Dear SAP PP
     With strategy 10, which settings are required to consume calls for stock transfers with planned independent requirements?
Regards

Hi all,
IF other configuration is require ?  How to implement this requirement?Also please explain in detail.  thanks

Similar Messages

  • Administrator settings are wiped out when called for Sysprep

    Hi All,
    I follow the below steps to imply sysprep on a clean PC with Windows 7 installed,
    1. Install windows 7 Ultimate,
    2. Install driver softwares as required
    3. Configure static IP
    4. Configure user settings including administrator.  Like Administrator will have the "Show hidden files" and some shortcuts available only for Administrator, and "Open each folder in its own window" option enabled.
    5. My Answer file is as below
    <?xml version="1.0" encoding="utf-8"?>
    <unattend xmlns="urn:schemas-microsoft-com:unattend">
        <settings pass="specialize">
            <component name="Microsoft-Windows-Shell-Setup" processorArchitecture="x86" publicKeyToken="31bf3856ad364e35" language="neutral" versionScope="nonSxS" xmlns:wcm="http://schemas.microsoft.com/WMIConfig/2002/State"
    xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance">
                <AutoLogon>
                    <Enabled>false</Enabled>
                    <LogonCount>5</LogonCount>
                    <Username>Administrator</Username>
                </AutoLogon>
                <ComputerName>CAPTURE01</ComputerName>
                <CopyProfile>false</CopyProfile>
                <RegisteredOrganization>CarlZeiss</RegisteredOrganization>
                <RegisteredOwner>CarlZeiss</RegisteredOwner>
            </component>
            <component name="Microsoft-Windows-Deployment" processorArchitecture="x86" publicKeyToken="31bf3856ad364e35" language="neutral" versionScope="nonSxS" xmlns:wcm="http://schemas.microsoft.com/WMIConfig/2002/State"
    xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance">
                <RunSynchronous>
                    <RunSynchronousCommand wcm:action="add">
                        <Order>1</Order>
                        <Path>net user Administrator /active:yes</Path>
                    </RunSynchronousCommand>
                </RunSynchronous>
            </component>
        </settings>
        <settings pass="oobeSystem">
            <component name="Microsoft-Windows-Shell-Setup" processorArchitecture="x86" publicKeyToken="31bf3856ad364e35" language="neutral" versionScope="nonSxS" xmlns:wcm="http://schemas.microsoft.com/WMIConfig/2002/State"
    xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance">
                <RegisteredOrganization>CarlZeiss</RegisteredOrganization>
                <RegisteredOwner>CarlZeiss</RegisteredOwner>
                <OOBE>
                    <HideEULAPage>true</HideEULAPage>
                    <HideWirelessSetupInOOBE>true</HideWirelessSetupInOOBE>
                    <NetworkLocation>Work</NetworkLocation>
                    <SkipUserOOBE>true</SkipUserOOBE>
                    <SkipMachineOOBE>true</SkipMachineOOBE>
                </OOBE>
            </component>
        </settings>
        <settings pass="auditSystem">
            <component name="Microsoft-Windows-Shell-Setup" processorArchitecture="x86" publicKeyToken="31bf3856ad364e35" language="neutral" versionScope="nonSxS" xmlns:wcm="http://schemas.microsoft.com/WMIConfig/2002/State"
    xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance">
                <UserAccounts>
                    <AdministratorPassword>
                        <Value>YgBlAGwAdQBnAGEAQQBkAG0AaQBuAGkAcwB0AHIAYQB0AG8AcgBQAGEAcwBzAHcAbwByAGQA</Value>
                        <PlainText>false</PlainText>
                    </AdministratorPassword>
                </UserAccounts>
            </component>
        </settings>
        <settings pass="auditUser">
            <component name="Microsoft-Windows-Deployment" processorArchitecture="x86" publicKeyToken="31bf3856ad364e35" language="neutral" versionScope="nonSxS" xmlns:wcm="http://schemas.microsoft.com/WMIConfig/2002/State"
    xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance">
                <RunSynchronous>
                    <RunSynchronousCommand wcm:action="add">
                        <Order>1</Order>
                        <Path>net user Administrator /active:yes</Path>
                    </RunSynchronousCommand>
                </RunSynchronous>
            </component>
        </settings>
        <settings pass="windowsPE">
            <component name="Microsoft-Windows-Setup" processorArchitecture="x86" publicKeyToken="31bf3856ad364e35" language="neutral" versionScope="nonSxS" xmlns:wcm="http://schemas.microsoft.com/WMIConfig/2002/State"
    xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance">
                <Display>
                    <HorizontalResolution>1280</HorizontalResolution>
                    <VerticalResolution>720</VerticalResolution>
                </Display>
            </component>
        </settings>
        <cpi:offlineImage cpi:source="wim:e:/sources/install.wim#Windows 7 ULTIMATE" xmlns:cpi="urn:schemas-microsoft-com:cpi" />
    </unattend>
    6. In audit mode, I pass the unattend.xml so called the Answerfile to sysprep as follows
    sysprep /oobe /generalize /unattend:unattend.xml
    7. The system shutsdown after applying the sysprep.
    8. When the system is started, all things are fine, the administrator account is also enabled but, when logged into administrator account, the system shows "Preparing your desktop" and resets all the shortcuts and user settings like "show
    hidden files" and "Open folder in its own window" are reset backup to windows default.
    Can any one guide me to retain these user settings for administrator profile.
    Regards,
    Arun
    programmer vc++

