UPGRADE ASSISTANT QUESTIONS for ECC6.0???????911

I have used upgrade assistant in the past for 4.6C and 4.7 upgrades and had no problems.  I am having trouble getting the assistant to work through the internet browers.  I need help with a couple of questions:
First:  Do I need do a prepare and SERVER option like I had in the past with R3UP?
Second:  Is there anything special that needs to be done for ports 4239,4240,4241. I can reach my server through the internet of some of the ports that R3 uses.
It seems the java is not recognizing my i5 server and I am not sure where the disconnect is. 
This is the error I am receiving when I try to start the upgrade assistant:
ERROR:  Unable to load resource: http://sapdev:4239/ua/uagui.jnlp
<!--
JNLP File for UaGui
-->
<?xml version="1.0" encoding="utf-8"?>
<jnlp spec="0.2 1.0" codebase="http://SAPDEV.SWIRECC.COM:4239/ua" href="uagui.jnlp">
  <information>
    <title>Upgrade Assistant</title>
    <vendor>SAP AG</vendor>
    <description kind="short">SAP Upgrade Assistant</description>
    <icon href="http://SAPDEV.SWIRECC.COM:4239/ua/pics/sdtgui_big.gif"/>
  </information>
  <security>
    <all-permissions/>
  </security>
  <resources>
    <j2se version="1.4+"/>
    <jar href="uagui.jar" main="true" download="eager"/>
  </resources>
  <application-desc main-class="UaGui">
       <argument>-host</argument>
       <argument>SAPDEV.SWIRECC.COM</argument>
       <argument>-port</argument>
       <argument>4241</argument>
  </application-desc>
</jnlp>

Usually it's done like
- PREPARE
- exchange SAPup with the newest version
- add your application fix <application>_FIX to /usr/sap/put
- $JAVA_HOME/bin/java -cp /usr/sap/put/ua/ua.jar UaServer
- give an administrator password
After that the UA should listen on port 4239
You can verify that on the machine via
netstat -tn | grep -i LISTEN | grep 4239
Also check that you have either no proxy or add the box' name to the exception list of the browser (because Java uses that exception list too).
Markus

Similar Messages

  • Migration assistant questions for Server 10.6.8

    Currently on 10.6.8 server on an iMac that was used for lots of things (users logged into it and installed apps).  Moving to the Oct 2009 Mac Mini Server that had no optical drive.  It has 10.6.8 server, and I want to migrate just for the server related stuff.
    I've already installed the 10.6.8 over the "remote install osx" in Utilities (over LAN), and it's sitting at the Migration assistant screen, showing no volumes, yet.
    1) do I now just plug the older server and new server directly together with lan cable for the migration assistant to see each other?  I know the server will be down for a bit during this...
    2) I don't want to migrate the all the apps and junk... just the server related stuff, like OD, user shares, etc.
    What settings should I be checking in the Migration assistant to have my server working with sharepoints, OD users, and all except APPS?

    I've done a migration recently from a Mac Mini Server to a Mac Pro. I thought that migration the server by portion (like you) would be the most normal way, but turns out that I actually mirrored the entire disk image and it worked great. I simply booted my Mac Mini in Disk mode (FireWire) and copied it over.
    In your case, it might be easier to start that way and remove the unwanted apps. At least, you'll be sure to have all your settings right away.
    If you don't do that and start with a clean install, you'll need at least to migrate over your OD user using the Server Admin OD. Then, you'll need to "ditto" your mail, iCal and Address Book data over. The 10.6 Admin Guides, available on the Apple support website, are very detailed on the backup procedures.

