Urgent - Avoiding PO creation from SC

Hi,
I need to stop the PO creation in SRM & R/3.
Pls suggest.
Thanks,
Shah.

Hi Kyamuddin
One option is to increase the approval level and see that the last approver do not apporve the SC and there by we can stop PO getting created for specific Prodcuct Category.
Other option is to change the Customisation settings in spro  --SRM Server -- Cross-Application Basic Settings -- Define Objects in Backend System (Purch. Reqs, Reservations, Purch. Orders)
In this path for this option, here we maintain product category wise  settings for backend documents you can change the 2 parameters
1 INC Proc  - Always External Procurement
2 Ext Procument - Always Purchase REquistion
By this you can avoid creating PO temporary and then change the setting normal.
regards,
Nimish Sheth
Pls reward points for helpful answers

Similar Messages

  • Avoid delivery creation from USEREXIT_SAVE_DOCUMENT_PREPARE

    Hi guys,
    I need to avoid the delivery creation, if certain condition occurs. How can I avoid that from the User Exit USEREXIT_SAVE_DOCUMENT_PREPARE?
    Thanks

    Hi,
              Try this BADI LE_SHP_DELIVERY_PROC , it will fire PGI preparation. In that you can write code as your
    requirement. I hope it will solve your issue.
    Thanks & Regards
    G.Vendhan.

  • SD Billing - Avoid Cancellation Creation if Invoice has not been posted yet

    Dear all,
    I have noticed this problem in my company system.
    Problem descripion:
    - you creates an invoice and the system doesn't post it for any reason
    - then you create the cancel of the invoice, BEFORE forcing the posting of the invoice
    --> user creates Cancel, Cancel is not posted as well.
    --> from now it is impossible to post both invoices: if you try to post the Invoice after the cancel creation, the VF02 recongnise that a CANCEL exists and do not allow for the posting
    --> standard VFX3 doesn't signal this kind of not posted documents situation.
    Ok, The right procedure for thes user should be: create invoice, if not posted then try to understand why not posted, and not CANCEL it.
    But in this case VFK3 was not able to detect the invoice was not posted: it was not in the list.
    So the 2 ways must be:
    1) one possibility could be undestand in VFX3 could be enhanced: I checked in OSS but I didn't find anything.
    2) other possibility: add a further check in interface between SD and FI in order to check if original invoice is not posted to FI and in this case block the cancel creation, as instead standard SAP does.
    Could you please give me an idea on how it would be better proceed?
    Thank You very much.
    Raffaella

    Dear,
    thank you for your feedback.
    in VOFA the flag is not ticked.
    The problem was that In VFX3 no data were found for the specified document (with all "Inclomplete Due To" check box  flagged), even if invoice and relative cancel were already created, but not posted.
    When we tryied to to post them, via VF02 for example, the system didn't warned anything specific and, doing the posting via debug, we discovered that the posting was stopped because VBRK-RFBSK = E = "Billing Document Cancelled".
    So, forcing via debug that value = ' ', because of the urgency of Finance Office, we could invoice it and then do the same for its cancel.
    So at the moment it is not possible for me to reproduce the error in the system.
    The only workaround I can imagine, is to find a way to avoid cancel creation if invoice is not posted yet.
    Do you think this is feasible way?
    Thank You veyr much for your suggestions.
    KR
    Raffaella
    Edited by: Raffaella Sacchetto on Nov 29, 2010 3:43 PM

  • PDF creation from ID - not outlining fonts correctly

    Hi all. I have a query regarding PDF creation from InDesign (so this could have been in the Acrobat section instead but went for this one).
    I work for a publisher using CS2+3 on PCs. We don't have one out of house printer as a rule but several. All have different requirements.
    Essentially we are converting fonts to curves from within InDesign when creating the PDFs. Therefore we have multiple files (curved and text) which is adding lots of time onto projects and adding a further margin for error with missing or out of date files. It seems this process is necessary as whenever I select the option to outline the fonts when creating the PDFs, the printers usually get in touch asking for the font, even though it has been outlined.
    I am hoping to find any simple solution, hopefully avoiding purchasing extra software, that avoids creating duplicate 'curved' files. I realise it's a big topic and not restricted to InDesign but this is the main software we are using so figured this was the place for it. Many thanks.

    I'll let others question the necessity of outlining text. It has been discussed many, many times before, and the only valid reasons I found so far are producing files for hopelessly outdated printers (the usual recommendation is "find another one, fast!") and for legacy custom hardware such as cutters and engravers.
    But this is really a mystery to me:
    It seems this process is necessary as whenever I select the option to outline the fonts when creating the PDFs, the printers usually get in touch asking for the font, even though it has been outlined.
    Tr this: outline all text in your ID document. Export as PDF. Check under Document Properties, Fonts. How many fonts do you see? If everything is outlined, there shouldn't be any.
    How does the printer know what fonts to ask for, and what is he ever gonna do with these fonts?

