TDS on subcontract items only

Hi experts,
We have a scenario in which
1. We will send 4 items to the subcontractor
2. The subcontractor will add 2 items to the assembly
3. Invoice will be for the full assembly (6 items) + Value addition cost.
Our requirement is that we need to pay the vendor for 2 items he has added and deduct the TDS for the service portion alone.
suggest how to configure this in the system.
Regards
ACR.Ruben

Hi,
You need to define entire sub contracting process for the above scenario.
Check the below links for more details :
http://www.sap-img.com/materials/sub-contracting-cycle.htm
before that you check the Constraints.
The following functions are not supported in Subcontracting for MRO Processes:
·        Goods movement using the Goods Receipt Order function (transaction code MIGO). Other standard goods movement functions, such as goods issue using the Transfer Posting function (transaction code MB1B) and goods receipt for purchase orders (transaction code MB01), are supported.
·        Refurbishment orders (standard order type PM04) in PM/CS
·        Forward exchange, where a subcontractor returns a serviceable part before the unserviceable part has been sent to the subcontractor.
·        Subcontracting MRP area
·        Repair of configurable parts
·        Archiving programs for serial numbers (object lists) in purchase orders and for certain special stock type tables.
·        Grouping, Pegging, and Distribution (GPD) does not take into account Subcontracting for MRO Processes, especially with respect to goods movements and special stock at the subcontractor, that is any special stock that does not have stock type Q.
·        In the case of return material authorization (RMA) orders, which you can create from repair orders in Sales and Distribution, the following constraints exist:
¡        There is no special stock indicator for MROsubcontracting in the RMA order or the relevant purchase requisition.
¡        The system does not copy the serial number from the RMA order to the purchase order.
¡        The system creates the return delivery for the original material and serial numbers and does not consider material number changes or serial number changes.
Hope clear.
Regards,
Kishore K

Similar Messages

  • Account assignment question (for subcontracting item category)

    Hello
    Is it possible to have a account assignment category with a consumption posting indicator V work with a subcontracting item category L?
    Our scenario is that a SD item category TAB auto generates a Subcontracting PO with account assignment M and item category L.
    The problem with account assignment M is that it references sales order, and does not propose BOM component material/quantity, like a standalone subcontracting movement (541 reference to PO)
    We want to issue components to the subcontractor referencing a PO, and maintain visibility thru ME2O (Which account assignment M wont allow).
    Is this possible ?
    I tried tweaking the account assignment category M by changing the consumption posting indicator to V.
    This allowed me to do the subcontracting issue 541 movement referencing a PO.
    However, I got 2 accounting errors at MIGO.
    No direct postings possible to G/L account 03-010
    I then changed the FS00 settings to allow direct postings, but got the next error and was stuck. I guess if these accounts are postable, my problem is solved but I don’t know how to do that!
    Acct. 03-010 for trans./event key BSX, postable directly
    If anyone is knowledgeable on account assignments or knows how I can solve these, I would greatly appreciate your input.
    Regards
    Ken

    Thanks for replying again, Gopala.
    Let me clarify, the SAP error I am receiving is at MIGO, following the successful transfer posting at MB1B (mtype 541 referencing the PO number. If I can get the proper account postings at MIGO (as in a standalone MM subcon scenario) here, my problem is resolved.
    When I hit post at MIGO (Finished Product mov type +101/Component reduction is -543 O) I receive the error "Acct. 03-010 for trans./event key BSX, postable directly " I then goto FS00 (G/L accounts) and uncheck the 'post automatically only' box. But then when I goto re-post at MIGO, I get the message
    "No direct postings possible to G/L account 03-010"
    So I am stuck in this circular error.
    Is this correctable?
    Thanks Again
    Ken

  • Credit Limit based on Open Items only.

