What kind of activities takes place in final preparation phaseregarding sd

what is final preparation phase what kind of activities takes place in final preparation phase  regarding sd module?

Hi Chandu,
Final Preparation:
As phase 3 merges into phase 4, you should find yourselves not only in the midst
of SAP training, but also in the midst of rigorous functional and stress testing.
Phase 4 also concentrates on the fine tuning of your configuration before Go-live
and more importantly, the migration of data from your old system or systems to
SAP.
Workload testing (including peak volume, daily load, and other forms of stress
testing), and integration or functional testing are conducted to ensure the accuracy
of your data and the stability of your SAP system. Because you should have begun
testing back in phase 2, you do not have too far to go until Go-live. Now is an
important time to perform preventative maintenance checks to ensure optimal
performance at your SAP system.
At the conclusion of phase 4, take time to plan and document a Go-live strategy.
Preparation for Go-live means preparing for your end-users questions as they
start actively working on the new SAP system.
I hope it will help you,
Regards,
Murali.

Similar Messages

  • WHAT KIND OF MEMORY DOES MY COMPUTER TAKE

    Hi I have an early 2008 white macbook (4,1) and I want to upgrade my memory. I currently have 1Gb of memory and its too slow. What is the maximum amount of memory my computer can take and what kind does it take ?
    Other information:
      Model Name:          MacBook
      Model Identifier:          MacBook4,1
      Processor Name:          Intel Core 2 Duo
      Processor Speed:          2.1 GHz
      Number Of Processors:          1
      Total Number Of Cores:          2
      L2 Cache:          3 MB
      Memory:          1 GB
      Bus Speed:          800 MHz
    Thanks
    Tyler

    The model 4,1 can use up to 6gb of RAM. It uses 667mhz PC2-5300 RAM
    These are good online stores for RAM
    OWC http://eshop.macsales.com/shop/memory/MacBook/DDR2/
    Crucial Memory http://www.crucial.com/
    Data Memory Systems http://www.datamemorysystems.com/apple-memory.asp
    Here are instructions on replacing RAM in a MacBook with a removable battery.  http://homeoffice.consumerelectronicsnet.com/articles/viewarticle.jsp?id=44404
    If you don’t have the tools to open up the MacBook OWC has a set for $5
    http://eshop.macsales.com/item/OWC/TOOLKITMHD/

  • How is Upgradation Process takes place?

    Hi Experts,
    I sincerely thankful to all who are providing solutions here. I have recently moved to Up-gradation environment from 4.6c to 6.00 ECC. But I need your help before i start up with pace in this assignment. Please give me an Idea at what point
    Up-gradation takes place and how it starts and where it ends.I would really appreciate If anyone can help me How to start this in step-wise method.
    Thanks in Advance,
    Kanna Palle.

    Hi,
    Check with links.
    1. SAP R/3 4.6 C to ECC 6.0 Upgrade using CU &UC method- Unicode conversion
    2. http://service.sap.com/erp-upgrade.
    3. https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/c08e5899-1444-2a10-e489-ef6ffbf13146
    Regards,
    Srini Nookala

  • What SRM config changes will need to take place with a change to Plant

    Hi
    Please could you tell me What SRM config changes will need to take place with a change to Plant, Co Code, Purchasing Org, Purchasing Group,
    Cheers
    B

    Yes Disha loads more questions,
    is it simply a GET_LOCATIONS_ that I need to run once all the new plants have been created in R3 or do i need to create the plants in SRM?
    With one Purch org to one co code to one plant how will this effect the workflow start conditions
    How will the be differnt to a on Purchasing Org to many co codes to many plants?
    Any thing else you think that I might need to do with this change
    Thanks
    B

  • What kind of graphics card should i get to run final cut pro x on my 2008 mac pro?

    What kind of graphics card should i get to run final cut pro x on my 2008 mac pro?