  • Error in the Upgrade Assistant for 11g

    Hi,
    I'm trying to upgrade a 10g repository to 11g using the Upgrade Assistant but it is returning an (unhelpful) error in the log file.
    Has anyone else experienced this error or know what it is?
    [2010-09-17T14:14:45.902+01:00] [Framework] [NOTIFICATION] [upgrade.Framework] Starting to upgrade BIEE.
    [2010-09-17T14:14:45.933+01:00] [Framework] [ERROR] [UPGAST-00138] [upgrade.Framework] upgrade exception occurred
    [2010-09-17T14:14:45.933+01:00] [Framework] [ERROR] [upgrade.Framework] Cause: An unexpected upgrade exception has occurred. Action: See the secondary error message for additional details.
    [2010-09-17T14:14:45.933+01:00] [Framework] [ERROR] [upgrade.Framework] UPGCMP-02712: Expected oracle.biee.admin:oracleInstance=*,type=BIDomain.OracleInstance,group=Service Oracle instance, found 2
    [2010-09-17T14:14:45.933+01:00] [Framework] [ERROR] [upgrade.Framework] UPGCMP-02712: Expected oracle.biee.admin:oracleInstance=*,type=BIDomain.OracleInstance,group=Service Oracle instance, found 2
    [2010-09-17T14:14:45.933+01:00] [Framework] [NOTIFICATION] [upgrade.Framework] Finished upgrading BIEE with status: Failure.
    Thanks.

    I ran into this same problem after I performed the steps in the enterprise deployment guide. One of the steps in Chapter 5, section 5.4.4 has you separate the bi_server1 managed server from the admin server into its own "mserver" directory structure by using the pack.sh and unpack.sh commands. This step appears to cause the problem. For now, what I have done is perform a complete reinstall and skip this step along with any other clustering related steps. Once I did this, I was able to run the upgrade assistant to upgrade the 10g repository to 11g.
    I have informed Oracle support about this issue. If they have a better work around, I will post it back here at a later date.
    Edited by: user10715047 on Dec 21, 2010 1:33 PM

  • Upgrade question for laptop to run PPro CS6/CC

    All,
    I've spent the last several days reading, researching and generally getting up to speed on what my options are re hardware moving forward, and though I've been a lurker/user of these forums (and others) for years, this is my first time engaging directly now that I feel I know a bit more. I must also say how incredible a resource the regular users like Harm Millard have been to self-taught but enthusiastic newbies like me - thank you!
    I've been a longtime self-taught, relatively light but still barely pro Premiere Pro user for the past ten years. For the past couple of years, I've been barely getting by using CS4 on my once-top-of-the-line Dell Precision M6500 laptop running Win7 Pro 32-bit. The M6500 is by far my favorite PC I've ever owned and is still rocking, even with older specs (listed below), but it is time to grow up, bite the bullet and (hopefully) upgrade this machine so that I can take advantage of CS6/CC and do a bit more heavy lifting (basic color correction, light After Effects, etc).
    I currently shoot on a Sony AX2000 in AVCHD, but am starting to do more work on my Canon t3i and am close to moving up to a Canon 5D mk3, so will be using more HD MOV files in the near future, possibly alongside the old AVCHD footage. Most of my exports are for HD web uploads, but also occasionally export to DVD. I do not anticipate stepping up to Red footage or the like in the near or mid future.
    My current laptop specs are as follows:
    Win7 32-bit
    4GB RAM
    Intel i7 quad core M620 (2.67GHz)
    500GB 7200rpm HDD
    Nvidia Quadro FX 2800M
    I've already ordered a RAM upgrade to get me to 16GB, have Win7 64-bit ready to install, and just bought 2 x 750GB 7200rpm HDD (Western Digital). Instead of investing in an all new machine (laptop or desktop), and considering the amazing stability and longevity (so far) of the M6500, I'd like to try and see if I can get this machine to a place where I can take advantage of CS6/CC and have it run stably and somewhat fast. I realize it's not the best option, and that getting an all-new tricked out desktop is the preferred option, but for budget reasons, that's not possible right now.
    Here's my plan:
    Upgrade so that system will be:
    Win7 64bit
    16 GB RAM
    2 x 750GB 7200rpm HDDs (internal)
    rest of the system listed above would remain the same as above - namely CPU and graphics card
    The machine can also support a mSATA mini SSD (up to 256GB), but I haven't splurged for that yet. I'm  trying to figure out whether to use the two new HDDs in RAID 0 and have the OS, project files, cache, source footage and export files all on those two RAIDed drives, or whether it would make a truly huge difference to add another internal SSD as the boot/OS/Program Files drive and leave the RAID 0 configuration to handle all video and project files. I've read enough to assume that adding the SSD is the preferred option, but it's pricey, and what I'm trying to determine is whether or not it's really worth the cost vs a straight 2-HDD RAID 0 configuration.
    I've read a lot about the dangers of RAID 0, but am not too concerned about failures since I use an online backup system (Sugarsync) for all my document files (this machine doubles as my main work PC) and I regularly back up all source and exported video files.
    On a separate note, I realize that my graphics card is not listed among the supported cards for CS6/CC - is that going to cause stability and/or significant performance issues, or will it work since I won't be doing 4k/Red files? Is the CUDA hack an option for me? I have the option of upgrading the card to a supported card (Nividia M5000), but it's hugely pricey (close to $2k) and unless it will make the machine an absolute stud for years to come, it's not worth it.
    So in short (yeah right ), here are my questions:
    Does my proposed new system have the juice to handle what I want to do?
    Which HDD setup is preferred, and by what degree (do I absolutely have to get the SSD to make this work?):
    2 x 750GB 7200rpm HDDs in RAID 0 for the entire machine
    1 x SSD (what size is minimum recommended?) as boot/OS plus 2x750GB HDDs in RAID 0
    Will my existing Quadro 2800M graphics card make the other RAM/HDD upgrades a waste of money?
    Is my existing CPU powerful enough to warrant these other upgrades?
    Sorry for the long post, and thanks for any help you guys can provide!
    Van

