Hi all,
I am working for a process industry, Here my client is having a fixed amount of mechine cost and Catalyst cost which would be amortized on monthly basis to the production orders.
apart from those costs laboratory cost is also charged on monthly basis to total quantity of production to arrive at cost per metric ton.
How can we charge this? shall we need to use any activity type for this?
this is not charged at the workcenter level but can be charged at production order level for the total quantity produced on monthly basis.
Please advise..
Any help will be greatly appricited..
Thanks in advance...
Regards,
Kumar.
dear suraj,
Could u please provide me with ur personal mail id or with ur contact number...
My mail id is [email protected]
1. there is a fixed amount say 1000 $ of depreciation to be charged to the finished product.
Eg:- total finished product qty is 5000 ton
total no. of production orders are 40 in this month
total bill of materials are 20 in this month
total routing processes are 2
total work centers are 3
please explain in this scenario how u will charge the depreciation of plant 1000$ to finished product.....THIS IS A PROBLEM IN DISCREET MANUFACTURING.
thanks for your valuable answers...
To assgin points as "6" as helpful answer, that radio button is not active.. so i have assgined only 2 points.. please give the solution for the above question and ill assgin u full points..
Anil.
Message was edited by:
anilkumar
Similar Messages
-
Actual Activity allocation and Planned and actual activity comparison issue in Product Costing
Friends,
I have tried to explain the issue i am facing currently under Product Costing......
1.Cost Component Structure
10 – Material
20 – Labour
30 – Diesel
40 – Electricity
2.KP26 – Planned under Fixed Price
Labour – 2.0 HR
Diesel – 1.0 HR
Electricity – 5.0 HR
3. When I run CK11N system collecting correct rates for all activities (Costing Lot Size- 1)
Like;
1 E LAB10 994310 2.00 2.00 AED 1.0 HR Labour Cost New
2 E DIE20 994320 5.00 5.00 AED 1.0 HR Diesel Cost New
3 E ELE30 994330 1.00 1.00 AED 1.0 HR Electricity Cost
4 M 1100000042 5.00 0.00 AED 1 PC RAW MATERIAL BAKERY CONSUMED
5 G 994201 0.00 0.00 AED Depriciation Cost
6 G 994202 0.00 0.00 AED Sales & Distribution Cost
13.00 AED
4.When I do process order Cost analysis for the produced goods it shows me different figures as my
BOM – RM is 1100000042 1 Quantity
Routing – All activity time is 1 Hr
40002 RAW MATERIAL BAKERY CONSUMED 1005/1100000042 5.00
40015 COST OF GOODS MANUFACTURED 1005/4400000071 13.00-
994310 Labour Cost New CBAKYPDDXB/LAB10 1.33
994320 Diesel Cost New CBAKYPDDXB/DIE20 3.33
994330 Electricity Cost CBAKYPDDXB/ELE30 0.67
2.67- AED
Note :- As per my understanding it should be
Labour Cost New 2.00
Diesel Cost New 5.00
Electricity Cost 1.00
5.Now after Process Order confirmation
40002 RAW MATERIAL BAKERY CONSUMED 1005/1100000042 5.00
40015 COST OF GOODS MANUFACTURED 1005/4400000071 00.00
994310 Labour Cost New CBAKYPDDXB/LAB10 4.00
994320 Diesel Cost New CBAKYPDDXB/DIE20 5.00
994330 Electricity Cost CBAKYPDDXB/ELE30 2.00
16.00
6.For Month end actual Activity calculation and load the activaty actual rates on product
I have configured the system in below manner
1 Work center = Mapped to 1 Production Cost center
Three Different Activities mapped to Secondary Cost Element with 43 Category
For Electrictity Activity assesment from Primary to secondary 1 more cost element created with
Category 42 Like; 994215-Electricity Cost All
One Actual Assessment has been configured to allocate Electricity cost from Primary Cost element to
Product/Order
7.Assessment Cycle Details
Controlling Area 1000 Controlling Area
Cycle ZELE01 Status Reviewed
Start Date 01.01.2014 To 31.10.2014
Text Elec. Cost Allocation to PROD
IND- Interactive
Assessment CEle 994215 Electricity Cost All
Sender
Cost Center CBAKYDXBAD
Cost Element 40204
Receiver
Cost Center CBAKYPDDXB
Tracing Factor
Var.portion type – Actual Activity
Selaction Criteria
Activity Type - ELE30
Receivers Tracing Factor
Cost Ctr Factor per 100
CBAKYPDDXB 100
8.I have received the actuall electricity bill for 1100 AED and the same has accocated through KSU5
After Cycle run when I follow below procedure
KSS2 Actual cost splitting
CBAKYPDDXB Production Dxb LAB01 183.33
CBAKYPDDXB Production Dxb DIE02 183.33
CBAKYPDDXB Production Dxb ELE03 183.33
CBAKYPDDXB Production Dxb DIE20 183.33
CBAKYPDDXB Production Dxb ELE30 183.33
CBAKYPDDXB Production Dxb LAB10 183.35
1100.00
Issue – System Split Electricity cost between all the activities assigned to Workcentres Cost Centre.
