Transfer Costs from AUC to Work Order

Hi,
Pre go-live balaces where loaded directly to the AUC, as opposed to the Work Order then settled to the AUC.
All of our capital reporting is done at work order level, therefore I want to transfer the balance from the AUC to the work order and then re-settle the work order back to the AUC. At present we cannot see the legacy costs relating to the capital project against the work order.
Is it possible to transfer costs off the AUC back to the Work Order?
Thanks
Jonski

Andres,
  Yes you could accomplish it through the process you had mentioned.It would probably be the simplest way to accomplish your requirement as well.
Regards
Narasimhan

Similar Messages

  • How to transfer cost from old sales order (cancelled) to new sales order

    Hi Gurus
    I want to know, how to move cost from one sales order to another sales order.
    SD created sales order before 1 month and there was production order behind this. Production was completed and all the cost was moved to sales order and also SD has raised invoice on customer. This transaction was completed.
    The above order was rejected by customer due to some changes in the order. SD raised another sales order and production order was created to to additional work. Production transfered above stock (produce before on old production order) to new production order.
    My problem is stock is now transfered to new production order but cost is still sitting on old sales order. How do I transfer cost from old sales order to new sales order. SD cancelled old invoice and raised new one with full value (old + new work) on new sales order. Now cost is on old sales order and revenue is on new sales order.
    Please help.
    Thanks

    Hi
    I have reverse the sales order settlement, PP order settlement to sales order and I have also done KB11N for transfering the cost to the new production order.
    The only problem is I was unable to transfer labour hour confirmation as cost element used for this are not for transfering cost. If I will reverse the confirmation in PP order system will reverse material movement also which I don't want any more. Can you please tell me how to I reverse the Labour hours with out affecting goods movement?
    Many thanks

  • How to transfer costs from one WBS to another WBS?

    Hi,
    I want to transfer costs from one WBS to another. Remember two currencies are maintained viz. local and group.
    So how can i transfer the balance such that both the local currency and group currency balance gets transferred.
    Please ensure that the transfer should show 0 balance outstanding in CJI3 report.
    I need to transfer because WBS is holding some value which was not settled in the previous year.

    Hi
    You can transfer the Amount from One WBS to Another through KB11N. In this you Choose the Screen Variant as "_WBS/Network_" and do necessary steps.
    Hope it helps.
    Regards
    Babu

  • Auto-update Notification from a PM Work Order?

    Hi,
    Is there a way of automatically updating info on a Notification from a PM Work Order? For example, the operator who creates a Notification puts in a wrong functional location and this is carried over to the Work Order that is created from the notification. While, the work is being executed, the Work Order processor will change the Func. Location to indicate the right one. But this does not reflect on the Notification. I am sure this is not config. Is there any bapi that I can use? Please advise.
    Regards,
    Arun

    These are some related Function Modules:
    IQS0_CHANGE_NOTIFICATION
    ALM_ME_NOTIFICATION_CHANGE
    BAPI_ALM_NOTIF_DATA_MODIFY
    ALM_PM_MAINTNOT_MODIFY_DATA
    You may consult your ABAPer to identify and use to suit to your needs.
    Logic will be the code will match the F/Locn in Order and Notification everytime the Order is updated and use the above FM to update the Notification. Obviously you need to use this logic in a User-exit possibly IWO10009.
    KJogeswaraRao

  • Transfering the Cost from Cost center to PM Work order

    Hi all,
    We have a scenario.
    we are doing material consumption from storage locaiton to a cost center using 201.
    when the material requirement comes from work order, we are doing reverse consumption posting from Cost center to storage location using 202. and then issue the material to work order using 261.
    Is there any way, that we can move the cost directly from cost center to work order (skipping the storage location in between).
    Thanks in advance.
    Piyush

    Hi,
    I guess Initially you are transferring material (201 movement) from Central Warehouse to Cost Center assigned to each department. After that, if you get any reservation from the particular department work order, you are issuing the components to work order by doing 202 & 261 movements.
    You can follow either one way.
    1. Without doing 201 movement type, once you create a order, based on reservation you can do 261 movement to order from central warehouse directly.
    OR
    2. Define storage location, do the stock transfer between storage locations. While creating maintenance order, assign the concern storage location in the order. So from that storage location, you can do 261 movement. Also by Material valuation, you can find the value of materials as well.
    Regards,
    Maheswaran.