    Hello Andres. I own an Early Mac Pro 2008, and have had the blessing of using both FCP X & Motion 5 for some time now. This is a pritty open question and it depends on your usage and the throughput nessesary to handle your work load. I can share what my set up is, & it may help you deside if this is enough power for you or help you move in another direction. Keep in mind that the buss speed and cpu are a big part of helping FCP X more so than the video card, although the video card does come into play here as well. Now if you are wanting to run Motion 5 as well, the video card is Almost Everything, and you need the biggest and best situation here that the throughput on this system will except. I'm running 14 gig of system ram, and the video card is an ATI Radeon 5870. For FCP X, running 1920x1280p footage optimised in pro-res 422, she can move along with some render time nessesary when dropping on the timeline, also filters, transistions, titles ex, have a bit of a laps time to render, but then she runs ok. This wait is not as much of a challenge with this set up as with Motion. I need a much bigger gpu on the video card for this app. Not sure if this computers throughput is really worth the upgrade. Beleive this though, Motion is demanding on using ALL you can give it. It is a Genious App, and it also calls for ALL THE POWER YOU CAN GIVE HER IN A VIDEO CARD. Conclution: if you are just starting which it sounds like, even a smaller video card than this can work For FCP X. Make sure you have at least 8 gig of cpu ram. 12 or more will help here. Also make sure the card is OpenCL compadible.....& this is in the thread above,,,,,,,,

  • How to "select" sth which takes place every n days?

    Hi there,
    I'm developing a JSP/Servlet-based event calendar for young people in a big German city. I recently ran into a problem while implementing a new feature requested by the team which is maintaining the website. Editors can enter events over a web-based form; currently supported are events which take place on a single day or spawn over multiple days.
    I've been asked to provide means of entering something like events which take place every n days, starting at a given date.
    I thought about storing the start date and an integer which holds the number of days after that the event should take place again. This would be very easy to implement on the frontend: A textfield/dropdowns for the date and a textfield/dropdown for the "repeat every n days" thing.
    But I can't think of any reasonably fast way to get those events from the database when my servlet should display all events between, let's say, December 1 and December 24.
    The only thing which came to my mind was selecting every event's start date, taking the "repeat every n days" field an check if the current date is one of those "repeat days" by repeatedly adding the "repeat every n days" value. But this would seriously affect the servlet's performance. Let me explain the above idea with some pseudo code:
    ResultSet rs = stmt.executeQuery("SELECT * FROM events ...");
    while (rs.next())
    Date startDate = rs.getDate(...);
    // don't care about the single-day and multiple-day events here
    int repeatEveryNDays = rs.getInt(...);
    while (startDate <= currentDate)
    if (startDate.equals(currentDate))
    // show event on search results page
    else
    // increase date by "repeatEveryNDays"
    startDate.day += repeatEveryNDays
    }As I knew this forum very well, let me emphasize that this is not some kind of homework assignment. If you want prove, go to http://www.under18.de and look at the site. But I doubt that will keep the trolls away from this topic :(
    Thanks for your ideas,
    Philipp
    PS: For those not so capable of understanding what some call German g, here's a Googled translation into English (ahem... ignore the text, it's colloquial German and Google doesn't seem to like it): http://translate.google.com/translate?u=http%3A%2F%2Fwww.under18.de&langpair=de%7Cen&hl=en&ie=UTF-8&oe=UTF-8&safe=off&prev=%2Flanguage_tools

    I just thought about this one: Assume I have an event
    starting on Nov 2 taking place every 7 days. Now I'd
    search for events between Nov 3 and Nov 11. The
    difference of start date - STARTDATE would be
    1, divided by 7 would be 1/7 (about 0.142857).
    Adding 1 to 0.142857 would be rounded to 1 (using
    integers), resulting in Nov 4 if I'm right. Well, Nov
    4 falls between start date and end date
    but there actually is no event on Nov 4 according to
    the 7-day period defined above. I don't get any
    further with your "calculate the next event based on
    that number plus one".Taking your example, the difference between start date and STARTDATE is 1 day, which means that the first event is after start date. Now the first occurrence that is after start date is (0+1)*7+STARTDATE, which is (Nov 2 + 7).
    All you have to do with this number is to make sure it isn't after the ENDDATE value (to verify it is in your repeating schedule), and doesn't fall after the end date that you are comparing for.
    Some math major can probably explain the calculation better than I have, but the basic idea is figure out what the first occurrence is that is after your start date and then make sure it's not greater than end date.

