Z logical component not visible in project administration

Hi All,
I have created new product in SMSY named ZLegacy and assigned logical component.
But when I try to assign this logical component to my project, I dont see the Zproduct. Is there any table which I need to change manually ?
BR,
Shyam

This forum is for the Flex SDK. The Flash Builder (formerly Flex Builder) IDE has its own dedicated forum. Questions specific to the IDE should be directed there.

Similar Messages

  • The date update from TFS online are not visible on Project pro

    Hi everyone,
    I updated the start date and the finish date from TFS online, i saved and refresh the page. Then On the Project pro i clicked on refresh.  The update are not visible on project pro.
    I don't no why because when i change the title of the task from TFS online. the update is visble on Project pro.
    Someone to help me??
    Thanks for advance.
    rexcs

    Hi rexcs,
    Since this thread is more related to Visual Studio Online, I will move it to the right forum for a better response. Thanks for your understanding.
    Best regards,
    We are trying to better understand customer views on social support experience, so your participation in this interview project would be greatly appreciated if you have time. Thanks for helping make community forums a great place.
    Click
    HERE to participate the survey.

  • SQL Server 2012 PowerPivot System Service not visible in Central Administration

    Hi all,
    I want to test PowerPivot 2012 on the following configuration:
    - Windows Server 2008 R2 
    - Sharepoint 2010 - Enterprise edition
    - SQL Server 2008 R2 
    - PowerPivot for Sharepoint<o:p></o:p>
    As such, I downloaded SQL Server 2012 Evaluation and tried to upgrade SQL Server 2008 PowerPivot for Sharepoint instance to SQL Server 2012 PowerPivot
    for Sharepoint. It didn't work as it's not possible to upgrade from Enterprise to Evaluation edition without a pid.
    Next, I uninstalled the existing SQL Server 2008 PowerPivot for Sharepoint and I installed the SQL Server 2012 PowerPivot for Sharepoint. 
    I started to configure PowerPivot in Central administration (http://msdn.microsoft.com/en-us/library/ee210609.aspx) , but I got stuck at the 2nd step Create and Configure a PowerPivot
    Service Application (http://msdn.microsoft.com/en-us/library/ee210685.aspx) in Central Administration.
    The problem is that both SQL Integration Service  and SQL Server PowerPivot System service are not visible in Central administration > Manage
    services on server; however they are visible and running in Windows Administrative Tools > Services.
    Do you think the services are missing in Sharepoint Central Administration because the Sharepoint configuration database is on SQL Server 2008, while the Powerpivot instance is on SQL Server 2012 ?

    Thank you for the suggestion.
    Meanwhile I have managed to solve the problem. What I've done:
    - remove PowerPivot configuration using the Power Configuration Tool
    - uninstall PowerPivot
    - reinstall PowerPivot
    - run PowerPivot Configuration Tool - I still got the parent service error
    - remove PowerPivot configuration using the Power Configuration Tool
    - run PowerPivot Configuration Tool - this time I received another error regarding the user that runs SQL Server Integration services
    - check  Sql Server Analysis Service account in Central Administration > Security > Service accountsManage service account - it seems that it was running under Local System account, although in Administrative Tools > Services it appeared to
    be run by my domain account
    - set a domain account for Sql Server Analysis Service in Central Administration
    - run the PowerPivot Configuration Tool - this time it went smoothly.
    The following url provides very useful info related to this type of issue: http://whitepages.unlimitedviz.com/2012/09/troubleshooting-and-removing-a-failed-installation-or-upgrade-of-powerpivot-for-sharepoint/

  • MSPS 2013 - related a document to the project tasks - Icon is not visible in project schedule

    When adding a document (related Items) to the project tasks in a project schedule at the task does not see the icon of the document.
    Although the icon issue or risk when binding is visible.
    And the icon is also seen in the "Projects Center"
    Also related items are not visible in the "Tasks" (http://server/PWA/Tasks.aspx) from the user.
    Attachments
    View, add or edit related information such as documents, issues, or risks.
    Issues
    Title
    Due Date
    Status
    Risks
    Title
    Due Date
    Status
    Documents
    Title
    File Name
    Status
    Maybe someone know why it don't works?

    Anyone can reproduce this steps on Project Server 2013:
    * Upload document to project site document library
    * Open project plan for editing in pwa, add to any task related item – uploaded in previous step document
    * Save and publish project
    Than check in project schedule and project center – icon associated document to task and project.