    Van,
    Tough love - I'm going to give you my honest opinion here, but it does make me feel bad since you seem to have already ordered parts before you posted.
    1. In a word no. Your processor is dual core. You really want at least quad core + hyperthreading for the media that you will be pushing around. The Quadro 2800M only has 96 CUDA cores and DDR3 (slow) memory. BTW, task manager shows 4 "cores" when you have a dual-core + hyperthreading.
    2. I'd choose 2. - much nicer - worth the cost
    3. yes
    4. no
    So what to do if you cut bait on your current plan and get a new laptop. Check out recent (< 6 mths old) threads here for lots of discussion at various price points. Gamers laptops and Sager/Clevo models definitely offer the best bang for the buck for laptops to run Premiere, mostly due to the GTX video line trouncing the Quadro line for performance for the price. I loved the Dell M6500 in its time. If you want to replace it with something current day the M6700 is good, but I like what HP is doing for the 17" workstation class even better in 2013. If you can buy a few months, I suspect the new smaller die size 22nm Intel cpus will be really help for laptop performance (desktops have just about all the cpu cooling capacity required, but in laptops cooling through tiny tiny coolers and tiny, tiny, quiet fans is way limited - so, the new lower wattage, cooler 22nm cpus should be much larger boost for laptop users than workstations).
    I suspect that I would really enjoy editing on a well thought out $1500 Asus, even better on a $2200 Sager, and would have similar performance with the support of HP or Dell at closer to a $3000 price point for the media you mention above. ADK sells Sager/Clevo laptops and has much better support for video (and audio) editors than HP or Dell ever dreamed to provide; prices would be a bit more than www Sager dealers but ADK is a no-brainer if you want "real" support and a machine that is tweaked for Adobe.
    Regards,
    Jim

  • SPAM Update needed for Upgrade Assistent

    For updating a SAP System (IDES 4.7) I assume I need the Upgrade Assistant!? I installed the UA-Server and connected with a browser to the local Service (http://x.x.x.x:4239/ua/UaGUI.html). After a few steps in the phase "PREPARE", the assistand is running into the following error: "The SPAM Version 15 of your system is too low!!!". I downloaded the newest SPAM-Package and unpacked it. The resulting files are "CSR0120031469_0026199.ATT" and "CSR0120031469_0026199.PAT". I copied them to \usr\sap\trans\EPS\in but the error still appears...
    Any hint how to get 'em working? Am I totally wrong with this solution?

    Hi Thomas
    I think for upgrading an IDES system you need to install it again. Anyway , this note 164244 says you can ask SAP for an upgrade if necessary.
    Regards
    Jose Luis Valverde

  • Re XP expiry - Windows upgrade assistant refers me to you for Acrobat advice. What do I need to do?

    re XP expiry - Windows upgrade assistant refers me to you for Acrobat advice. What do I need to do?

    I don't know. What version of Acrobat do you have, what OS are you now running, and what does the message say?

