Time Intervals & Schedules

Hi,
Can we apply a time Interval & schedule to a sql query? I have defined a time interval and am using that to query a DateTime field in my table. Its not taking the time Interval for the selected Start & End dates and hence the results are not per the time interval selected... Any ideas?
Thanks

This is the Data in My SQL table :
Name      Age                  DateTime
Abesh          26     2006-12-15 07:00:00.000
Partha         27     2006-12-16 07:00:00.000
Dipankar       27     2006-12-17 07:00:00.000
Pradip         25     2006-12-18 07:00:00.000
Rahul          24     2006-12-19 07:00:00.000
Amit           29     2006-12-20 07:00:00.000
The Database Fields are :
Name        : Char(10)
Age           : Int
DateTime   : Datetime
Query Template : Date Range Tab
In my Query Template I set the Start Date as : 12/16/2006 07:00:00 and the End Date as : 12/19/2006 07:00:00, Date Format : MM/dd/yyyy HH:mm:ss.
Query Template : SQL Query Details Tab
Selected Table : MyTable
Selected Columns : Name, Age, DateTime
Date Column : MyTable.DateTime
Query Output
Name            Age              DateTime
=================================
Partha          27.00       12/16/2006 07:00:00
Dipankar       27.00       12/17/2006 07:00:00
Pradip          25.00        12/18/2006 07:00:00
Rahul           24.00        12/19/2006 07:00:00
Hope this solves your query.

Similar Messages

  • How to run an "Automator" application at regular time intervals

    I would like to find out how to run an "Automator" application at regular time intervals, say at every 5 minutes.
    Is there any program, AppleScript or any method to do this?
    I would very much appreciate a help.
    Suwan

    save your workflow as an ical plugin, this will automatically insert the workflow into ical,and create a workflow category for it, then just set to repeat every 5 minutes, or save as an APP and use a program called CRONIX (freeware) to run the schedule.

  • Time Machine Schedule

    I find the Time Machine schedule for backups too frequent.  Is there a way of changing this schedule rather than doing my backup manually as I'm doing now?  It also uses a lot of space because of this.  Any help will be appreciated.

    If you have Time Machine ON, changes on Time Machine Editor will not apply. Remeber to switch OFF your time Time Machine Preferences, as Time Machine Editor will handles the intervals. Maybe that's the problem. Hope this helps.
    Taken from TME faq:
    FAQ
    Should I turn the big switch from the Time Machine preferences to OFF?Yes. TimeMachineEditor handles the scheduling itself and has its own ON / OFF switch (which behaves very much like the one from Time Machine).

  • Time Machine Scheduler doesn't backup

    Having downloaded time Machine Scheduler V4 beta I've selected 4 hr. intervals and skipped backups from 5A to 10P. TMS isn't making any backups. Anyone else have a similar situation?

    This would be an issue best taken up with the developer of that utility. There's probably a good reason why it's still in beta, and this may be one of those reasons. The developer provides the utility "as is", so I don't know how much help he will provide.
    Regards.

  • 'Overlapping Time Intervals' error while loading the Master Data

    Guys,
              Need you help with this. I am trying to load the Master Data (attribute) for InfoObject 0FMD_FRSITM using DTP from DataSource 0FMD_FRSITM_ATTR and am getting an error 'Overlapping Time Intervals'.
    This is happening due to overlapping Valid From/Valid To date's for the same Financial Statement Item (0FMD_FRSITM) with different Editions.
    If I select the option 'Ignore Duplicate Records' while loading the data, it is successful. But not all the records are loads and Editions are missing.
    Below is an example of how the data looks like.
    FRSITM         Valid To                  Valid From                 Edition
    1001             12/31/9999             04/01/2010                2010.1.1
    1001             01/31/2010             03/01/2010                2010.1.2
    1001             12/31/9999             02/01/2010                2010.1.3
    In the above scenario, the Valid To Data for record 1 and record 3 is the same (12/31/9999) and the record 3 is being ignore when I select the option 'Ignore Duplicate Records'.
    And also I see that the Edition is not the Key Field.
    Any suggestions or ideas? Appreciate your help.
    Thanks.