  • Integration Scenario - Component not visible

    Hi all,
    I have two s/w components - say main component and sender component. Both belong to the same product version.
    I have created an integration scenario in the main component and I want to create a swim lane corresponding to 'actions' that are already created in the sender component.
    So, when I choose "Insert application component" in the scenario's swim lane area, and select the product version, it does NOT show the sender component !
    Hence I am unable to include the actions of sender component in the integration scenario.
    I have also checked from SLD that there are few more components (like the sender component) that are assigned to the same product version, but still not visible while creating a swim lane, as mentioned above.
    I have tried the option of clearing SLD data cache, but it didn't help.
    What can be done about this ?
    Regards,

    Hi,
    did you make those software components dependet?
    just like in my weblog?:
    /people/michal.krawczyk2/blog/2005/08/26/xi-are-you-independentfrom-your-dependencies
    Regards,
    michal
    <a href="/people/michal.krawczyk2/blog/2005/06/28/xipi-faq-frequently-asked-questions"><b>XI / PI FAQ - Frequently Asked Questions</b></a>

  • ESS Content not visible in Content Administration

    I've installed SAP Netweaver 2004s Java + Portal 7.00 SP7.
    I also deployed ESS, MSS and PCUI_GP. The content of ESS is not visible when I look in de content administration. I'd expected it under "Portal Content --> Content provided by SAP --> End user content".
    Noting strange hapened during deployment. I'm using user Administrator (UME = Java database).
    Any sugestions?

    Hi wilbert
    Import the Portal content Buisness Package for ESS/MSS
    if u r working with ERP2004 download it from following link.
    ESS:-
    https://smpdl.sap-ag.de/~swdc/002007974700000167412004D/BPERP4ESS0_0-10003146.zip?_ACTION=DL_DIRECT
    MSS:-
    https://smpdl.sap-ag.de/~swdc/002007974700000246072005D/BP_ERP4MSS0_2-10002991.zip?_ACTION=DL_DIRECT
    unzip the zip file import it into portal.
    regards,
    kaushal

  • Folder Structure Not Visible under Content Administration

    Hi all,
    We have EP 6.0 SP13.The Folder structure(Both Business objects and Portal Content) under Content Administration and Folder structure under System Administration is not visible.I have logged in as Administrator and the roles assigned were:
    com.sap.pct.crm.crm_default_services
    Administrator
    ContentManager
    eu_role
    super_admin_role
    When i'm trying to access the portal content,<b>Loading...</b>is dispalyed in Content Area for a while and a message <b>'error occured'</b> is displayed in the status bar instead of <b>'Done'</b>.
    I'm also having a problem in Detailed Navigation.Nothing is visible under Detailed Navigation.
    Any Inputs on the above issues would be of great Help.
    Thanks and regards,
    Vijaya Sai.V

    Hi,
    There could be only 2 problems when PCD objects are not being shown.
    1) You don't have the permission to view it. But since you are an administrator, you don't have to worry about it.
    2) The browser is unable to show the PCD objects.
    Now lets look at the solution:
    I had faced the same issues where when I tried to access the portal using IP address, PCD objects will not show. So the solution is to access the portal through its "name" rather than the IP address.
    I guess you would have tried to access the portal by its name, then you had faced an error in browser and so you are trying to access the portal by IP address.
    if this is true, make an entry in the hosts file in your local machine, mapping the IP address to the domain name.
    If you dont know how to do it, please follow the following:
    Goto the following folder in windows
    C:\WINDOWS\system32\drivers\etc\
    You will find a file named hosts. Open it in notepad and give the IP address & domain name of the portal in the format specified there. Save the file. Now if you access the portal using its domain name, you should be able to see the PCD. If you are still not getting it, restart the machine and try once more. It should work.
    If you are using a Linux system, the file can be found under the \etc under the root folder.
    Regards,
    Vijai.
    Message was edited by:
            Vijai Mohan

  • Custom field not visible for Project task in PPM 5.0

    Hi,
    I have done the SPRO configuration required to add a custom field in Project task
    1. Enhance DB table. added  the field in structure DPR_TS_TASK_EXTENDED_ATTR, object type TTO
    2. Define field groups for custom fields
    3. Set up field control.
    The custom field tab has come after making SPRO changes. But the field is not visible on the tab.
    Please let me know if I am missing any steps.
    Thanks,
    Yomesh

    Dear Yomesh;
    You have to config the view or subview at:
    SAP Portfolio and Project Management -> Portfolio Management -> Global Customizing -> Global Field Settings -> Assign Fields to Views/Subviews
    Here try to to setup the view that you want to see the custom field.
    Hope you help you.
    Regards.
    Mariano

  • Development Component not visible in dev config, but visible in DTR,CBS

    Hi,
    we have recently migrated our production track from netweaver 2004 to 2004s. In the Dev Config perspective I am unable to see a DC, but I am able to see the same from the DTR perspective. I am also able to see this DC in CBS.
    I am unable to create a project or work on this DC because of this problem.
    Has anyone else faced the same problem ? What can be done to make the DC visible in the Dev Config ?
    Thanks in advance for your help.
    Warm regards,
    Rashmi

