TM implementation without standard shift pattern

Hi All,
Can you please let me know, how can we configure the Time Management, if the client is not having standard shift pattern. This is a shipyard. Here the employees are not having standard shift pattern.
Thanks & Regards,
Sumathi.

Hi Deck,
This is actually a ship yard, here employees are working in shifts, however specific shift pattern is not defined to anybody, because it all depends on the work assignment by the managers. In this case how can we configure the work shcdule. If i use the flexi time in the work schedule, how can i calculate the OT correctly, because there are different OT ratings based on working at day or night and after working for specific OT hours there is a different rating.
The concept that you have sent me, i did not understand.
Could you please give me more idea on this.
Thanks & Regards,
Sumathi.

Similar Messages

  • Proceeding without standard costing for May08 and June08

    Hi,
    We have implemented Material Ledger here.
    The backlogs are on.
    We are still on May08 backlogs.
    We had to proceed without standard costing for May and now also for June which we would be able to finish by July 20th.
    After that we will be doing the standard costing run for July 2008 by 22nd July.
    I dont think we neeed to calculate and settle variances for May and June 2008.
    Please guide.
    Could you please guide me on what precautions that need to be taken.
    Also, when I do the actual costing (ML) run for July in August 2008, I think only the variances for July will be calculated and settled.
    Any material Ledger experts, please advise and guide.
    regards,
    Nidhi

    Hi Elaine,
    Thanks a lot for your reply.
    You are absolutely right.
    The system will not allow me to close July in ML, unless I have closed May and June.
    Also, the second option is completely ruled out. Every material has to be included in the ML run.
    For carrying out ML closing activities for previous posting periods, the note no. 361236 would help. Please advise.
    Also, Elaine, I am noticing that despite the fact that we did not do the standard costing run for May 2008, the system is using the standard cost estimate of April 2008 to calculate all variances.
    I checked the costs analysis of all process orders and the system is correctly calculating the variances for all process orders.
    So please suggest if the steps I am mentioning below are correct:
    May 2008:
    I will first calculate production variance using T code KKS1
    Then settle the production variance using: CO88
    Then I will carry out ML run for May using: CKMLCP
    May closes in Material Ledger
    June 2008:
    I will first calculate production variance using T code KKS1
    Then settle the production varinace using: CO88
    Then I will carry out ML run for June using: CKMLCP
    June closes in Material Ledger
    Then I will do the standard costing run for July 2008.
    (Also please note that we closed May and opened June in MM using MMPV, because one region is still in May backlogs while the other has started June backlogs. So the current period in MM is June and previous period is May 2008. This I guess should not have any impact on the ML run for May 2008)
    Please guide me with possible reconstruction of steps.
    Thanks a lot & regards,
    Nidhi

  • Order settelement without standard cost estimate

    Hello,
    My Scenario MTS,
    Client doest not want to take Cost roll up (Standard cost estimate run) the price control code 'S' for all the Finish goods, Semifinish
    and raw materials.
    In this how to handle order settelment , variance calculation without standard cost estimate.
    Please provide configuration steps also.

    Hi,
    Can you let us know why your client does not want to update the std. cost price for a material?
    One of the key reasons for implementing SAP or any ERP system is to monitor the cost & value flows within the organization. Unless there is some compelling business need for it, you should strongly advise your client to go for costing of parts / assemblies.
    However if no costing is done & the std. price is '0' then if the activities have prices maintained, then when a confirmation is posted only the activity cost will be posted on the order. The variance calculated will then show only the difference if any b/n plan / target / actual activity costs, while part cost will remain zero.
    Regards,
    Vivek

  • How do I select all instances of a clip in the timeline at once without manually shift clicking each instance?