  • What kind of SSD do I need for my Macbook Pro 13(MD102E/A)?

    Hi guys and gals,
    The thing is that my hd is dead as punk so I will have to replace it. I want to replace it with a Solid State Drive, can you guys help me find what kind of hard drive can I use for this model: MD102E/A Macbook Pro?
    Thanks in advance.
    Ade Goldman

    Any 2.5" SATA SSD will work. Is it your plan to do the work yourself or take it to Apple. If the latter, then you will need to arrange to have an Apple SSD installed by them. They will not install one that you buy. If you do the work then shop for a suitable product at OWC or you can purchase other brands at places such as NewEgg.com. OCZ and Samsung both have compatible SSDs. Be sure to get one that supports SATA III 6 Gb/s also referred to as 6G.

  • How does Avilability check and TOR  takes place in SD

    How does Avilability check and TOR  takes place in SD? if you have any Tax configuration notes please send it to my mail ID?
    [email protected]
    Gopal

    ATP
    Types of Availability Check in Sales and Distribution
    Processing
    There are three types of availability check:
    _ Check on the basis of the ATP quantities
    _ Check against product allocation
    _ Check against planning
    The following SD-specific control features need to be maintained in Customizing:
    _ Checking group
    The checking group controls whether the system is to create individual or collective
    requirements in sales and shipping processing. In addition, a material block for the
    availability check with transfer of requirements can be set here. The checking group can
    also be used to deactivate the availability check. This option was created especially for
    the assembly order so that when the bill of material is exploded in the assembly order,
    the individual components, if necessary, can be classified as non-critical parts as far as
    procurement is concerned.
    The checking group specifies in combination with the checking rule the scope of the
    availability check. It is proposed in the material master record on the basis of the material
    type and the plant, and copied into the sales and distribution documents.
    _ Checking Rule
    You use the checking rule to control the scope of the availability check for each
    transaction in sales and distribution. You also specify whether the check should be
    carried out including or excluding replenishment lead time. The individual checking rules
    define by transaction, which stock and inward and outward movement of goods should
    be taken into account for the availability check.
    _ Schedule line category
    You can control with the schedule line category whether an availability check and
    transfer of requirements should be carried out in the sales documents. The possible
    settings for this at schedule line level are dependent on the settings in the requirements
    class which is determined from the requirements type of the material.
    _ Delivery item category
    The delivery item category can be used to control whether an availability check takes
    place in deliveries.
    Requirements type
    The various requirements are identified by their requirements type. The requirements
    type refers to the requirements class and its control features.
    _ Requirements Class
    The requirements class contains all control features for planning such as relevance for
    planning, requirements planning strategy and requirements consumption strategy. In
    addition, it is specified at a global level whether an availability check is to take place for
    the material in the sales and distribution documents on the basis of the ATP quantity
    (ATP = available to promise) and whether requirements are to be passed on. A finer
    degree of control can be obtained for sales documents using the schedule line category.
    Replenishment lead time is only included in the check performed on the basis of the
    ATP quantity.
    Prerequisites
    An availability check can only be carried out if the following prerequisites have been fulfilled:
    _ The control elements described above for the availability check must be maintained in
    Customizing for Sales and the relevant assignments made to the sales transactions
    _ The availability check must be switched on at requirements class level and - for the
    availability check in the sales documents - at schedule line category level
    A requirements type must exist by which the requirements class can be found
    _ A plant must be defined. It can either be proposed from the customer or material master
    record or can be entered manually in the document.
    _ A checking group must be defined in the material master record on the Sales/plant data
    screen in the Availability check field
    Configuring entries of the Availability Check
    IMG&#61664;SD&#61664;Basic fncs&#61664;Availability check and TOR&#61664;Availability check&#61664;Availability check with ATP logic or against planning&#61664;Define checking groups
    You can use SAP std checking groups of 01 for summarized reqts or 02 for daily reqts or u can create ur own.
