System is not converting unit of measure ment while doing cost estimation.

Hi All,
System is not converting unit of measure ment while doing cost estimation.
Now i am explaining system setting. based on this kindly help me.
Our Base Unit of Measure Measuremnt in Material Master is M2 (meter square) and We have maintained Unit conversion in Master as  1 PC is <=>2.5 M2.
We are running costing for 1 M2.
Producion we are doing in Peaces (PC) .  and i maintained Std Value for for Machin and Labour for PC only. and we maintained charge quantity in phases also.
While running cost estimation system is not converting std value of machin & labour into M2.instead it is showing full machin and labour time and value.
System showing PC value for M2 Cost estimate.
Can any one let me know where i am missing.
Thanks in Advance.
Regards,
Sahil

Hi,
as per your explanation: 1 PC (piece) = 2,5 sqm (m2), standard values for "labour / machine" maintained per PC.
I guess within T-code CUNI, the unit PC does not allow any decimal places (means there can be only 1 piece, 2 pieces, 2 pieces but not 1 and a half pieces, 2,63 pieces,...)
Now if you are running plan cost estimate for quantity 1 sqm (m2) SAP picks the "labour / machine" values for 1 PC (and not for 1 / 2,5 = 0,4 pieces) as decimal places for unit pieces are not allowed so its up-rounding.
Run cost estimate for 10 sqm (m2) which should be 4 PC and the result should be fine.
Best regards, Christian

Similar Messages

  • Unit of measure differs while doing the vendor returns

    Hi All,
       While doing the vendor returns even if I mention the order unit(PO) for return qty,In vendor returns printout it is showing Baseuint of measure,pls let me know problem would be functional side or print programe side
    Regards
    Raj

    Thanks,
    Edited by: Hari Raj on Apr 12, 2008 1:21 PM

  • Converting Unit of Measure (not quantity)

    Hello All,
    I have an interesting issue that I am not sure how to address.  I have done some searching online and through the forums on how to convert unit of measure.  Nearly all of the returned entries pertained to converting FT to LB, and scenarios like that.
    My issue deals with the data in the EORD table.  I created a custom program to create/update numerous source lists using a BDC for transaction ME01.  This way the user can enter numerous materials and plants into one program one time, rather than create each source list individually.  One such source list has a value in field MEINS as GAL (Gallon).  However this is the converted value, this can be viewed in SE16n.  If I use SE16, or debug the program, I can see the value in MEINS as GLL.  This is the unconverted value.  Thus when I create the source list I get an error.
    I was wondering if there was a function module I could use to convert the UoM.  I know I could create logic to check the value of UoM and if it is incorrect to change it using a custom FM or even in the logic of the enhancement itself.  But this could change over time, meaning more units could be added requiring more logic changes.  If there was a standard FM I could use, I could implement it once and be done with it.
    So does anyone have any advice or know of an FM I could use?  I will continue to search for an answer and if I find one I will post.  If my question is confusing please let me know and I will clear up anything I can.
    Thanks for your help in advance.
    Regards,
    C.

    There is a conversion exit on unit of measure, "CUNIT" (via table T006A) use
    CONVERSION_EXIT_CUNIT_INPUT    Conversion exit for commercial (3-char) measurement unit INPUT
    CONVERSION_EXIT_CUNIT_OUTPUT   Conversion exit for commercial (3-char) measurement unit OUTPUT
    Regards

  • How to convert  unit of measures in bex on master data attribute values

    Hi All,
    i need to convert the unit of measure in Masterdata Attribute values... that means ) ' 0grooss_wt'. this is attribute as a keyfigure of ' 0material' .. this ' 0gross_wt' values has to convert in KGs. at Present ' 0gross_wt' values are in KG and Grams...
    I can change these values in update rules by writting Routine.. But I need to convert it in KGS at BEX Query Designer Level..
    I need calculate like this
    quantity sold * Gross Weight.
    here Gross Weight is the formula variable which replacing the values of gross weight...
    i tried by creating conversion types in RSUOM t-code. but it works on keyfigures of infocube.. not on attribute values of master data...
    is there procedure in formula variable it self to convert unit of measure before replacing the values.....
    or is there any other  solution to  this Problem...
    Thanks in advance..
    regards
    ravi.p

