Does anyone know how to update the Settlement rules when creating a production order from CO01?
I have tried using badi WORKORDER_UPDATE, but the interface does not contain any Settlement rule data.
I also tried user exit IWO10027 but it was never triggered.
It is an ECC 6.0 system.
// Regards  Hans

hi
An internal order is usually used as an interim collector of costs and an aid to the planning, monitoring, and controlling processes needed. When the job has been completed, you settle the costs to one or more receivers (cost center, fixed asset, profitability segment, and so on).
for furthur notes
http://help.sap.com/erp2005_ehp_03/helpdata/EN/a9/ab7422414111d182b10000e829fbfe/frameset.htm
nagesh

Similar Messages

  • Auto Run Program not updating Settlement Rules for few WBS elements

    Hi,
    Addition of settlement rules for OPEX WBS.
    In producion system, two jobs are running daily for generating settlement rules of WBS elements but, all WBS elements are not updating with Settlement rules.
    It is becoming a problem in the Period end while doing the settlement. Currently we are updating the settlement rule manually.
    We have investigated and found the following WBS element with Profile name  are not updating Settlement rule.
    H-U0DU0204DE-EX-J0  - HHDC01
    H-N0U00ULD01-P1-D1-W2 - 000090
    H-U0DU0204DE-EX-U0-T1-OB - HHDC01
    H-U0DU0204DE-EX-U1-W1-ON - HHDC01
    H-U0DU0204DE-EX-U2-W1-ON - HHDC01
    H-U0DU0204DE-EX-I0-E1 - HHDC01
    H-U0DU0204DE-EX-I0-B1 -HHDC01
    H-U1DU0204DE-EX-U0-W1-ON - HHDC01
    Job Names :
    ZFPD_UK_SETTLEMENT_RULE_GEN
    ZFPD_NO_SETTLEMENT_RULE_GEN
    Please suggest on this issue
    Regards

    Hi,
    I suppose these are background jobs. Usually there is an issue with background jobs that are run for a custom developed program. Not sure why that happens. Even i faced this issue with a couple of jobs in my system. I have still not found out the reason as to why this happens. There might be a possibility that these projects were being processed in the foreground by some user and hence they were omitted from the run.
    I would suggest you to consult your technical guys on this.
    Regards,
    Gokul

  • Internal order settlement rule

    Hi Friends,
    We have a internal order type with investment measure for AUC. When I create a internal order it is creating a AUC in the background but no settlement rule is updated. I released the order, posted some values and ran KO88 ( with and without TECO status) but still settlement rule is not updated with AUC. It is not even allowing me to update settlement rule manually with the AUC.  Also in the settlement rule, I don't see AUC in the object type, but I see a FXA, not sure if it is an issue. Thanks in advance
    Edited by: nspv81 on Dec 7, 2010 10:05 PM

    Hi,
    The system design does not offer the settlement type "AuC" for manually created settlement rules. This is correct.                                 
    AuC-settlement rules can only be created by the system automatically if the order/WBS-element has an investment profile with the flag "Manage AuC" set. The investment profile can be reviewed in transaction OITA.                                                                               
    If this is the case then the system will create the AuC rule during the FIRST run of a periodic settlement (update run) by    automatically taking the AuC as a settlement receiver.                                                                               
    If you do however not use the investment profile you need to maintain a fixed asset settlement rule and enter the asset number manually.         
    regards Bernhard

  • Internal order "settlement rule" change

    Dear Gurus,
    I would like to change "settlement rule" in internal oder which has been used since go-live under ECC6.0.
    I go to KO02, keyin 'order number' ,enter and click on "settlement rule" button to update.
    but profitability segment line just display mode not changeable.
    How can i update settlement rule in KO02?
    kr,
    J.

    once you settle an order with a settlement rule you cannot change the rule no more.
    But you can create a new settlement  rule.
    First double click on the settlement rule you are currently using and for the "validity from field" give the last period. so this rule wont be in use anymore.
    than create a new rule.
    after these steps when you run the settlement, system will pick up the new rule you created.