    Dear Friends,
    Is it possible to set credit limit based on Open Items only ( Document Type RV)
    If the credit limit is crossed for accounting documents not yet cleared, then system should allow creating sales order, but block any deliveries further.
    Just to add this, we are using Oldest Open Item, to make sure system blocks deliveries if even one Billing document is overdue for payment.
    << Moderator message - Please do not promise points >>
    << Moderator message - Everyone's problem is important. Please do not ask for help quickly. >>
    Regards
    Trupti Deulkar
    Edited by: Rob Burbank on Dec 16, 2010 4:02 PM

    Hi,
    AT FD32,
    For respective customers Credit Limit should be made 99999999....(i.e maximum)
    Goto OVA8. Select the respective Credit Control area, Risk category & Customer Group.
    tick-> OpenItems
    Max.Open items 100% and Nodays Open here you can maintain the grace days (after the payment term limit expires) is allowed to do the transaction for respective customer.
    if grace days are '0', then as soon as payment term limit is expires system will block the transactions selected.
    Thank You,
    RB.
    Edited by: RB@007 on Dec 16, 2010 3:12 PM

  • Possibility to restrict interest calculation on open items only

    Hello All,
    How to restrict calculation to Open Items only via configuration when the system calculates interest on arrears. I have checked the options for interest on arrears and there is no option to restrict via customizing.Ofcourse, there is an option to calculate interest on open item in Item interest calculation but looks like the changes made for the item interest calculation (t056UX) will not work here for t056U(calculation on arrears).
    In f.2b , It is possible to exclude the cleared documents via dynamic selections as per the SAP note provided long time back. But this is only a work around.
    Any suggestions to restrict via configuration for int. on arrears for open items only?
    Thanks in advance....

    HI!
    It's used  for  Customer  Int  Calculations.
    INTEREST CALCULATIONS
    Ob46          Define Interest calculation
    Obaa          Prepare A/c balance interest calculation
    Oba4          Define Reference Interest Rates
    Ob81          Define Time Depend term
    Ob83          Enter Interest values
    F-52          Interest calculation
              To give Effect for floating rate of Int
              Foreign currency balances revaluation
    Ob59          Define valuation methods
    regards,
    Rup

  • Calculation for subcontracting item of type N (non stock) as it for type L(Stock)

    Hi Gurus,
    I have a Requirement for calculating the cost for Subcontracting  Non stock items N as it is getting calculated in standard functionality for subcontracting items of Type L.
    This will be done in CK11n ( used to calculate the standard cost estimate of the product) for header as well as component materials.
    please suggest the user exit or Badi where i can change.
    Please refer the below logic-
    BOM for the material 2000500 as Header and 1LPL0835298AB as a component and this component has an assembly with 7008508 as a component and this component is an Sub contracted item and this has an assembly with component 1LBA182151-3.
    Price calculation for the material 7008508 (Item Category as N). Since this is sub contracted item the price will picked from field EINE-NETPR.
    In EINA, pass the material (MATNR=7008508) to fetch the list of info records (INFNR) created for that material.
    Then it has to input those info records to EINE table along with Purchasing organization (EINE-EKORG=PT02).
    From the output of EINE table, it should compare the price (EINE-NETPR) of the PIR and should take the least price from those PIR`s.
    If the currency is other than PLN, then it should be converted to PLN based on conversion charges.
    For Material (MATNR=1LBA182151-3), it should pass the material number to table MBEW along with valuation area (BWKEY = WERKS).
    From the output, it should check the Price control (VPRSV) ‘V’ or ‘S’
    If ‘V’ the price will be picked from the field “VERPR”
    If ‘S’ the price will be picked from the field “STPRS”
    Also from the output, it should check the Price unit (PEINH) ‘1’ or other than ‘1’. If it is other than ‘1’ it should divide the VERPR or STPRS by PEINH. Then this is the price of the Material “1LBA182151-3”.
    The material (MATNR=1LBA182151-3) should be passed to table “MARA” and will take the Base unit of measure from that table “MEINS”.
    Br,
    Surya

    Hi Surya,
    Please put breakpoints in any of the below BADI's and check if any of them will trigger for your
    requirement:
    VALUATION_CK                            BAdI for Valuation in Product Costing
    CK_KALAMATCON2_CI                       BAdI for CI Fields for Table KALAMATCON2
    COSTINGRUN_CK                           Edit Costing Run
    COST_APPORTION_CK                       Maint Apportionment Structure Joint Production: Dist Rules
    CO_PROD_COSTING_CK                      Cost Management for Joint Products (Costing, Target Costs)
    DATA_EXTENSION_CK                       For Data Enrichment in Product Costing
    DYNPRO_EXTENSION_CK                     BAdI for Interface Enhancement in Costing
    ORDER_COSTING_CK                        Enables Header Data Changes in Preliminary Order Costing
    QUANTITY_STRUCT_CK                      Enables Quantity/Structure Changes in Costing
    SUR_STOCK_TRANSF_CK                     Overhead on Materials with Stock Transfer Between Plants
    Thanks
    Sri