    FRSITM Valid To Valid From Edition
    1001 12/31/9999 04/01/2010 2010.1.1
    1001 01/31/2010 03/01/2010 2010.1.2
    1001 12/31/9999 02/01/2010 2010.1.3
    1. While selecting ignore duplicate, make sure to-date is not part of symantic key.
    2. if system comes across two same records it picks up the latest one.
    3. It shall merge the timelines is overlap is found.
    4. I hope Edition is time dependent attribute
    I believe infoobjet key is FRSITM Valid To.
    In your case because first record has more period and may be the latets record system ignore the earlier one with the same time interval.
    have a look at Q table and you shall be able to figure out for your self.
    Hope it helps
    Vikash

  • SMS SRS Reporting Point - 7403 at regular time intervals

    Hi,
    At regular time intervals I see a 7403 error message in the "SMS_SRS_REPORTING_POINT" component appearing in my ConfigMgr 2012 SP1 environment. SQL Server 2012 is used.
    My reports are working fine and accessable via the Console and URL. This error 7403 appears twice a day. The srsrp.log states the following at the moment of the issue:
    STATMSG: ID=7403 SEV=E LEV=M SOURCE="SMS Server" COMP="SMS_SRS_REPORTING_POINT" SYS=servername SITE=XXX PID=8180 TID=6516 GMTDATE=Tue Aug 27 04:58:18.849 2013 ISTR0="servername" ISTR1="" ISTR2="" ISTR3=""
    ISTR4="" ISTR5="" ISTR6="" ISTR7="" ISTR8="" ISTR9="" NUMATTRS=0 SMS_SRS_REPORTING_POINT 8/27/2013 6:58:18 AM 6516 (0x1974)
    Failures reported during periodic health check by the SRS Server servername. SMS_SRS_REPORTING_POINT 8/27/2013 6:58:18 AM 6516 (0x1974)
    A few minutes before and after the health check is successful.
    I found out that at the moment of my 7403 error, the SQL RS recycle process is started. The log file reportserverservice.log looks like:
    06:55:58:: i INFO: Recycling the service from the default domain
    The recycle time of SQL Reporting services is configured at 720 minutes, so each 12 hours.
    Can someone tell me if this is normal and how I can avoid the 7403 error?
    Thanks.
    Greets!

    Yes I know this is an old post, but I'm trying to clean them up.
    Have you see this blog / KB before?
    http://myitforum.com/myitforumwp/2011/11/14/fix-configmgr-error-7403-srs-web-service-is-not-running-on-srs-reporting-point-server/
    http://www.enhansoft.com/

  • UK Delivery times on schedule?

    Hey Guys,
    Are the UK shipping & delivery times on schedule / correlate with the supplied Apple receipt?
    I ordered on the 28th July and have been given a shipping date of 18th August, with delivery 'on or before' 20th August. Are the dates provided generally correct, or a bit out?
    When can I likely expect to see the details to change regards the phone's moving westwards?
    Sorry if I've missed this elsewhere on the forum, but my eyes are aching... think I need them tested!
    Oh, I'm so excited!!
    Thanks

    just to add, that i tracked this via TNT, and all the tracking history this evening, is within the UK, and says delivery tomorrow, 13th - would have to be friday 13th eh! *rolls eyes*
    anyway, on this shipment there isnt this whole china and customs thing, its all been within the uk, and is now in northampton, so if this arrives tomorrow, this has effectively been next day delivery! very strange. lol
    i still would like to know if the 32 giggers are coming through quicker than the 16's.
    "+i am in the uk and ordered ordered 32gb ip4 from apple online on the 26th july. after my order it stated expected ship date of the 16th august with delivery being on or before 23rd august. its stayed like that for the ~2.5 weeks, today i had the preparing for shipping in the status. then an email saying it had been shipped today. but how long its journey will take is another matter, i know the ipad orders were virtually here a few days later after shipping, that they seemed to be shipped domestically, but i believe these iphones are coming via quite the exotic routes with stops in customs and all sorts, so the original receive date may well end up to be true yet, will post when i receive, incase its of any use to other UK ip4 orderers with similar dates!+"

  • DTP got failes due to overlapping time intervals of data records

    Hi,
    Can any one suggest me how to solve this issue....
    the problem is when iam loding Master Data DTP, the DTP is showing error message that Overlapping time intervals of data records.I mean the start data and end data for these error records are same.
    Eg: For some employees the start date and end data are same.
    Please advice , what can be done...
    Immediate reply is realy appreciated.