    Hi
    Have you tried to create a variable for ths kf with exit. I thnk it is possible here
    Assign points if useful
    Regards
    N Ganesh

  • Convert Unit of Measure

    Hi all,
    i need a function that must change another unit of measure, not base unit of measure.
    Which function can i use ?
    Thanks a lot.

    Hello,
    AFAIK there is no such func. It's always AUoM --> BUoM --> AUoM.
    You can use the function 'MATERIAL_UNIT_CONVERSION' for these conversion.
    BR,
    Suhas
    PS: In our system we've created a custom function module to the direct conversion for AUoM --> AUoM.

  • The system could not find any entries that are relevant to costing.

    plz give the solution ,its urgent
    Message no. CK060
    Diagnosis
    The system could not find any entries that are relevant to costing.
    System Response
    The system did not cost the object.
    Procedure
    Check whether the following objects should be flagged as relevant to costing:
    Items in the BOM
    Display BOM
    Operations in the routing
    Control key in the routing
    1. Look at the message log.
    2. Check whether a quantity was specified in the confirmation.

    hi,
    iam facing the problem while creating the
    stnadard cost estimate ck11n
    the system prompts the following message
    confirmation
    Logistics - General (LO)
    Information from the vendor to the recipient about the status of the purchase order.
    The term confirmation covers different types of information from the vendor to the customer, such as order, loading or transportation confirmation and the shipping notification.
    If materials planning takes place without a confirmation, planning can only be based on the delivery dates and quantities in the purchase order. In contrast, confirmations make it possible for the customer to plan the materials more precisely because between the purchase order and planned delivery date, more reliable information has become available.
    Logistics - General (LO)
    Communication sent by a vendor to a customer regarding the status of a purchase order.
    The term "confirmation" (short for "vendor confirmation") is an umbrella term for various types of information provided by a vendor to a customer, including order acknowledgments, loading or transport confirmations and shipping notifications.
    If the customer's materials planning and inventory control system does not work with confirmations, it can only refer to the delivery dates and quantities set out in the purchase order. The use of confirmations, on the other hand, makes the materials planning and inventory control process more precise, since between the PO date and the planned delivery date the customer receives increasingly reliable information about the pending arrival of ordered goods.
    Treasury Management (TR-TM)
    After concluding a financial transaction, a confirmation of the related contract data is sent to the relevant business partner. Confirmations can be printed or sent electronically directly from the R/3 System. Confirmation forms are defined via the correspondence type.
    Logistics - General (LO)
    Part of order monitoring, this documents the processing status of operations or sub-operations. In the SAP System, a distinction is made between partial and final confirmations.
    A final confirmation is used to determine
    at which work center the operation should be carried out
    who has carried out the operation
    the quantities of yield and scrap quantities that have been produced
    the size of the standard values required for the actual operation
    Materials Management (MM)
    Communication from a vendor to a customer providing information on the status of a purchase order.
    As used in this sense, the term "confirmation" can cover a number of different documents, such as order acknowledgment, loading confirmation, or shipping notification. Also termed "order acceptance/fulfillment confirmation".
    If the materials planning and control system operates without such confirmations, it can only work on the basis of the delivery dates and quantities in the purchase order. Confirmations, on the other hand, enable the customer to plan more exactly. In the period between the issue of the PO and the planned delivery date he is provided with more up-to-date and increasingly reliable information on the expected delivery.
    Project System (PS)
    A confirmation is a part of network control. It documents the state of processing for network activities and activity elements. There are two types of confirmations in the R/3 System: partial and final confirmations.
    A confirmation is used to record:
    the work center where the activity was carried out
    the person who carried out the activity
    the yield and scrap produced in an activity
    the actual values for the standard times
    Intellectual Property Management (CRM-IM-IPM)
    A report made by the licensee and defined in the rights sale contract on sales volumes or other quantities (such as audience figures for a film) during a period.