    Hello,
    You can only have one default profile. We use network share profile that is trimmed only to hold basic setup that all clients must have.
    If you are in a domain you can put the admins in their own OU:s (with "Active Directory - Users & Computers") and link the right Group Policy settings to the right OU-container. This is also a good way to do this because if the users computer changes
    the policy settings will apply automatically based on user account. Also if the admin needs to access users computer the correct group policy will make every fresh login set the folder settings etc. to right position.
    Folder Options - control panel config via Group Policy
    http://technet.microsoft.com/en-us/library/cc771379.aspx
    If you want to you can also link the Group Policy based on the security group of the user. That way for example when a user is added the the administrators group he will automatically get the right group policy containing the right settings.
    http://technet.microsoft.com/en-us/library/cc752992.aspx

  • Creating Planned Independent Requirements for an MRP Area.

    Hi All,
    I am trying to enter Planned Independent Requirements for an MRP Area, with requirement type VSE and I get the following error;
    "Only stock requirements are allowed when planning at MRP area level".
    I can enter at the Plant level with no problems.
    Any guidance is greatly appreciated.
    Kevin.

    The following is the excerpt from SAP [Help|http://help.sap.com/saphelp_470/helpdata/en/81/470a58ddab11d1b55b0000e82de178/frameset.htm] I think you maintained a planning strategy in the MRP view (for the plant) which doesn't support VSE.
    You can delete PIRs from an MRP area by deleting the MRP area number from the Creating Planned Independent Requirements screen and recompiling.
    When you define the planning strategies and parameters in the material master, these parameters apply to the whole plant, including all the MRP areas within the plant: You cannot maintain the MRP areas separately.
    The integration of the MRP area and the assignment of the MRP area in the sales order is supported only by a user exit in the sales and distribution user exit pool.
    Sales orders with MRP areas are created irrespective of the availability check control group in the material master.
    Customer order processing of production sales orders with the item category (account assignment Step E Single) is only maintained in the MRP area of the plant.
    In Customizing and in the MRP area user exit, make sure that when transferring individual sales orders, only requirements types KE, KEK, KEKS, KET, KELV, KEV, KEVV, VSEF, and VSE are generated.
    The following requirements types are valid for the MRP area: KE, KEK, KEKS, KET, KELV, KEV, KEVV, VSEF, and VSE.
    You cannot plan with preliminary planning materials in the MRP area.
    There is no planning strategy for the material segment of the MRP area.
    The planning strategy for the material master segment of the plant is assigned to the material segment of the MRP area.
    The consumption mode and the periods of adjustment are derived from the plant in the MRP area of the material master.
    Only consumption customer requirements with planned independent requirements are allowed: VSF requirements with KSV and VSFB with KSV.

  • Uploding MD61 (Planned Independent Requirements) Using BAPI

    Hi,
    i am using BAPI_REQUIREMENTS_CREATE for uploading the planned independent requirements (MD61).
    The flat file structure is like
    Mat. Number...................Week 01 Forecast...................Week 02 Forecast..................Week 03 Forecast.
    2011905..................................907........................................911..........................................916
    the problem is  i am  uploading  material no and  week 01 forecast. i am unable to upload remaining quantities for the same material no.
    plz help  me regarding this.

    I haven't used the BAPI to change Independent requirements, but there are standard transaction MD74, MD75 and MD76 to reorganize Planned independent requirements by date. These jobs are normally scheduled to run at start of period.