But I want to post that cost only to ELE30 Activity and not for all
When I RUN KSSI for actual Price determination system shows
OTy Object Name AUn Act Qty Total price Price (Fixed) PUnit
ATY CBAKYPDDXB/DIE20 Production Dxb HR 5.0 366.66 366.66 10
ATY CBAKYPDDXB/ELE30 Production Dxb HR 2.0 916.65 916.65 10
ATY CBAKYPDDXB/LAB10 Production Dxb HR 2.0 916.75 916.75 10
2200.06
2200.06 is almost double than 1100.00 which is actual electricity cost and the same is actually determined for all the activities.
After revaluation of the process order system posting below values
40002 RAW MATERIAL BAKERY CONSUMED 1005/1100000042 5.00 5.00
40015 COST OF GOODS MANUFACTURED 1005/4400000071 13.00- 13.00-
994310 Labour Cost New CBAKYPDDXB/LAB10 1.33 183.35
994320 Diesel Cost New CBAKYPDDXB/DIE20 3.33 183.33
994330 Electricity Cost CBAKYPDDXB/ELE30 0.67 183.33
2.67- 542.01
Production Variance is posted as 542.01….
I strongly believe there is some issue in configuration for activity allocation….
Main issue is
Point No. 4 – Different Figures in Process Order Cost Analysis
Point No. 7 – Assessment cycle run
Point No. 8 – KSS2 and KSII for Actual cost Allocation and Production variance…
Friends… I have tried to explain maximum please help me to understand the concept or missing configuration/Process.
Thanks
Sagar ChinchkarDear Rajneesh,
I have made the changes as suggested....
It seems now my Order Cost analysis and Product cost analysis are showing the same figures.
I have also maintained cost center splitting structure for ELE30 Activity allocation.
Structure Z1
Splitting structure for AT
Assignment 10
Electricity Cost
100
Allocation for ELE
Cost Element
994215
Activity Type
ELE30
Splitting Rule
100
Allocation for ELE
12
Activity quantity
Version 0
In my case actual activity confirmed is 3.1 for 2 orders in period 5
Order 1 - QTY 2
Order 2 - QTY 1.1
Total actual Electricity exp is 1150 in period 5
followed procedure to post actual activity on product is mentioned below
KSS2 Actual cost splitting - Result as expected 1150 for ELE30
KSII Actual price determination - Result as expected 3.1 actual confirmed QTY for ELE30 with actual price
QTY 3.1 Tot Price 3,709.68 Planned(FIX) 3,709.68 Per Units 10
(System is doing 1150/3.1*10=3709.68)
3.CON2 Actual revaluation of orders
Here while reevaluating the Process Orders system calculation is different
Order 1 - QTY 2 - 558.00
Order 2 - QTY 1.1 - 407.56
Total - 965.57
4. After CON2 system is changing the value of other activities like
LAB10 - Actual confirmed Value 10 to 0
DIE20 - Actual confirmed Value 10 to 0
Which should not be the case....
PL Act Var
40002
RAW MATERIAL BAKERY CONSUMED
1005/1100000042
10.00
15.00
50.00
40015
COST OF GOODS MANUFACTURED
1005/4400000074
26.00-
26.00-
994201
Depriciation Cost
WMBDDEP01
1.00
0.00
100.00-
994202
Sales & Distribution Cost
WMBDS&A01
1.00
0.00
100.00-
994310
Labour Cost New
CBAKYPDDXB/LAB10
4.00
0.00
100.00-
994320
Diesel Cost New
CBAKYPDDXB/DIE20
10.00
0.00
100.00-
994330
Electricity Cost
CBAKYPDDXB/ELE30
2.00
408.06
20,303.00
If we want to just post Electricity cost based on actual Electricity expenses and Labor and Diesel are based on planned activity rates.