  • New settlement Rule (copy of superior rule) in spite of message KD050

    Hi'
    I have a setup where WBS level1 is a Billing element.
    WBS level 2-3 are Acc. elements
    Settlement Rule for Billing element are maintained manual.
    Settlement Rule for Acc. elements are copyed from superior rule.
    I have generated Settlement rule, the projects are "running", the first settlement has been sucesfully completed.
    Now the organisation is changed and the Settlement rule should have a different Profit center.
    I put an end period at the Settlement rule at WBS level 1.
    I create a new Settlement Rule at WBS level 1.
    I put an end period at the generated Settlement rule at WBS level 2-3.
    Now I want to generate Settlement Rule again at WBS level 2-3.
    That is not possible because a settlement rule already exist.
    What can I do to get a new and updated Settlement Rule at WBS level 2-3?
    Thank you in advance for advice!
    Kind regards
    Lone Würtz

    Hi Lone,
    actually the request was raised by customer some year before, and I have done the implementation.
    After SAP_APP 603, there is a BAdI IF_EX_WBS_SETTLEMENT_RULE_NEW~GET_TEMPLATE
    what you need do, is to set the flag 'E_INHERITED_OK' = 'X'. 
    For a more complex case, you can even change the 'E_TEMPLATE_OBJNR' to use other WBS (instead of direct upplying WBS) as template.
    If you have lower Release, where the BAdI  WBS_SETTLEMENT_RULE_NEW is not available, please let me known your customer ID, there is a pilot note as modification for it, I can add it in the pilotlist.
    Kind regards,
    Zhenbo

  • Posting settlement rules in IW32

    Hi Everyone,
    I have to update settlement rule in IW32 for a particular service order without using batch input.Is there any function module to do that or any BAPI?
    Can I add events to Business object BUS2088 and use Workflow or FM to update?
    Thanks in advance,
    Regards,
    Srikar

    try fm...
    K_ORDER_SETTLEMENT_RULE

  • Settlement rule while creating service order

    Hi Gurus,
    1. can someone help me in knowing what should be passed as receivers key while updating settlement rule if i am using Sales Order for settlement ; sales order, sales order item, object number of item or something else because i tried to pass all of these but not working.
    2. I pass receiver category as SDI.
    Kindly help asap.
    Thanks,
    Ritu

    Hi Gurus,
    1. can someone help me in knowing what should be passed as receivers key while updating settlement rule if i am using Sales Order for settlement ; sales order, sales order item, object number of item or something else because i tried to pass all of these but not working.
    2. I pass receiver category as SDI.
    Kindly help asap.
    Thanks,
    Ritu

  • Update of confirmed quantity to the equivalence number in Settlement Rule

    We are in IS - Mill.
    Combined order is created with child orders. GR is done against Child Order.
    Is it possible that after TECO is done for Combined Order, the individual GR qty gets updated in the Equivalnce field of the Settlement rule of the Combined Order.
    What are the settings required..
    Kamlesh

    Hi Kamijha
    I had the same situation for co-product settlement.
    I would like that SAP automatically update the settlement rule by the proportion of product and co-product production quantity.
    I´ve raise an OSS to SAP and the response was negative. Only by a custom development or manually.
    Regards

  • Automatically GL account & settlement rule should appear in CO01 in creatio

    While Creating a Production Order in CO01 pl input the qty,finish date ,backward scheduling & release the order.
    This is REM ,choose prod version,click on Header---->Settlement rule
    Screen shoudl automatically show CAT---->GL ACCOUNT,Settlement Reciever say 59000000.
    But right now the values are inputed manually which meight result in errors & also wastage of time.
    What background settings need to be done (i think in OKO7) .Pl suggest.
    Thanking You
    Uday

    hi,
    Go to Settlement rule (CJ02),where enter the WBS .here go to Extra in the menu bar of that WBS ,under Asset under construction ckeck the box of Historiy....something like that .
    Regards
    Ricky

  • Capital Project Settlement Rule for lower WBS

    Hello,
    At my present client, for Investment projects the client want to settle top level WBS to AUC and capitalise it. So ideally the cost from lower level WBS should flow to top WBS. I am using substitution to remove investment profile from lower WBS.My concern is how do I auto populate the settlement rule for lower WBS to top WBS. I am aware about settlement strategy and OSS note 211324 (however dont want to implement this note)
    The appraoch I am looking for is using "WBS_SETTLEMENT_RULE' BAdI . However this BADI calls for strategy and I could not maintain the required strategy (settlement to top WBS). Is there some BADI/Function module available which can be called for updating the settlement rules on lower WBS while saving or Release ? Can I make use of exits in Substitution?
    Please let me know your opinions.
    Thanks
    Sarang