    Receiving (ECO-BBP-REC)
    An electronic document that combines the functions of goods receipts and service entry sheets. By creating a confirmation:
    Vendors can confirm that they have fulfilled their orders
    Employees can confirm the goods and services they ordered via their shopping baskets
    Central goods recipients can confirm the goods and services ordered by employees for whom they are responsibleconfirmation
    Logistics - General (LO)
    Information from the vendor to the recipient about the status of the purchase order.
    The term confirmation covers different types of information from the vendor to the customer, such as order, loading or transportation confirmation and the shipping notification.
    If materials planning takes place without a confirmation, planning can only be based on the delivery dates and quantities in the purchase order. In contrast, confirmations make it possible for the customer to plan the materials more precisely because between the purchase order and planned delivery date, more reliable information has become available.
    Logistics - General (LO)
    Communication sent by a vendor to a customer regarding the status of a purchase order.
    The term "confirmation" (short for "vendor confirmation") is an umbrella term for various types of information provided by a vendor to a customer, including order acknowledgments, loading or transport confirmations and shipping notifications.
    If the customer's materials planning and inventory control system does not work with confirmations, it can only refer to the delivery dates and quantities set out in the purchase order. The use of confirmations, on the other hand, makes the materials planning and inventory control process more precise, since between the PO date and the planned delivery date the customer receives increasingly reliable information about the pending arrival of ordered goods.
    Treasury Management (TR-TM)
    After concluding a financial transaction, a confirmation of the related contract data is sent to the relevant business partner. Confirmations can be printed or sent electronically directly from the R/3 System. Confirmation forms are defined via the correspondence type.
    Logistics - General (LO)
    Part of order monitoring, this documents the processing status of operations or sub-operations. In the SAP System, a distinction is made between partial and final confirmations.
    A final confirmation is used to determine
    at which work center the operation should be carried out
    who has carried out the operation
    the quantities of yield and scrap quantities that have been produced
    the size of the standard values required for the actual operation
    Materials Management (MM)
    Communication from a vendor to a customer providing information on the status of a purchase order.
    As used in this sense, the term "confirmation" can cover a number of different documents, such as order acknowledgment, loading confirmation, or shipping notification. Also termed "order acceptance/fulfillment confirmation".
    If the materials planning and control system operates without such confirmations, it can only work on the basis of the delivery dates and quantities in the purchase order. Confirmations, on the other hand, enable the customer to plan more exactly. In the period between the issue of the PO and the planned delivery date he is provided with more up-to-date and increasingly reliable information on the expected delivery.
    Project System (PS)
    A confirmation is a part of network control. It documents the state of processing for network activities and activity elements. There are two types of confirmations in the R/3 System: partial and final confirmations.
    A confirmation is used to record:
    the work center where the activity was carried out
    the person who carried out the activity
    the yield and scrap produced in an activity
    the actual values for the standard times
    Intellectual Property Management (CRM-IM-IPM)
    A report made by the licensee and defined in the rights sale contract on sales volumes or other quantities (such as audience figures for a film) during a period.
    Receiving (ECO-BBP-REC)
    An electronic document that combines the functions of goods receipts and service entry sheets. By creating a confirmation:
    Vendors can confirm that they have fulfilled their orders
    Employees can confirm the goods and services they ordered via their shopping baskets
    Central goods recipients can confirm the goods and services ordered by employees for whom they are responsible

  • Sales Information System (SIS) Reporting- Alternative Units of Measure

    Guys,
    Does anyone know how can we view SIS Reports (either using Standard or Flexible Analysis) in Alternative Units of Measure? Currently, all the quantities (example Order Quantity) are displayed in Base Unit of Measure .
    Thanks a Lot