    Title says it all!
    How do I select all instances of a clip in the timeline at once without manually shift+clicking each instance?
    The reason I want to do this is because I have a music video with MANY quick cuts. So clips are cut up and splattered all over the place. I am colour-correcting now and so I want to be able to select one clip everywhere it exists in the timeline so I can drag the effect onto all them at once, without having to find each instance of the clip in the timeline. This "batch select" would make it so I don't miss any instances of the clip and also saves a ton of time going through the timeline and shift clicking each time the clip turns up.
    I hope PP is smart enough to do this
    Thanks in advance!
    -- Tim

    Pick one instance of the clip, maybe even the first bit ... and use the new Master Clip feature ... here's first a written explanation and then a video tutorial on doing this ... it's a great feature.
    Adobe Premiere Pro Help | Master Clip Effects
    How to apply effects to all instances of a clip | Adobe Premiere Pro CC tutorials
    Neil

  • Re:No release of production order without standard cost estimate

    Hello Experts
    I do not want to release any production order without standard cost estimate
    I have come acroos the same problem raised by some other users and can you please suggest how to achieve this?
    Is there any way to achieve this without user exit?
    Thanks and Regards
    Subbu

    Hello Subbu,
    In this case, you need to put the status as "B4" Blocked in costing 1 view of material master, when you create the costing view and change it to "03" status when you released the cost estimate.
    Please note that this field can be overwritten in MRP view also. Hence please get the good control of material master and good coordination with PP team to achive this.
    Please let me know if you require any clarifications.
    Thank you,
    Regards,
    Santosh
    Please reward points if helpful.

  • Without standard release confirmation should not allow in process order

    Our clients need is that without standard release confirmation should not allow in process order.
    We are using CORK,cor6 and MB31 My need is to apply user exit in all cases.
    I got input from sdn User exit:-PPCO0006 Function module Exit_SAPLCOZF_003
    INCLUDE ZXCO1U06
    I need to activate this only during confirmation.ie confirmation to be avoided if cost is not released.
    Regards,
    Pert

    Hi,
    You are right. For preventing confirmation in case std cost estimate release is not available you need to do enhancement. You can check for following exit along with exit which you mentioned in your post :
    Enhancement     CONFPI05
    EXIT_SAPLCORF_405 - Process Ord. Conf.: Cust.-Specific Enhancements when Saving
    INCLUDE ZXCOFU10
    Check either of the enhancements which may fulfill your business requirement.
    Regards,
    Tejas

  • Goods movement - without Standard cost

    Hello All
    In our existing client system, price control for new material X is maintained as 'S'. We have not maintained the standard price in it yet.
    Ideally if price control is 'S' and you dont maintain a Standard cost of the material. SAP does not allows any goods movement on this material.
    But without standard cost if I am able to raise a Purchase order (which is fine) and also able to do GR (using MIGO).
    The result being GR is done and FI document is posted with PO price + MAP is updated with PO price.
    Is it std SAP functionality or is there is a setting which I have missed.  Please let me know.
    Note: Price control indicator for material type is 'S'.

    Dear Rajeshwari,
    1.You can use the plant specific material status to block the material for production,purchase and inventory management,by
    creating a new key in OMS4 and set the value as B in all these parameters and assign this value in the material master in MRP1
    view of the particular material and set the valied from date.
    2.In case if you want to remove this valu or say you have carried out a standard cost estimate,you can remove the assignment in
    MM02.
    3.For blocking the production order creation for the materials that does not contain a standard cost use this BADI -
    WORKORDER_UPDATE(method during Release).
    Check this link,
    Re: error msg if  no standard cost present  for  Production order target cost
    4.Also go through the points suggested by Ajay,
    Regards
    S Mangalraj

  • Shift patterns for work centers

    Hi,
    I have question regarding shift patterns for work centers. We are actually utilizing the work centres in a aftermarket setup (service jobs). What we would like to do is to add shift patters to the work centers which look similar to this:
    Mo-Su 07:00-19:00, Mo-Su 19:00-07:00     4days on/4 days off/4 days on/4days off. As you see we would like it to be a rolling schedule so the first 4 working days the day shift, then 4 days off, then the next working days the night shift and so on.
    Is there a way of simplyfying this setup? The length of the cycle can only be set to a maximum of 7 days meaning I can not create a rolling schedule in a simple way. I do know that I can manually add intervals with say a seven day cycle and defining the working hours and additional create shift for holding predefined working hours and breaks.
    I have looked at shift sequences but that doesn't seem to be helpful in this scenario? The sequence seems only to be used as a sequence on a daily basis. 
    If anyone has solution for this or if you have any thought on how to process I would be very thankful if you shared these.
    Thanks in advance
    Edited by: Karimi on Aug 12, 2008 1:13 PM