    The columns total sales and total deliveries are selection options whereby u can configure a checking rule to sum up reqts to post to MRP either individually or by day or week.
    Column 5, Block qty; set this block if u want several users to be able to process the material simultaneously in different transactions without blocking each other. The No Check indicator is used when u want a material to not be relevant for an ATP check.
    Defining a material block for other users. The Block checkbox is an indicator that enables u to block the particular material from being checked for availability if it is already being checked at the same time by another user.
    Defining the default value for checking groups. However should no entry exist for the checking group in the material master record, one can set a default value per material type and plant.
    Controlling the availability check. In this section, u tell the system what stock on hand and what inward and outward movements of stock it must take into account when performing the availability check. These settings are based on the checking group that is assigned to the material master record and the checking rule that is predefined and assigned to the sd transaction. The carry out control for the availability check must be maintained for both the sales order and delivery.
    TOR
    IMG &#61664; SD &#61664; Basic fncs &#61664; Availability check and TOR &#61664; TOR
    A line item in the sales order creates a schedule line. The schedule lines in the sales order transfer the requirements through to MRP. You can select the docs on which you want the TOR to happen. For ex, not for quotations.
    The TOR aims to ensure the ordered materials are available for the requested delivery date. The TOR can be set for individual or for collective requirements (materials master&#61664;sales/plant view).
    The TOR is dependent on the following data:
    The reqts type, reqts class, checking group and schedule line category.
    The reqts type and class are determined in the strategy group (material master&#61664;MRP3)
    For TOR to be carried out, a few criteria need to be met:
    Plant assigned to line item level, schedule line category should be switched on at TOR, TOR must be switched on at the reqts class level, checking group must be defined and allocated to the material master record (sales/plant view in the availability check field)
    The reqts class is the controlling factor for the availability check and the TOR for all sd types.
    Configuring the TOR:
    1) Use std 041 reqts class or copy and rename it. Use the indicators to select if this reqts class must carry out an availability check and/or a TOR.
    2) Define the reqts types. A reqts type is allocated to a single reqts class and not vice versa. It is based on the item category and the MRP type of the material.
    3) Assign the rqts type to the relevant item category in the sales order and the MRP type found on the material master record.
    You can select an alternative search strategy where u assign the reqts type to item category and MRP type. Can select source as 0, 1 or 2. (1 = Item type and MRP type strategy).
    4) The TOR and Availability check can be selected/de-selected at the schedule line category level.
    5) Block qty confirmation in delivery blocks. This is used to block the reservation of the TOR from MRP.
    6) Maintain requirements for TOR. Requirements can be used to determine that the TOR to MRP is not carried out unless a number of conditions are met.
    Availability Overview = CO09 &#61664; order qty, sd doc no, item no, requirements class.
    Stock requirements list = MD04 &#61664; sd no or dly no, line item, schedule line placing the demand
    Stock overview = MMBE &#61664; total stock per company, then plant followed by storage location, and finally a breakdown per batch
    this is the customising as weel as the knowledge part.
    PLease award pints if helpful
    thanks

  • How the communication take place between mobile to Desktop PC & vice-versa

    How the communication take place between mobile to Desktop PC & vice-versa
    Plz explain in flow way

    I am a student of BCS n final year n my final project is remote desktop capture of a pc using its ip from a mobile under nokia 6600 series.... I am new at this expecially java..
    can u guide me because i have searched a lot and could not find any help.
    can u plz plz help me...
    I have done some research work too n the module is divided into
    1. Communication between PC n application server
    2. Communication between application server n wap gateway
    3. Communication between way gateway and mobile
    Can anyone help/give a hint of how to proceed or what techonology to follow
    Waiting for your reply
    Leena Ali GIllani
    Peshawar, Pakistan

  • What is going to happen to my Final Cut Pro X projects if I reinstall the program?

    Hi, I am experiencing some problems with 'final cut pro x'. It is acting extremely strange, I have tried a few things but that didn't help, so now I am considering to reinstall it. My only concern being what will happen to my projects(will they be left in place, modified or deleted?)