    Hai john ,
          If i copy the mc.1 to make -Z report in this how can i view the stock in alternative units  as Kgs..But in master datas we maitained as BUM-Nos . For the same material master we are maitaining in additional datas as 1000 nos =40 kgs, if i take the report system will calculate the current stock with the AUM as kgs .for this pls suggest ie have 1000 nos stock if i choose AUM it should shows as 40 Kgs  .How to make program for calculating formulas.PLs  reply me asap
    Thanks in advance
    viswa

  • Convert unit of measure to metric

    Does anyone know how to convert a unit of measure to metric?  Is there a function module that I can use? Thanks.

    report ychatest.
    here qty is ur quantity field in ur internal table ,
    loop at itab.
      call function 'UNIT_CONVERSION_SIMPLE'
        exporting
          input                      = itab-qty
    *   NO_TYPE_CHECK              = 'X'
    *   ROUND_SIGN                 = ' '
         unit_in                    = itab-vrkme
         unit_out                   = 'EA'
      importing
    *   ADD_CONST                  =
    *   DECIMALS                   =
    *   DENOMINATOR                =
    *   NUMERATOR                  =
         output                     = itab-qty
    * EXCEPTIONS
    *   CONVERSION_NOT_FOUND       = 1
    *   DIVISION_BY_ZERO           = 2
    *   INPUT_INVALID              = 3
    *   OUTPUT_INVALID             = 4
    *   OVERFLOW                   = 5
    *   TYPE_INVALID               = 6
    *   UNITS_MISSING              = 7
    *   UNIT_IN_NOT_FOUND          = 8
    *   UNIT_OUT_NOT_FOUND         = 9
    *   OTHERS                     = 10
    modify itab transporting qty.
    Endloop.

  • Convertion unit of measure....

    Hi,
          I Have KWH(Kilowatt Hour), TO(Tonnes) and M3(Cubic Meter),How to Convert these values into single unit of measure?
    Regrads,
    devi,

    Hi,
    Check following thread as well
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/00944f2f-c3e8-2c10-ccb5-a6e4cc882db4?QuickLink=index&overridelayout=true
    RSUOM can be used to maintain the conversion parameters.
    Alternatively we can use numerator/denominator concept as well and get the multiplication done at report or Infoprovider level.
    You can also get that field from source if it is available readily.
    Thanks and regards

  • BEx Query:  Attribute not display Unit of Measure (UOM)

    In a BEx I am trying to create a query that displays attributes to 0EMPLOYEE.  One of the custom attributes is the employee's rate of pay.  We have the hourly rate, nightly rate, etc.  This attribute is a numeric attribute with currency assigned as the Unit of Measure.  I am trying to create a query displaying the pay rates from the attributes of 0EMPLOYEE but remove the unit of measure in the output.  I am aware this can be done on key figures using the NODIM formula.  How can I remove on an attribute?
    Example:  Output is $10.25 UOM.  I want it to display as $10.25.
    Thanks.

    Hi,
    Create a Formula Variable with Replacement Path for this Attribute.
    Use NODIM function for the Formula Variable.
    Let me know if it works according to your requirement.
    Regards,
    Geeta

  • Unit prie column disabled while doing miscellaneous issue.

    Hi,
    I'm doing miscellaneous issue on an item. but while doing the entry, the unit price column is disabled from entering the value. What could have gone wrong? But for some items the field was enabled to enter the unit price value. Both the items are having same templete and costing is also same(Average).
    How can the unit price column can be enabled for the item?
    Thank you
    Regards
    BKR.

