Workcentre change in capacity levelling

Hi Guys,
In capacity levelling of planned orders i want to move planned orders from one workcentre to another workcentre , could any one explain me how to do this.
Thanks and regards
Thamizhchelvan G

Dear,
Yes you can dispatch planned orders in CM21, CM22, CM25, CM27, CM28
Usually the following std profiles are used.
SAPSFCG021 SFC: Standard overview in order view
SAPSFCG022 SFC: Standard overview in indiv.cap.view
Just need to select  the order then click on Dispatch(press F5)
Or,
1. CM 25
2. Select multiple operations ( Edit> Select> objects that belong together
3. Press Shift button and simultaneously press mouse left/right button then drag and drop .
Please refer this link for capacity levelling,
http://help.sap.com/printdocu/core/Print46c/en/data/pdf/PPCRPLVL/PPCRP_LVL.pdf
Regards,
R.Brahmankar

Similar Messages

  • Capacity leveling, after Deallocate scheduling dates getting changed.

    Dear Experts,
    I have a issue in Capacity leveling using transaction CM25 - Online. I have created some production orders (using forwards/backwards scheduling) for overloading of WorkCentre's. When I dispatch orders it’s getting scheduled perfectly, but when I Deallocate same orders scheduled dates are getting  changed.
    Even after deallocation production orders schedule dates should be the same. Can you please help me in this regard?
    Thanks in advance.
    Prashanth

    Hello Prashanth,
    From SAP help Date Determination in Dispatching and Rescheduling - Capacity Leveling (PP-CRP-LVL) - SAP Library
    The current dispatching data is cancelled. The status "dispatched" of the operation is reversed. The order is rescheduled.
    If further operations exist for an order which has already been dispatched, the system automatically carries out midpoint scheduling. If no other dispatched operations exist, the system carries out lead time scheduling.
    If order date is in past then it schedules to current date during de allocation if you do not have enter number of past days allowed to start date in scheduling parameters.
    Br
    KK

  • Work Center(Capacity Level) Change Documents

    We have a requirement to capture work center change documents at the capacity level which I understand is not supported by standard SAP; note 352485(point 15). Is there, though, a customized solution that can be developed? Any thoughts would be greatly appreciated.
    Thank you in advance.

    Hi Usman,
    I have already tested the method you are mentioning. You cannot save a order without work center. So, you need to use a dummy work center and change all the open orders.. if you want to change capacity category from A to B. New capacity category should be mentioned in dummy or original work center.
    When you replace the work center, order will be gng for scheduling.. which leads to change of Basis start date and earliest start date... this is an inconsistency...
    To avoid it... i followed below steps
    1. Uncheck the capacity requirement indicator in all open orders
    2. when u try to delete, it will say "Capacity is still being used"
    3. Table KBED, use capacity ID and run, it will list out the pending orders
    4. When the table has no entries, delete the capacity category
    5. check all capacity indicator
    - Pithan

  • After capacity leveling  dependent requirement s to be adjusted

    hi
    iam planning a fert product on 30 th agust for 100nos
    created md61 -pir for 100 nos
    done mrp run at mdo2 and got scheduled dates for 100nos which has gone beyond the requirement date as i was chhosed leed time scheduling  and made dependent reqirement proposal for the order operation date.
    here the important thing is the work center which i nedd to produce was fully engaged inthe period (schedule period which system proposed)  .hence i made capacity leveling and planned order dates were changed again
    which are actual producion dates
    after capacity leveling my planned order was firmed
    my problem here is  the dependent requirement proposal date also
    need to be changed with respect to firmed planed order.
    how to achive this
    i tried with opu5
    but no changes in dependent reuirement proposal (planned order)
    plz suggest
    sasikanth
    vst-it projects

    hi
    i tried it but unfortunatly it is creating a new planned order and giving exemption messge to the firmed planned oder as cancel the proposal
    which is not at all acceptable
      means for a single PIR
    i made mrp run AND got planned order , after leveling the planned order was firmed
    means my pir was satisfied with this
    i made mrp run without changing PIR dates and quantity by expecting that it should propose a new dependent reqirement 
    but system created a new planed order to  pir date which sholud not happen.
    plz elobrate your view
    sasikanth
    vst-it projects

  • How to do capacity levelling

    Dear Frndz,
    Pls help me how to do capacity levelling.....
    Scenario:
    I have created two production orders for the same finish date as a result the work center is overloaded.Now I want to do capacity levelling.Tell me the step by step procedure to do capacity levelling, so that the capacity problem is solved.
    Regards,
    Srini.