  • Automatic PO creation from SC

    Hi Experts,
    I am using SRM 7.0 with extended classic scenario and I have issue in the automatic po creation. For some Shopping Carts the PO is not automatically created. The SC is having Source of Supply Assigned and all the approves have completely approved the SC.  The latest status is  I1111          Item in Transfer Process.
    I checked in RZ20, ST22 and could not find any error or dumps.
    For the SC item under BBP_PDBEI the BE_OBJECT_TYPE is BUS2201 and BE_OBJECT_ID 1, once I trigger the PO creation manually the PO object id is reflected here.
    For such SC I am running the report BBP_ALERT_SB_NOTTRANSFERED manually which puts the SC in I1112 Error in Transmission Status and later I can trigger the SC creation from the alert monitor.
    For POs created in this manner the PO is created in Held Status without any line items, is this normal?
    I have two questions which I want to understand, how is the automatic po creation from SC setup, is there any customizing involved for the po creation from SC to happen automatically?
    What else should I check to find the reason why the the SC was stuck in I1111 status and PO was not created?

    You need to configure the Purchasing group and this will take care of automatic transfer of Doc to sourcing cockpit. Make sure you also maintain the customization for sourcing always carried out for Prod categories.
    Regards
    Saurabh

  • Automatic PO creation from PR with no master data

    Dear gurus,
    Is it possible to run ME59- Auto PO creation from approved PR with no master data/source assigned/PIR? Assuming user create adhoc PR.
    Is it possible to run this process successfully if i didn't meet on the criteria below? let say no.1 is not checked?
    1.Material Master purchasing view, check automatic PO check box.
    2. Vendor Master purchasing view, check automatic PO check box.
    3. Maintain Source list for Vendor and Material (transaction ME01) and also see validity period.
    4. Maintain Purchase Info Record (transaction ME11), check info record category (must be standard or pipeline or subcontracting)
    5. Create a Purchase Requisition ( transaction ME51N), during creation select check box of Source Determination.
    6. Use transaction ME59 and execute for purchase requisition for vendor, you will be able to create automatic PO.
    Thanks in advance.

    Hi,
    yes all point should be checked
    check following link
    [http://www.sap-img.com/materials/steps-to-create-auto-po.htm]
    Regards
    Kailas Ugale

  • Purchase Order Creation from ME5A Report

    Hi experts,
    My client wants Purchase Order Creation from ME5A Report.
    He wants show Open Purchase Requisition through ME5A report then he will select Purchase Requisition Number or line item for po creation from there only.
    Please advice how I can map this process in sap.
    Thanks in advance,
    Chandhu

    Why don't you use ME57 to display open PRs and then assign sources and convert them to PO?
    Or use ME57 to assign sources and ME59 to automatically convert them to PO.
    You can create your very own format for report display using  custom "Scope Of List" for ME57.
    Look in SPRO under Purchasing>Reporting>Maintain Purchase requisition lists.

  • IDOC/BAPI for Production order creation from Legacy system

    Hi all
    We are using an interface to create Production orders from legacy to SAP. Would you recommend an IDOC or a BAPI to create Production orders. If IDOC or BAPI then could you please mention which one?
    thanks a bunch

    Hi John,
    For your purposes, please use BAPI for production order creation from legacy system. There is no standard inbound IDoc available to use. SAP has an IDoc for outbound interface only (message type LOIPRO).
    If there is an inbound IDoc available, I would recommend to use an IDoc.
    IDoc technology has excellent error handling and will allow you to reprocess an error (if any).
    BAPI is also good approach to use and fast in term of  processing.
    For BAPI approach, you can use BAPI BAPI_PRODORD_CREATE.
    Hope this will help.
    Regards,
    Ferry Lianto

  • Blocking RdA creation from Sales Order Schedule Line

    Hi Gurus,
    please do you know if there is a way to block the RdA creation from Sales Order schedule line, for TAS item category? I tried with Header Delivery block without quantity confirmation but even if quantity on schedule lines are not confirmed, RdA is created anyway.
    Thank you very much
    Kind Regards
    Andrea

    thank you

  • Item category determination during Purchase Requisition creation from APO

    I’m creating a  SNP Purchase Requisition in APO and when it is  published to R/3, a Purchase Requisition document is created in R/3.
    When this PR is created in R/3, I want the Item Category to be determined based on the Material master Special Procurement Type. ( eg: I’d like the Item category to be ‘L’ if the Material master Special Procurement Type = 30 (Subcontracting) ). But by standard, this field is coming as ‘Blank’ and this field could only be populated during the creation from APO.
    I found a user exit ( CIFPUR02 :  Enhancement of Purchase Order Interface (Inbound) ) on R/3 where I tried to populate the Item Category, but  when I do this, all the purchase order related data is getting deleted and hence no PR’s are getting created in R/3.
    Could anyone please tell me if this could be resolved using configuration and if not any  tips to do this technically would be very helpful.
    Thanks,
    Harsha

