Whr should maintained a business system group in SAP APO

hi gurus,
where should i maintain business system group in SAP APO
can u explain me, what is the process, how it will work, why need BSG in APO
prasad

Hi,
We maintain Business System Group in APO IMG.
IMG >> SCM Basis >>Integration >> Basic Settings for Creating the System Landscape >> Maintai n Business System Group
In this IMG activity, we determine the assignment to a business system group of this system and the ERP systems that are to be connected. By doing this, you create areas with the same naming conventions. These guarantee that the same names are used for master data and also their synchronization in distributed system landscapes.
In addition to the ERP systems, this system too must be assigned to a business system group (BSG) as an independent logical system.
Proedure :
u2022     Choose New Entries.
u2022     On the New Entries: Overview screen, specify the following information for the business system group:
             o     An alphanumerical key (maximum of 10 characters).
             o     A description of your choice
u2022     Save your entries.
Example :
An SCM System is to be connected with the two ERP systems A and B in which two different materials (for example a hammer and a screw), have the same material number (100). The two materials are to be represented as two different products in the SCM system.
Assign The two ERP systems to different BSGs. Assign the SCM system to one of the two BSGs.
u2022     ERP system A (material number 100 = hammer) -> BSG A
u2022     ERP system A (material number 100 = screw) -> BSG B
u2022     SCM system -> BSG A
Hope this gives you insight.
Regards
Datta

Similar Messages

  • Business systems group setting in location master

    Hello experts,
    I am currently in the process of trying to set up the integration models for a second R3 system to be connected to one APO system.  All of the locations / plants for the first R3 system were created under BSG1.  The locations / plants for the second R3 system were created under BSG2. 
    I have identical product in both R3 systems.  They have the same material numbers.  The materials have existed in APO for quite some time under BSG1.  When I try to send the material numbers from the second R3 system, I get an error that the materials already exist in a different business systems group.  I changed the config for the second R3 system to be BSG1 (same as first r3 system).  But now I cannot create an integration model for my plants, because they already exist under BSG2. 
    If I change my locations / plants to BSG1 would that correct my initial error message?  Is there a way to change the business system group of a location once a location already exists in APO? 
    FYIu2026 I tried using /SAPAPO/DELETE_LOCATIONS to delete the locations and resend them, but /SAPAPO/DELETE_LOCATIONS doesnu2019t seem to do anything.  After I run the program, I still have all of the locations in APO, whether the location was flagged for deletion or not. 
    Thanks,
    Matthew Bruckner

    Hi Matthew Bruckner
    do you set deletion flag to your location master ? If not, please set deletion flag at first, then please delete your location by using /SAPAPO/DELETE_LOCATIONS .
    To set deletion flag to your location, please perform following.
    1. Open transaction /n/sapapo/loc3
    2. From the menu, select "deletion flag".
        (the location should be de-assigned from related data like product, model)
    3. delete your location by using /SAPAPO/DELETE_LOCATIONS .
    And if you have same location or same location product, I recommend you to add some kind of information to your location and product by using CIF user exit.
    Please take a look at my comment in following thread.
    Re: Integration multiple R/3 systems with APO via CIF
    best regards
    Keiji Mishima

  • Business system * is not assigned to a business system group

    I am running XI3.0 (SP12), Oracle 9.2.0.6 on a Windows 2003 Cluster Server.
    I am trying to import some config from the Integration Directory from Dev into QA but I am getting the following error:
    <b>IMPORT XI 3.0 Design Objects
    Business system XIT is not assigned to a business system group with the ID (XISystemGroup)</b>
    I have copied my Dev SLD into my QA SLD.
    Has anyone else come across the error??

    Barry,
    You should ideally have assigned Business systems in ur QA landscape to 1 group & Business systems in your dev landscape to another group. Also , hope you have created transport targets for all ur Business systems in dev environment.In ur QA SLD , you should have two entries for each business system , something like
    DEV-BS-1 -> transport target -> QA-BS-1
    QA-BS-1 -> transport source -> DEV-BS-1
    Thanks
    Saravana

  • System not assigned to any business system group

    In transaction /SAPAPO/MAT1 an error occurs when I try to create a new product.
    Error message: " System SC1CLNT100 not assigned to any business system group".
    When I received this error I created business system group in SLD and assigned my system to this new business system group.
    Then I went to transaction RZ70 and executed Data Collector without Job scheduling.
    But when start transaction /SAPAPO/MAT1 again the error /SAPAPO/MAT030 still occurs.
    What should be done to make changes, which I made in SLD visible for the system?
    Thank you in advance,
    Kind regards,
    Maria Kazakova

    I assume you assigned this BSG in the IMG in APO
    "As an independent logical system, the APO System must, in addition to the SAP R/3 Systems, be assigned to a business system group (BSG)."

  • BUSINESS SYSTEM GROUP

    What is a business system group please explain in the simple words?

    Hi,
    BSG is concept used in SAP APO, as the APO is part of SCM server and this server in separate than the R/3 server. U can couple more than one R/3 server to one SCM server.  It might possible that every R/3 server has its diffrent nomenclature system for Material so in BSG the similar nomenclature system are grouped for streamline processing.
    Shekhar

  • Should i use Business system or Business service for a 3rd party file sys?