    HI,
    Capacity leveling after order creation
    This process covers capacity leveling of requirements from the production process, monitoring the capacity after different periods, and how the system determines the new values for the current order after changes are made to the quantities, times, and dates.
    1) T Code CM21
    2) Enter the field Plant & work Center
    3) Choose Enter.
    The current orders whose operations result in capacity loads at the selected work center are displayed. By scrolling through the different charts in the planning table, you can analyze the information provided.
    4)For a better view, choose Settings ® Scale ® Monthly period split.
    5) To automatically dispatch one or several operations of an order, click the red rectangle in the order's diagram section to select the order and choose .
    The order disappears from the order pool and reserves a time segment in the work center section.
    6) To manually dispatch one or more operations of an order, select the order in the diagram section, drag it to the work center section with the mouse, and place it in a time period that you select.
    7) To deallocate an order, select it in the work center's diagram section and choose .
    The order is again displayed in the order pool.
    8) To analyze the changes made in scheduling, select an order in the order's diagram section and choose Order.
    9) Choose Item and write down the start and finish dates of the operation you selected.
    10) Choose Enter until the Planning Table: SAPSFCG001 Finite Scheduling Forw./All Functs.Active screen appears.
    11) Drag the order to a valid section in the work center's diagram section. Make sure that you move the order to a valid and defined start and finish date.
    13) Select the order in the work center's diagram section and choose Order.
    14) Choose Item and compare the new start and finish date.
    15) Choose Enter until the overview tree appears.
    Regards,
    srivas

  • APO SNP capacity levelling heuristic

    I am using APO V5 SNP.
    I have a question about SNP capacity levelling heuristic.
    As I understand it, the heuristic works on a resource by resource basis and will aim to capacity level across time buckets.
    But suppose I have a product which has two different sources of supply (PDS/PPM) using different resources X and Y.
    Suppose the capacity using resource X is overloaded for week n, but resource Y is not overloaded.
    Can the levelling heuristic be used to move capacity from resource X to resource Y for week n, or would this have to be done manually via changing the PDS/PPM?
    Thanks,
    Bob Austin, Atos Origin

    Bob,
    You can move the load from X to Y if Y is an alternative resource to X. This can be accomplished by going to the capacity levelling button and then in the options check the box for 'Consider Alternate Resources'. After that you can mention muliple alternate resources also to be considered.
    Hope this helps.
    Regards,
    Abhi

  • Capacity leveling procedure

    Hi pp friends,
    I have done all required settings and i can see periodrequirements in CM22 but don't know how to carryout lelling execution steps and how will it benefit in case of production order.
    If possible send screen shots.
    Thanks in advance

    Hi,
    Capacity levelling can be performed more easily from transaction CM21(graphical) rather than CM22(Tabular).
    CM21 displays planning table with 4 separate parts. upper left part gives details of work center, lower left part gives corresponding planned order./production orders(you can restrict in selection screen only production orders/planned orders). lower right part gives Orders pool and load will be shown in red colour. Upper right part gives any changes mode to capaciry requirements.
    Please go through Standard SAP documentation related to Capacity levelling for more details.
    http://help.sap.com/saphelp_47x200/helpdata/en/49/e6f3340cdb8c44e10000009b38f844/frameset.htm
    From this transaction you can see capacity Overlappings on each work centers clearly. By levelling the capacity of production orders from here will change the scheduling of the operations.
    Regards,
    Krishna Mohan

  • CM01/CM21 - Capacity Leveling Customization

    Those who are still using R/3 for capacity leveling...
    1. Have you had complaints from your users that these R/3 transaction aren't user-friendly at all?
    2. Have they requested these to be customized?
    3. Have you customized these transactions? To what extent?
    The feel, look and config of these capacity transactions is very prehistoric (even before 4.0b)... nothing much has changed... then APO came in... the more leftout these transactions has become... users have resorted back to spreadsheets.. not good!
    So folks who've been stuck in R/3 land and cannot stand these standard transactions, what have you done??? I'm interested to know what you did, what technologies (i.e. web dynpro) you've used and how your users embraced it.