    Hi Dao,
    Thanks again for your reply.
    Here are the findings :
    1)The DC is not available in both the active and inactive tabs in the Dev config perspetive.
    2) I have only NWDS 7.0 on my machine, but Admin has the older version 6.4 and it was not visible on their machine.
    3) I tried Re-Synching the archives, but still no luck, the DC is still invisible.
    4)The DC was last modified during the creation of the new track, the activities making changes to the DC before that are mostly UI changes, no deletes etc.. which could cause the DC to not be visible.
    5) It is a WD DC.
    6) The DC exists in Cons/Dev (both active/inactive) DTR workspaces as well as CBS build spaces (on both versions of the track)
    7)There are no pending activities for this DC in the old track.
    8)There were couple of broken DCs on the new track but this is mainly because of compile time errors due to use of deprecated methods.
    While checking for all these items I noticed that the .dcref file for the DC is missing in the DTR for both active and inactive, could this mean anything ? Is this the reason for the DC not being visible in the Dev Config perspective ?
    Is there any way to recover the DC ?
    Thanks in advance for your help.
    Warm regards,
    Rashmi

  • Development Component not visible in the Consolidation Compartment in CBS

    Hi Experts,
    We have created a new development component on the track for which we
    have created an DTR activity. After we checked in, activated & released
    the activity successfully, we went to the consolidation tab in CMS and
    imported the activity. We could successfully imported the activity into
    consolidation system and got the message import finished. But when I checked
    in the Consolidation compartment, I could not found out my newly
    created Development component. I feel that the activities are not going there.
    I also tried restarting the NWDI server but still no luck.
    Kindly assist as without solving this issue we cannot assemble our
    components and cannot move them to Quality environment.
    Also, kindly assist how can we transport the entire SCA (where we have done the custom development) from development
    to Consolidation for the same state?
    Currently, we have lesser number of DCs in the SCA of my cons environment than my dev environment, so how can I exactly have the same state of custom developed SCA in my cons environment?
    Is there any provision of system restore so that we can overcome the above issue or any other means by which we can move the entire SCA from my dev environment to cons environment.
    Please suggest as this is affecting our go live activities.
    Thanks & Regards,
    Anurag

    Hi,
    when you have imported into cons and it said finished succesfully, then clicking on the button "Details..." can you confirm that all the 3 phases were succesful (dtr import, cbs make and deployment) ?
    Do you have any pending activations? You can check it in the CBS webui -- page "Activities".
    Can you see any requests in the TCS deployer as described by Pramod ? (you need to look for numbers in square brackets [ ]. If there are any it means that those requests are still being deployed. If this is the case and the requests are not disappearing from the TCS Deployer, then doublecheck if the RTS settings for CONS are ok. Here a hint for that: http://wiki.sdn.sap.com/wiki/display/TechTSG/%28NWDI%29%28CMS%29Q0002).
    Eventually if all this is fine, can you please trigger an Initialize Compartment (you do this in CBS webui -- select your CONS compartment).
    I hope this helps.
    Thanks and Regards,
    Ervin

  • DMS Tab it's not visible in Project Management (PPM 5.0)

    Hello Gurus;
    I have been active the SAP DMS option in:
    SPRO --> SAP Portfolio and Project Management --> Project Management --> Structure --> Define Project Types
    And configured the document settings:
    SPRO --> SAP Portfolio and Project Management --> Project Management --> Documents -->
    Create Status Profile for Documents
    Define Object Links for Documents in DMS
    Define Object Links for Project Status Reports in DMS
    But it isn't visible the DMS tab.
    Has anyone fixed this issue?
    Best regards,
    Mariano

    Hi Mariano,
    DMS Status Reports tab appears at the level of Structure tab. And SAP DMS is at the level of Basic Data under Structure tab.
    Check the application configuration CPROJECTS_FPM under the package DEVELOPMENT_PROJECTS_UI_WD in SE80.
    After launching the configurator, check if all the tabs are there for the CPROJECTS_FPM.
    Regards
    Amit

  • Deliverable Created in contract not visible in project management

    Hi All,
    We are using the deliverable tracking system of oracle project contract for creation of requisition of project related items.But those deliverable can not be seen in Project management screen. Is there any way to see these deliverables in project management?
    Thanks In Advance
    Saptarshi

    Hi
    By Oracle design there is no link between OKE Deliverables and the Project Management Deliverables.
    Those are managed on separate tables.
    You may consider customizing the system using API to create a PJT deliverable from an OKE deliverable, maintaining a DFF attribute to see the link between the two entities. My idea is to have something similar to Oracle's solution that creates an event in Projects Billing from a billing event that user creates in OKE.
    Dina

  • Logical component cannot be used in project

    HI
    after i add logical component in solar_project_admin
    i try to check system landscape
    and i get error "Logical component SAP_ERP_EHP_ABAP_EHP4 is not used in project (the name of the project)"
    i used in 2 different logical component in this project
    you now whay?
    best regards
    Naor

    I am receiving this message right now, while conducting prototype testing.
    Message no. SOLAR_SPROJECT055 - Logical component Z_CHARM_PT is not used in project CHARM_PT01
    I used this logical component in a previous solman project and it worked. Now I have closed that project and am trying to create a new one using the same logical component.
    Any help or suggestions are appreciated. Thanks.