    Hi Gurus
    My requirement is to send a file from 3rd party client system to SAP ECC system.
    I want to confugure a file sender CC to pickup the file and send it to ECC system thru proxy.
    Now, after going thru the SAP definitions of 3rd party Business system (if the system is present the landscape and technical details are available) and Business service (if system's technical details is not available because it is not present in the landscape. Only the interface details are available, for ex: external webservice), i am not sure which one to use.
    What is the use of using a 3rd Business system instead of using business service in my current situation?
    In both the cases, i can use a file sender CC and pickup the file from a folder using FTP protocol.
    What is the criteria based on which i need to take this decision?
    And finally, how are the system name & host name details, which we given during 3rd party technical system definition in SLD useful?
    Many Thanks
    Chandra

    Hi Chandra
    Its always preferred to use Business service for communication with systems outside the landscape. As it does not refer to any SLD components and safe to use on internet etc.
    What is the use of using a 3rd Business system instead of using business service in my current situation?
    If you want to use 3rd party system you need to define party based communication and it acts as a party in production environment. You can also create a Standalone sytem in SLD for your use. Standalone technical system mostly refers to standalone Java applications in landscape.
    n both the cases, i can use a file sender CC and pickup the file from a folder using FTP protocol.
    What is the criteria based on which i need to take this decision?
    If your communication is party based and the 3rd party you refer is a party for ERP then it make sense to use a third party communication and use party name as well.By this i mean business wise. Else its always good to use Business service.
    And finally, how are the system name & host name details, which we given during 3rd party technical system definition in SLD useful?
    To use this third party system you need to register products on TS else you will not be able to see any Interface etc while configuring in ID. you need to add all details to it in SLD.
    Thanks
    Gaurav

  • Problem by Maintaining a Business System for the Integration Server

    Hi to all,
    I have the following problem. I tried to change some Business systems configuration in SLD but accidentally deleted defined Business System for our Integration Server. After that I tried to create that business system again but I have the following error:
    Integration Server already defined. There is already an integration server defined for the selected technical system. Please select role Application System.
    Since than I’m receiving the following error message when I try to refresh my adapter engine cache:
    com.sap.aii.ib.server.abapcache.CacheRefreshException: Unable to find an associated SLD element
    Do you know how can I define the Business System again currently I can't see it in SLD Business systems?
    I’ve also checked the IS URL (TR: SXMB_MONI) and it seems that it’s ok. 
    Regards
    Naycho

    Hi Naycho,
    i think you have to clean up some sld rubbish
    Go to SLD / Administration / Content Maintenance. Choose left side "all classes" or "landscape description" and right side  "business system". Delete all entries you find for your business system, after that try to recreate it.
    Regards,
    Udo

  • How to Configure Business System in SLD (SAP-XI).

    Hi all,
      I am new to XI.  I want  to know the detail scenario of configuring Business system in SLD(System Landscape Directory) in SAP-XI.
    Can , anyone help me on this...

    hi suresh,
    gothrogh this below liks ..........
    http://help.sap.com/saphelp_nw04/helpdata/en/fe/39ae3d47afd652e10000000a114084/content.htm
    http://help.sap.com/saphelp_nw70/helpdata/en/7b/d4653fd1d3b81ae10000000a114084/content.htm
    http://wiki.sdn.sap.com/wiki/display/XI/WorkingwithSystemLandscapeDirectory+(SLD)
    regards,
    kesava

  • Technical/business system for non-SAP system

    Hi,
    I want to use a webservice from a non-SAP system.
    It is necessary to define a technical and business system in zhe sld for that non-SAP system?
    When yes, is this a standalone or a 3rd party system?
    Thanx

    I want to use a webservice from a non-SAP system.
    It is necessary to define a technical and business system in zhe sld for that non-SAP system?
    When yes, is this a standalone or a 3rd party system?
    you dont need to create Business system in Sld for 3rd party  just u need to create business component in id directly.
    please refer SCN for how to create Bus.component.

  • Make Business systems visible within SAP PI Tools

    Hi!
    I defined technical system and business system as well within SLD. Now I would like to see this business system within SAP PI tools (such as Integration Builder).
    Question:
    Which actions are requiered after the definition the technical and business system in order to work with these systems in SAP PI tools? 
    Is thers some documents describing this issue?
    Thank you!

    Hi,
    The order for without party is simple, just import it, then
    1. Create configuration scenario
    2. Assign this system to your scenario
    3. Create communication channels
    4. Create Sender Agreement, Receiver Determination, Interface Determination, Receiver Agreement
    And for with party.
    1. Create Party in Integration Directory
    2. Assign business system to this party
    Now when you create your scenario
    1. Create configuration scenario
    2. Assign this party and system to your scenario
    3. Create communication channels
    4. Create Sender Agreement, Receiver Determination, Interface Determination, Receiver Agreement
    >>- Creation of Party
    First
    >>- Creation of Business component
    Second
    >>- Creation of Scenario
    Third
    >>- Assign Business system
    Fourth
    Hope now it is clarified.
    Regards
    Suraj
    Edited by: S.R.Suraj on Oct 1, 2009 4:33 AM

  • Detail system landscape for SAP APO

    Hi All,
       Can u pls tell me the system landscape for APO with pictures. (i.e data flow in between ECC to APO through CIF also between APO submodules)
    purpose: need to prepare PPT.
    Thanks.