    Thanks Virendra. I agrree the only approach is development. But I need to give inputs to my developer.
    We tried with BADI "WBS_SETTLEMENT_RULE" but it didnt work as it calls strategy in configuration.
    So I am checking for some other options for e.g "WORKBREAKDOWN_UPDATE" which is called during save or Fn modules K_SETTLEMENT_RULE_FILL or K_SETTLEMENT_RULE_SAVE which I can use. This is a client requirement to create AUC only at top level n all cost to be rolled up to superior WBS n then settle to AUC.
    The other option I was thinking is of using exits thru substitution.
    What will be the best approach?
    Thanks
    Sarang

  • Error-M2O-Settlement rule for assembly order for item...could not be genera

    Hi,
    When I am creating Sales Order (VA01) for M2O, I am able to do the costing and copy the EK02 condition type. I have verified the the incompletion log, it indicates that document is complete.
    But while saving the sales order, the below error message is displaed:
    Settlement rule for assembly order for item 000010 could not be generated. Should the order still be saved?
                    Yes/No
    1. If No is choosen the following error message is displayed
           Error when processing Production order
          Error when processing Production order
          Message no. V1380
          Diagnosis
            A technical error has occurred. On calling up the assembly interface, exception 5 was triggered. The exceptions have the  following meanings:
    1 = External block,  2 = General error,  3 = Insufficient data for the interface,  4 = Order was not found, 5 = Update has been rejected, 6 = Final document number for Production order is not issued.  Procedure: Inform your system administrator.
    2. If Yes is choosen, it is creating Production Order without settlement rule. Able to perform GI & Gr. If I try to enter settelement rule (Settlement receiver SDI - Sales document item) in production order (CO02), the belwo error message is displayed
    "Distribution rule for Sales document item can only be created automatically Message no. KD063"
    We are using the requierement class with below details:
    Reqmts class: ZSO- for M2O
    AAC = E, Valuation = A, Settlement profile =SD1, RAKey = 000004, Assembly type = 3.
    Settlement profile contain:
    Allocation structure, PA structure, Default object type = SDI. Valid receivers: Optional -Sales Order / Prof. seg.
    If I make the Valuation field as blank in Reqmts class, there is no error while creating Sales order. And also Settelemnt rule with sales document item as receiver is successfully creating for the production order. Since the Valuation is blank in requirement class, it is Non valuated Sales order stock. All GIs & GR are non valuated
    The business requirement is it should be valuated sales order stock and the production varinaces has to be settled to Sales order. Then Sales order has to be settled to COPA.
    Need your valuable inputs to meet this requirement.
    Let me know if you need any further details.
    Thanks in advance.
    Regards,
    ADI

    Dear SAP PP Consultant ,
    What is the strategy group you are maintained in the material master ?

  • Settlement rule for AUC not automatically generated

    Hi Experts,
    I am working on a capital project scenario where I have configured the investment profile and assigned this to the project profile.  I have also configured the settlement profile and allocation structure for settlement to FXA.
    On release of the WBS element the AUC is automatically created.
    I have posted costs to the WBS element.
    When I run settlement in test mode, using CJ88 the details show the sender as the WBS element and the reciever as the AUC, and the amount = the cost posted to the WBS element in the posting period, (as expected)
    However, (now my problem)
    When I run settlement in "update" mode the settlement shows 1 settlement however when I drill down to see the sender or reciever details are blank.  There are alno no accouting documents and a settlement rule does not display for the WBS element.  There are no error messages even though the settlement has not taken effect.
    Please can anyone advise on the possible cause of this error.  One further  point the document type on the settlement profile is configured as "SA"  GL Account Document.
    Thanks in advance.
    Ian

    hi,
    Go to Settlement rule (CJ02),where enter the WBS .here go to Extra in the menu bar of that WBS ,under Asset under construction ckeck the box of Historiy....something like that .
    Regards
    Ricky