  • Where to download PeopleSoft Change Assistant Template for Upgrade ?

    Folks,
    Hello. I am upgrading PeopleTools 8.49 to 8.50.
    After configure Change Assistant 8.50, we need to download a specific Change Assistant template for upgrade process. I cannot find where to download it.
    Can any folks provide a link to download PeopleSoft Change Assistant template for upgrade PeopleTools 8.49 to 8.50 ?
    Thanks.

    Hi,
    You have to be a customer with a current maintenance agreement to have valid access to My Oracle Support (http://support.oracle.com) and the upgrade documentation and templates.
    Current customers who share documents and information from My Oracle Support with non maintenance customers, and others, may be in breach of their license agreement with Oracle.
    For reference:
    "... This software and related documentation are provided under a license agreement containing restrictions on use and disclosure and are protected by intellectual property laws. Except as expressly permitted in your license agreement or allowed by law, you may not use, copy, reproduce, translate, broadcast,modify, license, transmit, distribute, exhibit, perform, publish or display any part, in any form, or by anymeans. Reverse engineering, disassembly, or decompilation of this software, unless required by law for interoperability, is prohibited"
    regards
    Greg

  • Toshiba Upgrade Assistant for Windows Vista

    I have the Qosmio G35-AV600 and I got the Express Upgrade Package 4 Windows Vista. I've downloaded the Toshiba Upgrade Assistant for Wndows Vista but when I run it the following message appears "there are no vita softwear componentes availble for this computer model at this time". what is happening?

    I'm running Windows XP Media center Edition, and I want to install Windows Vista through the express upgrade DVD. At the support bulttins, I found how 2 do it but when I do as they said, the Upgrade Assistsnt shows that message.
    There is a problem with the upgrade assistant, so help me to have the latest version of it.

  • I can't get my Windows 7 pc to recognise my old LG VN251 phone via USB.   The verison software upgrade assistant runs and my phone is up to date.   I do get a window that pops up that says I can either run the bootstrap or look at the files on the phone,

    I can't get my Windows 7 pc to recognise my old LG VN251 phone via USB.   The verison software upgrade assistant runs and my phone is up to date.   I do get a window that pops up that says I can either run the bootstrap or look at the files on the phone, but I cannot see any photos.   Thoughts?

    We want to make sure we move your pictures to your computer schpee! Do you have a memory card on your phone? If your pictures are not on your http://vz.to/1OvJVey memory card we would want to move them. After you move them than try http://www.verizonwireless.com/support/knowledge-base-45147/ to move them to your computer. Keep us posted.   AmberF_VZW Follow us on Twitter @VZWSupport If my response answered your question please click the "Correct Answer" button under my response. This ensures others can benefit from our conversation. Thanks in advance for your help with this!!