    Hi Shaik,
    By checking this check box ...
    You won't get any duplicate records, before loading the data DTP removes the duplicate records and loads into Master data.
    So, you can avoid the duplicate records by checking this.
    Regards,
    Ravi Kanth

  • View and Print 15 minute time intervals

    Hi there
    I've hunted high and low but I can't figure out how to set my Week view up to show 15 minute time intervals. I also need to print this view out.
    Any suggestions would be welcome.
    Cheers
    Cat

    I don't think you can.
    AK

  • How to read from DAQ in different time intervals

    Hello,
    I am currently using LabVIEW 2010. I am new to LabView.
    I have 9 thermocouples I want to record the temperature from and create a graph.
    For one graph I want to graph the data every second for the duration of about 1.25 hours. For the other I want to record and graph the data every 2 minutes for a duration of 30 minutes. The temperature then would be ramped up in an oven and set to a higher temperature. When it is stabilized, recording of the data again will begin again at intervals of 2 minutes for the duration of 30 minutes.
    The first is only to see the real time temperature variation while the program is recording and running. The second graph and data is what I will use to analyze.
    What I need help in is finding out how you can read from the DAQmx at two different time intervals. I tried two parallel loops with each one graphing the two separate graphs I need with a delay time. Those two parallel loops where then surrounded by another while loop. The result is that the outside loop waits until both loops are finished so I do not get the correct results for the real time data graph.
    Is there a way to call on the DAQ data you need at the time interval you desire? Any suggestions to solve this problem? Thank you for your time and help.

    You are on the right track.  Sample the data at the fastest rate and send it to the 1st graph.  For the slower graph, take a sample from the faster data at your desired time interval.  You could use a timer and a case structure for something quick and easy and still have everything run in the same loop.  You could use two loops running at different speeds, it is just a little more involved and a few other things to consider. 

  • AS01 Asset Master - Problem with Cost Center in Time Intervals

    Hello experts,
    I need your help to solve this problem, in the tab Time-dependent - More Intervals - Overview of time intervals
    When i add a new interval and change the Cost Center, the system modify all the previos intervals setting the last Costo Center to all, i dont know why the system do that, thanks.

    Hi Gaetano,
    check that the prerequisites which are explained in [Note 684659|https://service.sap.com/sap/support/notes/684659] are fulfilled.
    I assume that you are on a release R/3 Enterprise or higher.
    - KOSTL activated in ACSET
    - cost element existing
    - field status allows KOSTL in the account
    - cost center maintained in asset master record
    Regards,
    Markus

  • Time based scheduling  of adaptors in NW 2004S

    Hi XI gurus,
    I know that time based scheduling  for adaptors(Let say polling starts at 2 AM daily) can be done in SP19 of NW2004.
    Could anyone tell me in NW2004S this feature  is availbale or not and if yes on which SP ?
    Regards
    Vijay

    SAP NetWeaver 2004 SP Stack Release to Customer (RTC) Additional nformation 
    SPS 21 Calender Week 42, 2007 (planned) 
    SPS 20 May 3rd, 2007
    SPS 18 August 22nd, 2006
    more detail
    https://websmp106.sap-ag.de/~sapidb/011000358700001130682005E
    SAP NetWeaver 2004s SP Stack Release to Customer (RTC) Additional Information 
    SPS 14 Calendar Week 45, 2007 (planned)
    SPS 13 Calendar Week 32, 2007 (planned)
    SPS 12 Calendar Week 21, 2007 (delayed)
    SPS 11 March 5th, 2007
    more detail
    https://websmp106.sap-ag.de/~sapidb/011000358700004584092005E
    hope help you!
    Please Award points if help is useful .