  • How to Transfer Cost From an Internal Order to Another Internal Order

    Dear Sir,
    We had one Internal Order opened for Asset Under Commission (AUC) . We also had opened another Internal Order and cost were booked in this Internal Order also .
    Now , we want to transfer the complete cost from 2nd Internal Order to 1st Internal Order . During the Transfer , we want to maintain the same GLs (i.e in 2nd Order the GLs get credited and in 1st Order the same GLs must be Debited)
    Pl guide us , how to transfer the cost .
    Regards
    B Mittal

    You can do a regular FI posting debiting and crediting the same account, with a different internal order in each line item.

  • Eq. not copying from Maint. Work order to Work Approval in WCM

    Dear Experts,
    While I am creating Work Approval from Work Order, Equipment number is not copied from Work Order as per screenshot. why?

    Greetings Parag,
    You have "Reference Object" in your Sequence above the "Reference Object with Installed equipment", which makes the transaction first fill the Functional Location only, and afterwards, the Equipment field is grayed out by the time it gets to copying it.
    Swap the Sequences of fields 50 and 200 or delete the field 50 from copy settings in
    SPRO > Plant Maintenance > Work Clearance Management > Master Data > Data Transfer When Creating with Template > Define Fields

  • View labor and material costs in plant maintenance work order

    Hi
    I am aware we can bring in the costs in the work order through Activity types and assigning the costs to the acitvity type.
    Is there anyway we can bring in the actual cost for the work performed by the associate? should we link the work center to HRMS?
    Please advise. I need your valuable input for all the points below.
    Main points that need to be addressed:
    1. Each associate that is capable of confirming hours to a work order needs to be assigned an hourly rate that is reflective of the actual cost for the work performed by this associate. These hours are then tracked through the work order to give a cost for labor assigned to that particular job.
    2.Any materials used in the performance of the required task(s) dictated by the work order will be assigned to that order. These materials can be assigned through SAP purchase requisitions, tool crib spot buys, or procurement with a purchase card.
    3.Standard reports need to be created so we can track the total maintenance costs for any level of the equipment hierarchy as currently set up in SAP. When this report is created it should show the total maintenace costs for all the levels of the equipment hierarchy broken down into labor cost and material cost.  I am using Tcode IW37N and IW40 . Is there any suggestion?

    Greetings Chandra,
    1) You will need to create Work Centres for your associates and create the Activity Types. You can default the Activity Type for each Work Centre and maintain the rate for the activity via t-code KP26 planning.
    2) Planned and unplanned Purchase Requisitions for Components with category N will debit the order with material costs. But what do you mean by "tool crib spot buys" and "procurement with a purchase card"? You may need to develop a solution to do such postings to the Order (or for purposes of Cost controlling, manual activity allocation similar to confirming work may be desired such as Manual Activity Allocations via CO transactions (KB21N), unless you can cover that with Purchase Requisitions and POs with "F Order" account assignment.
    3) MCI8 Cost Report should be suitable for you, once you set up the Value Categories & Cost Key Figures.
    See
    PMIS Cost Analysis Reporting Overview
    Maintenance Cost Key Figures in MCI3 and MCI8 Reports
    PM Order Value categories and costs display

  • Transfer cost from one WBS to another WBS

    Hi,
    I have transfered Actual Costs from one WBS to another WBS manually using transaction KB11N - Manual Reposting of Primary Cost.
    But in S_ALR_87013542 report, Still the old WBS is visible with No costs.
    What are the consequence of doing the transfer and where it will affect?
    Can i delete the old WBS after transfer?
    Thanks
    Vinoth

    Vinoth G wrote:
    Hi,
    >
    > I have transfered Actual Costs from one WBS to another WBS manually using transaction KB11N - Manual Reposting of Primary Cost.
    >
    > But in S_ALR_87013542 report, Still the old WBS is visible with No costs.
    Once you do a transfer posting system will pass a credit entry (negative value) to the old WBSE. so the net effect will be zero.

