Hello All
         I am having a FG under which there are two raw materials ROH1 & ROH2, MRP type for FG & ROH1 is PD & lot size EX, MRP type for ROH2 is VB & lot size HB. When am running Single-Item-Multilevel MRP for FG (using txn MD02) system is creating purchase requisition for ROH2 as well which shall not be the case as its MRP type is VB (Manual Planning).
        Looking forward to your valuable inputs for resolving this issue.
Regards,
J K Tharwani

Thanks for your inputs
         There is stock of ROH2 above the reorder point still the system is generating purchase requisition after I run the MRP for FG, I would like to inform you that I am running MRP of the FG against Customer independent requirement (Sales Order), am using strategy 50(MTO) for FG.
         I also checked the similar scenario with another FG but i kept strategy as 40(MTS) for it, & when am running the MRP against independent requirement of FG with 40 strategy am not getting any purchase requisition for ROH2 (having MRP type VB & lot size HB).
        Can you please make me understand this behaviour of the systtem. Again looking forward to your valuable inputs.
Regards,
J K Tharwani

Similar Messages

  • Max Number of Procurement Proposal for a date

    We have scenario where a user has changed fixed lot size for a material 11,70,000 to 1 Pc. As result more than 2 Million Purchase requisitions got created by MRP. Is there any standard config settings, where we can maintain max number of procurement proposal for given date or demand. So that we can prevent such occurances in future.

    Hello Amit.
    The materials planning creates a large number of order proposals in the amount of the fixed lot size for this one request for a fixed lot size (lot-sizing procedure 'FX') with a large number of requests and a small number of fixed lot sizes.
    In Customizing for the plant parameters of materials planning (transaction OPPQ, table T399D) you can set a parameter for the maximum number of order proposals that are created by materials planning for a requirements date.
    The materials planning of this material terminates regularly if the maximum number is exceeded. An error document with error message E098 is generated. This way you can prevent that the MRP run terminates if the lot-sizing procedure is set unfavorably.
    Best Regards,
    R.Brahmankar

  • Purchase Order is generated after MRP for Material with MRP Type ND

    Hi Everyone,
    Material type := HAWA
    My material procurement type = F i.e. External Procurement.
    MRP Type = ND in Production server , and VB in Quality
    Lot Size = EX
    Material Status :- 15 Pre-release both for Quality and production server
    The Material is bulk material and bulk material indicator is set.
    Purchasing View is also maintained for the same.
    Planning Strat = Z5 Company specific
    Special procurement key:- Z7 Company specific
    I am running MD02 with following parameters.
    Create Pur Req =1, PR
    Create MRP List = 1, MRP List
    Delivery Schedule = 3, Schedule Lines
    Planning Mode = 2 Re- Explode BOM & Routing
    Scheduling = 1
    Issue:
    After MRP run, system is  generating PR, Though with MRP type ND purchase requisition should not be generated.
    Observation:- Looks like there is inconsistency of material date in Quality and production server.
    When I tried to run the planning , The Error message was generated"Material status is set to pre- release.
    After changing the material status to 20 (Active ) , when we run the MRP , The error message is generated "Material is not planned automatically "
    We havent been able to locate the root cause so far
    Please guide us
    Thanks in Advance,
    Ayaz
    Edited by: Ayaz Alam Khan on Feb 16, 2011 2:41 PM

    IF the material is ND, system won't Run MRP for the material
    Observation:- Looks like there is inconsistency of material date in Quality and production server.
    There is no link
    When I tried to run the planning , The Error message was generated"Material status is set to pre- release.After changing the material status to 20 (Active ) , when we run the MRP , The error message is generated "Material is not planned automatically "
    system will read the X plant  material status or plant specific material status first and then only system will read MRP type

  • MRP FOR CBP MATERIALS- MRP TYPE 'VB', IN MD01

    Dear PP Gurus,
    My client wants to run MRP for consumption based planning materials (MRP type: VB), for there individual plants. For this I have suggested MD01 for planning in the perticuler plant by using the user exit available in the screen. But then also, after MRP run system is plannig all the materials which have MRP type PD as well as VB.
    The user exit parameters are
    User Exit Key: 002 (Consider MRP Controller for CBP)
    User Exit Parameters : CBP
    "CBP" is my MRP controller for materials which have MRP type 'VB'.
    Pl suggest me what & where is the problem?
    Thanks,
    Regards,
    Sachin Patil.

