Transporting LSMW without creating transport request( from quality to prodn

Hi All,
I have created an LSMW in quality, I need to transport it to production with out creating any transport request.
Kindly let me know the procedure for the same.
Please help!!!
Vivek Gupta

Hi,
In the transaction LSMW, from the menu:
From your Quality system give your lsmw name and then do:
Extras->Export Project
This will export your lsmw created to an local path.
Then after logging into Production you can import
that lsmw from the lsmw transaction only:
Extras->Import Project
Hope it helps
Regards
Mansi

Similar Messages

  • How i can transport request created in R3AR2 from Quality to Production ?

    Hi, Gurus !
    I'm new in CRM 7.0, and need your help. Well, we made our implementation in 7.0 version, and the things will be fine, until the start of work.....
    Well, the initial download of CUSTOMER_MAIN (in transaction R3AR2) do'n't run OK, because a lot of customers in selection have a bad data.... and this time, anybody change this data,
    Today, i know how to re-made this task.....
    But my question is : how can transport this request, created in R3AR2, from Quality to Production ?
    If the transport is not possible, the answer for the question is remake the request in Production ?
    Thank you very much.....
    Loduca

    Did you put your development in a transport when you first saved it? If yes, and if your transport system is properly configured you can release the transport using SE09 and import it into the production using transaction STMS.
    Markus

  • Creating Change Request from project structure

    Hello.
    Have somebody maked somthink like creating Change Request from Implementation project configuration structure? I want to initiate new change request directly from busines process step in transaction SOLAR02 for example.

    Hi
    Change request is created via action Create change document from support desk message
    so in solar02 tcode...goto issues/messages tab and create a message then
    crm_dno_monitor you can create a change request as i said and all the necessary data like ..system data,ibase etc is copied to ur change req from support message .
    Regards
    Prakhar

  • Error while transporting the request from quality to production of BI

    Dear all,
    When transporting a request (which contains elements of correction - in Bex designer) from quality to production of BI the following error is displayed and the request transport fails. Can the experts throw some light on this.
               Execution of programs after import (XPRA)
               Transport request   : RBDK904992
               System              : RBP
               tp path             : tp
               Version and release: 372.04.04 700
               Post-import methods for change/transport request: RBDK904992
               Post-import method RS_AFTER_IMPORT started for ELEM L, date and time: 20080406140407
               Start of the after-import method RS_ELEM_AFTER_IMPORT for object type(s) ELEM (Activation Mode)
               Error when activating element EY2CXLKXP5X5AY0RQ2XKN9EX8
               Element 5E4II2344I3JG4R6ACMYQ441Z is missing in version M
               Start of the after-import method RS_ELEM_AFTER_IMPORT for object type(s) ELEM (Delete Mode)
               Errors occurred during post-handling RS_AFTER_IMPORT for ELEM L
               The errors affect the following components:
                 BW-WHM (Warehouse Management)
               Post-import methods of change/transport request RBDK904992 completed
                   Start of subsequent processing ... 20080406140407
                   End of subsequent processing... 20080406140408
               Execute reports for change/transport request: RBDK904992
               Reports for change/transport request RBDK904992 have been executed
                   Start of................ 20080406140408
                   End of.................. 20080406140408
               Execution of programs after import (XPRA)
               End date and time : 20080406140408
               Ended with return code:  ===> 8 <===
    Thanks in advance.
    Regards,
    M.M

    Hi,
    First try to figure out the object type from the text obtained by following steps above.
    Goto Development server ,create fresh request (using transport connection) , transport to QA and then in to production.
    After successful transfer of the request for this object ,try to reimport the request which caused error and it should go smoothly without any error.
    Hope it helps.
    Regards
    Mr Kapadia