  • Data load from workrequest to work order in enetrprise asset management(eAM

    Hi all,
    I want to load data from work request to work work order in enterprise asset management(eAM) module.
    Pls send me any body having code for EAM_PROCESS_WO_PUB API
    Thanks&Regards,
    Hanimi

    Aditya,
    [Here's|Operation user status of work order; a similar post with useful info
    PeteA

  • Transfer cost from CE(WIP) to WBS(project)

    Dear Gurus,
    My client has settled all his WIP cost into a G/L, now we want to transfer this cost from G/L to WBS.
    Please assist what can be an ideal way of doing this so that we get both Fi and Co documents.
    Thanks and Regards,
    Manish
    Edited by: mash215 on Apr 9, 2010 8:52 AM

    Why dont you reverse the settlement?
    Sorry, I assumed that you have done settlement from WBS to G/L.
    Edited by: Ahmed Rifaee on Apr 9, 2010 1:00 PM

  • Assets (Investment profile): Transfer value from AuC to Fixed asset

    Good afternoon all,
    We have implemented Assets across investments profile. The settlement of investment is u201CSummary settlementu201D and we do not have u201CList of Originsu201D.
    We have created a project and then a WBS that automatically creates the AuC (asset under construction).  Transaction code CJ20N.
    Then we have created the purchase order (ME21N) and afterwards we have carried out an entry sheet (ML81N) where we have informed the WBS previously created.
    Through CJ88 we have done the settlement of the WBS and we have checked it.
    Now we have created the fixed asset and we would like to transfer the value of the AuC to the fixed asset. I am not able and I am a bit lost. I do not how to perform it.
    Any idea?
    Many thanks and regards in advance. Daniel

    Hi Renfe,
    If the asset is an asset under construction belonging to an investment measure, then the transaction code KO88 needs to be used.
    Warm regards,
    Murukan Arunachalam

  • Determine cost from pricing in sales order

    HI all,
       I am trying to overwrite the unit price of customer price(ZCUST)  when the order Gross Profit Percentage is below 10% once the material is entered during creation of a sales orderm not when saving order.
    GP % calculation is dependent on zcust and total cost.
    Below is the pricing structure.
       zcust                  80
       Zcost                10
          other cost        5
          Total Cost        15
    For ZCUST, it has routine in Col 'Cal Type' which picks up for zcust.   In this routine, i am trying to get Total Cost.
    When i debug this routine, the price for zcust is there all the time.  The price for Total Cost ($24) is not always there in this routine.   One time the total cost is 10, then 0, then 15, then 0, then $15. 
    Why is it the total cost changes all the time?  How  to tell when to use $15 instead of $10 in my GP calculation ?
    Any suggestions are appreciated.
    thanks
    Joyce

    Hi Rani,
    If the value of the condition type in the condition tab is greyed out it means that you cannot modify the value. The config for this done in [V/06] under the Changes which can be made tab you would find a field Manual Entries.
    Reward points if it had help you.
    Regards
    NP

  • Transfer requirement from SO to Purchase order

    hi,
    I had set up BOM for FG with RM. Such as I create sales contract to book RM, so that MRP will create requirement. And then I will create sales order, possible transfer this RM into new SO' FG (under same BOM). I know if the same level, the tranfer requirement is fine, however, i cannot make it down to other level. Pls advice
    thanks

    Sales order item text ---> PR item text -->Po item text
    The above link possible by std Text configuration
    If you want any Sales order header information then you have to use User exit to populate this header value into PR item text .
    and follow the above process

  • Is there any way to generate Cost report at maintenance work order level

    Hi,

    Ramesh,
      I am guessing those info cubes will only be populated, if Operational level costing has been activated in ECC 6.0 or it may just be the activity cost(Not necessarily the operation cost). This is because in standard, cost on the maintenance order is ONLY CAPTURED at Header level.I don't think you have operational level costing activated.
      You could create your custom reports for time entry by capturing the operation number is any one of the unused fields and then using it for collecting the cost at operational level. The same can be done for service entry sheet. You could use a unused field (Ex: Reference number) to capture the operation number and use the same for your reporting needs.
      You may have to do the same for other cost capturing objects like gods movements, Po's and Overheads(Just split the entire ovehead and apply it across the Operation).
      Using proper validations on save of various transactions and implementing a custom report it is possible to get the same.However, unless you activate operational level costing you wont be able to get any standard reports.
    Hope it helps.
    Regards
    Narasimhan