    In T.code : SHR0 (zero) Shift Report overview.
    Enter Report Type and Usage as workcentre, please do the this customazation then you find workcentres in F4.
    http://help.sap.com/erp2005_ehp_03/helpdata/en/45/c9ba093c512e96e10000000a155369/frameset.htm
    Please read the information from above link this should help.
    Jim

  • Best way to implement a standard layout across application

    What is the best way to implement a standard layout across the application?  For example, I am converting an HTML/ColdFusion site to Flex and I need to keep the look of the existing site in the new Flex app.  I need a standard layout on every screen in the new app with a standard header, footer and left nav bar.  Do I need to add that code to every screen in the app or can I just create on layout file and call that into every screen?  Thanks!

    There a few that will help you, look for Form and validator.
    Sincerely,
    Michael
    El 16/05/2009, a las 14:01, lee704 <[email protected]> escribió:
    >
    Thanks.  Are there sample data entry apps in the Tour de Flex samples?
    >

  • Jumping between apps without cmd shift

    In Tiger, I could work across various apps and in the finder without cmd shifting between apps as long as they were visible in one or the other monitor.
    In Leopard I have to cmd shift or select the gray bar at the top or along the side of an app to use it, not just click on a file or anywhere in the window as per Tiger, very tedious.
    I can't find a preferences menu option for this behavior either. Has this behavior changed between versions?

    Thanks Barney,
    Your mention of which apps has narrowed the problem down... its only Motion that I seem to have the problem with, other apps behave normally but Motion won't 'let go' til I have selected the top or side bar of another app. Many thanks, I think I need to reinstall Motion anyway.

  • Implementing  circular-left shift in java

    i'm an fresher currently in a project on SHA algorithm
    i would like to know how to implement circular left shift in java
    whether there is any method in java to implement this ,
    if in case what package i have to import.
    please reply me,
    yours sincerely
    hari hara ganesh.d
    india

    int number= ...;
    int shift= ...;
    int rotleft= (number<<shift)|(number>>>32-shift);kind regards,
    Jos

  • Mexico Digital Invoice Implementation without XI.

    Hi All,
    We are in the process of generating Digital invoice for Mexico.
    Is it possible to generate the Digital invoice without the XI system? If possible then what are the hurdles and challenges in achieving this. I did go through the list of Notes mentioned by SAP to implement Digital Signatures for Mexico. But they dont seem to mention about implementing with out XI system.
    Also is there any standard process to generate the XML required for Mexico. Appreciate any clarification for the above queries..
    Thanks in advance.
    Regards,
    Navin.

    Hi Naveen,
    Is important to consider three points at the moment of implementin Digital Invoice Mexico:
    Enablement of ODN (official document numbering).
    Enable digital signature in SAP.
    Creation of XML.
    You can perform the first two options withount PI/XI but the only problem will be the generation of XML, that for fiscal purposes is the digital invoice. If you are not using PI/XI you can do that by ABAP, Webmethods or any tool that generates XML.
    If you decide to generate the XML with ABAP, you dont need to use IDOC but is still needed to create an output message that generates the XML instead a smartform or other. This can be sent automatically to customers or to any kind of repository to keep the files for fiscal term.
    The structure of the XML must follows all Mexican requirements acording to Anexo 20 that you can find only in spanish.
    I suggest you to read the attachments on the following note, where you can find the structure and requirements and order of each XML field:
    1318342 - Digital Invoice Mexico IDoc basic type INVOIC02 Extension
    Regarding the standard process to generate XML in SAP, the only information provided by SAP is for PI/XI, so your ABAP team needs to take a look for anexo 20 structure:
    ftp://ftp2.sat.gob.mx/asistencia_servicio_ftp/publicaciones/cfd/Anexo20RMF2010.pdf
    I hope this may help you.
    Regards,
    RP

