WT6 PL10 - Synch not completing - Error during Order Synch

Hello everyone,
I have upgraded an environment to WT6 PL10 and the Synch never completes itself and I get the following error during an order synch:
-5002:Internal error (-5002) occurred
   at NetPoint.SynchSBO.SBOObjects.SBODocument.NP_2_SBO(Documents& document, NPOrder order)
   at NetPoint.SynchSBO.SBOObjects.SBOOrder.NetPointToSBO(NPQueueObject qData)
   at NetPoint.SynchSBO.SynchObjectBase.Synch()
Unfortunately the synch was not tested on any previous version of WT so I cannot be sure how to track it down unless I uninstall and go back to PL 8 which I know works.  What I mean by the Synch never completes is that the last line it shows is:
Completed SynchNotification.
And then it never finishes, never deletes the rows from the Transaction Queues on either side, and I have to close out of the Synch Manager to get it to run again.  If anyone else has had these problems, please let me know.
Thanks so much,
Kristen

Hi Kristen,
That one is tough.
How long have you allowed in to go before restarting?  If the queues are large, it might take a while.
I would try opening up a SQL trace and seeing what is going on.
Also, you might run sp_who2 in SQL to see if processes are getting locked.
Do you have a synchplugin on this?

Similar Messages

  • Factory calendor does not exist error during order creation

    Hi,
    I am getting the factory calendor does not exist error while creating the order. For this i will explain the details for this issue and guide me where is the problem.
    we are doing reconfiguration for the new plant in the client. In this client we are now creating new plant and doing the reconfiguration. While creating the order in new plant i am getting the below error message. i have assigned the existing factory calendor of the old plant to new plant in the existing client. i am thinking that factory calendor is not plant based. In work center i have assigned the factory calendor of old plant for the new plant work center. Please guide me.
    Regards,
    Mastan.

    Hi Dogboy,
    Thank You for immediate reply.
    Have you performed all PP configuration for 1007?
    It means i have created order type and order type parameters, availability check,scheduling, conformation steps for the ordre type.
    Master data,routing, bom creted in cewb with change number and assigned to routing in cewb.
    And factory calendor assigned in work center as old plant calendor only.
    Other tahn this nay steps need to consider for creation of order. anything i have missed. Please guide me.
    Have you assigned a factory calendar to plant 1007?
    Factory calendor is not plant specific. i think with in a client  i can assign same calendor to new plant also. anywhere i have not observed the calendor as plant wise. please guide me.
    Have you created a BOM for this material in 1007?
    Have you created a work center in 1007?   Does the work center have a factory calendar that actually exists?
    The above two steps i have done.
    Have you created a routing for this material in 1007, with operations in that only include work centers assigned to 1007, and assigned the routing to this material in 1007?
    Yes.
    Please guide me.
    Regards,
    Mastan.

  • I've been trying to purchase Texas holdem chips, but it comes up as.  Purchase not completed error!  Plz help me

    Need to purchase, but comes up as purchase not completed error.   Help me plz!!

    If you are also getting a message to contact iTunes Support then you can do so via this link and ask them why the message is appearing (these are user-to-user forums) : http://www.apple.com/support/itunes/contact/ - click on Contact iTunes Store Support on the right-hand side of the page, then Purchases, Billing & Redemption

  • Could not Complete Error with swatches

    Hi, I am running an action that Resets Swatches in PS6 and allows me to paint in Black or White. However everytime it gets to the Reset Swatches the action gived me a "could not complete" error. If I press OK it does reset the swatches.
    Likewise I have an axtion that Flips swatches, any action that has a reset swatches part fails.
    If I try to manually switch swatches I get the same error
    Any ideas what the problem could be please?

    Hi,
    What operating system are you using?
    Did you record the action in photoshop cs6 or is the action from an earlier version of photoshop?
    Have you applied the latest updates for photoshop cs6 by going to Help>Updates from within photoshop cs6?
    Have you tried resetting the photoshop cs6 preferences?
    http://forums.adobe.com/thread/375776?tstart=0

  • Prepayment functionalitygives an error during Order Entry

    Hi all,
    We have oracle applications Suite - 11i (11.5.10.2) .
    At time of prepayment during Order Entry form, we are getting following error.
    _"Function not available to this responsibility. Change responsibilities or contact your system administrator" ._
    Following is the Navigation Path :
    Sales Order Entry > Query with existing SO > Others TAB > Select ACTIONS button > Select PAYMENTS option .
    Thanks
    Sanjay

    Sanjay,
    This is because the Function that is invoked when you select the Payments Action from Sales Order Screen has not been granted to your responsibility. The best way is to check the ONT_SUPER_USER menu in application Developer (this is the menu that is used by order Management super user), and see what all functions are there (manily the ones without prompts like 'Sales Orders: Print Payment Receipt'). ANd then compare the same with the menu that your responsibility is using (System Adminsitrator >> Security >> Responsibilities). I think you should get your answer. Please let me know.