What setting is required in current system.....
Million thanks in advance....
Regards
Sagar Chinchkar -
Urgent:Issue of Product Search
Hi All,
In customer Product Search , it return only 100 items.
but in profile option value set IBE: No of Results in Search -->200(default)
but I am able to view only 100 records in customer UI.
please advise me how can i fix it ASAP
ThanksHi All,
If I set profile : IBE: No of Results in Search vlaue to 500 then it return 250 results.
Exactly half of Profile Value..
Even I check the jsp code and query. it looks fine to me..
please any body share your valuable points with me to fix ASAP.
Thanks & Regards -
Its an urgent issue in production.
Hi,
The user has forgotten the password and requested for the new one.After giving the new password by security->user->define.
once the new password is entered by the user after logging into the applications, there will an window comes automatically saying that password is expired.
But here the window comes out with error.
oracle error:-
cannot complete applications logon.you may have entered an invalid applications password or there may have been
a database connect error.
with regards,
Surya
Edited by: 515855736 on Jun 23, 2009 4:50 AMHi,
Can you find any errors in the database log file?
Please See Metalink documents (549979.1, 189490.1, 297165.1) and see if it helps.
Regards,
Hussein -
Error while adding the issue for production (item cost not found)
Hi all,
The scenario is,
when the user is trying to add the issue for production system is showing error item cost not
found.The item which is issued is Inventory + purchase item with manual issue method.The valuation
method for that item is FIFO.since the valuation method is FIFO,error related to item cost should
not occur.
Since the valuation method is FIFO.Item cost error should not occur.
The error related to item cost must not occur at the time of issue for production.
Regards-
Mona.Hi!
Please check these threads
Sales Delivery Document
Item Cost Error
No item cost was found -
Issues adding variable production cost
Hi
I am having issues to find the correct way to add production cost.
I know that basically a labour item that has cost in master data (Standard method) is added to the BOM and will then be added to the production order. However, this is a fixed cost, and even the same cost for every BOM/production oder.
How can I add variable cost to the production that i can easily change at the end of the production?
additional ...: I do receive invoices from external companies for the production/assembling - mostly some weeks after the production. Ho do i enter them into the system? Is there a way to link the received invoice to the cost of a production order?
Thanks for your help
FranzThanks for your answer!
Here's what I am going to do ... maybe someones interested in this too:
- Create an item with standard cost evaluation and a standard cost of 1$ (I plan to use this in BOM for production cost and purchase, mainly)
- Make this item a non-inventory, sales- and purchasing item
- Add a price to the price list (needed if used in sales and BOM sales calculations)
- Add the item, with a quantity relative to the production cost (external work) to be added, to the BOM / production order (i.e. 15.5)
- Use the item to issue a PO for this external work
- The production cost will be included in cost calaculation of item
- The invoice for the external work can be added to the system and the item does not have to be reevaluated
Franz -
Planned issues against a Product Cost Collector
Hi, I am very new to Product costing and currently looking to find out the planned quantities that are there against the actual quantities that are issued through a Product Cost Collector for producing a Semi finished good maintained in Kg. Any help?
Thanks
DeepankarHi
The issue is solved.
The problem was on our end that some of the transports were missing. Ajay was right and those transports were missing.
Thanks Ajay.
Really appreciate it -
1)what is different bitwen with quantity structureand with out quantity structure?
2)what is valvated stocks and non valvated stocks?
3)what is the need of cost component structure , how many segments can be define in cost component structure?
4)how we are going to do work ing progress in product cost
5) what are the status in order, types of order?Dear Pradeep,
1.Material Is Costed with Quantity Structure
This indicator determines whether the material is costed using costing with or without a quantity
structure.
This setting can be found in Costing1 view in the material master.
Use
If you usually cost materials using costing with quantity structure, turn on this indicator.
If you usually cost materials using costing without quantity structure, do not turn on this indicator.
You can change the indicator in the material master record at a later time.
Procedure
If you always cost your materials (including raw materials) using costing with quantity structure, you
should turn on this indicator. This improves performance, because the system does not search in vain
for existing cost estimates without a quantity structure for every material when it explodes the BOM.
Therefore, only turn on this indicator if you normally cost the materials using costing without quantity
structure.
Regardless of the setting, you can cost a single material with or without quantity structure. However,
you should bear in mind that this setting is always used in the costing run and in mixed costing
(creating procurement alternatives).