  • Process Order Creation without Standard Cost

    Hello All,
    I need a functionality.. If standard cost is not released for a period , system should not allow me to create a process order in the certain period.
    Is any standard configurations allow me to achieve this????
    Thanks & regards
    Mahesh
    Message was edited by:
            Maheshbabu M G

    Mahesh,
    Standard SAP allows creation of order without Std cost estimate. Only in REM you could make it give error.
    However I suggest you could implement the exit PPCO0006.
    In this the function module EXIT_SAPLCOZF_003 contains the import parameter CAUFVD_IMP which has material number (MATNR) and plant (WERKS). Pass these to table MBEW and get the value of STPRS (std cost). If this value is 0 then give the error.
    Hope this is useful....if so reward points and close this thread.
    Regards
    Ram

  • XML Publisher Report in EBS without Standard Oracle Report

    Hi folks ,
    i have some questions.
    Can I create a XML Publisher Report for the EBS without a Standard Oracle Report in EBS.
    So that I can build up the files with the Desktop Publisher, create Data Definition / Template with Upload / Create the executable und concurrent and than only start the new program in EBS ?
    I have the situation that I can start my program with the template in the background but ít is searching for the report on the file system.
    Thanks in advance for the feedback.
    regards
    Kay

    Hi Ravi ,
    can i do it only with the xml Publisher , because when i tried it in the past and get all the staff like Template / DD / CP up and running and started the CR i get an error from the system that he is missing a report directly in the file system... so he searched for the report himself on system like a standard 6i Report. But the template and the dd is stored in the db. So my question again, can I use the XML Puplisher without a Standard Report or can i use a dummy file only for checking and after that he use my template / dd.
    regards
    Kay

  • Standby implementation in Standard Edition

    To All,
    I am Ashok(DBA) from Nepal. My country is a developing country and cannot afford Oracle Entreprise Edition in most of the instuations.
    So I need to implement Standby database in Oracle Standard Edition. I need this feature both in Windows and Unix based platform.
    I will be grateful if suggestions come on implementing this feature in Standard edition.

    Hi!
    1) This is the wrong forum (try the Database forum).
    2) Yes, Oracle software is expensive.
    3) In order to use the DataGuard (Standby database) you need the Enterprise Edition.
    4) Workaround is to export / import regularly and use XE.
    cu
    Andreas

Maybe you are looking for

  • Help me I'm in a tough situation, is there a technical solution?

    Apple have previously disapproved my previous version of this issue because I was not clear about my questions, so I have chosen to rephrase them. Despite this "misunderstanding" I was actually asking for technical help and instead got deleted. Pleas

  • I've been "looking for printer" for four years.

    Hi everyone, I decided to bite the bullet and make a forum post before giving in to my frustration and chucking the thing out the window... I am running OS 10.6.8 on a mid-2008 MacBook and have an HP Photosmart C4385 all-in-one wirelessly connected.

  • No. of Channels in a PXI Embedded Controller

    How many DMA channels are present in the NI PXI 8105 controller ? I have read that in NI PXI 7831 r, there are a total of 3 DMA channels, So if I am using 3 such cards I need to have 9 DMA channels in my controller for sending the data to these cards

  • Error looking up remote object

    I have created an application that needs to reference several synonyms that exist in another schema on another server. When I compile my package in SQL Developer, I run into the error message: ORA-04045: errors during recompilation/revalidation of GI

  • Newbie saving question in Illustrator

    I know this is a newbie question. I designed a logo in Illustrator. Is there a way to save just the logo for exporting into other applications (ie Pagemaker or Photoshop) without having the white artboard? Thanks Brad