Want to change backgroung of Date Column

Hi Guys,
I want to change background of Date Column of table but condition is if date is greater than today then it should be in Red otherwise no.Do i need to do this from beam ?
Thanks,
Raul

Have a look at this:
http://andrejusb.blogspot.ie/2010/04/changed-row-highlighting-in-oracle-adf.html
http://www.techartifact.com/blogs/2009/05/conditionally-colouring-of-row-cell-in-adf.html
or
1. You can create a transient column to your VO with built in Groovy expressions like adf.currentDate.
2. and compare with you date column and change inlinestyle like #{row.myDate > row.currentDate ? 'background-color:red' : 'background-color:blue'}
Edited by: Lalit S on 7 Jun, 2013 10:59 AM

Similar Messages

  • I want to change the final date format in MM/DD/YEAR.

    HI all,
    I want to change the final date format in MM/DD/YEAR. Even my profile will be in any format like DD.MM.YY or YY.MM.DD .
    can any body tell me the way..

    declare variable:
    DATA : gv_date(10) TYPE c.
    and assign value to it:
    CONCATENATE sy-datum+4(2) sy-datum+6(2) sy-datum(4) INTO gv_date SEPARATED BY '/'

  • I want to change Cover Flow to columns in Safari

    I want to change Cover Flow to columns in Safari. Somehow the columns view I had in Safari Bookmarks changed to cover flow and I have lost all my subfolders within the bookmarked folders. Views in the Menu doesn't give the choice like in Finder!

    Safari 5?
    In the cover flow window, under the scroll bar there are 3 horizontal lines.  It is very hard to see those lins.
    Move the mouse cursor to that. Mouse cursor should turn into a hand cursor.
    Drag it upward and you will see Bookmarks in column view.
    Best.

  • Change YEAR in date column

    Ok,
    I have column Event_Time DATE type. It holds this type of values: '21.04.*0010* 10:59:30'
    Now I don't want to change anything except YEAR. I want to replace '0010' with '2010'.
    What is the easiest way to do it?
    thx

    Maybe something like this? (Note this is not tested):
    UPDATE  <table>
    SET     event_time = TO_DATE('2010' || TO_CHAR(event_time,'MMDDHH24MISS'),'YYYYMMDDHH24MISS')
    WHERE   TO_CHAR(event_time,'YYYY') = '0010'
    ;

  • I want to change the end date in SAP HCM Appraisal model

    Hi all,
    The short dump gives out this message:
    Object type SUBTY cannot be read for message type HRMD_A from segment type E1PLOGI
    i want to change end date of the appraisal model multiplier, where i have to go and change the same.

    declare variable:
    DATA : gv_date(10) TYPE c.
    and assign value to it:
    CONCATENATE sy-datum+4(2) sy-datum+6(2) sy-datum(4) INTO gv_date SEPARATED BY '/'

  • Why does Ical want to change the original dates to 2001 when syncing from my iPhone?

    Hi I was wondering if anyone could help with this as its driving me up the wall
    over the last few weeks I upgraded to Lion running 10.7.1 and until then my Iphone synced everything fine without any problems I have an Iphone 3G running 4.2.1 and when I sync now I get the Ical sync alert saying that more than 25% of my calender events will change on my computer.
    When I look nothing has changed accept the origianl date which is 1/1/2001 for anything that is being taken off my phone onto Ical and also for anything that is already on Ical, I keep telling it to sync later but everything I try it always comes up the same.
    I asked during the week in at the Apple store but was adviced that this problem had not been heard of before and to book both my phone an macbook in for a genius bar appointment.
    Anyone else come accross this problem or is it just myself?
    Kind regards Andy ;0)