CK11N and CK40N is used for costing material with quantity structure.
KKPAN is used for creating material cost estimate without quantity structure.
2.Valuated stock is the stock of the materials maintained in value basis,it may be under Restricted use
or non-restricted use .
Nonvaluated materials (UNBW)
Nonvaluated materials are managed on a quantity basis, but not by value.
5.status in a production order are for Eg,
REL Released
PCNF Partially confirmed
PRC Pre-costed
BCRQ Order to be handled in b
GMPS Goods movement posted
MANC Mat.availability not che
PDLV Partially delivered
SETC Settlement rule created
So after performing each business funtion the status of the production order changes.
Regards
Mangalraj.S -
Product costing by sale order(urgent)
Dear all,
1. Please tell me all the configuration steps to do product costing by sale order.
2. Also please tell me how to test it after configuring.
3. Please explain me the end user part also.
I will award full points.
Thanks & Regards,
A.Anandarajan.Hi,
Product cost by sales order is useful when a finished product is manufactured for a specific customer rather than for the normal make-to-stock inventory. You can use the Product Cost by Sales Order component in the following situations:
When you are manufacturing in-house with reference to a sales order in complex make-to-order production
When you are purchasing customer-specific trading goods with reference to a sales order and reselling them to your customers
When you are providing services whose costs are assigned to a sales order
When you want to collect the sum of the actual costs incurred for the sales order item on the sales order item (standard cost of goods manufactured of sales plus variances) For detailed information, refer to the sections Valuated Sales Order Stock and Settlement in Product Cost by Order or Period. -
Urgent : CO product costing into the SD pricing
client requiremnet is that product costing of material should be reflected in pricing procedure.
Thanks in advance.Hi Rahul,
you need to work along with CO guys.
the concern condition type is EK01 (cost from co used as a basis for furthur calculation of pricing)& EK02 (used just for reference -statisticle value)
this also has assignment in your respective doc. type.under billing tab.
hope this will put some light on required area.
karnesh -
Issue Relating to Power Cost in Daily Product Costing
Hi,
We are doing daily product costing. Here we want to allocate the power units of service to production cost centers proportionately on daily basis. Can anyone tell me is there any option in SAP and we need to go for development.hi,
Power usage or cost can be apportioned only monthly wise not possible on daily basis. U can run the distribution or assessment cycle only for month wise, but not on daily basis.
Regards,
Sreekanth -
Issue with Standard Cost estimates / Material Ledger
Background:
We have been using SAP for the last 5 years with Material Ledger active. Due to a number of reasons, we have not revised its standard cost estimates from 2001 till now. This means that at month end, we do not mark and release prices as recommended, nor do we mark prices and use dynamic release.
What Happened:
A new material called PFSW3 was made. This is a FERT. Before production
could start my team released the standard cost estimate for this material. Production was now able to proceed without problem. Then, when the time came to sell the material (VF02), SAP again raised the error 'cost estimate not found'. On checking the standard price in MM03, we discovered that the future cost estimate was missing. So we created and marked a new cost estimate in the middle of February 2007.
Problem:
When the first sale took place, SAP released the marked cost estimate and posted a Price Change document to adjust for the new standard cost. I understand this was due to dynamic release. Now, when month end came, the system settled all the production orders of material PFSW3 but did not do multi level costing on it.
Internal Investigation:
My team has determined that the material PFSW3 has price determination 2 set by mistake. All our other production materials (HALB and FERT) are
set to price determination 3 in the material master (accounting view).
Questions:
To sum this situation up,
we need to know why the material PFSW3 was not marked closed in its period status (CKM3) at the time of closing through CKMLCP?
What are the implications of not closing this material in Feb 2007 (current period status is showing 'Quantities and values entered')?
How can we close this material this month?
The future cost estimate is again missing for PFSW3 in March 2007 and I
fear we are going to face more problems as this material is sold to customers.
Please respond this is an urgent issue.Dear Shumyl,
Please, have a look at Note 645083 - Material period status set to "Closing Entry Completed" that might help to closing your material in previous period.
Hope it will be useful.
Regards,
Flaviano. -
Old material overwritten by new material code in Product cost collector
Hi SAP Gurus,
How can I work around if a product cost collector with material XXX has been overwritten by a new material YYY when creating the KKF6N.
Both material code having the same plant, same orde type,same production version but just different material code.