    Hi Karun,
    This is the code i'm using...
    select single * from marc into lit_marc
    where  matnr = c_eban-matnr
    and    werks = c_eban-werks.
    append lit_marc.
    read table lit_marc with key matnr = c_eban-matnr
                                 werks = c_eban-werks
                                 sobsl = 30.
      if sy-subrc = 0.
      c_eban-pstyp = '3'.
      endif.
    Here sobsl = 30 is the Special procurement type
    But when i try to populate c_eban-pstyp = '3', during the creation of Purchase Requisitions in R/3, in the program SAPLEMPI -> LMEPIF01
    this condition is encountered which deletes all the data in the tables that is used to create Purchase requisitions.
    <i>* get rsnum in the case of subcontracting
          IF XEBAN-PSTYP EQ PSTYP-LOHN AND                      "RB240999
             EXITFLAG_ORDID IS INITIAL.                         "RB240999
    refresh all component tables
            CALL FUNCTION 'ME_COMPONENTS_REFRESH'
                 EXCEPTIONS
                      OTHERS = 1.</i>
    Could you please suggest me anything to get around this.
    Thanks,
    Harsha

  • Automatic PR Creation from Sales order

    Hi All,
              This is with respect to PR creation from Sales order for 3rd party items.
    I am able to create PR from standard sales order and i dont have any issues with that.  I have used schedule line categories which is configured with Order type Z2, Item rel for dlvy checked and Acct assigment group as E.
    Now my question is , I want to copy partners from sales order to Purchas req. Currently some partners are getting transferred from Sales order to P.Req, But not all there in sales order. Where do we control the data that can be copied from Sales order to P. Req
    Thank you
    Kris

    Hi,
    Genrating PR, Mostely depends on shedule line,see which shedule line u r determining for HIGH LEVEL ITEM ,for that shedule line maintain setting is VOV6.
    kapil

  • While automatic PO creation from GR conditions to be fetched from condition

    Hi SAP Gurus, i have a requirement where in I want PO to be automatically created while doing GR.All other settings I have done. Now my requirement is tat say freight conditon FRC1 should be picked up from condition record.I already have condition record maintained.please let me know if this is possible or is it like that for automatic PO creation from GR info record is mandatory.Please let me know.Thanks

    Hi,
    Condition record will not help for the automatic PO creation from GR. Use Info record and maintain your conditions like discount, freight,packng and forwarding etc.....

  • Auto PO creation from PR through ME58 problem.

    Hi experts.
    We are providing facility to our client  auto po creation from PR through Me58 transaction code.
    I am facing amazing problem is that it is working fine in development client , not working in Quality and  Production client , exactly  problem is that ME58 u2013 Ordering Assigned Purchase requisition  & Process Assignment  Create PO , Purchase order cannot be created, PR  shift in document overview , it means user want to drag and drop in purchase order then system create PO , this problem I am facing in Quality & Production , but it is working fine in development server there is no need to drag and drop , immediately after Process assignment Create PO , system directly convert PR into PO  just only need to check and save PO. I compare everything with development & quality data including material master , source list and everything still I am unable to understand where is the problem , is there any customization settings related to auto po ?  pls. suggest any solution to solve this issue.
    Kumar

    Hi,
    Config setting.
    Settings for Automatic PO creation is:
    1. Select the Automatic PO check box/option in Purchasing view of material master
    2. Select the Automatic PO option in the purchasing data view of Vendor master
    3. Maintain Purchase info record
    4. ME56- Assign the vendors to PR's
    5. ME58- Create PO via assignment list(PR-> PO)
    6. ME57- Assign and process PR's
    7. ME59N - Create PO automatically via PR
    Above step by step procedure is involved in the Automatic PO creation.
    SAM

  • Auto PO creation from PR

    Dear All,
    I have done all process required for Auto PO creation from PR. With TCode Me59 i am able to create a PO also but some field in PO are blank like in header level Additional  tab - Validity Start and Validity End, in Communication tab - Your Reference and Our Reference.
    And while using ME59N, its shows error
    "PO cannot be created
    PO header data still faulty
    Enter Our Reference
    Enter Validity End
    Enter Validity Start
    Enter Your Reference
    Requisition could not be converted"
    How will i fill these field. Any link from info record or source list. These field are necessary in PO.
    Please anybody help me to solve this issue.

    Yes Sir. You have said the right thing. At first i have done the same that make these fields optional. but here as per our business these fields are mandatory for PO. Is there any other way that we forcefully enter data in these fields.
    And one more thing i want to ask, i have created PR through MRP run, in this how could i maintain fixed vendor, valuation type, purch org, info record. These all things are necessary to create auto PO creation. Now what are we doing that we create PR through MRP run and then go to change PR enter all these thing and then run ME59N. After that the same problem some fields are blank in PO.
    Please suggest me any other way to maintain this....

  • Automatic PO creation from Imported Approved Requisition

    Hi,
    Is there any setup to allow automatic PO creation from Imported Approved Requisition.
    1. Run Requisition Import to import approved Requisition with no workflow fired.
    2. Can we kick off automatic PO creation workflow without kicking off Requisition approval workflow?
    Any suggestion will be helpful.

    Hi,
    pl.review the MOS doc.
    How to Create and Approve a Standard PO Automatically From an Approved Requisition Sourced to Standard Quotations [ID 308470.1]
    HTH
    Sanjay