    Anyone able to help with this problem at all its still doing my head in ;0(

  • How can I change the type of column in matrix

    I want to change the type of column in matrix to it_LINKED_BUTTON, so it can show the orange arrow
    I added the column throw marketing documents (rows)
    It's seems the default column type  is it_Edit
    is there a way of changing the column type
    i tried the below code, but it did not work because the type property in a matrix column is readonly
    mtx.Columns.Item(0).Type = SAPbouiCOM.BoFormItemTypes.it_LINKED_BUTTON
    sincerely yours
    Riade Asleh

    i don't want to add a new column
    i want to change the column type of existing column in matrix, becuase it's bind to a field
    beside that, i can not add column , if the matrix has rows in it
    sincerely yours
    Riade Asleh

  • How to change the capitalization date

    Hi ,
    I carried out WBS to AUC settlement on 31.12.2009, due to which AUC cap. date becomes 31.12.2009. Now i want to change the cap date to 01.12.2009. How do i do it? Reversing the settlement using CJ88 can only change the first Acq date but not the cap date. Also cap date is not an editable option in AS02.
    Reason for all this is that i want the cap date of fixed asset to be 01.12.2009.
    Regards,
    DP

    Hi Srinu,
    Thanks for your reply. Are there any implications of changing the cap date manually? Is it an advisable option or is it better to keep asset value date as 31.12.2009 and then post an unplanned dep for the asset.
    Regards,
    DP

  • Changing proposed delivery date in sales order for one specific sales org

    Hi All,
    I want to change proposed delivery date in sales order automatically for one specific sales org only without changing lead time in VOV8.
    For that can I use MV45AFZZ. But it is asking access key to make changes. Is there any other user exit for the same. And how does exactly change it.
    Thanks in advanced.
    Points will be awarded.
    Regards,

    EXIT_SAPFV45E_001 has nothing to do with this - it is meant to update the purchase order from a sales order. It might not even be triggered if the sales order has no link to a purchase order.
    USEREXIT_SAVE_DOCUMENT is not really good for this either, because the delivery date has to be changed before that. If memory serves, it also influences the schedule lines and probably the ATP check and such. I would strongly advise against it. One of the other routines in MV45AFZZ should do just fine, USEREXIT_MOVE_FIELD_TO_VBAK for example.

  • GL Opening Balance Due Date Column not Editable

    Hi Experts,
    I am about to enter GL Opening balances for a new company I just created,I have created posting periods from January 2007 to date, I want to post an opening balance to 31 december 2007, I am able to enter the posting date but the due date (01.01.08 by default) is not editable,I want to change the due date to be the same as posting date(31.12.07) how can I achieve this ?
    Thanks in anticiption of your prompt response.
    Regards

    Hi Chiko,
    Opening balance is for new period.  Therefore, the due date should be in new period. If you can change it to last year, that should be called ending balance for 2007.
    Thanks,
    Gordon

  • Change default document date ?

    Hi guru,
    When posting material docs in t-code such as MB1A, MB1C, document date is defaulted from current system date.
    I want to change the document date to be suggested from an add-on table.
    I've investigated MB* enhancements without fruitful results.
    Any good idea ?
    Regards
    Mankyoo Kim

    Hi,
    We can assign ship-to party to selection screen.
    IMG>SD>Sales>Lists>Set Updating Of Partner Index
    Click on new entries 
    Transaction group "0", partner function "SH" and save it.
    Goto VA05 T.Code, click on partner functions tab. you will get pop-up window. choose "SH" and press enter
    you will get ship-to party filed in selection screen.
    Regards,
    Chandra
    Edited by: chandra sekhar S on Sep 17, 2008 2:15 PM

  • How to change the standard data type in xi

    Hi,
    presently we have SCM.i want to change the standard data type i.e" Replinishment order notification ".i want to change the length of the field .
    but there is no edit option for that data type.
    i even modified Software component version( http//sap.com/xi/scmbasis/global)with objects are original objects and objects are modifible(tick the check box)
    thanks in advance.
    atmakur

    Hi Atmakur,
      <i>i even modified Software component version( http//sap.com/xi/scmbasis/global)with objects are original objects and objects are modifible(tick the check box)</i>
        After doing this have you activated the change list? If not please do it and refresh it..and try to open..it will work..
    Regards,
    Prasanthi.