    If it's the same version that's being reinstalled (i.e., 10.1.1) neither the projects nor the events should be altered. That said, it's always smart to have back-ups of the projects, events and any external media they reference.
    If you want to get some ideas from contributors here about your FCPX problems, describe them in a post. Also specify what your system specs are, what kind of media and what kind of projects?  Possibly the problems can be fixed without resorting to reinstallation.
    Russ

  • I need to know what kind of disk i need for my portege z835-sp3240L

    I have an Portege z835-sp3240L Ultrabook and the SSD disk failed, so i need to replace it. I want to know what kind of disk i need (size, inches, etc) Please, can you give all the info about the disk. I live in Chile, so i can´t take it to a Toshiba repair place.

    Portege Z835-SP3240L
    Downloads here.
    Essentially any capacity SATA disk that fits a laptop should do.
    Best to restore the hard disk to its original out-of-the-box contents using Toshiba recovery media. All the drivers and utilities are properly preinstalled. Windows is preactivated.
    If you failed to create recovery media, you can obtain it from Toshiba. Scroll down to Get Recovery Media here. Toshiba in the US will ship to Chile (see this message).
    For instructions, see the section Restoring from recovery media, which begins on p. 65 of the User's Guide.
       Portégé Z830 Series User’s Guide
    If the disk uses advanced-format technology, see my message about that.
    -Jerry

  • What kinda problem is this?

    i cannot charge my ipod 5th generation, when i connect it to my laptop, it shows 'very low battery', and then it becomes black, then it shows 'very low battery', and black again... again and again, just cannot be charged. someone please help me, what kind of problem is this? is it because the battery died or something? thx

    How old is the iPod? Those batteries only take so many charges, then they finally just give out. You could get a battery replacement for a fee (from Apple of a third-party vendor).
    My fifth generation iPod video is a late 2006 model, and the battery on it is pretty much shot. A full charge will get me about 1.75 hours of music play, if that.

  • Assignment to feature TRVFD did not take place errro when using PR05 TCD

    Mates,
    whilst trying to create travel expense PR05 TCD,system throws "Assignment to feature TRVFD did not take place
    Assignment to feature TRVFD did not take place error message
    when using TCD PR05--travel expense manager
    to give  a primer ,V_T706Z i have miantained as 99-V_T706Z-TRIPF and my trip provision variant is 66 .Im quite not sure what is the screen ,field name default value that need to be maintained.
    t706z1(single field control for dialog) is dependent on the one we maintaain in the previous table,isnt it ?kndly crct me if my understanding is wrong.
    Intially i was not able to find the trip schema -FITVFELD TCD and then as suggested by our mates in one of the threads went to PRCO TCD and copied 99 and assigned it to the trip provision variant i had maintaained.
    In TRVCD irrespective of what i maintain in return value it shows the same error .I tried UGR as 99,i tried giving trip variant and tried return as 99 (one maintained in t506z) still shows the same message.It looks like im missing something.
    Kindly share your valuable inputs to fix this .
    No Worries
    KG
    Edited by: SAPenjoy:) on Apr 27, 2011 9:00 AM

    Hi Sally
    Thanks for elucidating that for me.I was thinking the other way around i suppose:).
    Well,TRVFD has lets say Molga -99,trvug -99->return value as USERGROUP_01
    I suppose USERGROUP_01 need to be entered in the trip schema isnt it ?
    as suggested when FITVFELD is executed i choose the trip provision variant and expand the tree with schemas
    Trip schema:01 bussiness trip
    trip schema :99 travel calendar
    trip schema :pl travel planning
    trip schema :sp weekly report
    trip schema :vs trip advances
    trip schema:xx KT trip
    could you kindly let me know in which schema the value need to be entered .plz correct me if my understanding is wrong.In the meanwhile i will also try to explore ,appreciate your help.
    No Worries
    KG

  • ICal won't let me the period over which an event will take place

    I used to be able to enter a period over which an event would take place in iCal (desktop, not MobileMe) Since converting to Lion, this option is not available. There is no place to enter "from" and "to". Curiously, it is still possible to do so in iCal on MobileMe (via the web.), as it used to be on my desktop iCal (available via the dock). If anyone has any idea what's wrong, it would be appreciated.