When saving the preliminary costing for the product cost collector for material YYY, the system prompted me the order number 700022 which is already existing and created for material XXX.
By right, this shd not be happened but indeed it did.
Now when displaying the report S_ALR_87013127 - Order Selection, the report showed the new material YYY was created with order number 700022 but the content of the data was for old material XXX.
Now my problem is how can I get back the product cost collector for material XXX as the original order number 700022 was meant for material XXX and not mat YYY.
And also when executing backflush (MFBF) for old material XXX, the error msg prompted as 'content of order 700022: Mat YYY transferred to interface (IMSEG):Mat XXX due to this I can't backflush material XXX.
Really appreciate your expertise on this urgently.
many thanks!problem due to system bug, have to log to OSS for help.
-
Error while creating Product Cost Collector
Hi SAP Gurus,
While creating Product Cost Collector I am getting the following Error:
Enter a distribution rule for Order without a validity limit
Message no. KD059
Diagnosis
The settlement profile used requires you to define a distribution rule for Order. For period 009 2008, however, you have not created a distribution rule for Order.
Procedure
Create a distribution rule for Order without a validity limit, because, if the distribution rule does have a validity limit, the system always issues this message in the period following the last valid period.
You can also use a different settlement profile that does not require such a distribution rule, or change the settlement rule used.
Can any one help where exactly i need to maintain this.
The settlement profile settings are fine.
I am getting this error only after i have changed the scenario to Reproting point back flushingDear Suryanarayana
Please check the corresponding settlement profile for product orders.
In most of the cases message KD059 means that no distribution rule is assigned to your production order.
This is not an error, but the system design. In order to avoid message KD059 you will either have to enter settlements parameters and a distribution, or change settlement profile for valid receivers in transaction OKO7 from 'settlement required' to 'Can be settled'.
I hope this helps resolve the issue for you. I wish you the best in your endeavours.
Kind Regards,
Brendan -
Product Costing - Message CK 318 ()
Hi Experts,
While executing product cost calculation for material YYY we had warning message CK318 - Cost estimate for material XXX contains errors -> Planned price). XXX is a component used in YYY and the message was issued because we did not have price for XXX. We are now able to proceed with standard cost release for YYY.
As I remembered previously, if you have an error in lower level, the higher level material would have been costed with error too. Seems that this is no longer the case.
I am not sure if this has changed in standard system in ECC 6 or we have to change message control for this message from Warning (W) to Error (E) but it seems the system reaction is not logical to me.
Thanks for shedding insights into this.
TeckHI Teck,
Can you go to OKKN, and quantity structure tab and check out the 'transfer active std cost meates if material costed with errors check box?
Best Regards
Vimal -
While product costing CK11N error
While using CK11N I am getting following error:
Sr.No. Error Description Msg No
1> No price could be determined for Material /Batch XXXXXXX/Plant XXXX 465
2> Cost Component split costed with value zero 240
3> No valid source of supply could be found. 380
4> Object was not costed 60
5> Cost estimate for material XXXXXXX /Plant XXXX is incorrect 168
Please help me how to fix above problem.
Thank you.Check following points,
Probably material might be split valuated,Check price is maintained for all valuation types including header in MM60.
Check price is maintained in info record.
Check type of procurement in MRP2,it will be external procurement - F.
Do product cost estimate using KKF6N.
Check production version is maintained in MRP4 ?
Check throughly all masters vendor,info record & material master.
It will solve the issue.
Maybe you are looking for
-
How to transfer printer settings from one Mac to another (both OSX)?
Hello, I have not found a detailed description on how to transfer printer settings from one Mac to another. My issue is that I have a Mac G5 with 3 different settings saved as "presets" for the same printer. This works great, since the posters I prin
-
Transfer website from one BC account to another BC account/
I am currently hosting a website on my Creative Cloud-BC account. The person whose business is related to the website would like to take on the management of the website. We are both Creative Cloud-BD account holders. 1) Is it possible to transfer t
-
Is it possible for Apple to add "key" to the view options selection?
Is it possible for Apple to add "key" to the view options selection?
-
Help needed to download app to ipad2
I have tried to download some apps to my ipad and the icons still have 'waiting' under them about 18 hours later! I have never had this problem before but have just updated the OS. Any ideas?
-
Quick preview issues - can someone please test
Quick preview does not seem to work correctly. When photographing, I do not have my camera automatically rotate my images. I do this so I can see a full preview on the LCD on the back of the camera. When I download images into Aperture, I rotate manu