Hi All
Is there any function module in R3 that accepts WBS element as input and gives its hirearchy? I would like to know the function module name that accepts WBS elements in the internal table as input and gives all associated hirearchies as output in the internal table.
Please advise
Thanks
Vennela
Hi,
we can see WBS Hierarch from cj20n tcode.
Can you please give us an idea about what you are trying to do with WBS, extracting into Bi or other use in R/3 itself.
Regards,
Vamsi.
Similar Messages
-
WBS copy via function module "K_PLAN_TO_PLAN_COPY"
Hi Experts
anybody please advise whether WBS copy to other via function module "K_PLAN_TO_PLAN_COPY"
is possible or not in below situation.
Currently we faced some issue when WBS satus is "TECO", we can not
copy WBS to another WBS (we want to copy whole wbs into others) by
function module "K_PLAN_TO_PLAN_COPY".
So we just change system status from TECO to REL then copy wbs to other,
however, we could face another issue with this way of copying. (since we
have to change wbs status, it could cause conflict against other project)
We want to copy wbs without changing wbs status via function module "K_PLAN_TO_PLAN_COPY".
Can it be possible? if yes, please advise how to, (settings/conditions/something like that)
Thank you.
SatoruHi Satoru,
The Function Module K_PLAN_TO_PLAN_COPY is not released for customers and therefore it is not intended to be used in customer specific programs or enhancements. For further details, please have a look SAP Note 109533.
Sorry for not having better news.
BR,
Enrique -
Use of text element in function module
hi friends what is the use of text element i.e list headings, selection texts,text symbols in a function module. where a can see these things after giving some text into it and activated.
kumar.hi
<b>Text Symbols</b>
A text symbol is a named data object that is generated when you start the program from the texts in the text pool of the ABAP program. It always has the data type c. Its field length is that of the text in the text pool.
Text symbols, along with the program title, list headings, and selection texts, belong to the text elements of a program. Text elements allow you to create language-independent programs. Any text that the program sends to the screen can be stored as a text element in a text pool. Different text pools can be created for different languages. When a text element is changed or translated, there is no need to change the actual program code. Text elements in an ABAP program are stored in the ABAP Editor (see Text Element Maintenance).
In the text pool, each text symbol is identified by a three-character ID. Text symbols have a content, an occupied length, and a maximum length.
Examples for text symbols in an ABAP program:
ID
Contents
Occupied length
Maximum length
010
Text symbol 010
15
132
030
Text symbol 030
15
100
AAA
Text symbol AAA
15
15
In the program, you can address text symbols using the following form:
text-###
This data object contains the text of the text symbol with ID ### in the logon language of the user. Its field length is the same as the maximum length of the text symbol. Unfilled characters are filled up with spaces. You can address text symbols anywhere in a program where it is also possible to address a variable.
If there is no text symbol ### in the text pool for the logon language, the name text-### addresses the predefined data object space instead.
You can also address text symbols as follows:
... 'textliteral'(###) ...
If the text symbol ### exists in the text pool for the logon language, this is the same as using text-###. Otherwise, the literal 'textliteral' is used as the contents of the text symbol. This is only possible at positions in the program where a variable can occur. You can create a text symbol for any text literal by double-clicking the literal in the ABAP Editor and replacing the literal with the text symbol.
You should use text symbols in your program whenever they need to be language-specific - for example, in a WRITEstatement.
If you program a list whose layout depends on field lengths, you should be careful, since the field length of text symbols will be different in different languages. You should therefore set the maximum field length of the field symbol so that there is enough space to translate it into other languages. For example, the English word 'program' has seven letters, but its equivalent German translation 'Programm' has eight.
The following example shows the use of text symbols in WRITE statements.
SET BLANK LINES ON.
WRITE: text-010,
/ text-aaa,
/ text-020,
/ 'Default Text 030'(030),
/ 'Default Text 040'(040).
If the text symbols of the above screen shots are linked to this program, the output looks as follows:
Text symbols 020 and 040 have no text symbols. For text symbol 020, the system displays a space. This is only displayed in this case because the blank line suppression has been turned off (see Creating Blank Lines).
regards
ravish
<b>plz reward if helpful</b> -
WBS Element and functional area/location
Hi All Gurus here,
Can a WBS element link to functional area/location(object in PM)? or the other way round, which functional area/location link to WBS element?
Best Regards,
ElvioDear Elvio,
Please go through the information in the link,reward if useful.
http://projectsystems.wordpress.com/
Regards,
Naveen Dasari. -
Functional Area for WBS Element
Hi Friends
While posting Invoices in SRM 7.0 for WBS elements the Functional Area is sometimes picked up from WBS element directly and sometimes from Responsible Cost Center of the WBS.
