Tables for mm03 (specification-material assignment)

Hi All,
We have a need to find out which material masters are assigned to GCD (Global Chemical Database) specifications.what are the possibilities from Material master side.
Specification information (in tab "Spec assignment") on material master side is on a structure RCGMMJIOT. can anybody help with the table name for the corresponding structure.
Thanks in advance

HI Vibhuti,
More detailed information about EHS tables are as follows
Description--> Table Name
Specification Header     ESTRH
Identifiers     ESTRI
Identifier - Regulatory list assignment     ESTRL
Referencing in specifications     ESTRR
Specification  - Material assignment     ESTMJ
Specification status assignment     ESTST
Specification - Value Assignment Type Assignment (Property tree)     ESTVH
Value assignment Item (e.g.  composition values)     ESTVP
Shadow table for AUSP (Characteristic values)     ESTAUSP
Additional Information: Value Assignment Assessment     ESTDR
Additional Information: Value Assignment Source     ESTDS
Additional Information: Value Assignment Usage     ESTDU
Additional Information - User-Defined Text     ESTDF
Value assignment table (Classes)     ESTVA
I hope this complete list may will be helpful for you.
Regards
Amol

Similar Messages

  • Putaway Block in Storage Bin for any specific Material Code

    Hi Experts,
    We have a problem, we have allowed mix storage, addition to stock in the storage type, our requirement is this, that we want to block one bin aa-01-01 for some specific material code xxxxx, but we want to allow putaway other material codes to that bin.
    How can we achieve this. Can we use LS07 or some other solution. Please suggest at the earliest.
    Regards
    Ishu

    Hi,
    In standard system, you can block one specific bin for the specific material with Putaway strategy "Fixed bin" by maintaining this bin in material master. It is unclear that you set "allowed mix storage" and again required material specific putaway in bin.
    You can change "Mixed storage" indicator to blank. Which explains "___"  Mixed storage is not allowed
           All storage units in a storage bin must contain the same material and batch (one quant).
    If you don't want to change any of current setting you'll need to use the user exit and maintain custom table where you can maintain specific bin for the material for the warehouse. After determination of the bin to putaway in the standard code you can check if it is conflicting to the entry in your custom table.
    Hope this'll help.
    Regards,
    Sudhir

  • Duty calculation for import PO for a specific material group

    Hi All,
    As per company requirement, we need to do changes in duty calculation for import PO for a specific material group.
    Current scenario :  Currently  duty calculating on MRP with abatement  35% ( We have ABTT condition @ 35% of MRP).
    For example:
    Material: ABC , Basic Price = 1000, MRP = 2000 and duty is 10%
    Duty  Amt = 2000(MRP) - 700(35% ABTT) *10%(Duty) = 130
    Cess 2 % = 2.6
    Ecess 1 % = 1.3
    Total duty =  133.9
    This duty (133.9) paid to custom vendor and loads in material cost.
    New Requirement:  For vendor payment purpose duty should be calculate as above but  for material cost should be calculated on Basic price.
    For Example:    
    Material: ABC , Basic Price = 1000, MRP = 2000 and duty is 10%
    Duty  Amt = 1000(BP) *10%(Duty) = 100
    Cess 2 % = 2
    Ecess 1 % = 1
    Total duty =  103 ( It should load in Material cost)
    New Condition Diff Duty Amt = (1300-1000)*10% = 30
    Cess 2 % = .6
    Ecess 1 % = .3
    Diff Duty Amt = 30.9 ( It should not be added in material Cost)
    Paid to custom vendor = 103 + 30.9 = 133.9
    Kindly suggest how to achieve this.
    Regards
    Jitendra

    Hi,
       Please check whether the requirement is logical or not.  Did you check the requirement with your accounts team?
       If you have different duty calculation for MIGO and MIRO, how the GL accounts will get balanced? As of my understanding, the requirement is clearly not logical.
    Regards,
    AKPT

  • Planned order is creating before planning bucket for a specific material.

    Planned order is creating before planning bucket for a specific material.
    Eg: Planning Bucket future: 12 months & Start date- 01/02/2012, but Planned order Availability/Requirement date is 12/23/2011.
    What causes this, how to fix it? Please suggest u2026
    Thanks
    Ravi

    Since your planning bucket start date is in the future, so this is normal that the system is trying to satisfy the demand in jan2012 bucket by creating a receipt on Dec23, 2011.
    Reasons for RECEIPT to be generated earlier is
    (1) There might be a FIRM HORIZON( SNP PROD HOR)
    OR
    (2) There might be a GR time and the system is considering that time
    In Customizing for Advanced Planning and Optimization -> Supply Chain Planning -> Supply Network Planning (SNP) -> Basic Settings -> Maintain Global SNP Settings, in the SNP:GR for Plnd Ords field, you have selected Processing Time.
    Blank out these times and see if it works, else do one of the following:
    (1) Set Period Factor(LOT SIZE TAB of PRODUCT MASTER) to 1, so that the receipts get created at the end of the bucket.
    OR
    (2) Create your demand at the end of the planning bucket period
    Thanks
    Kumar