  • Checkpoint not complete error

    hi,
    i am having oracle 11gR1 in windows 2003 server. i got the below mentioned error very frequently. I was having 4 redolog groups with 2 member each. After surfing in internet and discussion i have added 4 new groups of redo log with 2 member each. After adding i dint get the below error till now.
    Thread 1 cannot allocate new log, sequence 11813
    Checkpoint not complete
    Current log# 1 seq# 11812 mem# 0: D:\APP\ADMINISTRATOR\ORADATA\ORCL\REDO01.LOG
    Thread 1 advanced to log sequence 11813
    Current log# 2 seq# 11813 mem# 0: D:\APP\ADMINISTRATOR\ORADATA\ORCL\REDO02.LOG
    Thread 1 cannot allocate new log, sequence 11814
    Is that the perfect solution??????????????????????????????
    i am also a bit confused on why this error is occuring can any one explain me?????
    Is there any other solution for this error?????
    Thanks in advance

    Hi,
    You need to find a proper balance between the number of redo log groups, the redo size and eventually the speed of the storage used to store the redo log files.
    By adding more redo log groups, you actually "delay" the moment when the redo log group will need to be re-used (goes round-robin).
    At the same time, increasing the size of your redo logs will also increase the "loop back" time, but too large redo logs can / will increase recovery in case of instance crash.
    Increasing the number of ARCn processes may also help.
    Is that the perfect solution??????????????????????????????If you find one, let it be known!!
    But you can of course find a proper balance. Some tests based on knowledge you can gain from documentation is a "perfect" start.
    i am also a bit confused on why this error is occuring can any one explain me?????SB's post was more than clear enough
    HTH,
    Thierry

  • Checkpoint not complete error in alert log

    version : 10.2.0.5 , 11.2.0.2
    This is what I found about "Checkpoint not complete" from google
    "+This message indicates that Oracle wants to reuse a redo log file, but the current checkpoint position is still in that log. In this case, Oracle must+
    +wait until the checkpoint position passes that log. Because the incremental checkpoint target never lags the current log tail by more than 90%+
    +of the smallest log file size, this situation may be encountered if DBWR writes too slowly, or if a log switch happens before the log is completely full,+
    +or if log file sizes are too small.+ "
    Question1.
    What do they mean by Oracle reusing a redo log file ? When one ORL is full , oracle will switch to the next one ; it won't reuse it. Right ?
    Question2.
    "the current checkpoint position is still in that log" . What is checkpoint position ?
    Question3. How often does a checkpoint occur ? (frequency as per time)

    Question1.
    What do they mean by Oracle reusing a redo log file ? When one ORL is full , oracle will switch to the next one ; it won't reuse it. Right ?You have some groups of redo log, each redo log has members with same information. Redo log run in a circular way, when a group is full, changes to the next group of redo log and when the last group is written continue overwritten the first group.
    http://docs.oracle.com/cd/B28359_01/server.111/b28310/onlineredo001.htm
    Question2.
    "the current checkpoint position is still in that log" . What is checkpoint position ?copy and paste from:
    http://docs.oracle.com/cd/E14072_01/server.112/e10713/startup.htm#BABGDACG
    "A data structure that indicates the checkpoint position, which is the SCN in the redo stream where instance recovery must begin"
    Question3. How often does a checkpoint occur ? (frequency as per time)Checkpoints occur in diferents situations, not per time, please check:
    http://docs.oracle.com/cd/E11882_01/server.112/e16508/startup.htm#CNCPT89045