  • Doubt about the settlement rule of the Production ORder

    The only default distribution rule allowed for a PP order is PP1 or PP2.  We would need to change that to allow settlement to multiple receivers as a default. If that is the case, we may want to look into a user exit to update the settlement rule during production order creation instead so that the G/L account is correct from the beginning.
    Currently when we create the production order, the settlement rule will default the below, I am not sure if a user exit is able to maintain the Source as 200 (Materials)?
    If yes, we can then add the second rule for Source 100 (Labor and Mfg) via the user exit as well.
    In this case, SAP will not prompt us error of settlement with 200%, as they are from difference Sources.
    now anybody can explain me about the User EXit we have to correct this

    any help on this.. please its very urgent
    thanks in advance

  • How settlement rule will be created for Sales order with cost object

    Dear Experts,
    We are using product cost by sales order with valuated stock. In addition we are not using COPA
    We also consume some materials at sales order level and at the end of month we want to do the result analysis and settlement for the same amount. In this case can any on explain how system will behave regarding settlement of sales order cost and what entries will get pass in the system.
    In our case we have done below activities...
    we have created sales order,
    All production order activities completed till final GRN including month end activities
    Material consumption against sales order
    Result analysis executed
    At the time of sales order settlement, system throwing error (Sender doesn't have valid receiver, please create settlement rule for sender object)
    Then i checked in sales order there sales order settlement rule not defined.
    I guess this settlement rule need be generated by system automatically. If not, please let me know the process of it.

    HI kishore
          the reason is that sale order always carry the revenue  and production order and production period carry the cost .
       cost you can settle to the Material and even management want  to be settle the cost to material only in production order OR period
    but in sales order  when u sell the product it carry the revenue not the cost and management want see and analysis based on profitability segment are profit center level .
    Prerequisites
    If CO-PA is active, the system generates a settlement rule when you create the sales order. The settlement rule determines whether data is settled to other objects or other areas in Controlling. In accordance with this settlement rule, the relevant data is settled to CO-PA.
    If CO-PA is not active, create a settlement rule. This settlement rule that you create manually normally contains a G/L account as a receiver (such as 399999). You can also settle costs and revenues or results analysis data to objects with revenue.
    You can also settle the cost of sales calculated in results analysis to a fixed asset or a cost center. To do this, you must add to the allocation structure the results analysis cost elements under which the cost of sales is updated to the order.
    The settlement rule includes a distribution rule for the sales order item. The distribution rule is made up of a settlement receiver, a settlement share, and a settlement type:
    The settlement receiver (such as profitability segment or G/L account) specifies the object to which the actual costs and revenue of the sales order item are settled. The settlement receiver can be proposed through the settlement profile.
    The settlement share defines the percentage or the equivalence numbers used to distribute the costs to the individual settlement receivers. The settlement share for sales order items is usually 100%. A settlement share of 100% is preset in the system.
    The settlement type specifies full settlement of the sales order item. This ensures that all the data on the sales order is available for results analysis.
    Settlement still takes place in each period. The revenues and the cost of sales are transferred to CO-PA by period, and the work in process and the reserves are transferred to FI.

  • Settlement rule in rework process order

    Hello
    When creating a rework process order without material in CORO the system is asking automatically for the settlement rules. Here we can then maintain a cost center order order. This is very nice and perfectly fine to us.
    When now creating in a different case a rework order with material in COR1 (because we plan a goods receipt) the system is automatically taking the material as default settlement rule without asking the user. Would anybody know a way how to customize the system to ask the user in any case for the settlement rules? So the user really has to make a choice and is not always forgetting to update the correct values which are not only the material. (kind of a training issue but maybe the system can do something about that..)
    Thanks

    Hi,
    Please click this link
    http://help.sap.com/saphelp_470/helpdata/en/38/0cf817ed9b11d29fa2080009b0db33/content.htm
    Rework order
    thanks
    krishna

Maybe you are looking for

  • Mail going to Trash Folder?

    Almost all my mail is going straight to the trash folder on my iPad? Please Help?

  • Nested repeaters in Flex 3

    I have an Flex app that uses nested repeaters. The inner repeater uses the outer repeater's currentItem property. When using nested repeaters, do they repeat in an asynch fashion? It seems as though the outer repeater is repeating before the inner re

  • Hp mini 110 boot disk error after installing new hard drive and system recovery

    Need help,  HP mini 110 Windows 7 32 bit.  using my recovery disks I created i was able to recover to the old 160 gb hard drive.  After I installed new 320 Gig drive and used my recovery disks i now get boot disk error. Looks like system was installe

  • Internet Explorer 7.0 setting for Planning

    Hi Hyperion Experts, I read many times in this forum that Planning faces problem with Internet explorer 7.0 and better to use earlier version. otherwise some settings required in IE 7.0. Could anybody help me how to set IE 7.0 for Planning as I'm una

  • Imovie on 2 screens

    how to be able to use 2 monitors at the same time: 1 for edition and the second for preview? thanks!