  • Disable forward scheduling for a specific material

    Hi experts.
    We have a requirement to disable forward scheduling for a specific material during ATP check in sales order and delivery processing. I played with some configurations in "Basic functions > Availability check and transfer of requirements" and "Basic functions > Delivery scheduling and transportation scheduling", but none could help.
    Notice: we use APO.
    Example:
    Material X - has 108 pieces in stock and a production order of 1000 pieces scheduled on Feb 11.
    If I place a sales order of 109 pieces with requested delivery date of Feb 8, I need the system to not confirm this quantity, instead of confirming the quantity on Feb 13, as of standard behavior.
    Regards,
    Fábio Scaravelli

    Unfortunately, I do not know much about APO. However, I had a quick look and saw the the function responsible for scheduling in APO is /SAPAPO/APO_SCHEDULING. Within this FM, there are two user exits called:
    EXIT_/SAPAPO/SAPLVCRM_001
    EXIT_/SAPAPO/SAPLVCRM_002
    I am unsure if these can be utilised to achieve the desired behaviour. However, they may be worth investigating.

  • Tables for Documents&doc. type assigned to Equipment master

    Hi
    I need a table for Documents&d oc. type assigned to Equipment master .I have tried in ITOB, EQUI, DRAW. i could not find this
    Thanks
    Seenu

    hi
    yes you can use object key, it  is the one which relates with the equipment ( object key <b>EQUI</b>)
    regards
    thyagarajan

  • What is the table for checking billing types assigned to sales orders

    Hi Folks,
    Good morning!
    Could you please help me how to check the billing types assigned to sales documents.
    What is the table to see billing types assigned to sales documents.
    Regards,
    Sarath

    Hello Sarath,
    As mentioned by Siva in the above the table name is TVAK but if you are a functional guy then you should go by the functional assignment.We are assigning the default billing type in Tcode= VOV8.
    All sales document control you can find over here.
    Needless to mention this Billing type you are assigning over here is auto proposed during billing in VF01. But you have option to choose another billing type in VF01 itself considering you have maintained the Copy Control for that.
    Thanks,
    Suman$

  • How to pull multiple lines of info from a table for a Specific Company/Address

    What I would like to do is have one Table that I enter all my information on in Numbers for incoming rent like the one below. Since I have 8 spaces to rent I will have up to 96 plus rows of information to look at. But I would like to have Numbers then on separate pages is have the individual Companies have their own rent break down on a table with the Date Recieved and the amount they payed. From there on their separate page I can have the Late Charges come into play or whatever I choose.
    Date
    Company
    Address
    Rent Recieved
    Jan 1, 2011
    X
    430
    $1,100.00
    Jan 3, 2011
    Y
    440
    $1,200.00
    Jan 5, 2011
    Z
    450
    $1,300.00
    Feb 1, 2011
    Y
    440
    $1,200.00
    Feb 3, 2011
    X
    430
    $1,100.00
    Feb 8, 2011
    Z
    450
    $1,300.00
    Mar 1, 2011
    Z
    450
    $1,300.00
    Mar 2, 2011
    X
    430
    $1,100.00
    Mar 5, 2011
    Y
    440
    $1,200.00
    The following table would be on the separate page with the formula (I do not know how to write) grabbing the info from the above table.
    Company X Rent Recieved
    Date
    Rent Recieved
    From the formula that one of you gracious smart people provide I could create a table for each of the Companies that rent from me on their own Tables on separate Tabs.
    I know I could go to each individual Tab and write it in but I will be primarily working on my iPad and this would make it easier. I can also utilize the fresh Tables to do other calculations.

    I got a soluce with no swap.
    I created a new column (E)
    In E2, the formula is :
    =B&IF(ISBLANK(A),"",MONTH(A))
    Apply Fill Down
    In table of each company, I inserted a 2nd header row so that I may store the name of the company in A1.
    In A3, the formula is :
    =IFERROR(OFFSET(Tableau 1 :: $A$1,MATCH($A$1&ROW()-2,Tableau 1 :: $E,0)-1,0),"")
    in B3, the formula is :
    =IFERROR(OFFSET(Tableau 1 :: $D$1,MATCH($A$1&ROW()-2,Tableau 1 :: $E,0)-1,0),"")
    Select A3:B3 then Fill Down.
    That's all folks !
    Yvan KOENIG (VALLAURIS, France) jeudi 19 mai 2011 17:18:32
    Please :
    Search for questions similar to your own before submitting them to the community
    To be the AW6 successor, iWork MUST integrate a TRUE DB, not a list organizer !

  • Table for Process order Material movement.

    Hi experts,
    which table store process order material movement data
    movement type 309 261 etc.

    there are no ther tables, why would someone have two tables containing same info??? it would be redundant.
    MSEG is not really slow when you do qualified selects, if you can not do that you shopuld think about creating an index.