    Hi,
    To solve this you must update your studio. In lower studio versions (PlanViz) does not allow "unknown" XML tags sent by higher version servers. A fix for this issue was made so that PlanViz parser can simply skip unknown tags.
    Please go to version 74, if possible.
    Regards,
    Michael

  • Unit of measurement problem while converting SC to PO - Classic

    Hi
    We are using Classic scenario and on SRM 3.0 with SAP 4.70
    The problem:
    User created shopping cart with qty of 3.24 EA, when we convert this Shopping cart as PO in backend SAP system is removing decimal places in PO and making as 3 EA.  Like wise if SC is for 0.45 EA the PO will generate error because qty is 0 EA.
    I know decimal places are not configured in CUIN for EA in both SAP and EBP also.  But system allows me decimal places to create SC and manullay created POs in EBP and SAP respectively.  The problem is only when we conver SC to PO its Truncating.
    Any ideas, please help.
    Thanks in Advance
    Nags

    Hi Nagaraju,
    Looks like the problem lies in the default settings of the user profile (background user that talks to your R/3 system) that you are using to transfer the data to your R/3 system.
    Change your default settings of that system user and that should resolve your problem.
    Please award points for usefull answers.
    Thanks,
    Sundeep

  • Stocking multiple items on various pallets qty(not really Units of Measure)

    I have a customer who produces items in boxes. The boxes are what the items are stocked in.
    During production the boxes are packed on pallets; some pallets hold 32 boxes, the other pallets hold 48.
    The customer doesn't want to have two different stock items.
    The problem is that for some of their customers they need to send them the large pallets and for others they need to send the smaller pallets.
    Everything is batched tracked, so I was thinking of using an attribute on the batch.
    Perhaps the up coming multi UoM would work, or would I be better off with a warehouse module?
    Any ideas anyone?

    Hi,
    For easier control, adding itemcode is the best way because they are physically in different pallet, right?
    However, if your customer insist one item only, you may need a UDT to hold all BP with related pallet size. In this way, you can assign the right pallet to the right BP through FMS.
    Thanks,
    Gordon

  • My system can not connect with the Airport Express while the signal is very good?

    Neither my phone nor my desktop (windows 7) can not make a connection with the Airport Express. The signal keeps flashing amber.
    Several specialists have checked but can not solve this problem. Any ideas?

    I am in exactly the same boat...

  • Not appearing  Exicise Invoice/item tab while doing MIGO

    Hi,
    I am doing MIGO but in screen Excise item/invoice tab is not appearing , PO screen in Preview option also not appearing the Excise calculation component .
    Could any one help me to resolve it .
    Regards & Thanks
    Sukant

    Hi,
    you have to maintain the chapter ID for the material. Then only it will come in MICO screen. maintain tax code in logistics general- tax on goods movement.
    Thanks,
    Venkat.

Maybe you are looking for

  • Finder windows close randomly on network drive

    Hi, searched on google for long time and found nothing. I'm working in a small office (13 iMacs and Mac Pros) and the Finder have a strange behavior. In my office, 12 iMacs and Mac Pro are using OS 10.6.8 to 10.8.3, and there is a server that contain

  • Clearing values of input boxes

    Can any one Help me with the problem i am having with clearing the values for several input text fields from the generated HTML page. so the user can press the back button and all the fields are clear in the previous page. this is my line of thought

  • How to CREATE VIEW to merge two tables each of which has CLOB-typed column

    I failed in creating a view to merge two tables that have CLOB-type column each. The details are: Database: Oracle 9i (9.2.0) Two tables "test" and "test_bak", each of which has the following structure: ID Number(10, 0) DUMMY VARCHAR2(20) DUMMYCLOB C

  • I have a trouble, with lion my finder doesn't work, i can't open any window

    i have a trouble, with lion my finder doesn't work, i can't open any window

  • Duplex printing with HP Color Laserjet 4650dn

    Dear all, I wanted to print the handouts of a Powerpoint presentation (Office for Mac 2008, v12.2.5), but could not get a double-sided copy. The printer (HP CLJ 4650 dn) is installed with the OS X 10.6.4 embedded drivers etc. as HP CLJ 4650. Works fi