Also in cases when we have split account assignment with CC and WBS elements then many times only the COST Center Functional Area is passed for all the account assignment split.
E.G. we have 1 line item with 10000 value and Account Assignment is split in 4 parts 1 CC and 3 WBS element. For this functional are of the Cost Center is passed for all four account assignments rather than passing 4 different functional areas based on each cost element.
Can someone help me understand how the standard functionality works or is there any specific condition in which the responsible cost center Functional Area is picked up instead of WBS element Functional Area.
There are some documents where in case of split accounts system is passing separate functional area for each account assignment. So i am not able to conclude what is the standard function to determine Functional Area.
Regards
UshirHi Akash,
The scenario you mentioned is correct it will pick up the CC functional area in case there is no functional are on WBS but in our case that is not the case. For all the WBS we have the functional area maintained but still some times the functional area is picked up from responsible cost center of the WBS.
The problem is we are not able to replicate this in Q or D environment. The documents posted by users in production are pointing to some wrong Functional Area and its not correct.
Regards
Ushir -
Function module /SDF/AL_MAP_TRANSID_LOGH does not exist
When I am trying to activate query 0PT_C01_Q001 (DR4U5LBSCW5LRFCNU7PU3VTZZ) of Time Management InfoCube (0PT_C01 - Time and Labor) from BI Content, the following errors are happening.
Error when activating element B4RCXIS1HI47GC93QSNYJYZRZ
Function module /SDF/AL_MAP_TRANSID_LOGH does not exist
Error when activating element DR4U5LBSCW5LRFCNU7PU3VTZZ
Function module /SDF/AL_MAP_TRANSID_LOGH does not exist
Function module /SDF/AL_MAP_TRANSID_LOGH does not exist
So instead of Query this time I went to activate only Structure B4RCXIS1HI47GC93QSNYJYZRZ.
This time also it is showing the following errors
Error when activating element B4RCXIS1HI47GC93QSNYJYZRZ
Function module /SDF/AL_MAP_TRANSID_LOGH does not exist
Regarding function module /SDF/AL_MAP_TRANSID_LOGH error, I implemented Note 1114719 - Error when activating Content (/SDF/AL_MAP_TRANSID_LOGH)
We are using Support Package SAPKW70016 - SAP NetWeaver BI 7.0
Even after implementing Note 1114719, this error is still happening.
Any help on this issue would be great.
Thanks in advance
SubraAfter implementing the notes, when I installed it in the background, it worked. In the front end it is still not working.
-
Function modules or BAPI for posting plan costs for WBS Element
Hi all,
Does anyone know, whether there exists a function module or BAPI for posting plan costs to a WBS Element? K_COSTS_PLAN_PS does not work, because RKP1 is not allowed.
Greetingscheck
BAPI_COSTACTPLN_POSTACTINPUT Activity Input Planning: Posting
BAPI_COSTACTPLN_POSTACTOUTPUT Activity/Price Planning: Posting
BAPI_COSTACTPLN_POSTKEYFIGURE Stat. Key Figure Planning: Postings
BAPI_COSTACTPLN_POSTPRIMCOST Primary Cost Planning: Postings
BAPI_PDTRANSCO_POSTPRIMCOST Transfer of Planning Data: Post Primary Costs
K40C CO Actual Postings, Manual
BAPI_ACC_PRIMARY_COSTS_POST Accounting: Post Primary Costs
BAPI_COPAACTUALS_POSTCOSTDATA BAPI Operating Concern: Post Costing-Based Actua
BAPI_PRIM_COST_CHECK_AND_POST Primary Costs: Formal Parameter Check
S@meer -
Function Module to find Planned Costs and Actual Costs against WBS element
Dear All,
We have a requirement where we need to find out the Planned Costs and Actual Costs booked against a WBS element, in a year. The costs can be against all the plan versions or on individual plan version.
Are there any function modules to retrieve this value?
Thanks for the help.
Warm Regards,
JudithHi,
The easiest way would be to get the OBJNR for all WBS elements from PRPS and look up RPSCO and summarize for Value type (RPSCO-WRTTP) 1 for planned cost and 4 for Actual cost.
Please let me know if this helps.
jibat -
Function module to get the wbs element by entering Assignment No.
Is there any Function module to get the wbs element by entering Assignment No.???????
Thanks and regards
Manish Thakurhi Manish,
Just look at this function module.
function wbs_assignment_check.