  • HOW TO BRING BATCH SPLIT ITEMS ONLY  IN INVOICE

    Hi Team,
    We Have Following
    Business Scenario:  We Have already made a sales report in which we were fetching batch from VBRP table.
    1.Reason that when i do batch split and do Invoice I want to bring only Batch items in invoice.
    (I Have configured & Currently it is coming only Main Item wise Invoice.)
    Note: I have seen related blog's it is coming only Main item only if main item comes then it wont bring Batch nos.
    however customer demand's report batch wise sales.
    So kindly suggest
    Thanks
    YRHSP

    Dear YRHSP:
    We fance the same problem, when we implement main item only in the invoice.
    And we correct the report with table LIKP linked to VBRP - VGBEL Reference document and VBRP - VGPOS Reference ítem.
    Please check it
    Antonio Martinez

  • CJI5 commitment line items open items only

    hi guys,
    on the CJI5 screen paramter, there is one check box open item only.
    Could someone tell the exactly meaning of the paramter? How can we judge an WBS commintemnt line item is open or not open?
    thanks in advance

    another question:
    we always get the commitment amount from COOI table, if we do the partial GR for a PO iteam, can we still get the right commitement from COOI table via field WHGBTR?
    thanks agian

  • Possible for deducting TDS for a item ?

    hi all,
    Whether it is possible to deduct TDS
    for a item in ap invoice ?
    If yes, How to do it ?
    Jeyakanthan

    Yes you can do that.
    Mark the Item as 'Withholding Tax Liable' in the ItemMaster -> General Tab
    Mark the BP as 'Subject to Withholding Tax' in BP Master -> Accounting -> Tax Tab

  • How can we run MDBT transaction for non-valuated items only

    HI,
    We want to run the MDBT transaction for non-valuated items only...but through this transaction we can run for all items..
    How can we run only for non-valuated items???
    Regards,

    Dear Anil,
    MD02 - Material level planning ( Multilevel )
    MD01 - Plant level planning ( Multilevel )
    MDBT - Back ground MRP ( Multilevel )
    coming to ur query if all 20 materials belongs to one storage location or one MRP controller
    Then you perform MRP for that 20 materials with the above given user exit
    Also Plz refer my reply from this thread
    [Re: MD01 Replanification.]
    Regards
    Madhu

  • Create PO return for subcontracting item

    Dear Expert,
    I want to create PO Return for subcontracting item category.But when I tried to create it,the system prompted an error message:"Returns not possible for subcontracting items Message no. ME 548". Then I used SPRO to check the system message and there is no such a message in the system.Also I added this message into my system and set the catetory to "W". But when I create the PO Return,the same error occured.
    What should I do then?
    Any advice?
    Best Regard,
    Pauline

    Thanks for the reply.
    I have done one testing for PO return subcon item. I create the Normal PO return, and I create return delivery (mvt type 122) with reference to original material document.
    But when i checked in the subcon report ( ME2O/ MBLB/ MMBE) the subcon material dont have any effect when I create the return delivery. the subcon material should be increase as we return back the item to the vendor.
    Example here: we return back the boxes to the vendor, means the papers the we provided for them to produce the boxes should be increase ( means that they haven't done anything with the papers so the papers stock should increase)
    In the reports ( ME2O, MBLB, MMBE) they not show the changes in stock level of papers when there is return delivery transaction. I'm not sure whether I miss out something in the report ? or maybe there are other reports to show the subcon stock level.
    Pauline

  • Doing MIGO for subcontract item

    Hi Friends,
    When I am doing MIGO for Subcontracting items, I can explode the BOM & see the child parts. At that time I can change the qty. & unit of measure for child products. Is it possible to restrict these.
    I make BOM for the mail item & made PO accordingly.
    Because of this the value of the main item may be valued at higher or lower, which is not correct.
    Regards

    hi,
    the component u r attaching in the SC po, is planned consumption ratio, which is going to be used for conversion of finished goods-child material.
    here when u r making the GRN for child material, always there should be flexibility of changing the component conusmption, as there is always differance in planned and actual conumption.
    when u r sure that there is a change in conusmption pattern, u need to change the qty of the component while making the GR.
    (as per SC challan referance)
    if at after all goods receipt is done , and u observe the differance in component consumption, u can always adjust the same by MIGO_GS against PO-GRN.
    u cant make the component field in MIGO as blank and which is not advisable tooo.
    Edited by: manipal on Jan 8, 2008 6:15 AM

  • Time Machine Shows Desktop Items Only....?