    Dear,
    It is possible through
    User Exit: M61X000.
    You need to maintain MRP group assign it to the VB type material then go ahead.
    For details please refer this thread,
    Re: mass MRP run
    Regards,
    R.Brahmankar

  • Help needed for creating 1 invoice for 2 different material types.

    Dear, Gurus
    I really need help here I have spent 3 days cracking my head trying to solve the problem. Problem is client was creating invoice with reference to order and while invoice was being made it would cause an invoice split. The materials involved are Trading Good and Service Material. They would like only 1 invoice. Note nothing was different except material group and item cat. of the material. payment terms billing dates partners everything is same.
    Current item config for Trading Good material is ZMPI-project item cat.
    Copying requirements   023  Item ord.ref. w/o AZ        Billing quantity     A
    Data VBRK/VBRP         000                                           Pos./neg. quantity   +
                                                                                    Pricing type         K
                                                                                    PricingExchRate type
                                                                                    Price source
    Current item config for service Material is TAD-Service
    Copying requirements   002  Item/order-related          Billing quantity     A
    Data VBRK/VBRP         001  Inv.split (sample)            Pos./neg. quantity   +
                                                                                    Pricing type         G
                                                                                    PricingExchRate type
                                                                                    Price source
    I was told to change Data VBRK/VBRP to 003 One Invoice which I did in both of these item cat. and yes they worked perfectly but at time of creating the invoice for service material the qty that showed was 11. Note: In sales order it is 1 qty. So I went back into the config of item cat TAD and changed copying requirement to 023 instead of 002 but nothing changed. Seems a qty of 10 is referencing something else which I have no idea what or where it is picking this up from. Just to see or test things I went into the sales order and tried changing the service material qty then a weird popup appears and says service order 12344456 has been blocked. (Seriously I have no idea why this would happen or should be existing at all.) Even if for some reason it is being referenced the service order that is existing is qty 1.
    I really really do need help and if someone can help me that would be god sent.
    Regards, Ali

    You did not mention what value is maintained in the field billing quantity in the copy control->Item settings. Check for the service item, what value is assigned. Put value A and re-test.
    Note that whenever you change any settings in configuration side, you need to create a new documents to test the results of the settings. You should not use the existing documents.
    When you say the document is blocked, then check the status of the sales order to find the reason for blocking (like credit block, approval etc)..
    Regards,

  • Creating Service Accounts For Components of SQL Server

    Hello , am trying to install SQL Server 2014 on a windows  8 but dont know how to create the service accounts for the various components . 

    Hello , am trying to install SQL Server 2014 on a windows  8 but dont know how to create the service accounts for the various components . 
    Hi,
    You need to refer to below BOL article
    Configure service account
    Service account setup
    Please mark this reply as answer if it solved your issue or vote as helpful if it helped so that other forum members can benefit from it
    My Technet Wiki Article
    MVP

  • Pointers needed to create a JSP for week/hour calendar type component

    Hi,
    I am looking to get some pointers on how to create week/hour calendar type component in JSP.
    My application is JSP/struts2 based web application. I need to create a web page where users will see a week hour calendar and for any time slot will enter some information. Each time slot can have different information. For example: Sunday 9:30am to 10:00am - Click on this cell and pop up a dialog for info and save it without refreshing the page. At the end combine all this info for each slot and submit to the server.
    If there is already a component like this is available to use, please point me to that.
    Any ideas are welcome.
    Thanks,
    Developer in need.