  • Problem in creating part time work schedules

    Hello All,
    I have to create some part time work schedules rules for part time employees
    Work: Tuesdays to Fridays
    a)Tues-Thurs 6.5 hours per day   i.e. 9.30 to 5
      9:30 u2013 14:30 work
      14:30 u2013 15:30 - 1hr lunch break
       3:30 u2013 17:00
    b) Friday - 7 hours (9:30 to 14:30)
    Total hours per week are= 26.5
    1) I created one fixed break schedule 14:30 u2013 15:30 (unpaid)
    2) I created 2 Daily work schedules
    Tuesday to Thursday u2013 NOR & (created variant A)
    Only Friday u2013 NOR1
    3) I created one Period work schedule u2013
    P/Time u2013 Mon is FREE, Tue to Thursday as NOR , Fridayas NOR1 & Sat, Sun as FREE
    4) When I try to create Work schedule rule I got stuck in between:
    I configured weekly working hours as 26.5
    I configured monthly & annually working hours.
    But  I had problem to put daily working hours???
    because Tue u2013 Thurs are 19.5 hours (6.5 into 3) & Friday (7Hrs) =26.5
    Hence how to I club both the working patterns in one Work schedule rule???
    Please help me out in same
    Regards,
    Nithi

    niti
    actually i dont have SAP Login here
    in the Table V_T508A
    u define the annul working hours , Monthly working hours  right
    Can u tell wht are the other feilds there
    26.5 hrs is the Combination of two Periodic Work Schedule right ..........if yes
    26.5/31  31 is ur working days
    Edited by: Sikindar on Apr 6, 2009 10:10 AM

  • Help!!coll​ect data at particular time intervals/​cycles

    Hello,
             I have to write a program to collect data at particular time intervals/cycles. We collect data at 100 points per cycle for 5000 cycles. But due to the huge volume of data I have to collect at certain intervals ( say cycles 1-10, 29-31,49-51 .... 3999-4001 .. 4999-5000). I would appreciate if anyone could please help me with this program.
    Thanks and bext regards
    lax

    Hello,
              Thanks for your reply. I have just started with LABview and the program I am dealing with was written by someone else. Anwyays, we are using  a NI PCI 6259 data aquisition card and NI SCXI (these are data aquisition for each channel I guess). We collect the load and deformation data (using LVDTs), which is the primary purpose of the project. We apply a load for 0.1s and rest for 0.6s. We collect the data at 100 points per second for the whole test (which runs for either 90minutes or 5000 cycles). We just start the test and collect data all the way through and the rate of collection remains the same throughout the test.
              As for finding out when exactly the cycle starts and ends. We will have to find that with time I guess. We plan to collect data for the first 100 cycles, then for 2 to 3 cycles every 50 or 100 cycles (which may increase towards the end of the test, i.e. we might jump from 3000 to 4000cycles).As for collection we collect the data 1sample at a time.
             I have attached a part of the program which measures all the data (which is part of another program). Some VI's might be missing (DAQmx start task, DAQmx stop task, DAQ mx read). Please let me know if you have any solution. Thanks again.
    Regards
    lax
    Attachments:
    Measure_All_FastData_queue.vi ‏51 KB

  • Joining Timestamps and Time Intervals + SQL Server 2012

    I'm trying to compile a report for the uptime of some assets grouped into 10 minute intervals, with the time the asset went down reported on in the next 10 minute block and any block it crosses into.
    Currently I have two tables the first is a Calendar table with entries for each 10 minute block which creates my time intervals for the month.
    CalendarDate
    01/01/2015 20:20:00
    01/01/2015 20:30:00
    01/01/2015 20:40:00
    Etc.
    The second table is my Events table which gives me the start of the down time and the end of the down time along with some other useful data.
    StartTime:-01/01/2015 20:29:25
    EndTime:-01/01/2015 21:42:54
    Asset:-Asset01
    EventCode:-Event01
    TimeOnRoundedUp:-01/01/2015 20:30:00
    TimeOffRoundedUp:-01/01/2015 21:20:00
    And
    StartTime:-01/01/2015 22:01:31
    EndTime:-01/01/2015 22:02:01
    Asset:-Asset01
    EventCode:-Event01
    TimeOnRoundedUp:-01/01/2015 22:10:00
    TimeOffRoundedUp:-01/01/2015 22:10:00
    There is only 1 Event active per Asset at any given time but many events for different assets, some events only last 30 seconds and are within the same 10 minute reporting period, other events span one or more periods.
    The result set I'd like to see is grouped by CalanderDate, Asset and EventCode showing the total number of seconds in the ten minute window the asset was running.
    Using the two examples above I'd like to see the two rows below:-
    CalendarDate, Asset, EventCode, RunningTimeSeconds
    01/01/2015 20:30:00, Asset01, Event01, 565 (600-35)
    01/01/2015 20:40:00, Asset01, Event01, 0 (600-600)
    01/01/2015 20:50:00, Asset01, Event01, 426 (600-174)
    01/01/2015 21:00:00, (600-0)
    01/01/2015 21:10:00, Asset01, Event01, 570 (600-30)
    For the Events that Start and Stop in the same interval I can get those, using DATEDIFF, it's the Events that happen to span one of more periods I can't work out.
    I can add additional columns to the tables if needed.
    Any and all help is greatly welcomed, thank you for reading my post.
    Mark