    Hi
    Find the link WRT system integration
    System Infrastructure (SAP Library - Integration of SAP APO and SAP R/3)
    pls follow below thread for more info
    Integration multiple R/3 systems with APO via CIF 
    Raja kiran

  • Business systems Group

    Gents
    currently using SCM4.1, we have a situation whereby more than 1 R/3 system is connected to the APO system.  However in the near future the product numbers will be aligned for each R/3 system.  therefore product 1 will exist in each R/3 system, and the assumption at the moment is that they will be the same product description.
    Questions
    1. Will the creation of different BSG's for each R/3 system control the flow of data between the APO system and the R/3 systems.  Also is it necessary to create a different BSG for each R/3 system.
    2. Is it essential to use the exit APOCF005 to prefix the product master data from each R/3 system
    I have read the SAP help and it infers that the suer exit should be invoked.  however if someone has a real life situation this would help the understanding.
    Regards
    Paul

    Guys,
    I incorrectly stated that the products would have the same description, I menat to say they would have different descriptions.
    thanks
    Paul

  • Business System Groups - CMS

    Hi,
    I am following "How to Transport XI Content Using CMS", managed to install the CMS and finished up to 57th point.  As per the general SLD preparations, i need to create BS Groups, what my doubt is?
    a) while creating a group for DEV, I have assigned the Integration Server of DEV from the drop down box. To create a group for QAS, does i need to assign IS of DEV or QAS? If it is IS of QAS, which is not available in the dropdown box.  I am stuck up without any clue? plz help me!
    b) If any body is having the "How to Configure Groups and Transport Targets" document, plz forward it [email protected] or else give me the link.  I have searched for this document in the Market Place but cldn't find out.
    regards

    Hi,
    See It depends upon your landscape..
    If you want to transfer the Dev to Quality..
    --The basis team should create the all respective track..
    --After activating your Objects in IR ,ID  you will get another option in change list there you have to rclick and click on transport automatically transfered to QA..
    The other way is through file you can transfer..export ,import... options..
    -- this is you have to export the objects by SWCV or namesapce wise .. the all object will be stored under one path in server .. next you have to prepare the excel sheet you objects ..then the basis team will transfer the tpz file to qa and there it will be imported..
    Please see the CMS transfer links..
    Please see the below links
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/b8d8f7b2-0701-0010-b09a-cda4cca2c98e
    Where can I get installation files of DTR, CBS, and CMS?
    https://websmp201.sap-ag.de/~form/sapnet?_SHORTKEY=01200252310000071155&_SCENARIO=01100035870000000202 -> How to Guide on
    'How ToTransport XI Content Using CMS'.
    /people/sap.india5/blog/2005/11/28/xi-software-logistics-solution-iii-cms
    Regards
    Chilla..

  • Logical system error in SAP APO

    Hi Experts,
    We have a issue while transferring PLANT information from ECC system to SCM system.
    I am getting following error:
    Function/Q/SAPAPO/CIF_GEN_EVENT
    Text:- Local Logical System is not defined.
    Function/Q/SAPAPO/CIF_LOC_INBOUND
    Text:- Logical System APOCLNTXXX has not been assigned.
    I have created Logical component and assigned to the client in use, but still getting error as above.
    Regards,
    MSID.

    I have the same questions. when I configured my ECC and APO systems according the SCM 210, but I still meet the error like this
    logical system name  has not been assigned to
    syste:    user:
    Function/Q/SAPAPO/CIF_PRODUCT_INBOUND
    text:   logical system name  has not been assigned to
    my ECC is ECC6.0,and APO 7.0
    Can u help me,Thank u
    Rockey

  • Logical system and business system

    Hi experts, please help me with the below questions---
    1) What is the diff between logical system and business system?
    2)what is the difference between logical system(defined in R/3) and business system (defined in SLD) in idoc to file scenario.
    3) Is it require to give the logical system name of the xi server(Which we define in idx1 port) to the 3rd party system(Application system at the FTP side) to carry out file to idoc scerario?

    Hi,
    Business System :
    1. Business systems are logical systems, which function as senders or receivers within XI. Business systems can be SAP systems or third-party systems. Depending on the associated technical system.
    2. Business Systems should be mandatory used when dealing with Idoc's and Proxies .
    Business Service:
    1. Business Service requires manual adding on Inbound and Outbound Interfaces, Business Systems do not.
    2. Business Services are maintained across environments and so, their names cannot be changed. Business Systems names can be changed across environments by providing SLD level transport targets.
    3.In the Business Services we cannot maintain the Group and Targets in SLD. For Ease in transporting your ID/Configuration objects Groups and Targets are used in SLD for Business Systems.
    4.Business Service has no SLD Entries and No Assigned Products and SWCV's
    Regards
    Sangeetha

Maybe you are looking for