    Bryan,
    I agree with you Cap. Levlling is not frinedly in R/3 or ECC.
    However we use Capacity levelling for our collective order scheduling as it helps schedule parent & child orders as needed by planner.
    For this I use cutomised profile ZSAPPSG001 copy of SAP standard SAPSFCG001 - SFC: View work center/capacity (2 graf.).The agreed capacity overall profile is then called in your prod. schduling profile tcode : OPKP.
    You can customize user required Capacity levelling Overall profile in tcode : OPD0
    From there you can select any subprofile that meets user needs or further customize subprofiles as needed.
    Selection profile     SAPSFCS009 SFC: View Center  -> Capacity (2 graf.) ( tcode : OPD1)
    Control profile       SAP___C002 Gen: Planning table  ( tcode : OPDE)
    Time profile          SAPSFCZ002 SFC: graph. medium-term (3 months) ( tcode : OPD2)
    Evaluation profile    SAP___A001 Gen: Standard evaluation profile ( tcode : OPD3)
    Strategy prof.        SAP___T001 Finite scheduling forw./all functs.activ ( tcode : OPDB)
    Period profile        SAP___P002 Gen: Daily period split ( tcode : OPD4)
    Planning tab.profile  ZSAPPSL001 SFC: only main caps. (2 graf.) ( tcode : OPG0)
    List profile          SAPSFCI001 SFC: Production planning ( tcode : OPDH)
    As you can see I just customised a few changes in my Planning tab.profile  based on user requirement.
    I am sure this gives you good insight to research this further & give your users some customised screen.
    thanks,
    Ram

  • CM21 capacity leveling settings

    Hi,
    In CM21, is it possible to setup different colors for released  orders and created orders.
    Thanks in advance.

    Dear,
    Some settings in Customizing have to made to change the colors of operations or order depending on the status. Create a new object representation that must be entered in a new object representation selection via a modified decision table. Execute the query of the system status or the user status at order header level in the decision table using field AFKO-OBJNR. Field KBED-OBSTA can be used at operation level. The changes result in a new representation profile.
    Proceed as follows:
          1. Analyzing the used profile
                a) Go to the IMG structure for capacity requirements planning. Call your profile of the capacity planning table and note the following settings.
              o Choose 'Capacity leveling -> Capacity planning table -> Define profile for capacity planning table'.
              o Display your profile and take note of the following:
              o GraphObjectSele (Diagram section):
              o Repr.profile (Diagram section):
              o Group (Graphics profile):
              o Name (Graphics profile):
                  An overview of the used settings is displayed when you press the 'Check' pushbutton where you can execute the further analysis easily.
                b) Finding the graphic object type in question
                Double-click on the 'Graph.object.select.' area and take the graphic object type in question from the decision table:
                or:
              o Choose 'Capacity leveling -> Technical settings -> Capacity planning table -> Define graphical object type selection'.
              o Select your graphical object type selection and choose 'Decision steps'.
              o Find out which graphical object type is affected by double-clicking on the relevant table line.
                c) Select the required graphical element type
                An overview of the available graphical element types is displayed when you do the following:
                In the overview, double-click on the area 'Group, Name' and there on the used graphical element group.
                or:
              o Choose 'Capacity leveling -> Technical settings -> Capacity planning table -> Graphics -> Define graphics profile'.
              o Mark the line with the corresponding group and name and choose 'Goto -> Details'.
              o Note the used graphical element group:
              o Choose 'Capacity leveling -> Technical settings -> Capacity planning table -> Graphics -> Define graphical element'.
              o Position the cursor on the used graphical element group.
              o Here you will find the available graphic element types.
          2. Create a new graphical object representation
                a) Create a new representation profile in the used graphical object type selection based on the used representation profile.
              o Choose 'Capacity leveling -> Technical settings -> Capacity planning table -> Define graphical object type selection'.
              o Select your 'GrapObjSele' and choose 'Representation profile - overview'.
              o Select your representation profile and choose 'Edit -> Copy as...'.
              o Enter a new name.
              o Press ENTER to confirm your entries.
              o Copy all dependent entries.
              o Press ENTER to confirm your entries.
              o Save your entries.
              o Stay in the overview of the representation profiles.
                b) Define a new object representation selection for the respective graphical object type based on the types used there.
              o Select the representation profile created by you and choose 'Representation profile'.
              o Note the object representation selection for the required graphical object type:
              o Now choose 'Capacity leveling -> Technical settings -> Capacity planning table -> Define graphical object'.
              o Select the required 'Gr.obj.'
              o Call 'Object representation' in the Navigation window.
              o Select the 'Object repr.' you have noted before and choose 'Edit -> Copy as...'.
              o Enter a new name.
              o Press ENTER to confirm your entries.
              o Copy all dependent entries.
              o Press ENTER to confirm your entries.
              o Save your entries.
                c) Define a new object representation based on the object representation to be changed in the required graphical object type.
              o Select 'Object representation' in the Navigation window.
              o Select the 'Object repr.' to be changed and choose 'Edit -> Copy as...'.
              o Enter a new name.
              o Press ENTER to confirm your entries.
              o Copy all dependent entries.
              o Press ENTER to confirm your entries.
              o Save your entries.
              o Select your newly created 'Object repr.' and choose 'Graphical element type'.
              o Select 'New entries' and enter the respective graphic element type (see 1. c).
              o Delete the graphic element type to be replaced.
              o Save your entries.
                d) Insert a query for the respective graphic object type in the newly created object representation selection in the decision table so that the new object representation is displayed by the conditions specified through the system status or user status.
              o Select 'Object representation' in the Navigation window.
              o Select the new object representation selection and choose 'Decision steps' in the Navigation window.
              o Insert a line for the query of the status at a suitable position in the sequence 'Decision status, Sequence'. To execute this at order header level, you must specify a status comparison for structure AFKO, field OBJNR for which the new object representation can then be entered. Use field KBED-OBSTA if you want to evaluate the status at operation level.
              o Save your entries.
                e) Enter the new object representation selection in the new representation profile.
              o Choose 'Capacity leveling -> Technical settings -> Capacity planning table -> Define graphical object type selection'.
              o Select your 'GraObjSele' and choose 'Representation profile - overview'.
              o Select the representation profile you have created and choose 'Representation profile'.
              o Replace the object representation selection by the newly created selection for the required graphical object type and save it.
                f) Replace the available representation profile by the newly created one in your profile for the capacity planning table.
    You can refer the OSS note 71014 for details.