  • Change the validity date in change number

    hi team,
    I want to change the validity date of a change number from 01.01.09 to 01.03.09. I am getting an error "A BOM has already been changed using a change number with the same valid-from date as the selected date 03.01.2009".  I can change the date to before 01.01.09 but cannot after 01.01.09.
    Can you please help me.
    thank you,
    Satish

    Dear Mamiditi Satish Kumar,
    Is it a change number with release key or without release key?
    Do you want to assign a different validity date for the changes made using that change number?
    Try using alternative date field in CC02.and you have to select the object to assign the alternative date.
    Say if you want to assign an alternative date for a processed BOM,you have to select that object and
    enter the alternative date.
    Regards
    Mangalraj.S

  • Billing Date change to past date.

    Hi,
    Basically, I want to change the billing dates of few Invoices generated on 4 December 2008 to 29 November 2008 due to some tax changes in business.
    Is there any way we can change the billing date of an invoice to a past date?

    Dear Christino,
    Check with,
    T. Code: VF02
    Key-in your Invoice Doc. No. and "Enter"
    From menu bar,
    Go To --> Header --> Header
    Under Tab: Accounting Data, there is one Field: Billing Date, which would be in Editable-mode.
    Change the Billing Date, as required.
    Best Regards,
    Amit

  • How to change proposed delivery data in a SO

    Hi Gems,
        I am new to SD.
    I am creating SO with order type OR.
    The system is proposing Delivery date (and some other date like goods issue date, loading date etc.) as 2 days ahead of the current date.(these dates can be changed manually)
    U can find all these date in schedule line/Shipping.
    I want to change the proposed date to current date.
    beside this there are 2 other date in Availability control.
    1) Complete delivery (Dely/Conf. Date)
    2) Dely Proposal (Dely/Conf. Date)
    these are also proposing dates 2 days ahead and not giving permission to change it manually to current date (u can able to change it to any future date but not to any past date of proposed date).
    There is no problem while creating SO. But when I am trying to create delivery it's giving error as 'Dely/Conf. Date' is in future.
    Now, how to change these dates?
    Please help me to solve this problem.

    Hi Surajit
    As you have maintained 2 days , so go to VA02-> item data->schedule lines tab->check the delivery date
    If the delivery date is 14.02.2009 then go to VL01N and give manually the delivery date as 14.02.2009 ,
    then you can do  delivery
    Example :
    Today's date : 12.02.2009 ;
    Maintained days : 2 days
    Delivery date : 14.02.2009 ;
    Check the following parameters wheather you have maintained or not :
    In shipping point details check pick, pack , goods in transit  time
    In VOV8 check the Lead time in days
    In MMR check the GR time , In house production time
    Regards
    Srinath

Maybe you are looking for

  • Fields missing on FB60

    Hi, I have a couple of questions. 1. I see there are a few fields missing on the line item level on FB60. It's not the case for development or testing environment. But in Production it's happening. Does anyone know how to get these fields back? 2. Is

  • Disk Utility "Backup Failure"

    Hi all - I have a 500GB iMac running 10.6.8.  I am trying to save a bootable backup on my new WD MyBook Desktop 1TB hard drive using Disk Utility (11.5.2).  I have formatted the WD with 2 volumes, one of which (named "Boot2") is to be my bootable bac

  • Converting to tif

    Hi, I need to submit to a client tif files between 45.5-52MB. I have photos shot in NEF RAW and are about 15 MB before converting to tif in LR. When exporting and converting, the color space is set to sRGB, 8 bit, Resolution 300, and I have not selec

  • PO Currency different than PIR

    Hi, We recently changed the currency on a PIR but when creating a PO for the material and vendor, it's defaulting to the old currency. The company code currency is still the old currency.  Could that have something to do with it? Thanks ~ Chris

  • SOAP Address

    Hi, I have two LCES servers, one for development, the other Production. Client environment is Reader 8. On my form, I have a WSDL data connection, the URL is like this: http://development:8080/soap/services/name?WSDL The Invoke Button is set as "Run