TO confirmation with difference
Hello!
Could someone give advice how to solve following issue:
- i have purchase order for STO (with delivery).
- delivery document (type NL created)
- TO for delivery document created (we have warehouse functionality active)
- when confirm TO with difference, system issues following message " Item category is not defined VL324"
When posting the same material without difference the error message doesn't appear. I have checked assignment for item categories, seems all settins are there.
Where I could search for solution?
WBR,
Brucke
Thanx, Karthik!
I did check already on those settings- item category is relevant for picking. This is not the case. May be I have to do some settings for movement type 641? Any idea?
WBR,
Brucke
Similar Messages
-
TO confirmation with difference in HU
Hi,
I want to know which is the correct process, beacuse I want to report difference during picking confirmation in an HU, however it correctly sends the stock with a new SU but if we want to see the HU it sends an error that it has an Inventory status that does not enable to display or change, and we can not move the stock to other bin.
ThxThe only movement possible is to make a good issue of HU created in the difference
-
WM TO with differences using KANBAN
Hi experts,
I am executing stock transfer from WM managed storage location using Kanban. When the bin is empty, TR is created and TO created automatically , the kanban bin status set to "In-Process" (My status sequence has 3 mandatory statuses - EMPTY, In-Process and FULL). I need to confirm the TO with differences. As I cannot post WM TO with differences from Kanban Board, i went to LT12, foreground option and confrimed the TO with differences.
When I checked Kanban board for bin status, it's still in "In-Process" state and when I try to FULL the bin the system is throwing the error saying "TO items have already been with drawn".
Is it the standard behaviour or is there some thing we missed it somewhere?
Request you to help.
ThanksI also tried this with OM13 control type 2 - Direct stock transfer, and I had the same results.
-
Kanban with WM interface: WM TO with differences
Hi experts,
I am executing stock transfer from WM managed storage location using Kanban. When the bin is empty, TR is created and TO created automatically , the kanban bin status set to "In-Process" (My status sequence has 3 mandatory statuses - EMPTY, In-Process and FULL). I need to confirm the TO with differences. As I cannot post WM TO with differences from Kanban Board, i went to LT12, foreground option and confrimed the TO with differences.
When I checked Kanban board for bin status, it's still in "In-Process" state and when I try to FULL the bin the system is throwing the error saying "TO items have already been with drawn".
Is it the standard behaviour or is there some thing we missed it somewhere?
Request you to help.
ThanksHi,
In WM/PP interface you can't set automatic creation of TOs at the relase of PrdOrd. You can anly create TR when you release the PrdOrd.
As mentioned by Sarita Doddi you have to process the TR to get the TO.
You can do this manually from LB10 or you have to run report RLAUTA10 in SE38 (or schadule it as a background job). For details please check:
http://help.sap.com/erp2005_ehp_04/helpdata/EN/97/91cfd2571211d4b3210050045571f7/frameset.htm
Regards,
Csaba
Correction:
You can achieve immediate TO creation but not htrough WM/PP interface. See OSS note 566090.
Edited by: Csaba Szommer on Jul 30, 2009 9:49 AM -
I have just transferred my entire application file from an Imac to an identical Imac, both running OS 10.9.5. Everything works fine, excepting that when I attempt to open Photoshop 6, I am prompted for the serial number. I enter the serial number provided by Adobe, which I have confirmed with my "previous purchase" records kept by Adobe. It is demanding a "qualifying product", all of which is contained in the complete files I transferred. Why can't Adobe recognise my valid serial number for Photoshop 6?
I have just transferred my entire application file from an Imac to an identical Imac,
Say what?
Please use the proper installer.
Are you really talking about Photoshop 6 or about Photoshop CS6? -
Goods confirmation with quantity 0 and final delivery set
Dear SRM Experts,
I would like to share with you the below problem that i asked to be answered from SAP support and would appreciate any solution suggestions for this problem.
The problem I'm facing is relevant for two of my clients: one using SRM 4.0 with ECC 5.0 and the other using SRM 5.0 with ECC 6.0.
I was looking for a note solution concerning goods receipt reappearing in the confirmation screen (BBPCF02) although the confirmed quantity was equal to the ordered quantity and by chance I came up against note 1292032 - Goods confirmation with quantity 0 and final delivery set; that was released after a long list of notes that DID ALLOW the posting of Goods confirmation with quantity 0 and final delivery set.
[Note 1292032|https://websmp130.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=1292032]
Applying this note through the note implementation or Support package will ELIMINATE the option for the Goods Recipient (that do not have and will not have a PO change authorization) to indicate in any way that he is not expecting to receive those goods.