  • Which settings are required to explode a IPPE in the sales order?

    Dear Guru,
    which settings are required to explode a IPPE-object in the sales order?

    Hi,
    You may check this link.
    http://help.sap.com/saphelp_dimp50/helpdata/EN/9f/71fe40f652f323e10000000a155106/content.htm
    Thanks
    Krish.

  • What are the Trading Card Games for iPod touch that doesn't requires Internet connection?

    What are the Trading Card Games for iPod touch that doesn't requires Internet connection? Suggestions, please.

    Why not look at the apps and fine out?
    The odds of someone here knowing that are slim to none.

  • I am doing two calendars.  In one I am able to load 7 pictures, but in the other I can only load 5, my settings are set exactly the same for both.

    I am doing two calendars.  In one I am able to load 7 pictures, but in the other I am only aloud to load 5,  My settings are set exactly the same for both.
    Any ideas?

    What happens when you try to load the photos into the second calendar?  What iPhoto version?  What system version?
    OT

  • Planned independent requirements for MTO material

    how can i maintain PIRs for an item that has strategy 20 (MTO)? when i try to access MD61, sap tells me that i need a requirements type, however strategy 20 doesnt really have these,

    Hi Raf,
    If you are using planning strategy 20 (MTO) then directly create sales order
    If u r use planning strategy 10, 11, 40 (MTS) then you can use create PIR (planned independent requirements)
    Regards,
    Sankaran

  • Planned independent requirements for reservation

    Dear all,
    can planned independent requirements reserve material? if can, how to reduce?
    regards
    Gang

    Hi YMReddy,
    my requirement is that I input PIR for some materials, and want those materials reserved by this PIR, since this PIR are special, can not be used by other requirement.
    regards
    Gang

  • Update for Planned independent requirements MD61

    Hello,
    I'm doing update for Planned independent requirements, from excel file for plan, than incuding material and quantity per period, using transaction MD61. I have the next inputs:
    - Reqmts plan
    - Plant
    - Version
    - Planning horizon
    - Planning period
    I tried with 2 possible solution, with differents problems:
    1. Batch input to MD61: Here I have the problem with go to the next page, for quantity more than the rows displayed in the table control of dynpro in MD61. it does not work with OK_CODE '=P+'and I followed differents advices of other post in SDN but anything worked.
    2. Function module: BAPI_REQUIREMENTS_CHANGE and BAPI_REQUIREMENTS_CREATED, I deleted all materials for plan before the update through batch input (this works) then I can use both Function Modules. The problem in this solution is that when I have planning period: 'P' or 'K' the system saves the plan with inconsistences for variant of period or calendar (this information is managed in batch input on MD61)
    Thanks for your suggestions,

    Hi,
    Following are the tables
    PBIM                    Independent requirements for material
    PBED                    Independent requirement data
    PBHI                    Independent requirement history
    PBIV                    Independent requirement index
    PBIC                    Independent requirement index for customer req.
    Regards,
    Vishal

  • I have set up two users, one for myself and one for children.  The computer automatically logs in for the children with no password required.  When the children go to spotlight and type in a search criteria all of my files show up.  How do I prevent this?

    I have set up two users, one for myself and one for children.  The computer automatically logs in for the children with no password required.  When the children go to spotlight and type in a search criteria all of my files show and open up.  How do I prevent this?

    Log in to your account, and move all your files to your home folder. No other users should be able to access them there and they won't show up with a Spotlight search.
    Make sure your kids' account(s) do not have admin privileges.

  • Idoc type and message type for Planned Independent Requirement (PIR)

    Hi
    Can anyone please give me the information on the idoc type and message type for Planned Independent Requirement(PIR)?
    And also the prerequisites to use them.
    Regards,
    Lohitha
    Moderator message: please do more research before asking, show what you have done yourself when asking.
    Edited by: Thomas Zloch on May 23, 2011 10:45 AM

    Hi,
    You can use IDoc type WMMBID02 with message type WMMBXY.
    Also please check test program RLMBXY00 to simulate IDoc WMMBID02.
    Regards,
    Ferry Lianto