  • Guidelines to reduce downtime during upgradation R/3 to ECC6

    hi all........
    Here we implemented SAP R/3 4.6  in the year 2005.
    Now we are planning to upgrade our system to ECC6 unicode .
    We are planning to upgrade our Production and Development system to SAP
    ERP6 EHP4.As part of the upgradation; we had setup a test system with the
    following details:
    Sun Fire 480R (UltraSparc III + 1.05GHz x 4 processor)
    Memory 16 GB and Storage : Sun CSM 200 SATA HDD
    SAP R/3 4.71, single code pages 1100, Oracle 9.2.0.8.0, Solaris 9
    Test system with 1.2TB data copied from Production System.
    We have upgraded the test system using CU&UC method ( Upgrade Guide SAPERP6.0 EHP4 SR1 Abap ). It took 2 days downtime for full upgradation and 8 days for Unicode conversion.
    Requirement :
    To Upgrade the current systems without any additional hardware to SAP
    ERP6 EHP4 Unicode.
    As a part of the above, the cluster has to be upgraded to Sun cluster
    3.2, and operating system to Solaris10 (5.10)
    We are having the following queries:
    1. With only 1.3 TB data, we feel, the down time of 10 days is not
    realistic.Though we had not deviated from the above mentioned upgrade
    guide, what could be the reasons for this down time of 10 days?what arethe affecting factors? Kindly suggest the ways by which we can get
    reduced downtime . The referred Notes are (784118, 855772, 952514,
    936441, 954268, 864861 ) still we are unable to pin point the reason. Abreak up of this down time is given below for reference.
    2. Are there any alternate approved upgradation methods to reduce
    downtime in our present set up? (details of present set up is given below)
    3. How to calculate the down time with reference to(sapnote:857081) to in
    our setup
    Current Production System Details :
    System : Sun Fire V890
    Processor : 1.5GHz UltraSPARC IV+ processors -- 8no.s
    Memory : 64 GB
    Storage : Sun Storagetek 6180: HDD FCAL(16 no.s x 450 GB)
    15,000-rpm 4 Gb/sec 4GB data cache (Storage connected to server using FC
    cable)
    SAP : R/3 4.71 single code pages 1100
    Database : Oracle 9.2.0.8 data-size is around 1.3 TB
    OS : Solaris 9 (5.9)
    Cluster : Sun cluster 3.1
    Network : 1GB ethernet (1000BASE-SX)
    Architecture : Application and database server on Same system
    SAP Development system specification same as the above with 187 GB data
    size. PRD and DEV systems are on cluster; PRD failover to DEV system.
    The time taken for test upgrade - brief details:
    1. Kernel upgraded 6.20 to 6.40 (2hours)
    2. Oracle Upgrade to 10.2.0.4.0 (3.30 hours)
    3. SAP UPGRADE Preparation-Apply support packages (18 hours)
    4. Downtime Phase and Pre-Processing and Finalization Phase (20 hours)
    5. Unicode Conversion-Taking DB Export 109GB(Almost 10% of total DB
    size)(98 hours)
    6. Installation of unicode system using export (95 hours)
    Looking forward to hear from you.
    Best Regards,
    Rajeesh K.P

    Hi .......
    i am very sorry for late reply...............................
    The time taken for test upgrade - brief details:
    1. Kernel upgraded 6.20 to 6.40 (2hours)
    2. Oracle Upgrade to 10.2.0.4.0 (3.30 hours)
    3. SAP UPGRADE Preparation-Apply support packages (18 hours)
    4. Downtime Phase and Pre-Processing and Finalization Phase (20 hours)
    5. Unicode Conversion-Taking DB Export 109GB(Almost 10% of total DB
    size)(98 hours)
    6. Installation of unicode system using export (95 hours)
    2 days downtime means the sum of time used for above 4 activities ..........................
    as you suggested we can do the same 4 different down times......................
    Unicode Conversion-Taking DB Export 109GB(Almost 10% of total DB size) is taking a continuous down time
    of 98 hours (4.5 days ) (Activity 5)+  installation of Unicode system using the Unicode export is taking 95 hours 4.5 days
    (Activity 6)
    i think the we have to do activity 5 & 6 in a single stretch with out users, so it will take a continuous down time of 9 Days
    With this in mind I have a few questions for you to clear a little bit more all the problem.
    Q:1 Did you use more parallel jobs during Downtime than default? and I mean real Downtime where the SAP system is taken down
    No.we have used default number (3 ) of parallel jobs during downtime
    Did the system allow you to use ICNV (incremental converssion) for some tables?
    yes we may use ICNV
    Can you separate the Unicode conversion to a different weekend? or is a must for some business reason?
    Yes , we can separate the Unicode conversion to a different weekend , it will not affect our business
    Did you save the post download Report so you can see what are the most time consuming phases?
    i am not so clear about this question , we have made an activity chart with time duration as per the test upgrade. Or how we can save the post download report from the system
    Looking forward to hear from you.
    Best Regards,
    Rajeesh K.P

  • Will Upgrade Assistant work with MS SQL Server

    We have ODI installed om MS SQL Server 2005. Current version of ODI is 10.1.3.5 and would like to upgrade to 11.1.1. My question is can we use upgrade assistant to create 2 instances of ODI that has old 10g Repository DB and 11g Repository DB or is Upgrade Asssitant work only when repositories are installed on Oracle 11g.
    Thanks,
    Giri

    It's possible, but it's tough, you'll have to edit the ODI database to change the connection string to one that the new ODI likes, and the java driver to one Java likes.
    For SQL Server 2005, the JAVA_DRIVER it wants is: weblogic.jdbc.sqlserver.SQLServerDriver
    The connection string it will want will be like : jdbc:sqlserver://<host>:<port>;selectMethod=cursor;databaseName=<database_name>;
    Hope that helps, let me know if you want more info.