  • "NamingContextFactory class not found" error during deployment

    Hi all!
    I have a legacy app I need to migrate from JBoss 3.2.7 to 5.1.0 GA.
    I have found 13 problems so far and I resolved 12 of them.
    The problem I have now is:
    Jboss shows this error during startup:
    INFO  [Http11Protocol] Starting Coyote HTTP/1.1 on http-127.0.0.1-8080
    WARNING [collectionmgt] Error creating/registering StarcoreRootNode.
    javax.naming.NoInitialContextException: Cannot instantiate class: org.jnp.interfaces.NamingContextFa
    ctory [Root exception is java.lang.ClassNotFoundException: org.jnp.interfaces.NamingContextFactory]
            at javax.naming.spi.NamingManager.getInitialContext(NamingManager.java:657)
            at javax.naming.InitialContext.getDefaultInitCtx(InitialContext.java:247)
            at javax.naming.InitialContext.init(InitialContext.java:223)
            at javax.naming.InitialContext.<init>(InitialContext.java:175)
            at com.starview.dm.collectionmgt.StarcoreRootNode.<init>(StarcoreRootNode.java:50)
            at sun.reflect.NativeConstructorAccessorImpl.newInstance0(Native Method)
            at sun.reflect.NativeConstructorAccessorImpl.newInstance(NativeConstructorAccessorImpl.java:
    39)
            at sun.reflect.DelegatingConstructorAccessorImpl.newInstance(DelegatingConstructorAccessorIm
    pl.java:27
            at java.lang.reflect.Constructor.newInstance(Constructor.java:494)
            at com.starview.support.startup.Startup.instantiateClasses(Startup.java:516)
            at com.starview.support.startup.Startup.loadStartupClasses(Startup.java:310)
            at com.starview.support.startup.Startup.access$200(Startup.java:50)
            at com.starview.support.startup.Startup$1.run(Startup.java:130)
    Caused by: java.lang.ClassNotFoundException: org.jnp.interfaces.NamingContextFactory
            at java.net.URLClassLoader$1.run(URLClassLoader.java:200)
            at java.security.AccessController.doPrivileged(Native Method)
            at java.net.URLClassLoader.findClass(URLClassLoader.java:188)
            at java.lang.ClassLoader.loadClass(ClassLoader.java:306)
            at java.lang.ClassLoader.loadClass(ClassLoader.java:251)
            at java.lang.ClassLoader.loadClassInternal(ClassLoader.java:319)
            at java.lang.Class.forName0(Native Method)
            at java.lang.Class.forName(Class.java:242)
            at com.sun.naming.internal.VersionHelper12.loadClass(VersionHelper12.java:42)
            at javax.naming.spi.NamingManager.getInitialContext(NamingManager.java:654)
            ... 12 more     I see jnpserver.jar is present in common\lib\ folder, so don't really understand why this file can't be found. I also tried to copy jnpserver.jar , jbossall-client.jar and even jnp-client.jar to my_server\lib folder, but it didn't help.
    I'm using Windows XP SP3, Sun JDK 1.5.0_18, JBoss AS 5.1.0 GA.
    Which other info should I provide so it would be easier to help me? the startup script we use? jboss config files? jboss or app lib folder contents?

    Thanks everyone for your input.
    I added the sshfactory.jar file in the JavaTask folder and it worked.
    Thanks again.
    Khanh

  • Class Not Found Error during provisioning

    Hello,
    I am running on jboss-4.0.3-SP1, OIM 9.0.3 latest patch. I am new to this implementation and just rebuilt the dev environment. I am checking the provisioning of the resources and ran into a class not found error.
    The error says:
    2011-10-19 10:23:17,111 DEBUG [XELLERATE.ADAPTERS] Class/Method: tcADPClassLoader/findClass entered.
    2011-10-19 10:23:17,111 DEBUG [XELLERATE.ADAPTERS] Class/Method: tcADPClassLoader:findClass - Data: loading class - Value: com.jscape.inet.ssh.SshException
    2011-10-19 10:23:17,112 ERROR [XELLERATE.SERVER] Error encountered in save of Data Object com.thortech.xl.dataobj.tcScheduleItem
    2011-10-19 10:23:17,112 ERROR [XELLERATE.SERVER] Class/Method: tcDataObj/save encounter some problems: com/jscape/inet/ssh/SshException
    java.lang.*NoClassDefFoundError*: com/jscape/inet/ssh/SshException
    at java.lang.Class.forName0(Native Method)
    at java.lang.Class.forName(Class.java:164)
    at com.thortech.xl.adapterGlue.ScheduleItemEvents.adpFAPROVISIONING.implementation(*adpFAPROVISIONING.java:92*)
    at com.thortech.xl.client.events.tcBaseEvent.run(Unknown Source)
    at com.thortech.xl.dataobj.tcDataObj.runEvent(Unknown Source)
    at com.thortech.xl.dataobj.tcScheduleItem.runMilestoneEvent(Unknown Source)
    xxxxxxxxxxxxx
    When I looked at the process task named "FA Provisioning", line 92, I see this reference:
    90:
    91: //Initialize persistant object "INIT"
    92: clsINIT = Class.forName("*com.cpsg_inc.oim.unix.SSHCommandExecutor*");
    93: maoConstructorArgs = new Object[]{};
    94: masConParamTypes = new Class[]{};
    95: moCons = clsINIT.getConstructor(masConParamTypes);
    96: INITconsObj = moCons.newInstance(maoConstructorArgs);
    xxxxxxxxxxx
    When I open the adapter task named iNIT Connection (this is the first task in the FA Provisioning process task Adapter), API Source: JavaTaskJar:cpsgUnix.jar
    Application API: com.cpsg_inc.oim.unix.SSHCommandExecutor
    Constructors: 0 public com.cpsg_inc.oim.unix.SSHCommandExecutor()
    Methods: 9 public void com.thortech.xl.integration.tenetssh.helper.SSHPrvosioning.SSHInit(...)
    xxxxxxxxxxxx
    Then I made sure the jar file named cpsgUnix.jar is present in the OIM_HOME/JavaTasks directory.
    But still I have the error.
    What am I missing?
    thanks
    Khanh