  • Is capacity leveling is in ltp

    Is capacity leveling possible in the Long term planning i.e after simulative mrp run.
    Regards,
    Sunil Patil

    Hi Mr.Sunil Patil,
    Please check the help given by SAP.
    SAP allows this.
    http://help.sap.com/saphelp_470/helpdata/en/92/bf055544bd11d182b40000e829fbfe/frameset.htm
    Leveling Capacity in the Planned Order
    Prerequisites
    The planned order must be scheduled.
    Procedure
    Starting from the Long-term Planning node, choose Long-term planning ® Simulative planned order ® Change.
    The system displays the details screen for the planned order. From this screen, you can call up the capacity check, if necessary, by choosing Edit ® Capacity check. The system then checks available capacities. If no overload exists on the work centers in question, the system displays a message stating that no overload exists. If an overload does exist, the system branches to the capacity situation where you can make any necessary changes.
    To level capacities, choose Goto  Capacity leveling.
    The system displays the dialog box entitled, Settings for Capacity Planning if you have not yet defined any parameters for capacity planning.
    Select the appropriate planning type and the period type for capacity planning. If necessary, select a period of examination. Choose Continue.
    The system carries out scheduling using the parameters set in Customizing.
    If scheduling could not be carried out free of error, the system displays an overview of the scheduling errors based on the planned orders in question. From here, you can access the scheduling log to check the details on the scheduling errors. To do this, choose Log.
    5. Choose Continue. The system displays the evaluation of the capacity situation.
    Capacity leveling is also displayed with reference to a work center and a capacity category (for example, machine or person) and the unit of measure is displayed from the work center. Here, the following is valid: If a planning work center (routing header) is entered in the routing the system first displays this work center with the corresponding capacity category. Otherwise, the selection is random. The system also displays the following data:
    Order number, order quantity and order finish date
    Available capacity
    Total capacity requirements for the selected work center
    Capacity requirements for the material
    Capacity requirements of the selected planned order
    Capacity loads resulting from the selected planned order are specially indicated.
    Regards
    Mangal

  • Capacity levelling -automatic- SAP- PS

    Please tell us how system do the automatic levelling.
    I have created 2 similar activities.1 is starting today and 2nd after 3days. Ist is having 4 hours spare time and second is overloaded by 4hours.
    For this system should consider the spare time avilable in the workcenter for the particular day and should level it.
    Pls revert to us.
    Regards
    N.Raju