Please follow the below example to exemplify this problem:
A PO was created as follow:
Item Product Quantity Price
1 A1 10 10
2 A2 10 12
3 A3 10 14
4 A4 10 16
5 A5 10 18
6 A6 10 20
A first confirmation was created for the following products and quantities:
Item Product Quantity Final Delivery
1 A1 5 X
4 A4 10
5 A5 2
A second and FINAL confirmation was created for the following products and quantities:
Item Product Quantity Final Delivery
2 A2 8 X
3 A3 10
So at the conclusion of the above example:
For items 1; 2; 3; 4 the delivery completed indicator should be set as all expected quantities were delivered, as per items 5 and 6 they will remain open and as of note 1292032 there will be no way that the Goods Recipient can indicate IN THE SYSTEM that he is not expecting any more deliveries (keep in mind that he do not have any PO change authorization), and the PO will remain as opened and will keep appearing in the Confirm Goods / Services transaction.
Sending an e-mail to the purchaser, asking to set the Delivery Completed indicator in the PO is not a feasible option as all process should be backed up by the system and sending e-mails cannot be monitored by the system.
Kind Regards,
Raz Golan
Edited by: Raz Golan on Sep 24, 2009 1:16 PM.
-
Confirmation with Serial Number
Hi all,
Can anyone explain what's the purpose and how it works with confirmation with serial number? I already do customizing for one single entry confirmation to make serial number appear on CO11n.
regards,
ArmanWhat ever we entering the serial number In Confirmation, Its updating In COIB transaction after transfer you can see the list in
1) Go to IH20 or IH22
give the material No and serial No U can get the Installation Base No.
2) Go To IB53
give the installation No, U can see the assigned serial No . for header material
BUT there is no standard report for serial no relate with order operation
And the table related to serial No "EQUI" is no where link between the any Confirmation table. -
PO Confirmations with Multiple Line items
Hi Experts,
In our Business Scenario, the Purchase Order Confirmations are being received by IDoc from Vendors. IDoc Basic Type is ORDERS01.
Issue is when we have one PO line item, then the IDoc is getting processed successfully. But when we have Multiple PO line items, then the IDoc is failing with the following error
Material number differs from that of ordered material 000000000001797950
Message no. ME790
Diagnosis
The acknowledgment/confirmation for purchase order no. 8195817140 with item 00002 cannot be adopted because the customer material number from the IDOC differs from the material number 000000000001797950 from the PO.
Procedure
Either change the customer material number in the IDOC or get the vendor to send a new acknowledgment/confirmation with the correct material number.
There is no control observed in the Material. For the second line item of the PO it is happening. If this Material is a first line item in the PO, then this issue won't be there.
Request for your inputs please
Thank you,
Best Regards,
Ramakrishna MangenaHi,
Use T code WE60 to search for the segment documentation of IDoc type
IDoc needs three different kinds of segment types:
E1EDK01 is the main segment of an ORDERS01 IDoc.Used for calling program to pass the SAP IDoc syntax check.
E1EDP01 is the segment for a single order position. The field MENGE contains the quantity. Of course, this segment can occur more the once.
E1EDP19 represents an object definition. In this case the object is a material number. The field QUALF is therefore set to 002 and the material number is written into the IDTNR field. E1EDP19 segments are always children of E1EDP01
Thanks & regards,
ShreeMohan -
Store xml data with difference dtd in the same xmltype column?
Hi, all!
I want to know, whether i can store the xml data with difference DTD in the same xmltype column.
thank you for your help
rabbitAs long as the column is not based on an XML Schema
-
Hi
I have a problem when I need to confirm my finished product with the trx COR6N, it only shows the components (261), but for the finished product I have to post the confirmation with MIGO. It only happens when I have more than one phase in my master recipe. If I have only one phase, the confirmation for my finished product can be posted in COR6N. My control key has the Aut. Goods receipt checked and confirmation required.
Thanks in advance.Hi,
Your question is not clear...Automatic goods receipt is not happening when you have more than one phase?? is this is your issue......Automatic goods receipt setting can be done in two places....
1. Control key..assign the control key to the last phase and check...
2. Production scheduling profile..here also you can activate the automatic goods receipt indicator and assign this in work scheduling view in material master then check...
Thanks
Kumar -
Cannot Print Order Confirmation with Smartforms
Dear Sir/ Madam,
I tried to print Order confirmation with Smartform but failed with the return message as "Output could not be issued".
The followings were my settings:.
At NACE, the Processing rouines confiugration for Application: V1, Output Type:BA00 was
Medium: 1 Print output
Program: R2RRVADOR01
Form routine: ENTRY
PDF/SmartForm Form: R2RBL_SDORC_L
Type: Smartform
At VA02, the output was added as:
Output: BA00
Description: Order Confirmation
Medium: 1 Printout
Func: SP
Lng: EN
Could anyone consult out?
Cheers,
Simon
Cheers,
SimonHI,
In Txn. NACE... Select your "Application V1".. then choose the button "condition Record" then choose your output type then maintain the condtion..
Doc Type: <Value>
Function: SP
Medium 1
Date/Time: 4
Language:EN...
then choose the line and click on "Communication" button here maintain the "output Device, flag print immedieately/release After output.
and then try again.
If your using Smartform/Scriptform then you need to define like this:
Medium: 1 Print output
Program: R2RRVADOR01
Form routine: ENTRY
Form: R2RBL_SDORC_L
*PDF/SmartForm Form: *******Blank
*Type: ******Blank
Regards
GK.