  • Transportation failed while sending a request from DEV - Quality

    Hi sdns,,,
                       I got an error while sending a request from DEV -> Quality...Am new to transportation.. mayi know.. wat was this error and wat kind of action i need to take over here...
    I got an error message like this,,
    Start of the after-import method for object type R3TR ELEM (Activation Mode)          
    Element 0QWSUMHUOOK19OOUIFCLB4T8C was copied from 'modified' to 'active'              
    Error when activating element 45HKXU7KAG6V1I0L1W3LWEDZC                               
    Element 3Z571P6G8RCDNR3NQAEI8S6YW is missing in version M                                                                               
    Start of the after-import method for object type R3TR ELEM (Delete Mode)              
    Errors occurred during post-handling RS_AFTER_IMPORT for ELEM L                       
    RS_AFTER_IMPORT belongs to package RS                                                 
    The errors affect the following components:                                           
       BW-WHM (Warehouse Management)                                                      
    Post-import method RS_AFTER_IMPORT completed for ELEM L, date and time: 20070417044624
    Post-import methods of change/transport request I11K903499 completed                  
         Start of subsequent processing ... 20070417044621                                
         End of subsequent processing... 20070417044624                                   
    Answering getz really appreciated,
    Thanks & Regards,
    Aluri

    Hi,
    This error will come when your are transporting any Query/ BW elements to Production system.
    when there is element in the deve. class $TEM in your collected objects this error may come, so identify this elements and change this Dev.class to other package used in transportaion.
    To change all the elements to common dev. class first collecting the elements using transport connection. secondly, using the Pencil button at the menu of trasnport change to required dev.class.
    you can change individaul elements also.
    Regards,
    Vish.

  • Creating Change request from an Issue

    Hi, all.
    We have created new transaction type for change request (SDCR  at default) and have specified it for usage in parametre CHANGE_REQUEST in DNO_CUST04.
    However, creation of a change request from a issue (problem) ignores this customisation. As has shown code research - the constant there is used.
    Whether there are to it reasons or notices in the documentation?
    Whether there was for you such problem and how you solved it?
    Regards,
    Konstantin

    You need to maintain Transaction Types Mapping. Map your target procedure type (ZDCR) to your source procedure type (e.g. SLFN or ZLFN).
    Do this in IMG task "Define Mapping Rules for Copy Control"

  • Create user request from api OIM 11g r2

    Hi,
    I need to read a database and raise a request for creating uses. After  approval the user needs to be created in OIM 11g R2.
    I want to write a scheduled task which will read database columns and rasie a request to create users.
    I dont want to use UnauthenticatedSelfService api.
    Please suggest a way to achive that. any pointer / sample coede / suggestion  is helpful.

    Here are links to creating a request for a role and a resource.  https://java.net/projects/openptk/sources/svn/show/branches/Oracle/OIM11g/examples/java/OIMClient/src/oim/client/request?rev=1402
    I would suggest you start with these and modify the parameters to be for a user.  You will have to try some trial and error to get it working, unless someone already has it available.  And so far, no one who is posting does.  Give it a shot.  You can always create an SR with oracle and ask for assistance.
    -Kevin

  • Issue in Importing request from Quality to Production

    Hi Experts,
    I have a request which is successfully imported to ECC Quality system. I have collected the 'Customer Exits, Functional Module, Function Groups' in this request. I am  getting the following error when I try to open the Function module in se37 in the Production system after the Import Process.
    Function group ZRSAX contains errors
    So, Kindly help me resolve this issue.
    Thanks in advance !!!!
    Regards,
    Gokulkumar RD

    Hi Gokulkumar,
    This message is FL(023).
    Please  try to open the include report "zrsaxuxx" in tr-code SE38.
    After translated by Google:
    * Not for external call, for example, by rsfufill ...
    * Not even when you delete, because the bodies have gone
    * There is intercepted outside
    * Error in UXX how shall he completed while generating
    For German
    *   Nicht beim externen Aufruf z.B. durch rsfufill...
    *   Auch nicht beim Löschen, da müssen die Leichen weg
    *   Dort wird außerhalb abgefangen
    *   Fehler im UXX wie soll er beim Generieren abge
    Hope it is helpful to you.
    Regards

  • I want to upload om data through lsmw. how can i create transport request for lsmw data.

    can anyone help me?