  • Need field and table for spare part material and price for a given material

    Hi,
          In need to create a report with following fields:-
           Customer           Material          spare part material            spare part description             price                   currency.
    From which table and field I can get all this information.Please guide me.
    Hint.  cl30n transaction for material managemant.
             vk13 transaction for price maintenace.
    Regards.

    CL30N is a general transaction that can be used for any classification, but material master maintenance is usually MM01/MM02 or MM41/MM42
    Material description can be taken from table MAKT
    customer from table KNA1
    The question is what you are going to analyse? where do material and customer tie together? do you do the analysis on sales orders VBAK and VBAP ? or invoices  VBRK and VBRP? or customer material info record KNMT? 
    or do you capture this info in classification? then you get the values from AUSP
    Edited by: Jürgen L. on Aug 3, 2010 9:42 AM

  • EHS:Specification Material Assignment

    Hi,
    Can you please let me know how to assign a material to any specification of waste code (EHS-Waste Management)?
    I am getting an error massage "  You cannot assign materials to specification type Waste code."
    Thanks,
    Sameer

    hi sameer
    hope u remember me
    i am mandar sathe, working with satyam, where ur ex colleague nitin pandey is working
    answer to ur query
    waste is created as a material
    also waste is created as a specification with type REAL_SUB
    and this is the specification where material is assigned
    now to this waste (Real _SUB) waste code (specifciation of type Waste code) is assigned and to this waste code - waste catalog is assigned (EWC)
    if u hav problem in assigning a material to a specification of type REAL_SUb then plz check following configuartion
    specify specification type --> then select REAL_SUB and press on details (magnifier icon) and check whether Mat. Assignment check box is checked or not, if not checked then check it and try to assign a material to a specification
    hope i resolved ur query
    best of luck
    thanks and regards
    mandar sathe
    00919764007574

  • How would I find the first date a shipment occurred for a specific material

    We need to determine when an item is new and set the u201Cnew item indicatoru201D to True.  Once a material is considered new, the u201Cnew item indicatoru201D should remain true for a period of three years.  Each week, a process needs to run that looks at the material master data (First Arrival Date) and compares that with the current date to check if three years has passed.  If three years has passed, then the u201Cnew item indicatoru201D should be set to False. Initially, all items need to go through this process to set the new item indicator.

    Hi,
    You could setup a DSO keyed by material in which you have a date key figure that is set to MIN aggregation in the transformation. If you load that DSO from your shipments, it will automatically keep the date of the first shipment.
    You could then run a periodic load that could be picking up all the materials whose date in the DSO is older than 3 years and which are still marked as NEW_ITEM. In that load you then update the NEW_ITEM status.
    Cheers
    Henry

  • CO46 for sales order no exploded view for specific material

    Dear All,
    When using CO46 for a sales order it does everything correct exept for a specific material. It is displayed above the sales order in the hierarchy, like if it is not contained in it and there is no exploded view possible.
    When I look closer to the MRP for the material it has planned orders but the orders reducing quantity don't link to the sales order. The MRP element data is empty.
    Anybody has a clue?
    Thanks in advance,
    Michaë

    The material in the SOI created collective requirements. Change Material Master availability check to 02 and recreate SOI

  • Blocking Specific Material Type in Work Order

    Dear Gurus,
    Is there any way to block specific material type in work order. Could not find any suitable link in SPRO.
    Advance thanks for the update / response.
    Sahu.

    Hello Ajaya,
    Though I have never realized such requirement in SAP but I think user-exit "CNEX0026 : Customer enhancement for general inspection of material" can be useful. You can make use of structure RESBD or CAUFVD and fetch the material number which is being reserved in the maintenance order. Also, you will have to define the Z-Table for maintaining the material numbers which needs to be blocked. Configure the error message at the SAVE event.
    I have used this user-exit to make the entry of storage location mandatory whenever the material is reserved.
    I hope this helps. Please update the thread if you have managed to realize the requirement.
    Cheers!!!
    TOM

  • BATCH SPECIFIC MATERIAL UOM

    Dear All,
    I created material, base unit of measure EA order unit BOX.1BOX = 40 EA
    create PO ORDER 10BOX, 10*40=400ea.
    now the problem while receiving GR, I will receive 10box but each box 41ea.so it mean i received 10*41=410ea.
    I WANT TO CHANGE PACKING FACTOE IN GR ITSELF.
    How to do this scenario?
    i think it will work through batch specific UOM.
    PLS HELP ME HOW TO CONFIGURE BATCH SPECIFIC UOM BY STEP BY STEP  FOR THIS SCENARIO
    THANKS,

    Hi Bhaskar,
    U definitely need batch specific unit of measure for ur scenario.  do the following config
    1) Activate batch specific unit of measure
    2) Create a new batch specific unit of measure in "Edit batch specific unit of measure"
    3) Define calculation of proportion quantity from base qty
    4) Maintain the batch specific uom in material master
    5) Create class with CL02 for batch specific uom - assign relevant characteristic in this class
    6) Assign this class to material
    At the time of MIGO select the class and assign the new conversion factor
    U can change the conversion factor with MSC2N also
    Hope this will help u
    award points if found useful

Maybe you are looking for