  • ATP against planned independent requirements

    I have set up materials that are linked to planning materials using strategy group 63.  I have tested setting the planning material consumption to a 2 for forwards/backwards and 3 for forward only.  I have set up planned independent requirements by week.
    When I book a sales order it gives me a material availability date that is in the week prior to the availability of the material based on planning.  For example I have 100 parts available for week 30 which starts on July 21 yet my sales order shows a material availability date of 7/16 and a goods issue date of 7/18.  How can I ship the goods if they are not available yet.   Any ideas on what could be wrong?? 
    Many thanks for any and all help!!
    Debbie

    Hi YMReddy,
    my requirement is that I input PIR for some materials, and want those materials reserved by this PIR, since this PIR are special, can not be used by other requirement.
    regards
    Gang

  • Plan independent requirement?

    hi
    what is plan independent requirement and what is the link with it sales order.is it made after sales order or before sales order.please explain in detail.also please explain what is the the difference between
    mrp type PD and VB.
                                                                                    regards
                                                                                    sanjay

    As the name suggests ,it is independent on sales order or any other orders. It is the input to MRP. If for a material you are creating PIR in MD61 as 100 in 1 month, It means you need 100 qty of that material produced in your plant after one month. It is independent.
    Then MRP will give you the procirement proposals like purchase requisitions(if externally procured materials are short of the requirement..i.e for 100 qty) and planned orders(if inhouse materuals are short of the requirement..i.e for 100 qty)...
    PIRs are those which are created by you.. you can create them at any time. MRp will take care of making the necesary materials to be available for that requirement...i.e it will prompt us the dates on which the materials have to be available in the plant to meert the requirement...
    PD and VB:
    PDwill work with BOM structures.
    Imagine the final material A , and its component B
    you need 2 pieces of B to produce 1 piece of A.If you work with PD and you receive for example a sales order for A of 10 pieces , the MRP with PD will determinate that you need 20 pieces of B taken into account the sales order delivery date.
    The system will use the BOM to know the quantity that you need. You will not have additional stock for the component B. The system will procure when and how many pieces you need.
    IF with the same example you work with VB for component B, then you have to define a reorder point (example 5).
    If your stock is bellow that level ,the system will procure to get again the reorder point level. If you have enough stock (example 30) the system will not create any purchase requisiton for B, independent of the sales orders of A , and the reservation of 20 pieces.
    When yuo work with expensive components you should use PD , because you don´t have stock without pegged requirements.
    if the materials are cheap and you need to have allways some stock , you can define VB as planning type.
    karthick

  • Planned Independent Requirements

    Can any body tell me what exactly Planned Independent Requirements means and how it differs means from dependent requirements?
    Thanks for your time
    Thanks Again,

    Hi,
    To produce a finish material, there should be some requirements. The requirements can be in form of forecast or order based. Order based requirements are triggered by sales order or customer requirements. The forecast can be done in any any system for a particular finished product in SAP or non SAP system. After carrying out the forecast, this can be entered into SAP as planned independent requirements. The term PIR is nothing but requirements which are triggered by planning and not by order.
    PIR comes into picture when you are using a MTS or related scenario.
    Hope this make it clear to you.
    Regards
    Vineet

Maybe you are looking for

  • Bridge CS3 ver 2.1.0.100 most  buggy bridge ever

    With previous versions of bridge for CS3 I had occasional problems. The most vexing was that some Canon xti Camera raw files (CR2) and dng files could not have their file info changed via bridge. When I would right click on these files, the file menu

  • Media Encoder stop working

    My Media Encoder 4.0.0.0 stop working and the details about this interruption are below. Please, what I have to do to fix it? Thanks Wanderly Assinatura do problema: Nome do Evento de Problema: APPCRASH (Event) Nome do Aplicativo: Adobe Media Encoder

  • Wallpaper doesn't fill second monitor

    Hi everyone. This is kind of a minor issue but there is a user asking about it and I don't have an answer. It's a Windows 7 laptop connected to an external monitor with the laptop display set as the primary. On the external monitor, the background do

  • Flex Hero - Links in HTML component does not works.

    WebView-app.xml <?xml version="1.0" encoding="utf-8" standalone="no"?> <application xmlns="http://ns.adobe.com/air/application/2.5"> WebView.mxml <?xml version="1.0" encoding="utf-8"?> <s:WindowedApplication xmlns:fx="http://ns.adobe.com/mxml/2009"  

  • Equipment(Staus) IE 03------ STATUS, Where this value wuld b stored?

    Hi Experts, Am looking to pull the data of Equipment Status - IE03---->STATUS value, so, pls. let me know that, In which table I hv to look for? Or anz logic I need to write? thanq.