Edited by: Gnana Kumar on Nov 17, 2010 5:24 AM -
Overdelivery % ignores while confirmation with capacity category and splits
Dear all,
System ignores Over-delivery % while confirmation with capacity category and splits only.
Note:
1.Error message set for overdelivery in OPK4.
2.Check box for Unlimited Overdelivery in material master(Work Scheduling View) as well as in the production order is OFF.
Thanks,
SatyajitHi,
Set in OPK4=>
1)Overdelivery = Error when overdelivery tollerance is exceed.
Set in material MM02= in Work scheduling
1)Maintian Underdelivery Limit and Overdelivery Limit
2)Remove Tick of Indicator: Unlimited (Indicator: Unlimited Overdelivery Allowed)
Overdelivery tolerance limit=> Percent by which the quantity that is posted to goods receipt may exceed the production order quantity.
Indicator: Unlimited Overdelivery Allowed=> Indicator that specifies whether the quantity actually delivered may infinitely exceed the required production order quantity.
With Regards,
Ashish -
Number of Days with difference in 2 columns
Dear all,
Is this possible to display Number of Days with difference in 2 columns.
Regards,Or use simply the ABS() function
select abs( date1 - date2 ) from dual ;Francois -
User Exit for Production Order confirmation with CO15
Hi All,
what User Exit I should use when validating batch when we do Production Order confirmation with CO15.
Not when we create or release a Production Order.
Will reward,
mindaugas
Edited by: Mindaugas Kazlauskas on Jan 30, 2008 5:03 PMHi
The Follwing Userexits available:
Transaction Code - CO15 Enter Production order Confirmation
Enhancement/ Business Add-in Description
Enhancement
CONFPP01
PP order conf.: Determine customer specific default values
CONFPP02
PP order conf.: Customer specific input checks 1
CONFPP03
PP order conf.: Cust. specific check after op. selection
CONFPP04
PP order conf.: Customer specific input checks 2
CONFPP05
PP order conf.: Customer specific enhancements when saving
CONFPP06
PP Order Confirmations: Actual Data Transfer
CONFPP07
Single Screen Entry: Inclusion of User-Defined Subscreens
CONFPS01
PS confirmation: Determine customer specific default values
CONFPS02
PS confirmation: Customer specific input checks 1
CONFPS03
PS confirmation: Customer specific check after op. selection
CONFPS04
PS confirmation: Customer specific input checks 2
CONFPS05
PS confirmation: Customer specific enhancements when saving
CONF0001
Enhancements in order confirmation
CONFPI01
Process order conf.: Calculate cust.specific default values
CONFPI02
Process order confirmation: Customer spec. input checks 1
CONFPI03
Process order conf.: Cust. spec. check after op. selection
CONFPI04
Process order conf.: Customer specific input checks 2
CONFPI05
Process order conf.: Cust. spec. enhancements when saving
CONFPI06
Process order confirmation: Actual data transfer
CONFPM01
PM/SM order conf.: Determine cust. specific default values
CONFPM02
PM/SM order confirmation: Customer specific input checks 1
CONFPM03
PM/SM order conf.: Cust. spec. check after op. selection
CONFPM04
PM/SM order conf.: Customer specific input check 2
CONFPM05
PM/SM order conf.: Cust. specific enhancements when saving
If it is helpful rewards points.
Regards
Pratp.M -
Cancel the Confirmation with CN29
Hi All,
I have a activity with confirmed with the statsu of CONF. Now i need to concel the confirmation. Iam trying in CN29. But it is not turning back. Please guide for the solution.
Thanks in Advance.in sap it will not turn back but post a reversal entry
is settlement done? if yes you need to reverse settlement first then reverse confirmation
Maybe you are looking for
-
How can I print in black/white only a document that has colors in the original?
How can I print in black/white only a document that has colors in its original. I don't need the print out to be in color, and I don't want to waste the color ink.
-
How to get value of a component in a multiple level container in Javascrip
Hi, Can anyone help with this please. I have a JSC page contains a data table dataTable1which has a column contains a gridPanel1 which has textField1 and textField2. I can not use document.getElementById(form1:textField1) because textField1 is inside
-
Can not update apps after IOS8 update on iPhone 4s
Can not update apps after IOS8 update on iPhone 4s I can no longer update apps on my iPhone 4s after the IOS 8 update. The IOS 8 update took a very long time to complete, maybe 12 hours, and afterwards, it worked but updating packages were very slow.
-
Lync login issue with one domain but started working when domain is changed.
we have two domains in lync 2013 infra.i have enabled user id with one domain but its not allowing user to login.If we change user id to other domain it start working. it seems user id already existed somewhere in lync or active directory database. c
-
Any method or BAPI to enter disconnection for disconnection document?
Hi all, I try to enter disconnection in disconnection document. Any BAPI or Method I found ask me to create a work order and finish the old work order? Is there any BAPI or object method to perform enter idconnection without creating any work order