  • Software upgrade assistant launches IE

    Please help!  Everytime I plug my phone into my computer, the Verizon Software Upgrade Assistant starts Microsoft's Internet Explorer and loads a verizon web page.  I can't find any way to stop this from happening.  I don't use IE because it's too great a security risk.  I don't appreciate Verizon malware loading this program without my permission.  I also don't need and don't want to see Verizon's web page everytime I plug in my phone.  I tried removing the Software Upgrade Assistant, but then I get the "Software available for your phone" pop-up instead.  How can I prevent my system from starting IE everytime I plug in my phone?

    Bearone21,
          Thanks for your message.  My PC still connects to the internet
    just fine, but everytime I plug the phone into the USB port, the new
    software launches Internet Explorer (on the PC) and loads Verizon's
    Consumer Products web page.  There are two problems with that.  First, I
    don't use Internet Explorer because of it's inherent security risks and
    I don't want it running on my machine.  Second, I don't care to be
    spammed with the Verizon Consumer Products page every time I plug my
    phone in to sync it or charge it (several times a day).  I was hoping
    there was an option to turn this "feature" off.  A simple options menu
    box that would let me choose between "on connect launch browser." and
    "on connect do nothing" would be sufficient.  I've reviewed all the
    options and this choice doesn't appear to be available, hence my question.
          Note that this never happened until I did the 4.3 upgrade, so I
    have to assume it is another one of the several defects in the upgrade
    package.  There are a couple of simple ways to fix this defect.  The
    first, and best way, is for the software to give me the option to
    launch, or not launch Verizon's consumer products web page on USB
    connect.  That would solve the problem completely.  Failing that, the
    Verizon software should use the system default browser instead of
    launching IE. That might still be annoying, but at least it would
    resolve the security problem.
          I appreciate your response to my inquiry and hope that Verizon and
    Samsung will continue working together to fix the many problems with the
    4.3 upgrade.  Hopefully Verizon will recognize that the browser market
    has changed and IE users account for less than 23% of the browser market
    today (see http://en.wikipedia.org/wiki/Browser_wars).  Verizon needs to
    adapt to the new browser climate and stop writing software that is
    dependent on IE.
                   Thanks again,
    Dave *
    >>Personal information removed to comply with the Verizon Wireless Terms of Service<<
    Message was edited by: Verizon Moderator

  • Using DB Upgrade Assistant to migrate from 10.2.0.3

    Can you use the DB Upgrade assistant to migrate from 10.2.0.2 to 11gR2 Or do you have to be on a higher release of the EE db (ie. 10.2.0.5) to use the migration assistant?
    Thanks.

    Hello,
    this forum is dedicated for migrations of non-Oracle databases to Oracle, using the SQL Developer Migration Workbench.
    You will better be helped if you post your question into the Forum: Database - Upgrade which you can find at:
    Database Upgrade
    Regards
    Wolfgang

  • Windows 8 installation - Upgrade Assistant compatibility Issue - Bluetooth Win7 Suite

    Having procured an on-line download of Windows 8, from the Microsoft web site, I am a little concerned about an incompatibility identified by the Microsoft
     Upgrade Assistant; namely:-
     "Bluetooth Win7 Suite (64) - Atheros Communications"
    This incompatibility was identified after restoration of an original copy of the Windows 7 operating system, as installed by the manufacturer of my PC! (Recovered from an Acronis image).
    That is, the operating system, prior to installation of any personal software, or external hardware, or divers!
    Hence, I can only assume, that "Bluetooth Win7 Suite (64)" is a sub component of one of the original components of the computer:
    ASUS P8Z68-V LE Motherboard
    NVIDIA Quadro 600 1024MB Professional Video Card
    Intel  i7 2600K Processor (3.4 GHz - no over-clocking)
    16GB Corsair PC3-12800 1600MHz DDR3 Memory (4x4 GB sticks)
    Qty 2 Sony 24x DVD-RW drives
    Qty 2 120GB Corsair Force 3 SSD (No Raid)
    Qty 1 1000GB 7200 HDD
    Onboard High Definition Audio
    My plan was to perform a clean installation of Windows 8, but I have no understanding what the implications of this incompatibility will be!
    Namely, what the function of  Bluetooth Win7 Suite (64), is! And what hardware it is associated with!
    Whether a clean installation will work, without  Bluetooth Win7 Suite (64)
    Whether Windows 8 install will have onboard drivers, for all of the above hardware!
    After installation of Windows 8, and installation of the manufactures latest drivers, for the Motherboard and Video Card, will I have to search elsewhere 
    for a driver for the Bluetooth Win7 Suite (64)
    I would appreciate any advice on this matter!
    Brian