    Thanks everyone for your input.
    I added the sshfactory.jar file in the JavaTask folder and it worked.
    Thanks again.
    Khanh

  • Publisher not specified error during autorun from cd

    Hello,
    I am trying get rid of the publisher not specified when launching ADOBE PDF Doc from a CD.  Can you please tell me how to get this option removed? 
    The autorun.inf is as follows
    [AutoRun]
    Open=c:\Program Files (x86)\Adobe\Reader 10.0\Acrord32.exe
    shellexecute="Blah.pdf"
    icon=SC_Reader.ico
    label=blah blah..

    I guess I had to try something here. 
    Apparently when you use the autorun.inf you have to call the actual Adobe Acrobat reader program instead of the PDF File itself.  Now I am no longer getting the "Publisher Not Specified" error message but when I click on the Adobe program to run I am now getting "adobe reader core dll failed to load".
    How can I call the Adobe Acrobat program from the source location on the hard drive.  If you load the pdf file on the same CD you get the "publisher not specified" error.  Now I am trying to figure out how to call any of the installed versions of Adobe Reader.  I am currently running Adobe Reader X but some customers might have Version 8 or 9.  Does anyone know how to call any version of Adobe Reader from the autorun.inf file? 
    I called Adobe Support but they didn't answer my question. So maybe they know how to fix a pretty standard error based on the Google Searches. 
    Thanks,
    Calvin Grier, Jr.

  • Sales order stock does not exist error during PGI

    dear sir,
    we have two plants 1010 and 1020,we are using variant configuration for our finished goods
    we want to make the sales orders in 1010 plant and we manufacture the machine in 1020 plant.
    so we want to dispatch machine from 1020 plant (shipping point),eventhough we make sale order in 1010 plant.
    but while doing PGI ,system shows one error message "Sales order stock does not exist" message 184,area M7.
    if we see in MMBE stock of finished good is available in 1020(made 412 E movement)
    how to resolve this
    thanks and regards
    srinivas pai

    There can be two reasons for these kind of error
    - Your sales doc while creating this order & your item category is marked with special stock indicator as E and after this order is created you have not reserved stocks in your plant against this order. This reservation can be done in tcode MB1B movement type 412 E.
    - Let say, if it is reserved then check the same in tcode MMBE stocks reserved for your sales order.
    Otherwise reservation you may have done properly with correct movement types with special stock indicator E. But while creating the your sales order with item category may not have been marked with special stock indicator E. In this case even though the system has stocks reserved for that order and that order when comes for PGI system doesn't sense.
    In either of the case, you have to again do the process.
    Hope it can assist you.
    Thanks & Regards
    JP

  • Error during Full Synch Batch Risk Analysis - RAR

    Hi All,
    We are implementation SAP GRC AC 5.3 - SP 9 - RAR
    Currently we have uploaded the text objects and permission objects and performed full sych for User, Roles & Profile with the backend system and it was successful
    Then we have uploaded all the RAR Standard text files for SoD Rules and scheduled a Full Sych for Batch Risk Analysis as a post installation activity. But we got an error as below after 85% of completion and the background job failed.
    WARNING: Error: while executing BatchRiskAnalysis for JobId=12 and object(s):T-RD470878: Skipping error to continue with next object: Batch rolled back. Caused by java.sql.BatchUpdateException: ORA-01653: unable to extend table SAPSR3DB.VIRSA_CC_PRMVL by 8192 in tablespace PSAPSR3DB
    Can somebody please help us in resolving the above error message. Is it something to do with the table space availablity ?
    What are the consequences if we have not scheduled the Full Synch Batch Risk Analysis and start using the tool.We have to add some custom t-codes to the Standard rule set thereby tailoring it to the business requirement.
    Thanks and Best Regards,
    Srihari.K