    Hi Anand,
    There are 2 ways for transporting LSMW data from a system to another.
    1) Export/import this method gives you the opportunity to select the subprojects or objects you want to transfer. Hence you don't transfer the object a colleague might have created and that should stay in development system. LSMW -> Extras -> Export project  
    2)Transport request with this method, you can transport a LSMW project in full (you cannot select the objects you want). With this method, the project will be transported as any other SAP object in a transport order. 
    LSMW -> Extras -> Create change request 
    For more information, refer below link Steps to copy LSMW from one client to another
    Thanks
    KH

  • Transport a request from one server(quality) to another server(production)

    Hi All,
    I want to transport a request from one server(quality) to another server(production)
    Can we transport a request from quality to production programatically i.e. by using programing logic.
    Regards,
    Swarup

    Hi,
    It cannot be done programmatically. Although it can be automated by basis guys. They configure it in TMS (Transport Management System). You can check it using STMS. (if you are authorized to view it).
    Transport path are defined in TMS.
    For Automated Transport configuration is done in TMS.
    Generally automatic Transport are not setup between quality and production. Changes are first tested in Quality and then Transported by basis team either periodically / individually.
    In case of manual transport Transport Request can be imported in production using STMS_IMPORT transaction in production. (Basis guy will do it for approved Transports)
    If there is no direct connectivity - Basis people copy "data" file and "co" file and Transport it to target server (This is generally not the case in Quality - production as Transport path is always defined).
    Regards,
    Mohaiyuddin

  • Transport of activity from Quality to production for webDynpro Java applica

    Hi,
    can anybody tell me how do i go for transporting activity in webdynpro java applications from quality to production server.
    i have done some changes in webdynpro code  and deployed in quality system. i have created activity and now want to transport that to production so that the changed functionality should reflect in production system.
    Its urgent so your quick suggestion will be appreciated.

    Hi,
    can anybody tell me how do i go for transporting activity in webdynpro java applications from quality to production server.
    i have done some changes in webdynpro code and deployed in quality system. i have created activity and now want to transport that to production so that the changed functionality should reflect in production system.
    Its urgent so your quick suggestion will be appreciated.
    Hi Vijayalaxmi,
    Following are the steps for transporting the content from DEV to QA
    1. Check in the activity into DTR and activate it. Once it is activated successfully it will show green
    2. Now go to transport view and release the activity by drilling down in waiting... node.
    3. Once the activity is released it becomes available in the Consolidation tab of CMS.
    4. Import the activity in consolidation tab
    5. Assemble the components in the Assembly tab.
    Once you assemble an .SCA file is created in \usr\<SID>\trans\CMS
    6. Copy this file manually and deploy it using SDM in QA.
    Hope it clears your doubts
    Best Regards,
    Ravi

  • Changes are not reflected when objects transported from Quality to Productn

    Hi
    In case of moving some Transport requests from Quality to Production, some times the changes made to the selection screen of a report program doesn't reflect in Production. Also we don't see any Transport error while transporting. Moreover, we can see the changes by regenerating the Program in production.
    Would any one help me out in this with the reason for this.
    Pls suggest what needs to be done.
    Satish.

    HI,
    Thanks for the reply.
    - I have checked the respective transport too, and every thing seems to be fine.
    - Recently we went to go live, for the next release, so earlier before go live, we didnt faced any proble.. Only now we are facing this problem, that we find the changes relating to selection screen are not reflected when the object / prog is moved from qty to Prd.
    - Only problem is with the selection screen.(not getting reflected in PRD. In Qty we are able to see those changes.
    - Then in order to reflect these changes in PRD, we have to re generate the object, then only it get s updated..
    Satish.
    Edited by: satish c on Sep 22, 2009 3:35 PM

  • Transporting Transport Request from One System to other

    Hi All,
    I want to create tranport request from ECC 5.0 System to ECC 6.0 system.
    Please let me know steps for creating transport request and transporting transport request from one system to other system.
    Thanks in advance.
    Best Regds,
    zubera

    Hi,
    You cannot transport request from ECC5.0 to ECC6.0.
    Instead follow this:
    <b>In ECC5.0</b>
    Include all the objects into a transport request & provide the transport request no. to BASIS.
    BASIS team will create 2 files for you based on the transport request no.
    <b>in ECC6.0</b>
    Provide the 2 files to BASIS Team & ask them to import them.
    The objects would be available in ECC6.0
    Best regards,
    Prashant