    Hi Raju,
    Automatic capacity levelling is not possible in SAP PS.
    There can be various reasons for this:
    1. The system might not be able to decide what other work center u want to select if there is an overload.
    2. The system might not be able to decide whether to change the dates in the activity or not.
    By the way, you can do it through some ABAP program.
    regards
    sunil kar

  • Resource scope when performing capacity leveling with Optimization method

    Hello,
    Can anyone tell me if, when performing the Optimization method in Capacity Leveling for transportation resources production resources are validated? I am currently testing this and I found out that if the capacity variant of the production resource is no 00, 01 or 02 the system will give an error message when trying to level a transportation resource, the message indicates that there is no available capacity for the production resource.
    When reading documentation in help.sap it appears to me that Capacity Leveling should only focus on the resource to be level not in other resources and in this case my transportation resource has available capacity that shouldn't be affected for master data errors of production resources...
    Could somebody help me clarify this issue?, I have already open a message and they suggested me to change the capacity variant of the production resource, evidently when I do this everything works but I still don't understand why capacity leveling, with Optimization method, of a transportation resources is checking on production resources.
    Thanks!
    Erika

    Hello Ian,
    I am not talking about the SNP Optimization Run that is certainly manipulated by the constraints that you update on the optimization profile; in this case "Capacity Leveling with Optimization Method" the constraints are automatically set by the system and what I need to know is if these constraints are considering not only the resource that is to be leveled (in this case the transportation resource) but also the production resource.
    Sorry but your answer does not correspond to my request, because you are talking about the Planning Optimization run and I am talking about  "Capacity Leveling with Optimization Method".
    Erika

  • How to change default compatibility level

    How can one change the default setting for Compatibility, under Password Security - Setting. Default in Acrobat 8 is "Acrobat 5.0 and later". I would like to change this to "Acrobat 7.0 and later".

    Hi,
    You cannot change the logging level which comes in console output.
    The log configuration you have modified using EM, will change the soa log configuration. You can access the SOA logs at $DOMAIN_HOME/servers/soa_server1/logs/soa_server1-diagnostics.log file. This is the file, SOA used to store its component logs.

  • Changing the Dunning level and reports for Dunning

    How can I change the 'Dunning level' for line items in the 'Dunning History/Dunning overview'? I have read in help.sap that I can change it, but am not able to find where I could do that.
    link: http://help.sap.com/erp2005_ehp_03/helpdata/EN/bc/2127c4265911d286d6006008bbc8e8/frameset.htm (In 3rd para).
    Can anyone tell me if there are any reports available to view the 'Dunning list'(other than Dunning History in F150).
    Also, Our client needs a report which shows a list of all 'customers' and 'line items' Blocked for Dunning.
    Please give me your suggestions ASAP.
    Thanks
    Edited by: sapfan 20062007 on May 3, 2008 10:39 PM

    Thanks .
    I'm looking at running the ALFS editor . I'm in WebAS 7.00 . The Themes/templates and brand colours on the left frame does appear but the bsp page does not appear . used the standard bsp page which appears as a default ( bsp add it05 ) . The error message is as follows
    The following error text was processed in the system:
    BSP Exception: Das Objekt entrypoint.htm_sap-themeRoot=/sap/public/bc/ur/design2002/themes/alfs1000101F5FFFA2F4F4F2929296F8FAF3F5F7F in der URL /sap/bc/bsp/sap/it05/entrypoint.htm&sap-themeRoot=%2fsap%2fpublic%2fbc%2fur%2fdesign2002%2fthemes%2falfs1000101F5FFFA2F4F4F2929296F8FAF3F5F7F ist nicht gültig.
    But if I run the bsp application manually then the right theme does get picked up . I made the entry in the bspthemeroot table and put in the alfs parameter in the above url ( 1000101F5FFFA2F4F4F2929296F8FAF3F5F7F  ) . The bsp application works fine but not the alfs editor . Any ideas ?

  • I need to change the input level and I can not open the track info pane in the new garageband. Can you help me?

    I have tried the help menu. It only shows how to open the track info pane in the old garageband. It shows the info button, which is not in garageband anymore. I need to open the track info pane to change the input level. If there is another way to do this please tell me.

    Open the "Smart Controls" for your track, and then press the Info button .
    The "record level" slider is at the top of the Info panel below the track heads.

Maybe you are looking for