    Hi,
    Based on my research, it seems that Bluetooth Win7 Suite (64) is a program developed by Atheros Communications.
    So, do you have any Bluetooth device? Did you install it?
    Please also check if it lists in Programs and Features.
    However, if you do not have any Bluetooth device or you do not use this program, in my opinion, it will not affect the installation of Windows 8.
    Hope this helps.
    Jeremy Wu
    TechNet Community Support

  • Windows 8 Upgrade Assistant failed on Satellite P775

    I tried running the Windows 8 Upgrade Assistant on my Satellite P775.
    It started by displaying
    Checking Components; download Windows 8 Components data.
    Reading Components.
    Got component TOSHIBA Wireless LAN Indicator
    ... etc ...
    Got Component TOSHIBA Contrasena de supervisor
    Reading Windows Components.
    then displayed a Message Box
    "Failed to read Target (Windows 8) INI file."
    How can I solve this?
    Thanks

    Thanks for the reply.
    Yes I followed that procedure.
    My model is Satellite P775-112 PSBY3E and is listed as being compatible
    After installing Windows 8, I noticed that the DVD drive was no longer accessible, as described in the following thread: http://forums.computers.toshiba-europe.com/forums/thread.jspa?threadID=68222&tstart=0
    So I disabled the Windows Service "Toshiba Optical Disc Drive Service" (TODDSrv.exe 1.0.0.8), and the DVD drive is now visible. However Toshiba Video Player still does not work (says it has compatibility issues) and I can not view DVD videos.
    I then ran the Windows 8 Upgrade Assistant, which failed immediately with the error "Failed to read Target (Windows 8) INI file".
    I found some posts on the forum with a similar error with the Windows 7 Upgrade Assistant (Failed to read Target (Windows 7) INI file. None of the posts has a clear description of what this error means but I've tried all of the suggestions.
    Here's a list of what I've tried:
    - Rebooted
    - Upgraded BIOS to latest version (2.10)
    - Run Upgrade Assistant as Administrator
    - Run Upgrade Assistant with "Toshiba Optical DIsc Drive Service TODDSrv.exe 1.0.0.8 started or stopped.
    My main problems at the moment are:
    - Toshiba Optical DIsc Drive Service causes DVD drive to disappear
    - Toshiba Video Player won't run
    - No way to view DVDs
    I'd be happy to install the drivers and applications individually if the Upgrade Assistant doesn't work - is there anywhere I can download them?

Maybe you are looking for

  • AddressBook Hang after upgrade to 10.7.2

    I have used AddressBook in 10.7 and upgraded to 10.7.1 seamlessly. I mostly use it to sync from my Gmail contact. But recently after upgrade to 10.7.2 It says It support iCloud and I am no need to sync with Google anymore. ???? But from what I see al

  • My itunes won't update and update won't download

    I keep getting sent to the download page, and I click and save file but it enver saves anywhere. And i can't download this stupid update.   HELP!?

  • Selection screen default value maintain,user cant chage the default value

    hi Friends SELECTION-SCREEN  BEGIN OF BLOCK SCLDBLOCK WITH FRAME. SELECT-OPTIONS:   S_WERKS FOR EBAN-WERKS DEFAULT 'IN01' NO INTERVALS NO-EXTENSION ,                   S_MATNR FOR EBAN-MATNR,                   S_BANFN FOR EBAN-BANFN,                 

  • Chaning business area in asset master

    Hi gurus, Can we change business area in asset master? is there any customizing or transaction?

  • Lead Org determination from Employee responsible