    I dont know of an already existing application that can do this. However, here are some ideas on creating your own:
    Create an html table in JSP who's number of rows and columns match what you would find in an ordinary wall calendar for the given month and year. Use the Calander.java class to obtain the number of days in the current month and build the JSP page accordingly (Calendar.java should automatically take care of leap year). You will probably need to add 'next' and 'previous' buttons to the form to retrieve the previous and next month(s) in case the user wants to access previous or future months. Each cell in the table displays that day (example ' 28 '). Notice my convention the first column is usually 'Sunday'.
    Next, determine what to put in each cell. One suggestion is to embed a table in each cell with 48 rows (24 hours in a day, 1/2 hour resolution= =48), and two columns (first column is for time: example: "10:30am to 11:00am", the second column is for the user's appointment message).
    Above that embedded table is the day (example: '28'). If a user has no information in the embedded table, the outer cell will appear to have nothing but the '28' in it.
    Next, how to populate the cell. When the user clicks on the cell, have an onclick event call a javascript function. The function will pop up a new window (a child window) by calling 'window.open( )' (google 'window.open'). In the pop up, show a table with 48 rows, 2 columns that the user can type in a message within column 2. When the user clicks 'submit' button on the pop up, call a javascript onclick function that reads all the message cells. Any cell not empty will populate the corresponding cell (day, rowID, columnID) back on the parent window by calling something like this: window.opener.document.myFormName.myTextField.value = someValue
    (google 'window.opener'). Once this is done, close the child window from that javascript function. By calling 'window.opener', you dont have to refresh the parent window.
    Next, if the user clicks on the parent window cell that is already populated, you will have to pass all theexisting information for that day through the window.open( ) to the child window so the pop up child window will show that preexisting information (that way he can add to the cell or alter it as he pleases).
    Next, after he alters many days on the calender, you have to provide an 'update' button on the parent form so the user saves his changes (write the data to a database record, with his name attached to that record). Note: if he clicks the previous/next button, he will lose any changes unless you also save the information before going to the previous/next page.
    Next, you might want to provide a vertical scroll bar on the table cell if
    the end user has many messages that cant be viewed in the parent cell all at once. Note each cell should be a fixed number of pixels width/height so it shows correctly. Have Fun!

  • Can't create Inbound Delivery for PO with Packing type material  -- HU

    Hi friends,
    I create a new packing material, and maintain packing material type. And then create a PO but I can't create an inbound delivery by VL31N.
    The error message:
    No item category exists (Table T184L EL VERP V )
    Message no. VL320
    Diagnosis
    There is no item category available in item category determination in the delivery (table T184L) for the following entries: EL VERP V
    I tried to add new item by SM30 with T184L, but still more errors. So it doesn't mean there are erros with delievery type determination.
    Any help?
    Thanks,
    Bruce
    Edited by: Bruce Hu on Jan 10, 2008 7:53 AM

    Hi Anil,
    Welcome to SCN for your first post. Did you check with your functional people about this.
    Regards,
    Madhu.

  • Can we create a StructDescriptor for a pl/sql Type declared in a Package?

    Hi,
    I went thru many threads on the forum regarding passing Structs and Arrays from java to pl/sql and back. In one of the threads, Tom Trevor has asked this question, but I do not see any definitive answer there. (if it's there, maybe I didn't get it).
    I want to refer to a pl.sql Type (Record) declared inside a package while creating a StructDescriptor. Is this possible?

    This is only possible, when u define ur custom type globally. The reason being, in JDBC code when u define struct statement, the code with db connection in constructor finds that if the custom type is present in DB , it does not search in specific procedure, so it would only get this , if ur cuustom type is defined globally.
    --Mukul                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   

  • How to pass parameter to cursor for loop having table type?

    Hi Friends,
    I am wondering how to pass a parameter into second for loop in the example code below.Please see the bold statements and answer my queries.
    Thanks a lot .Here is the code .
    declare
    l_bom_header_tbl BOM_BO_PUB.BOM_HEADER_TBL_TYPE ; ---TABLE TYPE
    V_bom_header_tbl Bom_Bo_Pub.Bom_Head_Rec_Type := Bom_Bo_Pub.G_MISS_BOM_HEADER_REC; ---Record type
    v_bom_components_tbl Bom_Bo_Pub.Bom_Comps_Tbl_Type := Bom_Bo_Pub.G_MISS_BOM_COMPONENT_TBL;---nested table type
    c:=0 number ;
    k:=1 number ;
    begin
    BOMPXINQ.Export_BOM(
    P_org_hierarchy_name => l_org_hierarchy_name,
    P_assembly_item_name => l_assembly_item_name,
    P_organization_code => l_organization_code,
    P_alternate_bm_designator => '1Test',
    P_Costs => l_costs,
    P_Cost_type_id => l_cost_type_id,
    X_bom_header_tbl => l_bom_header_tbl,
    X_bom_revisions_tbl => l_bom_revisions_tbl,
    X_bom_components_tbl => l_bom_components_tbl,
    X_bom_ref_designators_tbl => l_bom_ref_designators_tbl,
    X_bom_sub_components_tbl => l_bom_sub_components_tbl,
    X_bom_comp_ops_tbl => l_bom_comp_ops_tbl,
    X_Err_Msg => l_Err_Msg,
    X_Error_Code => l_Error_Code);
    if l_Error_Code = 0 then
    for i in 1 .. l_bom_header_tbl.COUNT LOOP
    V_bom_header_tbl.organization_code :='DSC';
    Can we assign a table type to record type like below statement?
    V_bom_header_tbl.assembly_item_name:= l_bom_header_tbl(i).assembly_item_name ;
    k:=1;
    I want to pass parameter  l_bom_header_tbl(i).assembly_item_name  into the for statement below: How to achieve this?
    for j in 1 .. l_bom_components_tbl.COUNT LOOP
    Can we assign a table type to table  type like below statement?
    v_bom_components_tbl(k).Assembly_Item_name := l_bom_header_tbl(i).assembly_item_name ;
    k := k + 1;
    end LOOP;
    end loop;
    end;
    Edited by: ILovePlSql on Mar 22, 2010 7:51 AM
    Edited by: ILovePlSql on Mar 22, 2010 8:16 AM