""Lokale Schnittstelle:
*" IMPORTING
*" REFERENCE(I_COMPONENT) LIKE RESBDGET STRUCTURE RESBDGET
*" REFERENCE(I_PSPEL) LIKE RESB-PSPEL
*" REFERENCE(I_RFPNT) LIKE AFVC-RFPNT
*" EXPORTING
*" REFERENCE(E_PSPEL) LIKE RESB-PSPEL
e_pspel = i_pspel.
endfunction.
hope this helps u
REWARD IF USEFUL
thanks and regards
suma sailaja -
Function module to find the child of WBS elements
Hi,
i need to find the KSTAR (Cost Element) for the corresponding WBS element . If the particular WBS element does not contain the COST Element, then to find all the children WBS element .
I need to find all the child WBS elements and its level for the parent WBS element. I am using the table COSB and PRPS table . kindly solve to find a FUNCTIONAL MODULE which uniquely the child WBS element. Kindly help to solve.Hit the PRPS table where STUFE(Level in Project Hierarchy) > Current level and project Id = Current project ID.
Hope it helps.
Reward if it is useful.
Thanks,
Srinivas -
Function module to get the status of WBS elements IN Project Systems
Hi,
I am suppose to delete the WBS elements in PS depending on certain conditions. WBS elements that are to be deleted should satisfy the following conditions:
1. Status of WBS elements should not be AUC construction
2. WBS element, which have cost association, like PO association or internal order association shouldnt be deleted WBS element does not have confirmed activities.
3. WBS elements, which have confirmed activity in association with their networks, should not be deleted.
Either I can check for status of WBS for the above mentioned conditions or if u can suggest me some diff way I shall be grateful
Need help in this regards.
ThanksHi
Use the FM:
<b>JV_GET_WBS_ATTRIBUTES</b>
Regards,
Sreeram -
RFC function to get the WBS Element formatted string
Hi,
Is there an RFC function I could use which would do what the CONVERSION_EXIT_ABPSN_OUTPUT does?
We are using Project IDOC to replicate WBS element in our procurement system. The IDOC only provides the unformatted version of the WBS Element id.
Thanks
Michaelhi michael,
I believe BAPI_PROJECT_MAINTAIN is the bapi you are looking for ..
also you could refer the thread below for sample code of the same
[LINK|Update WBS element;
This bapi will help you update the WBS element ..
you could also refer the following wiki
http://wiki.sdn.sap.com/wiki/display/PLM/HowtouseBAPIinProjectSystem+Module
Best regards
Manthan. -
Hi all. Is there a function module that can be used to retrieve the budget for a given WBS element? Thanks in advance and I'll be sure to award points for a helpful answer!
Sorry to bump this, but does anyone know the answer, or do I need to supply more information?
-
Function Module for WBS Status
Hi all.
ECC 6.0.
I am trying to figure out a way to reach the status of a WBS element; CNJ_STAT-STTXT_INT. Does anyone know of a function module that could perhaps read this status or another way to do so? I do realize that the include FCJWBO00_STATUS_TXT_FILL can read the status, but surely there must be a FM for this as well?
Thanks for info.Hi,
What about BAPI_BUS2054_GET_STATUS?
Regards,
Eli -
Which functional modules we can use to update the costs in WBS?
Hello friends,
I need to update the costs assigned to WBS elements at cost element level using TCode CJR2. Which function modules are available to do this?
Can you show me sample implementation for the same?
Thanks in advance,
Amol C.You can't.
A UIImage object is a high-level way to display image data. You can create images from files, from Quartz image objects, or from raw image data you receive. The UIImage class also offers several options for drawing images to the current graphics context using different blend modes and opacity values.
Image objects are immutable, so you cannot change their properties after creation.
Maybe you are looking for
-
Is there a way to Change the Writing Speed When Burning CD-R's?
Is there a way to change the writing speed when burning CD-R's? I don't see any options in Disk Utility. Rob P.S. Since I am burning coasters lately with the Pioneer DVR-111D, I though that I might solve the problem by using a lower write speed.
-
Photo loss from a project when creating a smart album
Running Aperture 3.4.3 on iMac with OS X 10.7.5. Photos stored on internal drive. After creating two smart albums based on a date range, one with keywords and one with ratings, some, but not all, of the photos that appeared in the smart albums disapp
-
Whatis going on with iTunes. I can't get back on after doing an udate. It says the update failed, but I can't get back in to try again.
-
How to send big message one bye one without bpm in PI 7.0
Hi frnds, I have to send a big messages one by one to the CRM, without using BPM. Can you please suggest us some way around, the data is going to CRM via proxy and at the sender side we are using file content conversion which we don't want to change.
-
I had a connect with 2 computers - pc and macbook. I often switched cable between them and one day connect on macbook disappeared and it still disappears. But connect on pc is ok and I don't know what is a problem - or it's a bad cable, or it's a bad