java, Compiled Code)
    at oracle.ifs.common.IfsException.<init>(IfsException.java, Compiled Code)
    at oracle.ifs.beans.parsers.IfsXmlParser.preParse(IfsXmlParser.java, Compiled Code)
    at oracle.ifs.beans.parsers.IfsXmlParser.getParserName(IfsXmlParser.java, Compiled Code)
    at oracle.ifs.beans.parsers.IfsXmlParser.parse(IfsXmlParser.java, Compiled Code)
    at oracle.ifs.beans.parsers.IfsXmlParser.parse(IfsXmlParser.java, Compiled Code)
    at oracle.ifs.utils.common.ParserHelper.parseExistingDocument(ParserHelper.java, Compiled Code)
    at oracle.ifs.protocols.ntfs.server.FileProxy.parseFile(FileProxy.java, Compiled Code)
    at oracle.ifs.protocols.ntfs.server.FileProxy.cleanupFile(FileProxy.java, Compiled Code)
    at oracle.ifs.protocols.ntfs.server.FileProxy.runFileProxy(Native Method)
    at oracle.ifs.protocols.ntfs.server.FileProxy.run(FileProxy.java, Compiled Code)
    This is a serious problem since we use an XML editor that adds BOM's.
    Regards
    Patrik Johansson

  • J1IS in subcontracting with full payment of excise duty

    hi
    Can u tell me please
    In subcontracting with full payment of excise duty I have created PO,sent material to stock provided to vendor (541).while creating outgoing excise invoice with referance to material doc.(MATD)
    i am getting following error.
    GL account has not been assigned for MSUSP in customization
    Message no. 8I447
    Diagnosis
          GL account has not been assigned for the excise a/c in customization
    I am not getting where to assign G/L
    Reg
    Roc

    hi
    please check this customization setting
    Logistics - General --> Tax on Goods Movements --> India -->Account Determination
    Specify Excise Accounts per Excise Transaction &
    Specify G/L Accounts per Excise Transaction

  • Subcontracting with full payment of excise duty

    Hello friends,
    Can u plz give the complete configuration details for setting up Subcontracting with full payment of excise duty, Cenvat, Edcess.
    Purushotham

    Hi,
    Process Flow for Sub contracting with Excise duty
    1)The purchasing clerk creates a subcontract order for the subcontractor’s srvices.
    2)The warehouseman creates a transfer posting for the materials that you want to send to the subcontractor.
    3)The excise clerk creates an outgoing excise invoice for the materials.
    4)You send the materials to the subcontractor, together with the excise invoice.
    5)The subcontractor processes the materials and returns them to you, together with another excise invoice.
    6)The excise clerk captures the subcontractor’s excise invoice, using the purchase order as the reference document.
    7)The warehouseman enters the goods receipt.
    8)The excise supervisor posts excise invoice.
    The accounts payable clerk posts the subcontractor’s invoice.
    For this one only u require Account dtermination for ETT for OTHER in Logistic general-Tax on goods movement-India-Account determianation.
    Raghu

  • Subcontract with full payment of excise duty

    hi gurus
    Can any one provide me itutor link of subcontract with full payment of excise duty,import cycle,import under custom bonded ware house
    Thanks in advance
    Roc

    hi
    This is a subcontracting under full payment of duty scenario.
    Refer this link
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/09/ebf138cdd78a4be10000000a114084/frameset.htm
    Subcontracting Under Full Payment of Duty
    Purpose
    This procedure illustrates how you use the system to send materials to your subcontractors for processing using normal excise invoices.
    Prerequisites
    You have created a condition type for manually entering excise duty in the subcontract order. In the standard system, you can use condition type JEXC, maintain in pricing procedure.
    Process Flow...
    1. Create a
    tract order for the subcontractoru2019s services.Enter excise manually in the condition type JEXC & take a tax code for VAT calculation.
    2. Do the transfer posting for the materials that you want to send to the subcontractor.
    3. Create an outgoing excise invoice for the materials by J1IS & J1IV.
    4. You send the materials to the subcontractor, together with the excise invoice.
    5. The subcontractor processes the materials and returns them to you, together with another excise invoice.
    6. Captures the subcontractoru2019s excise invoice, using the purchase order as the reference document.
    7. Do the goods receipt & refer excise invoice in excsie tab.
    8. Posts excise invoice.
    9. The accounts payable clerk posts the subcontractoru2019s invoice.
    for imports
    Import scenario
    To map Import procedure into SAP , follow the following steps :
    1.Create material master of import goods.
    2.Create vendor master record of import vendor and Customs clearing vendor.
    3.Maintain CIN settings.
    4.Maintain J1id.
    5.Maintain Pricing procedure SAP standard JIMPOR..,maintain required conditions..JCDB,JCV1...
    6.Assign the schema to respective import vendor in Purchasing view of VMR.
    7.Create import PO ,check in conditions of JCDB, JCV1 the customs clearing vendor(Indian vendor) and percentage is assigned..This can be done by In condition tab select condtion then click on display,then enter.
    Save the PO.
    8.MIRO --Capture Bill Of Entry.(Commercial Invoice No.,).Customs clearing first .Here CVD will b converted to BED.
    9.Capture Excisse invoice--j1iex.
    10.MIGO.
    12.Post Excise Invoice.
    13.MIRO...Payment to vendor(import vendor)
    http://help.sap.com/erp2005_ehp_01/helpdata/en/95/3ca40a110511d4b5ae006094b9ec21/frameset.htm
    regards
    kunal
    award if helpful