    ILovePlSql wrote:
    V_bom_header_tbl.assembly_item_name:= l_bom_header_tbl(i).assembly_item_name ;
    v_bom_header_tabl is a record type and l_bom_header_tbl is a table type .So is the above statement ok?I asked you for type definition. Please provide definition of BOM_BO_PUB.BOM_HEADER_TBL_TYPE and Bom_Bo_Pub.Bom_Head_Rec_Type. If BOM_BO_PUB.BOM_HEADER_TBL_TYPE is table of Bom_Bo_Pub.Bom_Head_Rec_Type then your statment is OK. For example:
    SQL> declare
      2      type BOM_HEADER_TBL_TYPE is table of emp%rowtype index by binary_integer;
      3      l_bom_header_tbl BOM_HEADER_TBL_TYPE;
      4      V_bom_header_tbl emp%rowtype;
      5  begin
      6      select * bulk collect into l_bom_header_tbl from emp;
      7      for i in 1 .. l_bom_header_tbl.count loop
      8        V_bom_header_tbl.ename := l_bom_header_tbl(i).ename;
      9      end loop;
    10  end;
    11  /
    PL/SQL procedure successfully completed.
    SQL> SY.

  • MRP type "VB" components generated dependent reqt. after MRP by sales order

    Good morning to all SAP gurus
            I hav scenario for mech. industry where we r going to implement MRP run , having FERT which is MTO scenario and " PD" MRP type.and its BOM components having MRP type "VB" with no strategy type. At MRP run after creating sales order system generated purchase requisition for components(ROH) depends on sales order requirements along with reorder point PR. So please help me system shouldn't generate PR depends on sales order requirements should create as per reorder point PR only.
           EX.   To manu. 1 nos of FERT  (PD) required 1 nos of ROH (VB) . we r creating sales order of 10 nos. , reorder pt is 11 and
    stock is 15. after mrp run system generated PR for 10 nos which is dependent for sales order.
           Pls elaborate regarding above scenario. Thanks in advance.
    Regards
    siva

    Dear
    Practically speakig , system should generate special stock PR as you are dealing with MTO sales order and MRP should plan the depedent requirement accordingly based on the MRP4 -Indiviaul and Collective Indicator -1 .
    But , if you do not want to consider it as special stock  , then you need to assing MRP4 Individual and Collective Indicator -2  and run MRP MD02-2,1,1,3,3  .
    In you case , you have already stock 15 pc  and ROP -10 , so system will not genreate any PR because , it will fullfill the requurement ( 10 PC FERT -10 ROH)  .Once the stock fall behind 10 , then it will trigger PR  .
    Hope this is clear
    Regards
    JH

  • MRP Type V1 - Does it create Exception Message for "Reschedule-in"?

    Hello Experts,
    We are using MRP Type V1 (Which has the Manual Re-Order Planning + External Requirements). However we are facing and issue with the Rescheduling part. Scenario is as following:
    Material ROP is - 5000
    Open Pur Ord is - 5000 (due in 01 June'09) based on the Std Lead time of the Material
    Stok on hand is - 0
    At this point a Sales Order is entered for 1000 pcs
    After MRP Run, we expect an Exception Message for the Purchase Order to have "Reschedule-in". But, instead, system creates a PReq for 1000 pcs and the required date is NOT the Sales Order required Date but based on the Std Lead Time of the Material.
    I have set the Material Lead time - 60 Days
    I have set the Reschedule horizon - 0 Days ( I even tried with different Days but NO use)
    However, when I change the MRP Type to PD, system generates a "Reschedule-in" Exception Message for the Purchase Order.
    How can I get the "Reschedule-in" Exception Message for the Purchase Order with the MRP Type V1?
    Thanks for your help in Advance!