    I'm using a 2GHz Intel Core Duo iMac, using Time Machine to backup to a 400GB Iomega external drive.
    The problem is when I go in to Time Machine to 'look back in time', the only items which appear in the historical finder windows are those items or folders actually located on my desktop, but excluding "Macintosh HD". This means, for example, if I want to restore an old file from my "Documents" folder of 1 week ago, I can not, as this can not be accessed via the desktop (bearing in mind the Macintosh HD icon also does not appear).
    Any ideas? Time Machine preferences do not account for this problem - I have not restricted backup to desktop items only.

    Time Machine displays whatever is selected in the left sidebar window. Try clicking on your hard drive, documents, pictures, etc. in the sidebar window one at a time and you will see the Time Machine display change to reflect their respective contents.

  • Calculation of cost for subcontracting item of type N (non stock) as it calculating for type L(Stock)

    Hi Gurus,
    I have a Requirement for calculating the cost for Subcontracting  Non stock items N as it is getting calculated in standard functionality for subcontracting items of Type L.
    This will be done in CK11n ( used to calculate the standard cost estimate of the product) for header as well as component materials.
    please suggest the user exit or Badi where i can change.
    Please refer the below logic-
    BOM for the material 2000500 as Header and 1LPL0835298AB as a component and this component has an assembly with 7008508 as a component and this component is an Sub contracted item and this has an assembly with component 1LBA182151-3.
    Price calculation for the material 7008508 (Item Category as N). Since this is sub contracted item the price will picked from field EINE-NETPR.
    In EINA, pass the material (MATNR=7008508) to fetch the list of info records (INFNR) created for that material.
    Then it has to input those info records to EINE table along with Purchasing organization (EINE-EKORG=PT02).
    From the output of EINE table, it should compare the price (EINE-NETPR) of the PIR and should take the least price from those PIR`s.
    If the currency is other than PLN, then it should be converted to PLN based on conversion charges.
    For Material (MATNR=1LBA182151-3), it should pass the material number to table MBEW along with valuation area (BWKEY = WERKS).
    From the output, it should check the Price control (VPRSV) ‘V’ or ‘S’
    If ‘V’ the price will be picked from the field “VERPR”
    If ‘S’ the price will be picked from the field “STPRS”
    Also from the output, it should check the Price unit (PEINH) ‘1’ or other than ‘1’. If it is other than ‘1’ it should divide the VERPR or STPRS by PEINH. Then this is the price of the Material “1LBA182151-3”.
    The material (MATNR=1LBA182151-3) should be passed to table “MARA” and will take the Base unit of measure from that table “MEINS”.
    Br,
    Surya

    Hi Surya,
    Please put breakpoints in any of the below BADI's and check if any of them will trigger for your
    requirement:
    VALUATION_CK                            BAdI for Valuation in Product Costing
    CK_KALAMATCON2_CI                       BAdI for CI Fields for Table KALAMATCON2
    COSTINGRUN_CK                           Edit Costing Run
    COST_APPORTION_CK                       Maint Apportionment Structure Joint Production: Dist Rules
    CO_PROD_COSTING_CK                      Cost Management for Joint Products (Costing, Target Costs)
    DATA_EXTENSION_CK                       For Data Enrichment in Product Costing
    DYNPRO_EXTENSION_CK                     BAdI for Interface Enhancement in Costing
    ORDER_COSTING_CK                        Enables Header Data Changes in Preliminary Order Costing
    QUANTITY_STRUCT_CK                      Enables Quantity/Structure Changes in Costing
    SUR_STOCK_TRANSF_CK                     Overhead on Materials with Stock Transfer Between Plants
    Thanks
    Sri