    Sri,
       As Gangadhar mentioned this is a tablespace issue. You need to make sure to have enough space while running full sync risk analysis job. Please extend your database space and run the risk analysis job again.
    Regards,
    Alpesh

  • Balancing field "Profit Center" in line item not filled - Error during GR

    Hi
    When we tried to do MIGO for a non stock material (Account assignment category K), we are getting an error message that "Balancing field "Profit Center" in line item 001 not filled".  The interesting factor is that we did the GR for similar kind of PO a week before. This PO is exact replica of the old one but wondering why we are getting this error now.
    Please help me in resolving this issue as well as please let me know why it did worked in the earlier time and not now.
    Thanks
    Venkat.

    Hi
    Pleaes note that it is not allowing me to enter the profit center, neither in PO nor in GR.
    I created two different POs.
    a. Both are for non stock material  with account assignment category 'K'
    b. Material group for both the POs are same.
    c. GL Account i entered in both the POs are same.
    d. CO area entered in both the POs are same.
    e. Ogranizational details of both the POs are same.
    f. Ofcourse 'Ordering Unit' is different in both the POs.
    When i tried to make a GR for the first PO, it is automatically proposing the profit center and i can post the GR. But when i tried the second PO, it is nether defaulting the profit center nor asking for profit center. It is giving an error message "Balancing field Profit Center in the line item 001 not filled.
    We have not changed the profit center or any configirutaions and when we tried to do the GR simultaniously for both the POs, one get posted correctly and the other one is giving this error message.
    Can any one of you please let me know what should be the reason ?
    Thanks
    Venkat.

  • Download does not start, error with order

    i've been trying to dowload lightroom 4 for more than a week. the download does not start and when i try to buy the program i get a "error with your order message" any idea what i should try next??

    MichaelAShea which web browser are you using?  Please try a different web browser.  If you continue to face difficulties then I would recommend installing via the Creative Cloud Desktop application.  You can find more details at Install and update apps - https://helpx.adobe.com/creative-cloud/help/install-apps.html.

  • Installation not completed - error at step# 10

    I was not able to get past step #10 to establish a passcode because it came up with an "error in configuration" and would not let me proceed.  Yet, even though I just had to exit without completing installation, now all of my family is able to connect wirelessly with our laptops and all seems fine, but did I miss any important steps after #10 that will cause problems in use later?  This router is installed in a vacation rental a long distance from our home so I want to make sure it is correct before we leave.
    Product #WRT54G version#8
    Cayman

    hi...  
    actually sometimes it does happen.....
    but to make sure that the router has properly connected get in to the interface go to the status and check if yOu can get an IPaddress and DNS from there...

Maybe you are looking for

  • IDVD ejects disk before burn is complete

    I am attempting to burn a large combined video and data DVD project (6.8 GB), and encountering a problem in which iDVD ejects the disk from the drive just BEFORE the burn reaches completion. The progress bar just sits there at 100% saying that its la

  • How can you tell what week you have and if it's refurbished?

    Hello. I just did a phone swap and it was a white box. I'm wondering if there's any way to tell if it's a refurb? The genius said it's new, but I'm just curious. Also, I've heard that the first 5 digits are the week? Like mine is 82832 - that means f

  • Hi, I am bringing my verizon iPad air to Brazil later this month and would like to access cellular data. How do I do that? Thanks in advance.

    Hi I am bringing my verizon iPad air to Brazil later this month and would like to access cellular data. How do I do that? I understand there is something about swapping or disabling sim cards, but I am a little unclear and verizon was no help. Thanks

  • Photosmart 7520 Cartridge Problem

    Hello.I am having trouble installing replacement cartridges for the Photosmart 7520.  I place them in, locking them in place as I should and keep getting the error "One or more cartridges appear to be missing or damaged".  They are HP cartriges so th

  • Alerts or Exceptions from BPM

    I have BPM where there are multiple send steps ( Files ) and Sych Sends as well. I would like to send alert if Send step fails. We donot have CCMS. I would still be able to send alerts to list of Users I guess. How can I achive this. BPM steps: Start