    Give this a go:
    DECLARE @calendar TABLE (dateTime DATETIME)
    DECLARE @daTetime DATETIME = '2015-01-01'
    SET NOCOUNT ON
    WHILE CAST(@dateTime AS DATE) = '2015-01-01'
    BEGIN
    INSERT INTO @calendar (dateTime) VALUES (@dateTime)
    SET @dateTime = DATEADD(MINUTE,10,@dateTime)
    END
    SET NOCOUNT OFF
    DECLARE @events TABLE (startDateTime DATETIME, endDateTime DATETIME, asset VARCHAR(20), eventCode VARCHAR(20))
    INSERT INTO @events (startDateTime, endDateTime, asset, eventCode)
    VALUES ('2015-01-01 02:39:57','2015-01-01 02:59:32','asset01','event01'),('2015-01-01 10:22:57','2015-01-01 13:01:32','asset01','event01'),('2015-01-01 17:38:57','2015-01-01 19:39:32','asset01','event01')
    SELECT *,
    DATEDIFF(SECOND,
    CASE WHEN e.startDateTime >= c.dateTime THEN e.startDateTime
    WHEN e.startDateTime < c.dateTime THEN c.dateTime
    END,
    CASE WHEN e.endDateTime <= DATEADD(MINUTE,10,c.dateTime) THEN e.endDateTime
    WHEN e.endDateTime > DATEADD(MINUTE,10,c.dateTime) THEN DATEADD(MINUTE,10,c.dateTime)
    END
    FROM @calendar c
    LEFT OUTER JOIN @events e
    ON e.startDateTime BETWEEN c.dateTime AND DATEADD(MINUTE,10,c.dateTime)
    OR e.endDateTime BETWEEN c.dateTime AND DATEADD(MINUTE,10,c.dateTime)
    OR c.dateTime BETWEEN e.startDateTime AND e.endDateTime

Maybe you are looking for

  • Populating the "Collections" drop down list in FEP reports

    When an FEP Antimalware report (e.g., the Antimalware Activity Report) opens in Report Manager or the FEP console, I see a drop-down list labeled Collection: from which I need to make a selection before the report can run.  But on our site, this drop

  • Unibody 15 " january 2009....screen goes black, won´t start/react

    I have got this problem: Working on the computer, screen suddently turns black. Computer still running i think as there are fan-noise. This happens totally unpredictably, only thing to do is force quit by holding power button. I saw the thread below

  • Include connections file - subfolder

    I have just loaded a brand new site onto a webserver (it was tested on another site as a sub site) the main site has a subfolder called admin and is connected to the database via <!--#include file="Connections/lra.asp" --> and it all works fine. howe

  • FR Web Report - Can't export to query

    In Hyperion Planning/Workspace 11.1.2.1, after running Web Report (HTML), cannot "Export in Query Mode" to Smartview. It launches Excel, but the worksheet stays blank and the report is not populated. It doesn't make a differenc if I'm already logged

  • I'm having a strange problem with itunes Match (as do many apparently)

    In several instances, I have individual songs within an album that has been matched that are showing as ineligible. How to fix? I have two Apple IDs authorized on my computer (my wife's and mine) but that shouldn't explain individual songs that have