  • CHaRM-Action "Create Transport Request" is cancelled

    Hi All,
    when i click on the action "Create Transport Request" and save the change document the following error is displayed
    "Action Create Transport Request in system SM2 200 of type Source Systems has been cancelled"
    where SM2 200 is our Dev Client in the same Solution manager.
    i did add the SAP ROLE "SAP_S_RFCACL" to the user in both the client and gave full authorization
    but it did not help.
    Regards,
    Pradeep L

    hi Pradeep,
    i am doing ChaRM configuration in our Solman system and also new to this.
    i need help for "Create Transport Request" from CRM action....
    Is it possible to create TP request from CRM action??
    if yes please guide me how to do it?
    Expecting ur reply...
    Regards,
    Selvakumar RV

  • How to Transport LSMW to development server to Prodution server

    Hi all,
    I would like to know how we transport LSMW(project, sub-project, Object) from development server to Production server.
    Thanks
    Vipin Nagpal

    Hi Vipin,
        Actually, it depends based upon the requirement. There are some advantages and disadvantages with both of the methods.
    See the following documentation. I think this would be helpful for you and based upon your requirement you proceed further.
                 <b>Transport LSMW Projects</b>
    The LSM Workbench provides data transport for a project via both the SAP transport system and down-/upload. (Excluded are the presettings for IDoc inbound processing. These presettings should be manually created in every SAP system and every client.)
    <b>1. Generate Change Request</b>
    Choosing this function creates an SAP change request containing all information about an LSMW project. This SAP change request can be exported / imported with the usual means of SAP correction and transporting. You can find this function in the initial screen under Extras -> Create change request.
    When transporting LSMW data this way, you can trace the transports any time in SAP correction and transporting.
      <b>Note 1</b>: When importing such a request, the complete project is deleted from the target system first. It is then created again.
      <b>Note 2</b>: When exporting the transport request, all changes to the selected project made until the time of export are entered (not only until the time of creation of the transport request.)
    <b>2. Export Project</b>
    In the initial screen, select Extras &#61664; Export project. This first displays the structure tree of the selected project. Via Select / Deselect you can select whether the entire project or parts of the project are exported. Then select Export. The program then creates an ASCII file.
    Note: The selected elements are exported together with their documentation
    <b>3.Import Project</b>The exported mapping and rules can be imported into another SAP system.
    On the selection screen, select Extras -> Import. The program then prompts you to enter the name of the PC file. The file is imported and the contents are analyzed. After the analysis, a list of the subprojects and objects found is displayed.
    You can now mark the objects to be imported. Project data existing already are check-marked. They are overwritten by the import.
    You can prevent a project already existing in the target system from being overwritten by using function "Import under different name".
      Note: The selected elements are imported together with their documentation.
    If you feel this is helpful, don't forget to reward points.

Maybe you are looking for

  • Problem with Flash video in webpage

    I've encoded a number of videos in the FLV format(using both Flash Video encoder and Quicktime), using standard preset settings, inserted in webpage using dreamweaver standard - Insert Media - Flash Video. When I try to play the videos, online or tes

  • Is there a length counter of sorts

    I am splicing together video clips. Is there a counter where I can start at a certain number and end at a number, within the length of that clip?

  • Creating Selection Criteria for an Existing CR2008  Report

    I have an Crystal .rpt that works outside of SBO 8.8. It is base in a view (VIEWUNIONVENTASNOTASDETALLE). Before importing in SBO 8.8, I change a parameter that is dynamic into a static one and changed its name according. From Vendedores to Vendedore

  • ISE distributed : router and switch update

    I have 2 ISE 1.2 I configured ISE1 as primary for PAN, MNT and PSN and it work fine Now I am configuring ISE2 as secondary PAN, MNT and PSN Found below the actual configuration of the router, switch and WLC where ISE1_IP is configured 1. Router (sub-

  • How to create a time counter

    Hello expertsl, I have a new challenge on board. I have a form that is automatically popped up. Now on the form, i need to insert a timer that as soon as it pops out, the timer starts and then i have to enter some data in the form and as soon as i pr