  • How To create a maintenance project - logical component missing?

    Hi experts,
    we plan to activate ChaRM in our Landscape.
    We don't have created a maintenance project in solution_manager cause there is a logical component missing.
    I followed the instructions of the tutorial on  https://websmp206.sap-ag.de/~sapidb/011000358700006932702005E.sim (Creation of a maintenance project).
    I recognized there is the logical component "ZCHANGE REQUEST MANAGEMENT" missing.
    This seems to be a modified origin SAP Component.
    Does anyone know where to find these component?
    Maybe with informations what has to be changed for the Z*copy or is this only a 1:1 copy?
    Does anyone have a detailed document for configuring ChaRM on SolMan 7.0 (Mailadress is visible on my business card)
    thanks in advance
    kind regards
    Thomas
    Helpful answers/documents will be rewarded, surely!

    You need to set up your solution and therefor define a logical component in SMSY. For instance the logical component might consist of your ERP E, Q and P systems.
    This logical component is added to an SMI Project. It basically tells the SMI project which systems are involved in the process. After that you will have to create an IMG project, CTS project, release the SMI project to the Change Request Management and generate Maintenance Cycle and Task List (this is all being done in SOLAR_PROJECT_ADMIN).
    /cheers

  • ChARM - Additional logical component does not show up in tasklist

    Hi,
    the Area is Change Control Management in SolMan with EhP1
    Situation:
    - SOLMAN_SETUP and configuration for ChARM (number ranges etc.)
    - two transport routes: A and B with DEV, QAS, PPRD, PRD
    - all systems are maintained in SMSY (PPRD, PRD are virtual)
    - two logical components: logA, logB
    - one project in SOLAR_PROJECT_ADMIN
    -- system landscape - systems are maintained
    -- img projects are created
    -> Change Request -> Show tasklist
    ONLY Systems from logA are available. Creation of transport requests for logA are fine.
    Through different errors and changes logB was changed after creating tasklist for logA.
    Has anyone an idea why the systems from logB are not in the tasklist?

    senthilprakash selvaraj wrote:
    > To be very specific,
    >
    > Login to SAP CRM system.
    > Goto:  SYSTEM-->status
    >
    > In there under SAP SYSTEM DATA group, you will be able to see a "Magnifying Lens" icon just below Component Version field --> click it
    >
    > there you will be able to see the exact version&level of the component.
    Yes, that's where I copied that line
    SAP_ABA 702 0009 SAPKA70209 Cross-Application Component
    from.
    senthilprakash selvaraj wrote:
    > Now ask your basis team to deploy the same version&level in SAP PI as its shown in the CRM system.
    Ah, the PI/XI content could be missing, even if this shows up in the list of products and software component versions in the SLD?
    I have just checked in the ESR, that seems to be the problem, thanks.
    senthilprakash selvaraj wrote:
    > Note: Thou the release version might be same, the level of the component deployed in both the system might be different. hence the problem.
    You mean if the service pack is different? I doubt that this would result in the SWCV not showing up in sproxy.
    Monika.

Maybe you are looking for

  • PSE 13 responds slowly

    Recently downloaded PSE 13. With even the most simple of tasks, I have the little circle that goes round and round showing it is "thinking". Is this normal? Should I uninstall and reinstall? Any help is appreciated. Thank you.

  • Blacklist an address or bounce an email back - how to?

    I'm used to a couple of email accounts that I've had through a 3rd party web hosting service (namecheap.com).  Using their cPanel configuration panel I'm able to maintain a list of whole or partial email addresses as a blacklist, where any incoming e

  • Try to open multipul photos in Camera raw

    When I try to open multipul raw photos from cs6 mini bridge, after selecting them, none open up. If I do one it works fine. I also tried the review mode and only one opens...  

  • Export quality issues

    When I export from Lightroom 4 my image quality changes dramatically between the Lightroom image and the exported image. I have my export settings at 1500x1500 and 240 pixels per inch. Any ideas on how I can keep the exported image the same as the on

  • DTW importing COGS Account in Sales Order

    What's the column of COGS Account in Sales Order template to import through DTW?