    Anil,
    Reorder point/External MRP performs net requirements calculation (within replenishment lead time).  If the existing firmed supply elements minus the existing requirements bring the projected stock below ROP, it will propose an order that will bring the projected stock back to reorder point.  The proposal will generally come at replenishment lead time.
    In the normal business cycle, your sales order would confirm to lead time, and you now have a confirmed sales requirement at lead time, plus a new purchase req to bring the stock back to the reorder point.  The scenario you have described is working exactly as it is designed.  Consumption based MRP will not normally try to reschedule supply elements to match requirements inside of lead time.
    Rescheduling horizon generally is counted from the end of lead time.  It won't help you here.
    I guess if you insist on having a reschedule message, you could change your lead time to 0 days.  Not a wise move in my opinion.  You then have locked yourself in your choices of types of Sales order availability checks into one that ignores lead time.  You also have to find a way to let your buyers/planners know what the 'real' lead time is when they place their orders on the vendors.
    I don't know why you are using a consumption-based planning type (reorder point).  It sounds like your business requirements are that you actually need to be using a demand-type planning method (eg, your supply elements are driven by your demand, not by a reorder point/desired stock level).  If PD works the way you want, why aren't you using it?
    Regards,
    DB49

  • Creation of SDEB's for MRP type = VB materials.

    Hi Gurus,
    When we run plant wise MRP, SDEB's are created instead of Purchase requisitions for all Manual re-order point materials. We understand that SDEB's are created when the stock of tha material is above tha Re-order point, and this SDEB's indicate tha MRP controller whether he can create manually Purchase requisitions or not.
    But, we are getting these SDEB's for the materials that have stock below the Re-order point as well. Which is not correct i think.?
    For your information, when we run material wise MRP there are no SDEB's at all.
    Please explain what might be the Root cause and the solution to over come this..
    Thanks for your understanding..
    Naveen.A

    Dear colleague,
    without checking the issue it is difficult to know if there is an error.
    Please check if the following information can explain the behaviour of your system:
    A)When you do MD01 or MDBT the creaton indicators defines in the
    customising are used . whereas when you run MD02 or MD03 the creation
    indicator on the individual screen is used.
    Single-item planning and total planning follow a different logic
    concernng the creation indicators.This is also described in the
    documentation for Master Planning/Materials Planning (Chapter 4, Section
    2) and in the Implementation Guide.
    Single-item planning:
            The entered creation indicators are generally valid.
    Total planning:
           The entered creation indicators are used as default values.
           For materials from an MRP group, the values from the MRP group
           apply (if available).
           The creation indicator for delivery schedules can additionally be
           specified per plant. This is used if nothing was specified via
           the MRP group.
           Thus, the priority is as follows:
          1.  MRP group
          2.  Plant
          3.  Initial screen
    B)In MD02 system can de multilevel (For components of a header Materia)
    or/and Multiplant (Stock Transfre ) planning. In such cases for all the
    materials involved the creation indicator used in the screen is used.
    C)The creation indicator makes sense only for materials having
    procurement type external procurement (F) in material master. For the
    materilas which are produced in house (Procurement type E) system will
    always create planned orders.
        And Materials having procurement type X(Both procurement types ) is
    treated as Inhouse produced material by planning . Thus for such
    materials system will always create a planned order. Now this planned
    order can be converted into a production orer or into a purchase
    order(via purchase Requisition).
        When you run MRP with "Create Purchase Requisition " in the opening
    period , then the syetm uses in the opening period defined via  the
    scheduling margin Key. In material master , MRP 2 View we maintain
    scheduling margin key. And in Transaction OPP1->Planning->Scheduling and
    Capacity Parameters ->Define floats we maintain the opening periods per
    plant. I am attaching details of Opening period :
       opening period: Opening period is the time which the MRP controller
    needs to analyse.Thus he has this buffer with him to rectify any issues
    before converting the planned order into purchase requisition.
    The opening period is only used in backward scheduling.
    Suppose There is a requirement for a material on date =RD1
    Let the Goods receipt processing  time  is= T1
    Let the planned delivery time =L1
    Let the purchasing Processing time = X1
    Let the opening period for this material is P1
    Time line  for external procurement:
            Planned Del   Pur proc         GR Process
              Time            Time          Time
    ___|__________|_________|___________|___
                  L1            X1         T1
       SD                                         RD1
    Now accoring to Basic scheduling:
       Receipt/Requirements Date(RD1)
       Release/Start Date(SD) = RD1-T1-L1-X1
    Now let me explain to you when the planned order an purchase
    Requisitions are created:
    Let us say the date on which you do MRP be MR1
    OD = Opening Date
    From above diagram :
                                     Opening Per
                                     In Sch Mar Key
    __________________|______________|
      XX                          OD                 SD
                                                  Release/Start Date
    If your MRP date(generally Today) is lying between XX and OD (and
    excludind OD)then
    MRP creates planned order and if it lies between (and indclind OD)
    OD and SD then we create purchase req.
    when your MRP date comes between the period OD and SD then you do not
    have time left to analyse and therefore instead of you in such cases
    forgetting and delaying system automatically creates purchase req.
          In general if , if your order start date or release date is after
    the opening period from today then MRP will create planned order.
    Oterwise it creates Purchase req.
    Check also if you have the note 1063969 applied in your system.
    I hope it solves the issue. Otheriwse I think you should open an OSS message with connection to your system,
    best regards,
    maria