  • Vendor name not showing correctly in TDS GL line item display fbl3n

    Hi Gurus,
    I am facing an issue in regards to TDS. As you know that normally we make a cheque payment to a vendor, we issue one cheque for one vendor.
    But my client follows a slightly different practice. Suppose they have to pay an amount of 30000 to three vendor A B C equally 10000 each. They right a self cheque to the SBI bank and also send them the list of these 3 vendors who are also having their account in the same bank. They instruct the bank to take money from their  account and then credit in the respective vendors account.
    Now the transaction goes like this:
    Vendor A   10000
    Vendor B    10000
    Vendor C   10000
        To Bank                 29700
        To TDS on A              100
        To TDS on B              100
        To TDS on C              100
    Now when the user will go to FBL3N and check the TDS GL 100020196 and see the line items it should show like as per the client:
    Vendor A       100
    Vendor B       100
    Vendor C       100
    But it shows the below result:
    Vendor A   100
    Vendor A   100   ( should be vendor B)
    Vendor A   100   (should be vendor C)
    I believe that is the standard behavior of the system to show the vendor line. They do not want to change the way of their posting and their concern is if it shows like the same at the time of return filing how will know vendor wise tds.
    Now either I need to resolve this situation in FBL3N or give them a report which should give them Vendor wise TDS information for the TDS filing.
    J1INMIS report is there but it shows only the TDS and the vendor number, it does not give the vendor name. I either want a solution of this issue in FBL3N or a report which shows vendor wise TDS with vendor number and name. Please let me know if there is a solution to this issue.
    Kindly consider this very urgent.  I am attaching the relevant screenshots.
    Thanks
    Urmila

    Hi
    Unfortunately there is no report in SAP other than J1INMIS which caters to Indian reporting requirements. You can think of enhancing the same.
    Also check your enhancement for FBL3N as to why it is not working as it should with the help of your ABAP Colleagues. It is not displaying the name correctly.
    Thanks & regards
    Sanil Bhandari

  • GR of subcontracting items without issuing  components

    Hi all
    I am facing a problem regarding subcontracting. In a PO of material X  (item category L (subcontracting)) of required quantity 10, a component Y quantity 50 to make X is to be given to the vendor. The problem I am facing is that I am able to post GR of all material X without issuing any Y to the vendor. I should not be able to do this until all the component quantity (50) has been issued to the vendor. If I issue 5 Y then I should only be able to receive 1 X at max or not even 1 X. When I issue some quantity of Y it stays in subcontracting stock as seen by transaction ME2O.
    How to settle this stock with subcontractor and what should be done to not be able to MIGO all 10 X until 50 Y has been issued to vendor or or to be able to do it proportionally ?
    Also fine tune my concepts in this regard.
    Thnx

    Yes receiving is a physical activity not a computer activity but what I want to say is that even if X is physically received, the user should not be able to MIGO it if the components issued (subcontractor stock) is not settled.  When I MIGO the received items and enter 0 quantity for the issued component the system lets it be. Instead the system should issue an error implying  that all components have not been issued to vendor, so you can not receive X until you have issued all Y.
    Try to understand my point. I know physically the vendor will send the product only when he has received all components from us but on the system, I am able to receive all X without even issuing a single Y. This is important for me because if some receiver does this without settling the subcontractor stock, it will become an odd case because the movement type 543 which does this component settling is not selectable. It is automatic for subcontracting component line item. Kindly test this scenario on your system. Make a subcontracting PO, do not issue a single component to vendor and then MIGO this PO it with 0 component quantity. I am able to post the GR which i should not be able to because the shipper has not issued a component and the receiver is able to receive on the system. I just want the system to not receive until all the components have been shipped.

Maybe you are looking for

  • Solution on Link Failover for Hosted Webserver

    Hi, One of my customer has Web based application which is hosted over internet on IP provided by ISP. Challange is in case, the ISP link fails webserver is not available. Customer is planning to add one more link from different ISP. How do I Load bal

  • Registering Planning app with shared services

    Hello all. I created a new classic planning app (11.1.1) with the intention of mirroring our production app. I've copied that outline from the production app to the new app. I've also exported the sql server database used by the production planning a

  • IPhoto 8 hangs / beachball - solution

    I was having trouble with iPhoto 8 hanging when i started the application. I fixed this problem by unchecking both sharing options in the preferences (share my photos & look for shared photos). If only one on these options is used iPhoto starts behav

  • Hi, Can I use my CC Team account single app subscription to get indesign cs5?

    Hi, Can I use my CC Team account single app subscription to get indesign cs5? I puchased a single app subscription but realized I need an older version, can I deactivate my indesign 2015 and use my monthly subscription to install CS5?

  • Latest Version of Azure SQL Database

    What is the latest version of Microsoft Azure SQL Database ? Are there likely updates to newer versions ?