    Ferd II, you genius! It worked like a charm. I changed the region from the default Custom to Canada and iCal again works as it should.
    But the bonus that came with your solutuion is even better.
    Lion inexplicably changed every single file-modification date on my computer – including those on files I'd backed up on a hard drive.on backup drives – to January 5 2011. I spent days trying to figure out what was wrong. (An answer is still pending from Apple techs who were also unable to explain what happened.)
    I was despairing of not being able to retrieve the orginal dates. Naturally, when I saw the dreaded January 5 2011 as the example in the system pref for Language and Text, I figured it was another instance of conversion.
    But when I set the region to Canada, every one of the corrupted file dates, all those January 5 2011s, reverted to their proper modification dates! Amazing. The only one that didn't is the example/default in the Language and Text pref box.
    I will let Apple's techies know that Ferd II solved the problem.
    Thank you so much for your help and for sticking with the problem. I can now sync my iPhone without fear of infecting it.

  • When there are several tabs open, why does the search always take place on the 2nd tab (the first tab seems never to change from the home page) despite my selecting a different tab in which to do a google search?

    I have Mozilla Firefox 10.0. When I open it, it correctly opens on the homepage in the first tab. Once I have another, or several, tabs open, no matter which tab is active, any google search I do immediately takes place in tab No 2. It doesn't seem to matter how many times I go to e.g. tab 4 to do a search (because I wish to compare with the webpage open in tab 2), yet it always now does the search in tab 2. This is very irritating. There must be some setting that has gone pear-shaped, but where/which? Any suggestions? Thanks.

    Try the Firefox SafeMode to see how it works there. <br />
    ''A troubleshooting mode, which disables most Add-ons.'' <br />
    ''(If you're not using it, switch to the Default Theme.)''
    * You can open the Firefox 4.0+ SafeMode by holding the '''Shft''' key when you use the Firefox desktop or Start menu shortcut.
    * Or use the Help menu item, click on '''Restart with Add-ons Disabled...''' while Firefox is running. <br />
    ''Don't select anything right now, just use "Continue in SafeMode."''
    ''To exit the Firefox Safe Mode, just close Firefox and wait a few seconds before using the Firefox shortcut (without the Shft key) to open it again.''
    '''''If it is good in the Firefox SafeMode''''', your problem is probably caused by an extension, and you need to figure out which one. <br />
    http://support.mozilla.com/en-US/kb/troubleshooting+extensions+and+themes
    ''When you figure out what is causing that, please let us know. It might help other user's who have that problem.''

Maybe you are looking for

  • Java in Oracle

    Hi, Wanted to know to what extent java is used in Oracle siebel CRM. Heard the main core work is in C++. I have 2 + exp in java will it be good to work in this area. * Heard java has only UI development part in this.(is jsp used) To what extend is ja

  • Msg.exe Error 5 Getting Session Names

    Ok after 2 days of research and messing with policys i still have yet to resolve this issue. Due to vista not having netsend anymore I tried using the msg.exe command. So far I have got it to work just on my local computer. But sending it to other vi

  • Can you resolve problem

    m faceing one error on my screen when m using adobe premiere & save file then the one massage come on my display "adobe premier pro cs6 has been sttoped working" can you resolve the problem

  • OracleXE crashes straight after install (CentOS 4.5)

    I Installed the Oracle XE rpm:s (client and server) and then run /etc/init.d/oracle-xe configure as instructed. I did not change any port assignements from the defaults. After this, no Oracle server was running, and I finally found out that it had cr

  • Reg:ALE/IDOCS

    Hi Experts, I have one doubt in ale/idocs that is , some idocs are accidently posted, how to solve this issue. at the same time how to avoid duplication of idocs. please send the answers. Thanks & Regards, N.Narasimha Rao.