  • MRP type for two different types requirments( Sale order and PIRs)

    Dear All,
    We have requirment  some materials we have sales order and PIRs. For sales order we want to consider with "MRP type" as PD and PIR we want to consider "MRP type" as VB manual reorder point planning.
    Is there any stadard  solution.
    If standard solution not possible also poivde some inputs on enhancement.
    Regards
    Sailendra
    Edited by: nivedita yadav on May 7, 2010 2:31 PM

    Sailendra,
    your post is confusing, how you want to different MRP type for same material?
    and why its needed?
    1) you can use MRP type PD , and incoming sales order will search in existing stock or will create procurement proposal ( depends upon what strategy you are using)
    2) If you  are using VB then when ever you stock will fall below the reorder point you maintained in material master , system will create new procurement proposal, here the manual means the value you need to maintained manualy for reorder point and safety stock.
    In automatic reorder point planning, both the reorder level and the safety stock level are determined by the integrated forecasting program.
    The system uses past consumption data (historical data) to forecast future requirements. The system then uses these forecast values to calculate the reorder level and the safety stock level, taking the service level, which is specified by the MRP controller, and the material's replenishment lead time into account, and transfers them to the material master.
    hope it will help you.
    Regards
    Ritesh

  • Procurement qty restriction while running MRP

    Dear Expert,
    In our plant there is a GCPB consent issue,in GPCB consent issue we can dispatch only limited quantity of product as per the approved quantity per month, in other words we can't dispatch the material above GPCB approved quantity.
    For example :
    We have a product Sodium chloride which GPCB approved quantity is of 25 kg per month, that means we can't procure more then 25kg for this product. So please guide me how can i control the procurement of this product during MRP Run so that system will not generate the PR if the quantity including the stock is more than the GPCB approved quantity.
    Regards,
    Phalgun Patel

    Mario asked you planning method which means MRP type , not planning strategy.
    From your reply I assume that you're using PD. Change it to VB and enter the manual re-order point values.
    For example: enter your re-order point as 5, lot size as HB and maximum stock level as 25, in this case as soon as stock goes below 5 (let assume it goes to 4) it's gonna create a procurement proposal for a quantity of 21.
    or
    enter your re-order point as 5, lot size as MB (monthly lot size) and rounding value as 25, so whenever stock goes below 5 it will create a procurement proposal for 25.

Maybe you are looking for

  • ITunes 7 - "iTunes has encountered a problem and needs to close"

    I was prompted to update to 7.0.1, so I did. When everything finished and I tried to open it, it doesn't even open, but says,"iTunes has encountered a problem and needs to close". I have tried everything, I have seen some other forums about this but

  • Sort Albums Doesn't Work

    I have a bunch of albums in iPhoto that I am trying to sort, and it just doesn't work. When I select them, right-click, and choose "Sort Albums" from the context menu, either *nothing* happens, or else the order of the albums is altered in some seemi

  • Can you please help with iPhone 4 camera?

    I am running ios 7 and have been for a few months with no problems. When I went to take a photo yesterday, I clicked on the Camera icon and a black screen with a white circle came on.  I tapped the white circle (even though that's not usually what I

  • How to dynamically create header record in a file

    Hi All, how can we create custom header in data file. i have interface that creates file dynamically and Generate Header is set to true. The file header contains the column names. i want to create different file header like FileName_noOfrows_currentD